1. New Q-SFM Auditor Manual Book Update Sep,26- 2019duplicated
1. New Q-SFM Auditor Manual Book Update Sep,26- 2019duplicated
1. New Q-SFM Auditor Manual Book Update Sep,26- 2019duplicated
CONFIDENTIAL
Competitive
Production/
Quality
4 5 Problem
1 2 3
Standard
Abnormal
Immediate Provide Subordinates
Visualization of Problem Solving OJD Developed
Abnormality in a shop
3 Moving Items
1) Physical Goods 3) The proper understanding of Floor Management Task
2) Work (People)
3) Information (Data) Kanban
Over Box Fluctuation
Height
Over Max
Over Flow
Abnormality jump
Into our eyes at glance The Shop Floor Management in Toyota is:
① An abnormality jumps into our eyes at glance
② We can count the number of physicals by 1 piece unit at glance
Visual control
after visualization
Only posting on a board. There are many data, but there is no PDCA cycle,
Display
there is no target. These are standing out of management
PROPERTY OF TMMIN-PROHIBITED TO COPY/DUPLICATE/SHARE WITHOUT TMMIN PERMISSION 6
Who have to manage Shop Floor?
Factory
[Top Management]
Role: Follow up
countermeasure &
support activities
[Oerator]
Role: Follow the
rule /STDW
should be linked
DM implement In-Process
Process KPI
Result KPI
Step 3
Sustain Standardized
Work & Skills
Step 2
Outflow
Outflow Prevention
to Following Process
Outflow Prevention
to Market/Customer
Step 1
Check 1) Organization 2) Job response 3) Quality Policy, 4) Activities 5) Top to down 6) Deployment of
Point: structure each member Policy main KPI. plan policy sharing KPI/Quality target
Criteria:
❷ Identification response job of each member
❶ There are team support this activity
(not only quality section).
Check 1) Organization 2) Job response 3) Quality Policy, 4) Activities 5) Top to down 6) Deployment of
Point: structure each member policy main KPI. plan policy sharing. KPI/Quality target
Criteria:
Detail :
❸ Numerical quality target. a) Directorate Policy Division KPI
b) Action
(a) (b) (c) (d) (e) c) Target Sub KPI
d) Schedule Implementation
e) Departement Responsible
Check 1) Receive market Quality 2) Problem 3) Yokoten (expand) 4) Countermeasure 5) Top management
Point: info and flow action analysis countermeasure status involvement
Criteria:
❶ There is claim routing/procedure, quality information visualization
Information Criteria
1. Check Part Name, P/N, 1.Defect (1to3 pcs)
Model, Lot N. Info to MGR, AGM, GM, Co
Concern
2. Lot Delivery 2.Defect (3 pcs up)
Info to MGR, AGM, GM,
3. Customer Requirment SGM, Co Concern
3.Defect Safety
Sketch/ Photo, Info to MGR, AGM, GM,
SGM, Co Concern, VP
Check 1) Receive market Quality 2) Problem 3) Yokoten (expand) 4) Countermeasure 5) Top management
Point: info and flow action analysis countermeasure status involvement
Check Check
Items Memastikan info untuk check process
Membuat pemastian Check
untuk mengeceknya Cannot detect
Detection status
~by TBP Tools Kapan, di mana, siapa,
bagaimana
Analisa Penyebab Can identify
the cause
Create Quality problem
Dari kapan
Seberapa sering, berapa Check Cannot Can Assembly WItnessing communication sheet
banyak identify
Disassembly investigation Cause Problem detection check detect problem
identified ① Supervisor
the cause -Request ke Assy untuk pembongkaran ① Detectability Check ② Quality member at
-Request untuk hadir melihat proses pembokaran to find problem cause Check ① Problem contents
Assembly
Analisa Problem (QC Engineering)
③ QC engineer ② Vehicle history
(grup Assembly yang terkait) ③ Detection status
Check standar (Member Quality di Assembly) Parts ④ Cause
(Member Quality di Unit) Request C/M for outflow prevention problem WItnessing
