Job Procedure Index: 01 Piling Work
Job Procedure Index: 01 Piling Work
Job Procedure Index: 01 Piling Work
Construction Methodology
02
Excavation Work
03
WBM Site Grading Work Survey Work Back Filling Work Sand Filling Work Plain Cement Concrete Reinforced Cement Concrete Brick Work
04 5 6 7 8 9 10
[Type text]
Page 1
1.0
PURPOSE The purpose of this Procedure is to ensure that a standard construction and workmanship can be achieved up to the satisfaction of client/consultant.
2.0
SCOPE This procedure is applicable to the execution of piling work. It intends to correlate and control all the tasks needed to be done in order to get a satisfactory product. In brief, it controls the following activities:
2.1.
PILING 2.1.1 Setting up of piling location. 2.1.2 Preparation of bentonite slurry. 2.1.3 Fabrication of reinforcement cage. 2.1.4 Installation of temporary casing. 2.1.5 Boring. 2.1.6 Lowering of reinforcement cage. 2.1.7 Cleaning of bore. 2.1.8 Concreting. 2.1.9 Withdrawal of temporary casing.
3.0 1. 2. 3. 4. 5. 6. 7. 8. 9.
REFERENCES/IS codes Contract Specifications./Technical requirement Approved for Construction Drawings. IS: 2911 (Part 1/Section 2) Code of practice for design and construction of pile foundations. IS: 2911 (Part 4) - Code of practice for design and construction of pile foundations - Load test on pile. IS: 2502 Code of practice for bending and fixing of bars for concrete reinforcement. IS: 456 - Code of practice for plain and reinforced concrete. IS: 10262 Recommended guidelines for concrete mix design. IS: 2386 (Part I to VIII) Methods of tests for aggregates for concrete. IS: 383 Specification for Coarse and fine aggregates from natural sources for concrete.
Page 2
[Type text]
General The purpose of this method is to describe the construction of bored pile with temporary collar casing followed by stabilization of the borehole by bentonite suspension. The working sequence is as follows: 4.1.1 Setting up of piling location The work shall be carried out in accordance with the drawings approved by the client/ consultant for construction. The surveyor shall check all reference points before starting the survey work. The survey work shall be carried out from whole-to-the-part method as far as possible. Only calibrated and approved instruments shall be used. The pile locations shall be set out accurately using suitable surveying techniques and clearly marked using steel pins. All points shall be firmly fixed and guarded against any disturbance Reference points shall be established for each pile point, preferably equidistant from the pile point, to facilitate identification of the pile points at the time of execution as well as to check the installation of the casing. Care shall be taken to identify all utilities that may obstruct execution of work. 4.1.2 Preparation of bentonite slurry Position of the tank shall be finalized keeping in view the capacity of the installed pump and the distance between the tank and the piling location. Capacity of the tank shall be such that it can store sufficient quantity of slurry for the number of piles that can be done in a day.
[Type text]
Page 3
4.1.8 Concreting
4.1.8.1
Approved cement, aggregate, water and admixture shall be used. Concreting will be done by batching plant or
[Type text]
Page 5
accordance with IS-10262 & SP-23. 4.1.8.3 Minimum cement content & maximum water cement ratio is as per most specification (Clause no. 1703-1) for different grade of concrete. B Concrete mixing, transporting and placing.
Concrete shall be transported by means of transit mixers, when concreting will be done by batching plant and placed as near as practicable to its final position. So that no contamination
segregation or loss of its constituents material take place or when concreting will be done by mixer machine, concreting shall only commence when sufficient number of mixer machines are available at site in running condition. Other arrangements for concreting, i.e., supply of water, electricity, ingredients for concrete must be ensured to be satisfactory. The tremie should be large enough with due regard to the size of the aggregate. For 20mm aggregate the tremie pipe should be of diameter not less than 150 mm. Aggregates of size more than 20 mm shall not be used. The tremie head shall be removed from the tremie assembly and the concrete hopper of adequate capacity shall be fixed to the tremie pipes. The hopper and the tremie should be a closed system through which water cannot pass. After filling up the hopper with the first charge of concrete, it will be ensured that the concrete passes through the tremie
uninterruptedly, forcing the bentonite slurry out of the tremie pipes. The next and the subsequent charges of concrete shall then be poured in the hopper and the concreting shall be carried out with small jerks so as to facilitate the flow of concrete and simultaneous compaction. The tremie pipes shall be
[Type text]
Page 6
4.2 Sampling & Testing : The Minimum frequency of sampling of concrete of each grade shall be in accordance as Quantity work, M3 of below: in No of Samples 1 2 3 4 4 + one additional sample for each additional 50 m3 or part there of.
