Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Specifications Vapor Barrier/Dampproofing (Ecodamp)

Download as doc
Download as doc
You are on page 1of 6

SPECIFICATIONS

VAPOR BARRIER/DAMPPROOFING (ECODAMP)

SECTION 071000 – FLUID-APPLIED POLYMERIZED VAPOR BARRIER AND DAMPPROOFING


(Above Grade)

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Surface preparation and substrate treatment.


2. Vapor barrier and dampproofing membrane.
3. Sheet flashing and accessories.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 4 Section “Masonry” for concrete unit masonry placement, curing, and
finishing.
2. Division 4 Section “Masonry” for masonry restoration and cleaning.

1.3 PERFORMANCE REQUIREMENTS

A. General: Provide a vapor barrier and dampproofing system that prevents the passage of
moisture in the absence of hydrostatic pressure and complies with physical requirements
as demonstrated by testing performed by an independent testing agency of manufacturer’s
current dampproofing formulations and system design.

1.4 SUBMITTALS

A. Submit Product Data for each type of vapor barrier/dampproofing specified, including
manufacturer’s printed instructions for evaluating, preparing, and treating the substrate,
technical data, and tested physical and performance properties.

B. Project Data - Submit Shop Drawings showing locations and extent of vapor
barrier/dampproofing, including details for substrate joints and cracks, sheet flashing,
penetrations, and other termination conditions.

C. Samples – Submit representative samples of the following for approval:


1. Vapor barrier/dampproof membrane material.
2. Geo-textiles and detailing sheet as required.
3. Repair grouts.

D. Installer Certificates – Submit certificates signed by manufacturer certifying that Installers


comply with requirements under the “Quality Assurance” Article.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Engage an experienced Installer who is certified in writing and


approved by vapor barrier/dampproofing manufacturer Epro Services, Inc. for the
installation of ECODAMP material.

B. Manufacturer Qualification: Obtain vapor barrier/dampproofing materials and system


components from a single manufacturer Epro Services, Inc.

C. Field Sample: Apply vapor barrier/dampproofing system field sample to 30 sq./ft. (2.8
sq./m.) of deck or wall to demonstrate surface preparation, joint and crack treatment,
thickness, texture, and standard of workmanship.

1. Notify Architect one week in advance of the dates and times when field sample will be
prepared.
2. If Architect determines that field sample, does not meet requirements; reapply vapor
barrier/dampproofing material until field sample is approved.
3. Retain and maintain approved field sample during construction in an undisturbed
condition as a standard for judging the completed vapor barrier/dampproofing material.
An undamaged field sample may become part of the completed Work.

D. Pre-installation Conference: A pre-installation conference shall be held prior to application


of the vapor barrier/dampproofing system to assure proper substrate and installation
conditions, to include contractor, applicator, architect/engineer and special inspector (if
any).

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to Project site as specified by manufacturer labeled with manufacturer’s


name, product brand name and type, date of manufacture, shelf life, and directions for
storing and mixing with other components.

B. Store materials as specified by the vapor barrier/dampproofing manufacturer in a clean,


dry, protected location and within the temperature range required by vapor
barrier/dampproofing manufacturer. Protect stored materials from direct sunlight.

C. Remove and replace material that cannot be applied within its stated shelf life.
1.7 PROJECT CONDITIONS

A. Protect all adjacent areas not to be applied to. Where necessary, apply masking to
prevent staining of surfaces to remain exposed wherever membrane abuts to other finish
surfaces.

B. Perform work only when existing and forecasted weather conditions are within
manufacturer’s recommendations for the material and application method used.

C. Minimum clearance of 24 inches is required for application of product. For areas with less
than 24-inch clearance, the product may be applied by hand.

D. Ambient temperature shall be within manufacturer’s specifications. (Greater than +20ºF/-


7ºC.)

E. All plumbing, electrical, mechanical and structural items to be under or passing through the
vapor barrier/dampproofing membrane shall be positively secured in their proper positions
and appropriately protected prior to membrane application.

F. Vapor barrier/dampproofing membrane shall be installed before placement of reinforcing


steel. When not possible, all exposed reinforcing steel shall be masked by General
Contractor prior to membrane application.

1.8 WARRANTY

A. General Warranty: The special warranty specified in this Article shall not deprive the
Owner of other rights the Owner may have under other provisions of the Contract
Documents, and shall be in addition to, and run concurrent with, other warranties made by
the Contractor under requirements of the Contract Documents.

B. Special Warranty: Submit a written warranty signed by vapor barrier/dampproofing


manufacturer and Installer, agreeing to repair or replace vapor barrier/dampproofing that
does not meet requirements or that does not remain moisture resistant within the specified
warranty period. Warranty does not include failure of vapor barrier/dampproofing material
due to failure of substrate prepared and treated according to requirements or formation of
new joints and cracks in the substrate.

1. Warranty Period: 1 year after date of Substantial Completion.

PART 2 – PRODUCTS

2.1 MANUFACTURERS

A. ECODAMP; Epro Services, Inc., Wichita, KS, 800-882-1896

1. Spray-Applied ECODAMP.
2. Detailing-mastic ECOLINE-T.
3. Repair–grout QUIK-SET.

2.2 DAMPPROOFING MATERIALS

A. Fluid applied dampproofing system – ECODAMP: a single-course, high-build, polymer


modified asphalt emulsion. Waterborne and spray applied at ambient temperatures. A
nominal thickness of 20 dry mils (15 mil minimum), unless specified otherwise. Non-toxic
and odorless. Manufactured by Epro Services, Inc.

