Data Project Crashing

Project management
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Data Project Crashing

Project management
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Microsoft Excel 16.

0 Answer Report
Worksheet: [Data.xlsx]Sheet1
Report Created: 25-01-2024 15:41:28
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Solver Options

Objective Cell (Min)


Cell Name Original Value Final Value
$B$13 Earliest Event Time 144 144

Variable Cells
Cell Name Original Value Final Value Integer
$B$6:$B$12

Constraints
Cell Name Cell Value Formula Status Slack
$F$6:$F$13 >= $G$6:$G$13

$F$9 Actual Activity Time 0 $F$9=0 Binding 0


$B$6:$B$12 >= 0
Microsoft Excel 16.0 Sensitivity Report
Worksheet: [Data.xlsx]Sheet1
Report Created: 25-01-2024 15:41:29

Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$B$6:$B$12

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$F$6:$F$13 >= $G$6:$G$13
$F$6 Actual Activity Time 12 6 12 1E+030 12
$F$7 Actual Activity Time 8 5 8 1E+030 4
$F$8 Actual Activity Time 8 0 4 4 1E+030
$F$9 Actual Activity Time 0 0 0 0 1E+030
$F$10 Actual Activity Time 4 1 4 4 24
$F$11 Actual Activity Time 12 2 12 1E+030 4
$F$12 Actual Activity Time 8 0 4 4 1E+030
$F$13 Actual Activity Time 4 1 4 1E+030 36

$F$9 Actual Activity Time 0 4 0 1E+030 0


House Building Project
Activity
Earliest Actual Network
Event Activity Activity
Node Time Node (i) Node (j) Time Time
1 0 1 2 12 12
2 12 2 3 8 8
3 20 2 4 8 4
4 20 3 4 0 0
5 24 4 5 4 4
6 32 4 6 12 12
7 36 5 6 8 4
144 6 7 4 4
Project Crashing with linear programming
House Holding project

Earlies Actual Network


Node t Event Node (i) Node (j) Activity Activity
Time Time Time

1 0 1 2 12 12
2 7 2 3 8 8
3 14 2 4 7 4
4 14 3 4 0 0
5 22 4 5 8 4
6 26 4 6 12 12
7 30 5 6 4 4
Project Time= 30 6 7 4 4

Limit time to complete 30


the project

Project Crashig Cost= 2500


ng

Activity
Activity Actual
maximu
Crash Crash
m Crash
Cost Time
Time
400 5 5
500 3 1
3000 1 0
0 0 0
200 3 0
7000 3 0
200 3 0
7000 1 0