Power Plant Familiarization
Power Plant Familiarization
Power Plant Familiarization
Contents
Introduction
Basic idea of electricity generation
Thermal Power Station
Elements of Thermal Power Station
Overview
Conclusion
Introduction
3
2
Introduction(contd.)
Water system
Turbine
Generator
Condenser
Cooling Tower
Chimney
Switchyard
August 30, 2016
Wagon Tippler
8
Conveyer belt
9
FD fan
10
10
Pulverized Mill
August 30, 2016
11
11
12
12
13
Boiler
13
14
14
15
Super heater
15
16
(c) Economiser:
The function of economiser is to:
I. Absorb the heat from outgoing flue gases
II. Increase the temperature of the feed water
coming from the condenser and gives the
heated water to the boiler. With this the
efficiency of boiler is raised and the fuel
consumption is also saved.
16
17
Economiser
17
18
(d) Air-preheater:
The function of the air-preheater is to recover
some of the heat from the flue gases. Therefore,
the air is passed through the preheater before it
is passed to the inlet of the forced draught fan
so that it gets preheated and with this
condensation of flue gases and corrosion of air
preheater is prevented. This increases the boiler
efficiency and air temperature.
18
19
Air-preheater
19
Water system
20
20
Turbine
21
21
Turbine
22
Turbine
22
Generator
23
23
Condenser
24
24
Cooling Tower
25
25
26
26
Chimney
27
27
Switchyard
28
28
29
30
30
Conclusion
31
31
32
32
THANK YOU
CORE JAVA