RC500 to ControlEdge
RC500 to ControlEdge
RC500 to ControlEdge
Commercial Proposal
Contact Information
Emil Tamnishki at Emil.Tamnishki@Honeywell.com
Zhuldyz Sankibayeva at Zhuldyz.Sankibayeva@honeywell.com
Zhanibek Yeskendir at Zhanibek.Yeskendir@honeywell.com
Notice
Honeywell Confidential
©2018 Honeywell International Inc. All rights reserved.
1. Introduction
As per TCO request by e-mail, Honeywell is sending this proposal for replacement of RC500 controllers installed in
IB, RV, TCOV LLSs to a new generation ControlEdge controllers.
Proposal includes hardware requirements and off-site engineering activities
Onsite engineering activities and SAT are part of separate proposal/service order
2. Hardware
q- Price,
Description Part # ty EURO Total, EURO
IC-4720-J-2780 REMOTE IO PANEL-IB LSS
CPU
Redundant Controller SC-UCNN11 1 8112 8112
Expansion End Plate, Right SC-TEPR01 1 153 153
IO Racks
Expansion End Plate, Right SC-TEPR01 3 153 459
Expansion End Plate, Left SC-TEPL01 3 153 459
IO
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI* SC-UMIX01 6 1217 7302
16485
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 16 485,00
IC-4200-J-2742 REMOTE IO PANEL-RV LSS
CPU
Redundant Controller SC-UCNN11 1 8112 8112
Expansion End Plate, Right SC-TEPR01 1 153 153
IO Racks
Expansion End Plate, Right SC-TEPR01 3 153 459
Expansion End Plate, Left SC-TEPL01 3 153 459
IO
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI* SC-UMIX01 6 1217 7302
16485
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 16 485,00
IC-4300-J-2798 REMOTE IO PANEL-TCOV LSS
CPU
Redundant Controller SC-UCNN11 1 8112 8112
Expansion End Plate, Right SC-TEPR01 1 153 153
IO Racks
Expansion End Plate, Right SC-TEPR01 3 153 459
Expansion End Plate, Left SC-TEPL01 3 153 459
IO
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI* SC-UMIX01 6 1217 7302
16485
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 16 485,00
Spare
CPU
Redundant Controller SC-UCNN11 2 8112 16224
q- Price,
Description Part # ty EURO Total, EURO
IO 0
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI SC-UMIX01 2 1217 2434
18658
The cost of equipment delivery on DDP terms, Almaty, excluding VAT.
Delivery time 12 weeks € 18 658,00
Software
RTU Builder, client license SP-EBLDR1 1 2743 2743
ControlEDGE Builder software. Link for download SP-EMD150-ESD 1 1 1
Execution Environment Option PLC SP-CSPLC1 3 388 1164
3908
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 3 908,00
Total € 72 021,00
* IO count calculation is taken as per existing total IO numbers in RC500s (used and not used)
3. Off-site engineering
Item Description mh Price Sale Price
General
1 Project Manager 40 $ 145.00 $ 5,800.00
2 Project Administrator 40 $ 67.00 $ 2,680.00
Off-site engineering. Planning (m/hrs – Expat Lead Eng.)
1 Cabinet drawings 40 $ 150.00 $ 6,000.00
2 Functional Design Specification 40 $ 150.00 $ 6,000.00
3 Detailed Design Specification 40 $ 150.00 $ 6,000.00
4 FAT Procedure 40 $ 150.00 $ 6,000.00
5 SAT Procedure 40 $ 150.00 $ 6,000.00
6 Hot cut-over procedure 40 $ 150.00 $ 6,000.00
Off-site engineering. Software build (m/hrs – Expat Lead Eng.)
1 Software implementation 143 $ 150.00 $ 21,450.00
Off-site engineering (m/hrs - KZ Lead Application Eng.)
1 Internal Factory Acceptance Test:
- KZ Lead Application Eng. 40 $ 80.00 $ 3, 200.00
2 Factory Acceptance Test:
- Expat Lead Eng. 40 $ 150.00 $ 6,000.00
- KZ Lead Application Eng. 40 $ 80.00 $ 3, 200.00
TOTAL: $ 78, 330.00
4. On-site engineering
Duration in
Item Description Daily rate / USD Sale Price / USD
days
On-site engineering (m/hrs – Technician, KZ Lead
Application Eng.)
1 Site installation works 15 $ 500.00 $ 7,500.00
2 Site Acceptance Test 14 $ 1, 117.92 $ 15, 650.88
Number of
MOB / DEMOB Budget Rate / USD Sale Price / USD
travelers
2 MOB/DEMOB * 1 $ 800.00 $ 800. 00
TOTAL: $ 23,950.88
* Estimated price is for budgetary proposal purpose and will be invoiced as per actual costs.
Best regards,
Emil Tamnishki