Ukur posisi problem ⑤ Responsibility
Ukur posisi yang terkait Check (Member Quality di Body) ① Supervisor Check ⑥ Witness
Check
(Member Quality di Toso) ① Occurrence countermeasure ② Supplier ⑦ Measures
(Member Internal chousa) taken by problem responsibility ③ QC Engineer
(Supplier) Check ② OK/NG judgement until complete the
occurrence countermeasure Parts (unit)
③ Get the information of vehicle which as problemt WItnessing ■××
the first vehicle to be checked ① Supervisor
Prepare documents for
Process investigation Check
(Inspection/Assembly process) ② Unit QC member Morning meeting
① Job observation ③ QC engineer
② Check instuction sheet ① Problem contents
③ Changing point Check ② Vehicle history
Cause Request to Engineer ③ Detection status
④ Hear from management members and Unknown
line members Request untuk menganalisa problem ④ Cause
Check Check Check
⑤ Check delivery condition Measure for problem ⑤ Responsibility
⑥ Witness
⑦ Measures
Check 1) Receive market Quality 2) Problem 3) Yokoten (expand) 4) Countermeasure 5) Top management
Point: info and flow action analysis countermeasure status involvement
Criteria:
❹ Visualization countermeasure status with updating
❸ There isi methode to yokoten countermeasure
Check Normal condition : 1) Sampling audit rule 2) Data recording 3) Visualization audit result
Point: Abnormal condition : 4) Sampling audit rule 5) Data recording 6) Visualization audit result
Poor installation of
Clip Pillar molding
2/3 (Assy)
Check 1) Drawing control 2) Part Inspection Standard (PIS) and Quality Control 3) Item check
Point: Process Chart (QCPC)
PIS
No. ACTIVIES
Check Sheet
? 1 Times / Month for A Rank (Monthly Check)
PT. TOYOTA MOTOR MANUFACTURING INDONESIA MODEL : SIENTA SUPPLIER : ###
Location : Incoming Parts Area ? 1 Times / Week for B Rank (Weekly Check)
? 1 Times / Day for C Rank (Daily Check)
100 % CHECK SAMPLING QUALITY CONTROL DIVISION
PART SAMPLING CHECK SHEET PART NO. : 69030-0K090 INSPECTOR :
QC PLANT#2 DEPT
Check items : ~ Appearance PART NAME : LOCK ASSY, FR DOOR W/MOTOR, RH
NO
CHECKING
IT EM
ST ANDARD
FREQUENCY
(if during 1 week 100%CHECK MET
check not founded of problem HOD
again)
OK
NG
C Rank (Daily Sampling)
OK
and WI RECEIVING INSPECTION SECTION
Rejection 0 PPM
~ 100 % Check NG B Weekly check = Rejection on the range of PPM target
Items check :
B Rank (Weekly Sampling)
1 Missing part Not Allowed 5 pcs/ item Visual
? Base on Problem Found Out from all Rank of Sampling Method C Daily check = Rejection > PPM target
2 Wrong part Not Allowed 5 pcs/ item Visual OK
NG Routing perubahan Frequency check : Data Cek Stok 100% (selama 5 hari) :
A Rank (Monthly sampling)
3 Miss assembling Not Allowed 1 pcs/ Lot Visual
~ Std Check,
No. Item check : No. Item check :
Note : ~ Check of part base on TIS OK
Tgl Judge Judge
4 Unfinished Not Allowed 5 pcs/
~ Give Tag Ok if part item
condition is Good Visual
A NG Qty Cek
Scratch No Harmfull 5 pcs/ Give Tag OK or NG after Qty NG
5 ~ Give Tag NG if partitem Touch
condition is No Good and keep in place Check of Parts base on TIS
~ Freq. Check
NG
checking process OK C No. Item check : No. Item check :
6 Crack Not Allowed which have
5 been
pcs/determined
item (LSR area) Visual Tgl Judge Judge
OK
B Qty Cek
7 Deformation Not Allowed 1/ Lot Visual
~ Method Check
Qty NG
8 Apply Grease Apply all moving area 1/ Lot Visual Tag OK = Tidak ditemukan problem, NG = Ditemukan Problem
Tag Part NG Send
OK NG to LSR area
Each Caulking Work 1/ Lot by Sample
9
2 Daily check of Small Part Dimention ~ Confirm
Bulan, Tahun …………., ………….
