TECHNICAL DATASHEET The vendor shall fill the following datas of air cooled condenser and the same data sheet shall be forwarded to us along with your offer, GEI OFFER NO. : 001978/12-13 / ACSC Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 /Height - Inlet steam header elevation - Bottom ACC header elevation (Air m inlet height Fan ring height) - Minimum open space required m around ACC - Air velocity at suction (Bundle m/s face)(k/d) 13 Weight (Tentatively) - Dry weight - Operating weight 14 Fouling factor Steam Side sq.m.hr.C/Kcal Not required kg kg 640000 641200 2.00 15 12.5 / 10 m 22.6 Description Process flow medium Condenser type Condenser duty / heat exchange TG exhaust steam quantity Turbine exhaust enthalpy Condensate enthalpy Turbine exhaust steam pressure Turbine exhaust temperature Condensate temperature @ CEP Dryness fraction at inlet Turbine Exhaust nozzle orientation ACC plot area (Excluding walkway) mxm/m 51.68 x 13.1 x 24 Kcal/hr TPH Kcal/KG Kcal/KG ATA C C Unit DATE : 25-04-2012 Parameters Turbine exhaust steam Air Cooled 23076000 45 568.8 56 0.18 Ata 57.41 57 90.6 Top
Air side Length of steam duct from TG 15 terminal point No. of bends / total equivalent 16 length 17 Tube bundle (Condenser) - Design pressure and temperature -Total no of condenser bundle - No. Of bundle / module - No. Of tubes/ bundle - No. Of tubes per row - Tube type - Tube length - Tube size and wall thickness - Tube material - Header material 18 Tube bundle (Dephlegmators) - Design pressure and temperature -Total no of dephlegmator bundle - No. Of bundle / module - No. Of tubes - No. Of rows per bundle - Tube type - Tube length - Tube size and wall thickness - Tube material - Header material 19 Fin - Fin type - Fin material
sq.m.hr.C/Kcal m
0.0002 25
nos / m
5 / as required
mm mm
11400 31.75 & 38.1 / 1.5 SA-214 (ERW) IS-2062 Gr. A/B
ata ,C nos nos nos nos Not required since each condensing tube bundle
mm mm
LL-Overlapped Aluminium
- Fin OD and thickness - Fin pitch at different locations - Fin fixing details 20 Heat transfer - Overall U - bare tube - Overall U - finned tube - Flow type : cross flow / parallel - LMTD overall - Provided heat transfer area -Finned - Steam side pressure drop - duct - Total system pressure drop 21 Air side data - Temperature at inlet - Temperature at outlet - Pressure drop across the system - Air velocity across the tube bundle - Air velocity at exit 22 Total air flow Total air flow 23 Fan data - No. of fans - Fan type - Fan diameter - No. Of blades (tentatively) - Blade material - Air flow per fan - Static pressure - Fan speed - Fan blade angle adjustment range - No. of motors
mm x mm mm
C M Kg/cm2 Kg/cm2
nos
RPM kW Yes/No
drive - Gear box type - Gear box service factor (Rated ) - Motor enclosure - BKW at fan shaft (k/d) - Fan absorbed power (k/d) - Avg. Fan sound level @ 1 m from dB (A) ACC periphery 24 System Air Evacuation Ejector make No of hogging ejector Required motive steam quantity Later on (During start up of the system only) Motive steam pressure Motive steam temperature No of holding ejector Required motive steam quantity Motive steam pressure Motive steam temperature Evacuation time Motive steam Ata/Deg.C pressure/Temperature Motive steam quantity (Hogger/ 1st Holding /2nd Holding)** 25 Condensate pumps - No. of pumps - Flow rate per pump - Pumping head nos m/h mWC 2 (1 w + 1 S) 60 130 Kg /hr Later on 11 / 350 ata Deg.C min ata Deg.C nos 11 350 2 x 100% Later on 11 350 30 nos Mazda Ltd. / New Field 1 x 100% 85 kW kW
84.11 89.75
mWC kW
- Pump motor rating - Pump motor speed 26 Drain pot pumps - No. of pumps - Flow rate per pump - Pumping head - NPSH - Pump motor shaft power - Pump motor rating - Pump make and type
kW rpm
45 2900
- Pump motor speed - Location with ref. to ground level 27 Fin cleaning System -No of pumps -Cooling water Required 28 Storage tank - Condensate storage tank capacity - Tank type / orientation - Tank material and thickness - Corrosion allowance - Tank size (dia, Length) -Quantity of initial filling water/
rpm mts
1 x 100% m3/hr 30
mm mm mm , mm
Pressure /temperature required 29 Expansion bellow - Shape - Material of construction/ thickness mm Circular SA-240 TP304 / 1.0
- End connection - Quantity / location 30 Steam duct - Steam duct size (Main/ Dist) - Material / thickness - Steam velocity - Estimated condensate in duct - Steam duct IBR / Non IBR - Effective capacity of Drain pot - System relief valve on steam side nos (type, make, No. Off, etc.) - No. Of flanges, flange type in the M3 mm mm M/s Kg/h
1440 / 1440 & 1060 IS-2062 Gr.A/B / 8 , 8 , 6 60 4000 Non IBR 2 Rupture Disc / BS & B/ 1 no.
Not applicable steam line, gasket type 31 Make / manufacturer - Finned tube - Headers / pressure parts - Fan assembly - Electric motors Seimens/Kirloskar/ABB / BB - Ejector Systems - Condensate pumps - Bellows Lonestar / Flexicon Elecon/ Premium Gear / - Gear box Flender India/ Equivalent 32 Structures - Stair case, Platform and Column - Wind shield material / thickness - Painting for all exposed parts 33 Cleaning system - Type and make Fixed Nozle type/ GEI make mm RCC Color Quoted sheet / 0.6 Yes Mazda Ltd. / New Field KSB / Sulzer / Flowserve Atulya/ Metallic Bellows / GEI Industrial systems Ltd GEI Industrial systems Ltd Aerotech /Parag / Cofimco CGL/
- Quantity of water / pressure 30 m3/hr / 22 bar required - No. of flexible hoses / nozzle - Frequency of cleaning Recommended TG operating floor level considering steam duct layout 34 and drain pot below the operating floor. Guaranteed auxiliary power 35 consumption - Fan power at motor shaft end - CEP pump motor - Drain pump motor - Fin cleaning pump motor 36 Instrument list, make, type, etc. Instrument air requirement 37 Characteristic curves For Air cooled condenser Fans CEP pump Later on Later on Later on On condensate pipings 38 Insulation details from CEP discharge to Dearator inlet m3/hr kW kW kW kW 359 40 2.0 35 As per supplier list attached Later on 12 1/ 36 Once in 15 days