TCO Last Lift Stations RC500 to ControlEdge migration

Commercial Proposal

Prepared for: TCO Automation Group


Prepared by: Honeywell Service Team
Issued: Sep 13, 2018

Contact Information
Emil Tamnishki at Emil.Tamnishki@Honeywell.com
Zhuldyz Sankibayeva at Zhuldyz.Sankibayeva@honeywell.com
Zhanibek Yeskendir at Zhanibek.Yeskendir@honeywell.com

Notice
Honeywell Confidential
©2018 Honeywell International Inc. All rights reserved.
1. Introduction
As per TCO request by e-mail, Honeywell is sending this proposal for replacement of RC500 controllers installed in
IB, RV, TCOV LLSs to a new generation ControlEdge controllers.
Proposal includes hardware requirements and off-site engineering activities
Onsite engineering activities and SAT are part of separate proposal/service order

2. Hardware
q- Price,
Description Part # ty EURO Total, EURO
IC-4720-J-2780 REMOTE IO PANEL-IB LSS
CPU
Redundant Controller SC-UCNN11 1 8112 8112
Expansion End Plate, Right SC-TEPR01 1 153 153
IO Racks
Expansion End Plate, Right SC-TEPR01 3 153 459
Expansion End Plate, Left SC-TEPL01 3 153 459
IO
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI* SC-UMIX01 6 1217 7302
16485
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 16 485,00
IC-4200-J-2742 REMOTE IO PANEL-RV LSS
CPU
Redundant Controller SC-UCNN11 1 8112 8112
Expansion End Plate, Right SC-TEPR01 1 153 153
IO Racks
Expansion End Plate, Right SC-TEPR01 3 153 459
Expansion End Plate, Left SC-TEPL01 3 153 459
IO
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI* SC-UMIX01 6 1217 7302

16485
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 16 485,00
IC-4300-J-2798 REMOTE IO PANEL-TCOV LSS
CPU
Redundant Controller SC-UCNN11 1 8112 8112
Expansion End Plate, Right SC-TEPR01 1 153 153
IO Racks
Expansion End Plate, Right SC-TEPR01 3 153 459
Expansion End Plate, Left SC-TEPL01 3 153 459
IO
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI* SC-UMIX01 6 1217 7302
16485
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 16 485,00
Spare
CPU
Redundant Controller SC-UCNN11 2 8112 16224
q- Price,
Description Part # ty EURO Total, EURO
IO 0
28 Mixed I/O: 8 AI, 2 AO, 10 DI, 6 DO, 2 PI / DI SC-UMIX01 2 1217 2434
18658
The cost of equipment delivery on DDP terms, Almaty, excluding VAT.
Delivery time 12 weeks € 18 658,00

Software
RTU Builder, client license SP-EBLDR1 1 2743 2743
ControlEDGE Builder software. Link for download SP-EMD150-ESD 1 1 1
Execution Environment Option PLC SP-CSPLC1 3 388 1164
3908
The cost of equipment delivery on DDP terms, Almaty, excluding VAT. Delivery time 12 weeks € 3 908,00
Total € 72 021,00
* IO count calculation is taken as per existing total IO numbers in RC500s (used and not used)
3. Off-site engineering
Item Description mh Price Sale Price
General
1 Project Manager 40 $ 145.00 $ 5,800.00
2 Project Administrator 40 $ 67.00 $ 2,680.00
Off-site engineering. Planning (m/hrs – Expat Lead Eng.)
1 Cabinet drawings 40 $ 150.00 $ 6,000.00
2 Functional Design Specification 40 $ 150.00 $ 6,000.00
3 Detailed Design Specification 40 $ 150.00 $ 6,000.00
4 FAT Procedure 40 $ 150.00 $ 6,000.00
5 SAT Procedure 40 $ 150.00 $ 6,000.00
6 Hot cut-over procedure 40 $ 150.00 $ 6,000.00
Off-site engineering. Software build (m/hrs – Expat Lead Eng.)
1 Software implementation 143 $ 150.00 $ 21,450.00
Off-site engineering (m/hrs - KZ Lead Application Eng.)
1 Internal Factory Acceptance Test:
- KZ Lead Application Eng. 40 $ 80.00 $ 3, 200.00
2 Factory Acceptance Test:
- Expat Lead Eng. 40 $ 150.00 $ 6,000.00
- KZ Lead Application Eng. 40 $ 80.00 $ 3, 200.00
TOTAL: $ 78, 330.00

4. On-site engineering
Duration in
Item Description Daily rate / USD Sale Price / USD
days
On-site engineering (m/hrs – Technician, KZ Lead
Application Eng.)
1 Site installation works 15 $ 500.00 $ 7,500.00
2 Site Acceptance Test 14 $ 1, 117.92 $ 15, 650.88
Number of
MOB / DEMOB Budget Rate / USD Sale Price / USD
travelers
2 MOB/DEMOB * 1 $ 800.00 $ 800. 00
TOTAL: $ 23,950.88
* Estimated price is for budgetary proposal purpose and will be invoiced as per actual costs.

5. Terms and Conditions


All Terms and Condition are in line with Existing IMA11 agreement.

Best regards,

Emil Tamnishki