B. Fluid applied dampproofing physical properties.

ECODAMP – TYPICAL CURED PROPERTIES (MEMBRANE ONLY)

Elongation ASTM D 412-98a 5500%


Tensile Strength ASTM D 412-98a 9 psi
Hydrostatic Water Pressure ASTM D 751-00 10 psi
Water Degradation ASTM D 2939-94 No Effect
Adhesion ASTM C 836 11 lbf/inch
Perm Rating ASTM E-96 .1049 gr./hr./sq. ft.
Low Temp. Flexibility ASTM C 836-00 No Cracking at
Ð6.7¼C
Shrinkage ASTM C 836-00 0.03%
Chemical or Environmental
Resistance:
Hydrochloric & Sulfuric 13%
Acetic 30%

2.3 AUXILIARY MATERIALS

A. Sheet Flashing: 60-mil reinforced modified asphalt sheet good with double-sided adhesive.

B. Reinforcing Strip: Manufacturer’s recommended polypropylene and polyester fabric.

C. Repair grout: QUIK-SET a rapid curing, high-build mortar joint repair material.

D. Joint Detailing Sealant Mastic: ECOLINE-T, a high viscosity polymer modified water based
asphalt material.

PART 3 – EXECUTION

3.1 EXAMINATION
A. Examine substrates, areas, and conditions under which vapor barrier/dampproofing
materials will be applied, with Installer present, for compliance with requirements. Do not
proceed with installation until unsatisfactory conditions have been corrected.

3.2 SURFACE PREPARATION

A. Clean and prepare substrate according to manufacturer’s recommendations. Provide


clean, dust-free, and dry substrate for vapor barrier/dampproofing application. Power
washing or sand blasting is an accepted cleaning method on existing structures.

B. Mask off adjoining surfaces not receiving the vapor barrier/dampproofing to prevent
spillage or over-spray affecting other construction.

C. Close off deck drains and other deck penetrations to prevent spillage and migration of
fluids.

D. Remove grease, oil, form release agents, paints, and other penetrating contaminants from
concrete.

E. Remove fins, ridges, and other projections and fill honeycomb, aggregate pockets, grout
joints, tie holes, and other voids with ECOLINE-T, hydraulic cement, or rapid-set grout.

3.3 PREPARATION AND TREATMENT AT TERMINATIONS AND PENETRATIONS

A. Prepare vertical surfaces at terminations, at penetrations through substrate, and at


expansion joints and sleeves according to ASTM C 898 and manufacturer’s
recommendations.

B. Apply two coats of ECOLINE-T (30 mil each) and embed a joint reinforcing strip in
preparation coat and apply a second coat over embedded joint reinforcing strip ensuring
its complete saturation and covering.

1. Terminations should be treated 6 inches up vertical and 6 inches on horizontal.


2. Penetrations should be treated in a 6-inch radius around penetration and 3 inches onto
penetrating object.

3.4 PREPARATION AND TREATMENT OF JOINTS AND CRACKS

A. Prepare, treat, rout, and fill joints and cracks in substrate according to ASTM C 898 and
dampproofing manufacturer’s recommendations. Remove dust and dirt from joints and
cracks complying with ASTM D 4258 prior to coating surfaces.

B. Vertical - Apply two coats of ECOLINE-T mastic, 6 inches on each side of joint and embed
a joint reinforcing strip in preparation coat and apply a second coat over embedded joint
reinforcing strip ensuring to complete saturation and covering.
3.5 VAPOR BARRIER/DAMPPROOFING APPLICATION

A. Set up spray equipment according to manufacturer’s instructions.

B. Mix materials according to manufacturer’s instructions.

C. Start installing vapor barrier/dampproofing material in presence of manufacturer’s technical


representative.

D. Apply vapor barrier/dampproofing material, according to manufacturer’s recommendations,


by spray.

E. Apply one spray coat of ECODAMP to obtain a seamless membrane free of entrapped
gases, with an average dry film thickness of 20 mils (1.0 mm) and a minimum dry film
thickness of 15 mils (.875 mm) at any point.

F. Apply vapor barrier/dampproofing material to prepared wall terminations and vertical


surfaces to heights indicated according to manufacturer’s recommendations and details.

G. Verify film thickness of vapor barrier/dampproofing membrane every 100 sq./ft. (9.3
sq./m.).

3.8 FIELD QUALITY CONTROL

A. Membrane may be checked for coverage with a lightly oiled, needle nose depth gauge,
taking four (4) readings over a one square inch area, every 500 square feet. Record the
minimum reading. Mark the test area for repair.

B. Test areas are to be patched over with ECODAMP to a 35- mil minimum dry thickness,
extending a minimum of one-inch (1”) beyond the test perimeter.

3.9 CURING, PROTECTING, AND CLEANING

A. Cure vapor barrier/dampproofing membrane according to manufacturer’s


recommendations, taking care to prevent contamination and damage during application
stages and curing.

B. Clean spillage and soiling from adjacent construction using cleaning agents and
procedures recommended by manufacturer of affected construction.

You might also like