TMMIN -QDRI input Info to TMMIN-QDRI after Tanggal Cek
? Decide of part number base on schedule finishing check
DAILY SHEDULE Frequency check
? Decide qty dimention check (according to requirement) CEK Note
Input data after checking
CHECKING FREQUENCY
?
process NO STANDARD METHOD
Remarks : QRE Supplier should bring Insp Tools, Safety Tools by him self ITEM CHECK Judge (O=OK, X=NG)
3 Pick Up Inspection data
1 Missing part Not Allowed 5 pcs/ item Visual
? Input data to Daily Check Sheet Check Sheet
2 Wrong part Not Allowed 5 pcs/ item Visual
TMMIN -QDRI info
to Supplier if 100% TMMIN -QDRI make
4 Feed Back Check 3 Miss assembling Not Allowed 1 pcs/ Lot Visual
Founded problem reporting data
~ If Founded problem info to Supplier, TMMIN-QDRI and related partieses
and do temporary action immediately
(
TMMIN -QDRI request to
TMMIN-PAD Log for the
4
5
Unfinished
Scratch
Not Allowed
No Harmfull
5 pcs/ item
5 pcs/ item
Visual
Touch
preparation of cheque 100%
REVISI No. W ORKING TOOLS SAFETY TOOLS Inspector 6 Crack Not Allowed 5 pcs/ item Visual
No. DATE ITEM App Check Prep 1 Taper Gauge Hand Gloves
7 Deformation Not Allowed 1/ Lot Visual
1 2 Pencil and eraser Helmet
2 3 Pencil Dermatograph Safety Shoes INOAC-P INOAC-R PEMI AMA KFN ASAHI NTC 8 Apply Grease Apply all moving area 1/ Lot Visual
3 4 Tag of OK & NG
4 5 Tool & gauge to
9 Each Caulking Work 1/ Lot by Sample
5 dimention check DENSO ABA AISIN ATI IGP SAKURA 10 . .
11 . .
12 . .
14
.
.
.
15 . .
STEP 1 A. Set Basic Rules/Standards
A. (5) - Establish a system to comply with regulations (∇R).
No. 5 - Confirm that the production meet the regulation as drawing and PIS requirement.
Check 1) Drawing 2) Part Inspection 3) Item check in Work 4) Control list 5) Machine or process
Point: Standadr (PIS) Instruction (WI) or EIS
point MC#1 1 TMMIN 800A N46 53112-010KL GRILLE RADLWR T/GRADE TSOP7 11BK03
MC#02 3 TBINA 660A N17 67613/4-0K310-B BOARD,RR DOORTRIM, RH/LH AZ864E4 201B-1
PIS QCPC
3 TMMIN Y70Z N49 75851/2-YP010-00 ROCKER PANEL, RH/LH TSOP7 11BK03
❷ PIS
MC#05
7 TMMIN 650A N37 67750-KK010-C0 BOARDASSY- BACK DOOR TRIM AZ564GL 201B-1
must
8 TMMIN 660A N20 62511-0K560-C0 PANEL, QTRTRIMRH AZ564GL 201B-1
MC#07
9 TMMIN 660A N21 62512-0K560-C0 PANEL, QTRTRIMLH AZ564GL 201B-1
reflect
(∇R)
point TMMIN
PT. TOYOTA MOTOR MANUFACTURING
INDONESIA
STANDARD OPERATIONAL PROCEDURE
APPROVED CHECKED PREPARED
PLANT : KARAW ANG PLANT / QCD TITLE / PROCESS : PART INSPECTION CHECK for QRE SUPPLIER
DEPARTMENT : INSPECTION SOP NO. : S O P - A D Q 1 0 0 - R 0 0 8
AREA : PAD-LOGISTIC DATE : 1 4 - 1 0 - 2 0 0 5 SEPRIAWAN
❺ Identify ∇R
Check items : ~ Appe arance
NG
C Rank (Daily Sampling)
CHECKING FREQUENCY OK
NO ST ANDARD
(if during 1 week 100%CHECK MET
check not founded of problem HOD
again)
IT EM OK
~ 100 % Check NG
B Rank (Weekly Sampling)
1 Missing part Not Allowed 5 pcs/ item Visual
? Base on Problem Found Out from all Rank of Sampling Method
2 Wrong part Not Allowed 5 pcs/ item Visual OK
NG
on machine or
A Rank (Monthly sampling)