Concrete
[Type text]
Page 7
Job Procedure for Excavation PURPOSE THE PURPOSE OF THIS PROCEDURE IS FOR SUPERVISION OF ALL EXCAVATION WORKS AND TO ENSURE THAT PROPER QUALITY CONTROL IS EXERCISED AT SITE. SCOPE: THIS PROCEDURE COVERS SUPERVISION AND METHODS OF RECORD KEEPING FOR ALL EXCAVATION WORKS.
[Type text]
Page 8
JOB PROCEDURE FOR WBM 01 PURPOSE The purpose of the procedure is for supervision of all WBM works & to ensure that proper quality control is exercised at site.
02
SCOPE This procedure covers supervision & method of record keeping for all WBM works. Specifications : As per Tender Document.
03
REFERENCE DOCUMENTS :
[Type text]
Page 9
iv)
v) vi)
vii)
viii)
ix)
In case of conflict between procedure and specification, specification shall supersede procedure.
[Type text]
Page 10
JOB PROCEDURE FOR SITE GRADING PURPOSE The scope of this job procedure is to provide approved, predetermined & controlled methodology for execution of various earth work activities in site grading SCOPE The procedure deals with the Earth work in excavation & filling for embankments etc. This also gives a guideline regarding record keeping. REFERENCE DOCUMENTS As per tender document.
PROCEDURE
[Type text]
Page 11
PURPOSE THE PURPOSE OF THIS PROCEDURE IS TO ENSURE PROPER CONTROL IN SURVEY WORKS. SCOPE: THIS PROCEDURE COVERS ACTIVITIES FOR CARRYING OUT SURVEY WORKS.
[Type text]
Page 12
REFERENCE PILLARS TO BE CONSTRUCTED TO FACILITATE EASY CONSTRUCTION. THESE PILLARS ARE TO BE CHECKED BY THEODOLITE AND PROTECTED UNTIL THE COMPLETION OF MAJOR ACTIVITIES. LEVELS OF EXISTING GROUND TO BE TAKEN JOINTLY BEFORE COMMENCING OF EARTHWORK. DURING CONSTRUCTION, LEVELS AT REQUIRED STAGES TO BE TAKEN AND CHECKED BY LEVELING, INSTRUMENTS. THE SURVEY WORK TO BE CARRIED OUT BY AN EXPERIENCED SURVEYOR AND TO BE CHECKED BY CONSTRUCTION ENGINEER AND IN LINE WITH THE INSTRUCTIONS OF ENGINEER-IN-CHARGE. PERMANENT GRID PILLARS TO BE APPROVED BY CONCERNED ENGINEER AND TO BE MAINTAINED UNTIL COMPLETION OF THE JOB. IN CASE OF CONFLICT BETWEEN PROCEDURE AND SPECIFICATION, SPECIFICATION SHALL SUPERSEDE PROCEDURE.
B)
C)
D)
E)
G)
[Type text]
Page 13
PURPOSE: TO ADOPT PREDETERMINED & CONTROL METHODOLOGY FOR CARRYING OUT THE ACTIVITY. SCOPE: THE SCOPE THIS PROCEDURE INCLUDES SELECTION OF SUITABLE EARTH FOR
PROCEDURE: BACKFILLING AROUND COMPLETED FOUNDATION STRUCTURES, TRENCHES AND IN PLINTH SHALL BE DONE TO THE LINES & LEVELS SHOWN ON DRAWINGS INCLUDING ANY TRIMMING SURFACES AS MAY BE NECESSARY. THIS SHALL BE DONE WITH THE SELECTED & APPROVED EARTH FROM
[Type text]
Page 14
PURPOSE : THE SCOPE OF THIS JOB PROCEDURE IS TO PROVIDE APPROVED PREDETERMINE & CONTROLLED METHODOLOGY FOR EXECUTION OF THE ACTIVITY. SCOPE: THE PURPOSE DEALS WITH THE SAND FILLING IN BLANKET COURSE IN ROADS & DRAINS WORKS ETC.
