Individual Road Profile Data Analysis
Individual Road Profile Data Analysis
(Causeway/Culvert/ Minor
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
1 MC Road to Kolanakudur Road NLMD 121 0/2 PIPE CLVERT PIPE 1 rows 600 dia NP2 5.2
from Km.0/0 to 13/685 CLVERT
=13.685
1/0 PIPE CLVERT PIPE 1 row 600 dia NP2 7.5
CLVERT
1/4 PIPE CLVERT PIPE km1/4,1 row 800 dia NP2 10.0
CLVERT
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
9/8 PIPE CLVERT PIPE 1row 800 dia NP3 10.00
12/4 PIPE CLVERT CLVERT
PIPE 1row 800 dia NP3 10.00
PIPE CLVERT CLVERT
PIPE 1row 800 dia NP3 10.00
12/6 PIPE CLVERT CLVERT
PIPE 1row 1000 dia NP3 10.00
13/2 PIPE CLVERT CLVERT
PIPE 1row 600 dia NP2 7.50
PIPE CLVERT CLVERT
PIPE 1row 600 dia NP2 7.50
13/6 PIPE CLVERT CLVERT
PIPE 1row 600 dia NP2 5.70
2 Old MC Road (Manubolu NLMD086 140/2-4 old arch culvert CLVERT
old arch 7vent x 1.5 m 0.5
Village limits) from 140/4-6 old arch culvert culvert
old arch 1vent x 2.2 m 0.5
Km.140/285 to 142/305 culvert
=2.02KM 141/0 PIPE CLVERT PIPE 1row 1000 dia NP3 15.00
141/0-2 PIPE CLVERT CLVERT
PIPE 2rows 1200 dia NP3 15.0
PIPE CLVERT CLVERT
PIPE 2rows 1000 dia NP3 15.0
CLVERT
3 Ramasagaram Vemulachedu NLMD043 0/2 slab culvert slab 1 vent x 2.5 m 0.3
road km 0/0 to km 16/4= 0/6 slab culvert culvert
slab 1 vent x 2.5 m 0.3
16.4KM culvert
1/0 slab culvert slab 1 vent x 2.5 m 0.3
1/4 PIPE CLVERT culvert
PIPE 1row 1000 dia NP3 12.5
1/8 PIPE CLVERT CLVERT
PIPE 1row 1000 dia NP3 10.0
2/0 PIPE CLVERT CLVERT
PIPE 1row 1000 dia NP3 5.0
CLVERT
(Causeway/Culvert/ Minor
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
3 Ramasagaram Vemulachedu NLMD043
road km 0/0 to km 16/4=
16.4KM
1 2 3 25 26 27 28 29 30 31 32 33
2/7 PIPE CLVERT PIPE 1row 1000 dia NP3 5.0
3/4 PIPE CLVERT CLVERT
PIPE 1row 0.600 dia NP2 7.7
3/6 CLVERT
low level cause way low level 3vents x 3.00 m 0.4
4/0 slab culvert cause
slabway 1 vent x 2.0 m 0.3
culvert
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
7/6 slab culvert slab 1vent x 3.0 m 0.3
culvert
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
PIPE CLVERT PIPE 2rows 1000 dia NP3 10.0
14/2 PIPE CLVERT CLVERT
PIPE 2rows 900 dia NP2 7.5
14/4 CLVERT
low level cause way low level 6 rows x 1000mm np3 10.0
14/8 PIPE CLVERT cause
PIPEway 2rows 900 dia NP2 7.5
15/8 PIPE CLVERT CLVERT
PIPE 1rows 1000 dia NP3 5.5
16/2 slab culvert CLVERT
slab 1vent x 3.0 m 0.4
4 Sydapuram - Paleru to NLMD201 0/0-2 slab culvert culvert
slab 1vent x 2.0 m 0.3
Thokalapudi from km 0/0 to 0/8-10 PIPE CLVERT culvert
PIPE 2rows 600 dia NP3 10.0
km 8/0 = 8KMS CLVERT
(Causeway/Culvert/ Minor
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
5/8-10 slab culvert slab 1vent x 8.0 m 0.5
6/4-6 PIPE CLVERT culvert
PIPE 1row 1000 dia NP3 10.0
6/6-8 PIPE CLVERT CLVERT
PIPE 1row 1000 dia NP3 10.0
6/8-10 PIPE CLVERT CLVERT
PIPE 1row 1000 dia NP3 10.0
PIPE CLVERT CLVERT
PIPE 1row 1000 dia NP3 20.0
7/0-2 PIPE CLVERT CLVERT
PIPE 1row 1000 dia NP3 10.0
CLVERT
5 Utukuru –Perumallapadu Road NLOD 006 0/0 PIPE CLVERT PIPE 1row 600 dia NP3 8.8
from Km.0/0 to 5/330 0/4-6 CLVERT
low level cause way low level 4rows of 500mm 7.00
1/6-8 slab culvert cause
slabway dia&2R1000MM 1vent x 6.9 m 0.5
culvert