3 Miss assembling Not Allowed
Note : 1 pcs/ Lot Visual
~ Check of part base on TIS
4 Unfinished Not Allowed 5 pcs/
~ Give Tag Ok if part item
condition is Good Visual
❸
checking process
6 Crack Not Allowed which have
5 been
pcs/determined
item (LSR area) Visual
process
8 Apply Grease Apply all moving area 1/ Lot Visual Tag Tag Part NG Send
OK NG to LSR area
9 Each Caulking Work 1/ Lot by Sample
2 Daily check of Small Part Dimention ~ Confirm
TMMIN -QDRI input Info to TMMIN-QDRI after
? Decide of part number base on schedule finishing check
Identification
DAILY SHEDULE
? Decide qty dimention check (according to requirement) CEK
Input data after checking
?
process
Remarks : QRE Supplier should bring Insp Tools, Safety Tools by him self
3 Pick Up Inspection data
? Input data to Daily Check Sheet Check Sheet
(∇R) point
TMMIN -QDRI info
to Supplier if 100% TMMIN -QDRI make
4 Feed Back Check
Founded problem reporting data
~ If Founded problem info to Supplier, TMMIN-QDRI and related partieses
and do temporary action immediately
(
TMMIN -QDRI request to
TMMIN-PAD Log for the
preparation of cheque 100%
Check 1) Training road map for new comer 2) Evaluation test 3) Skill matrix 4) Skill level up
Point:
Criteria:
❷ Have clear evaluation criteria both of paper test and shop floor test
❶ Have flow or road map for training
operator (new comers, rotation)
[a] [b]
[c] [d]
Audit result
Detail :
a) Element kerja
b) Key point check
c) Motion
d) Cycle time 1
TAG IDENTITAS
PROCESS BELUM SELESAI
DATE :
SUPPLIER :
PART NO. :
PART NAME :
PIC PART :
LAMA PENYIMPANAN :
Criteria:
❺ Have action and record for abnormality
❹ Have criteria for 4M abnormality management)
Check 1) Drawing 2) Part Inspection 3) Item check 4) Control 5) Machine or 6) Clear procedure of abnormality
Point: Standard (PIS) on WI/EIS list process handling (forward and backward checking)
Criteria:
❷ PIS must reflect (∇S) point ❸ Identification (∇S) point in WI
❶ Drawing confirm (∇S) point
Check 1) Drawing 2) Part Inspection 3) Item check 4) Control 5) Machine or 6) Clear procedure of abnormality
Point: Standard (PIS) on WI/EIS list process handling (forward and backward checking)
Check 1) TOYOTA certify result: confirmation (PESS, SSAS, CPPP, etc.) 2) ∇S Awareness training for inspector
Point:
Check 1) TOYOTA certify result: confirmation (PESS, SSAS, CPPP, etc.) 2) ∇S Awareness training for inspector
Point:
Check 1) Non-conformance part 2) Identification status 3) Stop delivery procedure (including inform suspected NG
Point: part to customer)
Criteria:
❶ Operation procedure of NG part handling and problem ❷ Have clear identify on part for separation
investigation flow
Identify on part
PROPERTY OF TMMIN-PROHIBITED TO COPY/DUPLICATE/SHARE WITHOUT TMMIN PERMISSION
STEP 1 B. Preventing Defect Outflow to Market/Customer
B. (2) - Establish abnormality handling procedure for non-conformance outflow from manufacturing process.
No. 12 - Identification & separation of abnormal or NG part.
