Quote 16-10-2023
Quote 16-10-2023
Quote 16-10-2023
com
Quotation
Sr. No Particulars Qty Rate
1 False ceiling work 850.00 90.00
2 Electrical works
Making Light Point in Ceiling 32.00 650.00
Making 5 amp plug point 15.00 750.00
making 15 amp point to heavyequipments 2.00 1100.00
Making A. C. Point 2.00 1200.00
Circuit for points with 6Sqmm wire 250.00 130.00
Circuit for A.C point 90.00 140.00
Making Telephone point/TV Point 4.00 750.00
CAT 6 CABLING points 160.00 80.00
Making Distrubution Board with mcb's for circuit And ELCB for Mains 2.00 24000.00
Control
Lignt Fixtures
Decorative light fittings 1.00 14500.00
Spot Light 25.00 650.00
Wall Fixtures/Led strip 180.00 140.00
3 Carpentry work
a Reception table 12.00 2200.00
b Providing and fixing T.V. Panelling in Laminate finish with all necessary 24.00 620.00
hardware and fitting
Note:
* GST will be separate at18% on basic amount
* Items other than above mentioned estimate shall be charged extra
* Delivery Schedule to be discussed & derived upon
* Invoicing to be done as per actual measurements
* Actual Scafolding at site to work ,Drinking water and electricity to be supplied by clients
* Mathadi / ESI should be absorbed by client
Payment terms:
* 50% Mobilisation advance along with Purchase/ Work Order
* 30% After delivery of material on site
* 10% At the time of prefinishing stage
* Balance amount against final invoice
* Taxes Extra Applicable
Fo r AARYA DESIGN
1650,Next to Tilak Smarak,Opp. Old SP post office,Tilak Road ,Sadhashiv Peth ,Pune 411030
Actual Qty Actual Rate Amount
50000.00 0 0 0 50000
20000.00 2 7500 15000 5000.00
4500.00 0 0 0 4500
126500.00 28 2500 70000 56500.00
20000.00 0 0 0 20000
35000.00 1 5000 5000 30000.00
16500.00 0 0 0 16500
467500.00 8.5 35000 297500 170000.00
49000.00 350 90 31500 17500.00
2297380.00 419000
Grand Total 1018360 370000
by clients
Fo r AARYA DESIGN