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
Pipe Pipe
Km 1/4, culvert 1R x 0.80 5.0 No - -
Culverts Culverts
Pipe Pipe
Km 1/8, culvert 1R x 0.80 5.0 No - -
Culverts Culverts
Pipe Pipe
Km 2/2, culvert 2R x 0.80 5.0 No - -
Culverts Culverts
Pipe Pipe
Km 2/6, culvert 1R x 0.90 5.0 No - -
Culverts Culverts
Rapur –Penubarthi Road from Pipe Pipe
6 NLMD 040 Km 3/2, culvert 1R x 0.90 5.0 No - -
km.0/0 to 4/9 Culverts Culverts
Pipe Pipe
Km 3/8, culvert 1R x1.0 5.0 No - -
Culverts Culverts
Pipe Pipe
Km 4/2, culvert 1R x 1.0 5.0 No - -
Culverts Culverts
Pipe Pipe
Km 4/4 culvert 2R x 1.0 5.0 No - -
Culverts Culverts
Slab Slab
Km 2/2, culvert - - - 2V x 1.50 0.3
culvert culvert
Pipe Pipe
(Km.21/2, culvert 1R x 0.80 5.0 No - -
culvert culvert
Adurupalli –Penchalakona
7 Road from Km.17/4 to 23/6 & NLMD 036
Km.24/4 to 28/2
(Causeway/Culvert/ Minor
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2
Adurupalli –Penchalakona 3 25 26 27 28 29 30 31 32 33
7 Road from Km.17/4 to 23/6 & NLMD 036 KM 22/4 Pipe Pipe
culvert 1R x 0.8 5 No - -
Km.24/4 to 28/2 culvert culvert
Pipe Pipe
,KM 23/4 culvert 1R x 1.0 5 No - -
culvert culvert
Slab Slab
Km 22/800 culvert - - - 1V x 1.80 0.3
culvert culvert
Pipe Pipe
culvert 1R x 0.8 7.5 No - -
Km 15/8 Culvert Culvert
Pipe Pipe
,Km 2/2 culvert 1R x 0.80 7.5 No - -
Culvert Culvert
(Causeway/Culvert/ Minor
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
Slab Slab
Km 13/8, culvert - - - 1V x 6.0 0.3
Culverts Culverts
Slab Slab
Km 14/6, culvert - - - 1V x 6.0 0.3
Culverts Culverts
Slab Slab
Km 16/8 culvert - - - 1V x 6.0 0.3
Culverts Culverts
Slab Slab
Km ,17/4 culvert - - - 1V x 6.0 0.3
Culverts Culverts
Slab Slab
Km ,17/6 culvert - - - 1V x 6.0 0.3
Culverts Culverts
Slab Slab
Km ,19/6 culvert - - - 1V x 6.0 0.3
Culverts Culverts
Slab Slab
Km ,20/2 culvert - - - 1V x 6.0 0.3
Culvert Culvert
Minor Minor
14/8, Minor Bridge - - - 2vx10.0 0.3
Bridge Bridge
Minor Minor
18/2, Minor Bridge - - - 3vx16.0 0.3
Bridge Bridge
Minor Minor
20/10, Minor Bridge - - - 1vx9.0 0.3
Bridge Bridge
Minor Minor
21/4, Minor Bridge - - - 3vx11.0 0.3
Bridge Bridge
(Causeway/Culvert/ Minor
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
Major Major
Km 17/4 Major bridge - - - 6V x 11.0 0.3
bridge bridge
Pipe Pipe
Km 1/8 culvert 1R x 0.80 7.5 No - -
culvert culvert
Pipe Pipe
Km 2/4 culvert 1R x 0.80 7.5 No - -
culvert culvert
Pipe Pipe
Km 4/8 culvert 1R x 0.80 7.5 No - -
culvert culvert
Minor Minor
Km 1/4 Minor bridge - - - 4x7.8 0.4
bridge bridge
Cause Cause
Km 0/2 Cause ways - - - 2RX0.60 0.25
ways ways
(Causeway/Culvert/ Minor
( No. - Span in m)
CD Structure
Length (km)
Length (m)
Road Code
Slab/ Box
Structure
Structure
Location
Sl. No.
Road
1 2 3 25 26 27 28 29 30 31 32 33
Cause Cause
Km 1/8 Cause ways - - - 2RX0.60 0.25
ways ways
Cause Cause
Km 2/4 Cause ways - - - 4RX1.0 0.5
ways ways
Pipe Pipe
Km 1/0, culvert 1R x 0.8 5.0 No - -
culvert culvert
Pipe Pipe
Km 3/8 culvert 1R x 0.80 5.0 No - -
culvert culvert
Pipe Pipe
Km 4/2 culvert 1R x 0.80 5.0 No - -
culvert culvert
Pipe Pipe
Km 4/4 culvert 1R x 1.0 5.0 No - -
culvert culvert
Slab Slab
Km 0/8 culvert - - - 1V x 1.2 0.3
culvert culvert
Pipe Pipe
KM 2/4, culvert 1R x 1.0 5.0 No - -
culvert culvert
45
44
Sl. No.