Check 1) Non-conformance part 2) Identification status 3) Stop delivery procedure (including inform suspected NG
Point: part to customer)
Criteria:
❸ Clear procedure of STOP delivery and “bad news” to customer
Check 1) Part repair 2) Judgement 3) Repairing 4) Operator skill 5) Mark on part 6) Confirmation part after
Point: criteria standard repaired
Check 1) Part repair 2) Judgement 3) Repairing 4) Operator skill 5) Mark on part 6) Confirmation part after
Point: criteria standard repaired
Criteria:
❺ Identify mark on part (after repaired)
❹ Identification operator skill for
repairing
Check 1) Part repair 2) Judgement 3) Repairing 4) Operator skill 5) Mark on part 6) Confirmation part after
Point: criteria standard repaired
Criteria:
❻ Item check problem (Effect from repair point)
1. Follow up progress
Detail No. 2
Detail No. 3
Criteria RPN
Revise
Check 1) Pokayoke (sensor 2) Pokayoke point 3) Dummy 4) Daily 5) Sign status of 6) Pokayoke abnormality
Point: detection NG) map on machine test function check sheet leader procedure
Criteria:
❶ Must be Visualization pokayoke lay-out on board 1 ❷ Identification pokayoke point on machine
❸ Master
dummy with
calibration
tag
Check 1) Pokayoke (sensor 2) Pokayoke point 3) Dummy 4) Daily 5) Sign status of 6) Pokayoke abnormality
Point: detection NG) map on machine test function check sheet leader procedure
❸ Identification ❹ Identification
issued date expire date
Check 1) Tool list or 2) Calibration tag 3) Daily check 4) Sign status of 5) Procedure of inspection tools abnormality
Point: tool mapping sheet leader (include backup tools system)
❹ Leader's signature
Check 1) Material or process defect 2) Defect area 3) Problem record 4) Action Countermeasure
Point:
Check 1) Materials store 2) WIP (Work in process) 3) FG (Finish Good) store 4) Logistic routing
Point:
Criteria:
Check 1) Rule of incoming part 2) Part inspection standard/WI/EIS 3) Inspection result 4) Daily record & result
Point: inspection. visualization
Check 1) Rule of incoming part 2) Part inspection standard/WI/EIS 3) Inspection result 4) Daily record & result
Point: inspection. visualization
Criteria:
❹ Have daily record & result visualization of Receiving Inspection
Daily Achievement
Monthly Achievement
Check 1) Supplier Evaluation 2) Result visualization 3) Problem investigation 4) Audit plan and audit result
Point:
Criteria:
❷ Easy to get data and know status
❶ There is evaluation criteria for all supplier
(Suppliers performance evaluation)
Supplier Claim Result
Check 1) Supplier Evaluation 2) Result visualization 3) Problem investigation 4) Audit plan and audit result
Point:
Criteria:
❸ Supplier problem report ❹ There are plan for audit supplier and result
Check 1) Establish quality gate operation management rules 2) Establish quick action, feedback and follow-up
Point:
Criteria: ❶ Have QG rule: setting of check item, NG part handling and procedure to review the item check
Socialization to members
Setting item check and review ASSY QUALITY GATE LOCATION visualize
2. Time
3. Category 4. Location
1 2
1. items problem of quality 3
gate …
Check 1) Establish quality gate operation management rules 2) Establish quick action, feedback and follow-up
Point:
Criteria:
❷ Have quick action, feedback and follow up
4. Create problem sheets
1.Record problem for specific problem (5
category)
Qty
Items problem
Progress
prob.