PROCEDURE: SAND FILLING IN PLINTH/FOUNDATION/BLANKET COURSE SHALL BE AS PER SPECIFICATION AS MENTIONED IN THE ANNEXURE E OF TENDER DOCUMENT. FILLING SHALL BE CARRIED OUT IN LAYER NOT EXCEEDING 15 CM AND SHALL BE COMPACTED MECHANICALLY OR BY SATURATION TO SPECIFIED
[Type text] Page 15
PURPOSE: THE PURPOSE OF THIS PROCEDURE IS FOR SUPERVISION OF ALL PCC WORKS AND TO ENSURE THAT PROPER QUALITY CONTROL IS EXERCISED AT SITE. SCOPE: THIS PROCEDURE COVERS SUPERVISION AND METHODS OF RECORD KEEPING FOR ALL PCC WORKS.
MATERIAL: ALL MATERIALS LIKE FINE AGGREGATE, COARSE AGGREGATE, CEMENT SHALL BE APPROVED AND TESTED AND SHALL CONFIRM TO SPECIFICATION AS MENTIONED IN THE TENDER DOCUMENT. THE FREQUENCY OF TESTS SHALL BE AS PER ABOVE SPECIFICATION OF ANNEXURE-E.
[Type text]
Page 16
1. EXCAVATED SURFACE SHALL BE CHECKED BEFORE PCC. IT SHOULD BE WELL COMPACTED & FREE FROM STANDING WATER, MUD OR DEBRIS. 2. EXCAVATED LEVEL SHALL BE CHECKED AS PER DRAWING / STRUCTURE. 3. PCC SHALL BE AS PER SPECIFICATION & AFC DRAWINGS. 4. TOP LEVEL OF PCC SHALL BE CHECKED BEFORE RCC AND SHALL BE RECORDED ON THE POUR CARD. 5. CURING SHALL BE DONE AS PER SPECIFICATION. 6. WHEREVER GRADE OF PCC IS MENTIONED, NUMBER OF CUBES SHALL BE TAKEN AS PER REQUIREMENTS AND TESTED FOR ACCEPTANCE. 7. IN CASE OF CONFLICT BETWEEN PROCEDURE AND SPECIFICATION, SPECIFICATION SHALL SUPERSEDE PROCEDURE.
PURPOSE: THE PURPOSE OF THIS PROCEDURE IS FOR SUPERVISION OF CONCRETING WORKS AT SITE AND TO ENSURE THAT PROPER QUALITY CONTROL IS MAINTAINED. SCOPE: THIS PROCEDURE COVERS SUPERVISION AND METHODS OF RECORD KEEPING FOR CONCRETING WORK AT ALL STAGES.
PROCEDURE: BEFORE CONCRETING: 1. MATERIAL SHALL BE TESTED IN LAB AS PER SPECIFICATION AND AS DIRECTED BY ENGINEER-IN-CHARGE. 2. AVAILABILITY OF VIBRATORS, WATER, LIGHTING ARRANGEMENT, ETC. SHALL BE ENSURED. 3. POUR CARD SHALL BE SUBMITTED BY THE CONTRACTOR AFTER CHECKING.
[Type text] Page 17
[Type text]
Page 18
PURPOSE: THE PURPOSE OF THIS PROCEDURE IS FOR SUPERVISION OF ALL BRICKWORK AND TO ENSURE THAT PROPER QUALITY CONTROL IS EXERCISED AT SITE. SCOPE : THIS PROCEDURE COVERS SUPERVISION AND METHOD OF RECORD KEEPING FOR ALL BRICK WORKS.
1)
2)
3)
4) 5) 6)
APPROVED BRICKS SHALL BE SOAKED IN WATER BEFORE USE AT SITE FOR A PERIOD THAT IS SUFFICIENT FOR WATER TO PENETRATE IN TO THE FULL DEPTHS OF BRICKS IN STACK. THE SURFACE OF R.C.C. SHALL BE WELL CLEANED FROM DUST/DIRT PARTICLES APPLYING WATER AND WIRE BRUSH IF NECESSARY BEFORE COMMENCEMENT OF BRICK WORK . PROPER HACKING OF R.C.C. SURFACE SHALL BE DONE AT JOINTS OF BRICK WORK WITH RCC BEFORE COMMENCEMENT OF MASONRY WORK. BRICK WORK SHALL BE DONE IN ENGLISH BOND PATTERN. CEMENT MORTAR SHALL MEET THE REQUIREMENTS OF IS 2250 AND SHALL BE PREPARED BY MIXING CEMENT AND SAND BY VOLUME. MORTAR SHALL BE MIXED IN PROPORTIONS AS SPECIFIED IN DRAWING SPECIFICATION.
[Type text]
Page 19
[Type text]
Page 20