Nomenclature of the
Road
2
including Start & End
to 3/6
chainages and Total
Length (km)
Km.11/360 to 13/0
Dachur –Tatipalli Road from
Podalakur –Rapur Road from
3
Road Code
NLMD 041
via thumai road from km.0/0 NLMD 173
Location
ie Chainage of Centre of
Km 2/8
25
12/2,
CD Structure
Slab
Pipe
Pipe
Pipe
Designation of CD
culvert
26
,: Km 11/8 Culverts
Km 12/4 Culverts
Culverts Structure
Existing Type of CD
Structure
(Causeway/Culvert/ Minor
27
culvert
culvert
culvert
culvert
Slab
Pipe
Pipe
Pipe
culvert
Culverts
Culverts
Culverts
Slab/ Box
-
1R x1.0
1R x 0.8
1R x 1.0
Length (m)
-
No
No
No
( No. - Span in m)
1V x 1.2
-
-
-
0.3
34
2.00
6.00
Waterway (m)
4.00X2
Length of CD Structure
(m)
35
8.50
2.50
6.70
( length between Back to
back of Abutments)
36
5.00
7.40
8.50
(Outer to Outer)
37
4.50
3.75
7.00
Length of Linear
2.5
2.5
2.5
2.2
34
1.5X7
Waterway (m)
Length of CD Structure
(m)
3.7
3.7
3.7
3.2
35
17.2
( length between Back to
back of Abutments)
6.5
6.5
36
7.50
7.50
7.50
(Outer to Outer)
6.5
6.5
Roadway Width (m)
37
7.50
7.50
7.50
Length of Linear
2
7.5
2.5
2.5
34
2.00
3.00
Waterway (m)
Length of CD Structure
(m)
2.2
3.2
8.2
3.7
3.7
3.4
35
11.1
( length between Back to
back of Abutments)
7.5
36
7.50
8.00
7.50
7.00
7.00
10.00
(Outer to Outer)
7.5
Roadway Width (m)
37
7.50
8.00
7.50
7.00
7.00
10.00
Length of Linear
1.5
2.5
34
3.00
3.00
Waterway (m)
Length of CD Structure
(m)
2.4
8.5
4.4
3.7
4.4
35
( length between Back to
back of Abutments)
7.5
7.5
36
7.00
7.00
7.00
(Outer to Outer)
7.5
7.5
Roadway Width (m)
37
7.00
7.00
7.00
Length of Linear
2
3
2.8
34
2.70
3.00
1.50
24.00
Waterway (m)
Length of CD Structure
(m)
4
4.3
2.8
4.4
35
31.4
( length between Back to
back of Abutments)
10
7.5
7.5
36
8.50
7.50
7.50
6.50
(Outer to Outer)
10
7.5
7.5
Roadway Width (m)
37
8.50
7.50
7.50
6.50
Length of Linear
6.9
34
3.00
8.00
Waterway (m)
Length of CD Structure
(m)
4.3
8.2
9.3
35
( length between Back to
back of Abutments)
8.5
8.5
36
8.50
(Outer to Outer)
8.5
8.5
Roadway Width (m)
37
8.50
Length of Linear
-
-
-
-
-
-
-
-
-
2.5
34
Waterway (m)
Length of CD Structure
(m)
-
-
35
4.25
( length between Back to
back of Abutments)
6.0
6.5
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
36
(Outer to Outer)
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
Length of Linear
-
-
-
-
-
-
-
-
2.5
34
Waterway (m)
Length of CD Structure
(m)
3.5
35
( length between Back to
back of Abutments)
7.5
7.5
7.5
7.5
7.5
7.5
5.0
5.0
36
5.00
(Outer to Outer)
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
Length of Linear
0.8
0.8
0.8
3.4
3.4
3.5
34
Waterway (m)
30.6
9
45
18.4
Length of CD Structure
(m)
2.4
2.4
2.4
5.8
5.8
6.2
35
( length between Back to
32.2
9
47
19.2
back of Abutments)
7.0
7.0
7.0
7.0
6.5
6.5
6.5
6.5
6.5
6.5
6.5
36
(Outer to Outer)
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
Length of Linear
-
-
-
-
5
98
34
Waterway (m)
28
Length of CD Structure
(m)
-
-
-
-
15
35
68.2
( length between Back to
30.4
back of Abutments)
5
7.0
7.5
7.5
7.5
7.5
7.0
36
(Outer to Outer)
7.0
7.0
Roadway Width (m)
37
3.75
3.75
7.00
7.00
3.75
Length of Linear
-
-
-
-
-
-
5
25
0.8
34
Waterway (m)
Length of CD Structure
(m)
-
-
-
-
-
-
40
15
2.4
35
( length between Back to
back of Abutments)
5
5
5.0
6.0
5.0
5.0
5.0
5.0
5.0
36
(Outer to Outer)
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
Length of Linear
-
-
-
0.8
34
Waterway (m)
Length of CD Structure
(m)
-
-
-
2.4
35
( length between Back to
back of Abutments)
6.0
5.0
5.0
5.0
36
(Outer to Outer)
3.8
3.8
Roadway Width (m)
37
3.75
3.75