2. Visualize by Graphic
Criteria:
❷ Can be trace on part or tag
❶ Rule or operation procedure
TagPart NG
Check 1) Skill refreshment 2) Evaluation test methode 3) Refreshment training plan 4) Evaluation result
Point:
Criteria:
❶ Clarify the skill that need to refreshment
2. Not obey WI
X
After TL Check
WI and found MP Job needs sensory Skill,
not follow WI (Check painting part)
Check 1) Skill refreshment 2) Evaluation test methode 3) Refreshment training plan 4) Evaluation result
Point:
Appearance Sensory
Step 3 : Check Part Sample
Check 1) Skill refreshment 2) Evaluation test methode 3) Refreshment training plan 4) Evaluation result
Point:
Check 1) Confirm leader board in each line, 2) Confirm GL mission for safety, 3) Board is updated daily and follow up by
Point: content: KPI, Sub-KPI and Process KPI quality, productivity, cost and HR SPV and manager periodically
Criteria:
❶ KPI & Sub-KPI target link to company hoshin, process KPI consist ❸ Updated & signed daily by GL,
of actions to improve KPI & Sub KPI (not include Quality only)
1 SPV & periodically by Manager
Main
KPI
❷ GL has mission for Safety,
Sub Quality, Productivity, Cost & HR
KPI
Process
KPI
BIRA
Check 1) Leader role 2) Training plan 3) Evaluation methode 4) Skill matrix 5) 4M control items
Point: 6) 4M board/assignment board 7) Visualization 8) Changing point record 9) C/m status 10) Skill visualization
Criteria:
1. Organization
2. Visualize Team
Members Location
3. Attendance
5. Leader Job
4. 4M changing point information Hourly
Check 1) Leader role 2) Training plan 3) Evaluation methode 4) Skill matrix 5) 4M control items
Point: 6) 4M board/assignment board 7) Visualization 8) Changing point record 9) C/m status 10) Skill visualization
Check 1) Leader role 2) Training plan 3) Evaluation methode 4) Skill matrix 5) 4M control items
Point: 6) 4M board/assignment board 7) Visualization 8) Changing point record 9) C/m status 10) Skill visualization
Criteria:
❽ Recording changing point
❻ Board control
❼ Updated => know current condition ❿ Can know skill of each operator
1 26/09/19 Revise Sample Check point criteria, Item no. 7, 13, 16, 26, 27, 1
Revised Summary :
Evaluation Item Check Point
No Criteria Problem/ Root Cause Action Status
Number Number
1 7)Operator skill 1) Check operator Have check sheet, ~Cycle Time not item check on Check Refreshment Criteria
management working follow plan/schedule audit, Sheet (C/T is mandatory not only Work for WI standard
Standard audit result Sequence) requirement with
Solved
caused Check sheet only already QSFM Manual Book
enough
2 13) Repairing skill 2) Judgment Criteria Can repair or can't ~Part after repair not check by QC Highlight Manual
evaluation method repair caused Only Have Repair Area already book and refreshment
enough to expertise
Solved
3 16) Pokayoke 1) Pokayoke (sensor Visualization pokayoke ~Pokayoke Map unclear (Equipment Highlight Manual
management detection NG) map lay-out on board Map only), not pokayoke visualisation book and refreshment
caused Trainee Judge Mapping to expertise
Solved
Machine already enough
4 26) Inspector skill 2) Evaluation test Evaluation criteria & ~Criteria refreshment not include on Highlight Manual
refreshment method record Evaluation Criteria (outflow, not follow book and refreshment
WI, low working hours) to expertise
Solved
caused Trainee judge by criteria &
record refreshment refer to schedule
already enough
5 27) Confirm work 1) Confirm leader KPI & Sub-KPI target ~Content of Mision Board, Quality Highlight Manual
operation of board in each line, link to company hoshin, Matters only (not iclude Safety, book and refreshment
supervisors in order content: KPI, Sub-KPI process KPI consist of Productivity, Cost & HR) to expertise
Solved
to keep STDW and Process KPI actions to improve KPI caused Trainee judge Mission Board of
& Sub KPI Quality matters already enough