Seat No.: ________ Enrolment No.

___________

GUJARAT TECHNOLOGICAL UNIVERSITY


BE - SEMESTER–VI (NEW) EXAMINATION – SUMMER 2023
Subject Code:3161713 Date:04-07-2023
Subject Name:Instrumentation Project Management
Time:10:30 AM TO 01:00 PM Total Marks:70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
4. Simple and non-programmable scientific calculators are allowed.

MARKS
Q.1 (a) What are the important aspects in Project cost estimation? 03
(b) What do you understand by Project Scope, Quality and organization 04
structure? Explain with one example.
(c) Differentiate between Projects and Contracts, Explain EPC, BOOT, BOT 07
with suitable example.

Q.2 (a) Which are the Microsoft office tools can be used in project management? 03
Explain with one example
(b) In which case Project S curve is used? explain with example 04
(c) Enlist various project management functions and explain 1. Project planning 07
and scheduling. 2. Project review 3. Controlling and directing related to
projects.
OR
(c) What do you understand by SOW ( Statement of Work) Explain in details 07
Q.3 (a) Define Control valve coefficient. 03
(b) Explain loop checking of temperature transmitter. 04
(c) Compare CPM and PERT with various points. 07
OR
Q.3 (a) Enlist importance of wiring and tagging in control panel. 03
(b) Explain importance of Intrinsic safety related to process plant. 04
(c) Write short note on project engineering documents and drawing. 07

Q.4 (a) Draw and explain control valve characteristics 03


(b) Enlist selection criteria for control valve. 04
(c) Enlist various types of Level instruments and its selection process. 07
OR
Q.4 (a) What is importance of NEC Code? Enlist any two NEC Code. 03
(b) Explain selection criteria for pressure instruments 04
(c) Enlist various types of pressure instruments and its selection process. 07

Q.5 (a) Write full from of ISO and importance of ISO 9000 03
(b) Which are important aspects of Project work coordination? 04
(c) Enlist various points related to construction and startup in project and 07
explain any two in details.
OR
Q.5 (a) Explain calibration of pressure gauge. 03
(b) Write short note on selection criteria for flow instruments 04
(c) Compare pneumatic, hydraulic and electrical system with various points. 07

******