Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Padc P78M

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

11/24/2024

PROJECT NO.: SHEET OF


COMPUTED BY:
CHECKED BY: SECTION: 652

PERMEABLE ASPHALT DRAINAGE


COURSE - TYPE P-78M

CALCULATE:
/2) X D X 90# / YD2 / IN = TONS
9 FT / YD X 2000# / TON
2 2

NOTE: IF USING AREA NO LENGTH OR W1 FIGURE IS NEEDED IN COMPUTATION.


AREA /
BEG. STA. END STA. LENGTH W1 DEPTH TONS
W
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0.000 TOTAL 0.00
SAY 0
PROJECT NO.: SHEET OF
COMPUTED BY:
CHECKED BY: SECTION: 652

PERMEABLE ASPHALT DRAINAGE


COURSE - TYPE P-78M
(CONTINUED)

NOTE: IF USING AREA NO LENGTH OR W1 FIGURE IS NEEDED IN COMPUTATION.


AREA /
BEG. STA. END STA. LENGTH W1 DEPTH TONS
W
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 TOTAL 0.00
SAY 0

You might also like