IR No- JG2P1-107000287170-IR-05
IR No- JG2P1-107000287170-IR-05
IR No- JG2P1-107000287170-IR-05
: JG2P1-107000287170-IR-005
INSPECTION REPORT
Rev: 00 IR Date: 23-Nov-2024
JOB ORDER: BI No. 10-14815
CONTRACT No.: 6600051611 (IK); 6600051612
(OOK)
JAFURAH GAS PLANT EXPANSION GAS
PROCESSING FACILITIES
Company / Client: SAUDI ARAMCO Contractor: L&T Hydrocarbon Saudi Company
Vendor / Sub-Vendor: M/s. D’Hondt Thermal Location: Ratnamani metals & tubes limited (SS-
Solutions / Ratnamani metals & tubes limited. Indrad), Near Chhatral GIDC, Gujarat, 382715,
India.
Contractor's PO No. & Date: LTHS Onshore/75001- Sub Vendor PO No. & Date: LTHS
47883/APS & 30.03.2024 ONSHORE/78000-20081/AP Dated: 18.05.2024
Inspection Lot No.: 107000287170 Dummy PO No: ABIK-861-32-D169-DB
IAP No & Rev No: QM-866-IAP-0011-01 Rev. 0 Item Description: Stainless Steel Tube
(for SS Air Fin Cooler, D’Hondt)
Inspection Notification No.: Inspection Notification Date:
JG2P1/NOI/0194/IL#107000287170/7 Rev.1 NOI-8 (18 to 22-NOV-2024)
In-Process
Inspection Stage Final FAT
(Stage Inspection)
A. Reference Documents:
Page 1 of 9
IR No.: JG2P1-107000287170-IR-005
INSPECTION REPORT
Rev: 00 IR Date: 23-Nov-2024
JOB ORDER: BI No. 10-14815
CONTRACT No.: 6600051611 (IK); 6600051612
(OOK)
JAFURAH GAS PLANT EXPANSION GAS
PROCESSING FACILITIES
SAEP-1142 17 April 2022
10 ITP/4224000058/SA-213 01 Inspection and Test Plan Approved
11
Air under water test procedure for Approved in
DHTS1-QM-866-PL-0073 B
tubes code 1
Approved in
12 DHTS1-QM-866-PL-0074 B PMI test procedure for tubes
code 1
Approved in
13 DHTS1-QM-866-PL-0072 B Eddy current test of tubes procedure
code 2
B. Non-Conforming Items:
Sr. No. NCR No. Description Status (Open/Closed)
-- -- -- --
-- -- -- --
C. Attendees:
Sr.
Name Organization Position
No.
1 Mr. Narendra Jadeja AOC-APAVE/TPIA Company Monitoring Inspector
2 Mr. Nimesh Kumar Patel L&T/TPIA TQ Cert./L&T nominated Inspector
3 Mr. Vitthal thumber D’Hondt D’Hondt nominated inspector
4 Mr. Nilesh Rathod RMTL RMTL QA/C
5 Mr. Ramdas Shinde RMTL RMTL QA/C
Page 3 of 9
IR No.: JG2P1-107000287170-IR-005
INSPECTION REPORT
Rev: 00 IR Date: 23-Nov-2024
JOB ORDER: BI No. 10-14815
CONTRACT No.: 6600051611 (IK); 6600051612
(OOK)
JAFURAH GAS PLANT EXPANSION GAS
PROCESSING FACILITIES
satisfactory.
6. Manufacturer's internal test report for
the eddy current testing of the total
quantity of tubes has been reviewed
and found to be in order.
1. Air under water test were witnessed for
10% of randomly selected tubes with
test pressure 150 PSIg Minimum and
holding time 05 second Minimum, as per
the approved procedure and in line with
specification requirements.
2. There was no evidence of pressure drop
or leakage observed during the required
pressure holding time.
12 (0020/0090)
– 3. The manufacturer submitted internal test Satisfactory
1 Air Under Water reports for the hydrostatic test of the without Nil
test of tubes total quantity of tubes, which were Comments
reviewed and found in order.
(subsequent lot of 247 Nos & 121 Nos
& 922 Nos & 2,544 Nos & 2,520 Nos of
tubes)
4. The water chloride content certificate
was also reviewed and found to be
below 50 PPM.
Calibration certificate of Pressure gauge
were reviewed and endorsed.
7,8,10,16
(0020/0020)
1. Sample selection and identification
(0020/0060)
(0020/0030, carried-out for lab test (Product Analysis,
0040,0050) C% checked by Spectrometer, corrosion Satisfactory
1 (0020/0110) – test IGC Practice “E”, Tensile, Flaring, without Nil
Sample Flattening & Harness test) as per Comments
selection/ Approved ITP, PR, Specification 01-
identification for SAMSS- 47 & SAES 206 requirements
testing
-- -- -- --
I. List of Attachments:
Attachment No. Description No. of pages
1 Vendor Offer list 01 Page
2 Vendor Stage inspection document 35 Pages
Page 5 of 9
IR No.: JG2P1-107000287170-IR-005
INSPECTION REPORT
Rev: 00 IR Date: 23-Nov-2024
JOB ORDER: BI No. 10-14815
CONTRACT No.: 6600051611 (IK); 6600051612
(OOK)
JAFURAH GAS PLANT EXPANSION GAS
PROCESSING FACILITIES
Page 6 of 9
IR No.: JG2P1-107000287170-IR-005
INSPECTION REPORT
Rev: 00 IR Date: 23-Nov-2024
JOB ORDER: BI No. 10-14815
CONTRACT No.: 6600051611 (IK); 6600051612
(OOK)
JAFURAH GAS PLANT EXPANSION GAS
PROCESSING FACILITIES
Page 7 of 9
IR No.: JG2P1-107000287170-IR-005
INSPECTION REPORT
Rev: 00 IR Date: 23-Nov-2024
JOB ORDER: BI No. 10-14815
CONTRACT No.: 6600051611 (IK); 6600051612
(OOK)
JAFURAH GAS PLANT EXPANSION GAS
PROCESSING FACILITIES
Page 8 of 9
IR No.: JG2P1-107000287170-IR-005
INSPECTION REPORT
Rev: 00 IR Date: 23-Nov-2024
JOB ORDER: BI No. 10-14815
CONTRACT No.: 6600051611 (IK); 6600051612
(OOK)
JAFURAH GAS PLANT EXPANSION GAS
PROCESSING FACILITIES
Page 9 of 9