7fa Control
7fa Control
7fa Control
Project #: H74625.1
Phase: DMAIC
Date: 10/11/2002
Green Belt: John G Cosh
g SIX SIGMA PROJECT TEAM GE Power Systems
• METRIC
– Each module is measured for existence and completeness as scored
by the Module Quality Check Sheet (MQCS).
• DEFECT
– Any module or Tab of a module that is not included and scored on
the Program Evaluation Scorecard (PES).
• OPPORTUNITY
– Each Module in the overall program.
g Project Summary - Measure GE Power Systems
Fishbone Diagram
2
ng
si
ss
is
e
m
oc
3
st
or
Pr
Lo
st
r
ew
e
ts
lo
ne
e
ar
av
en
vi
gi
P
er
th
be
en
e/
t
Measurements Materials Manpower
In
er
no
at
ld
d
in
av
fD
se
fie
o
tr a
2
H
U
ed
e
ut
ot
us
w
2 Students Knowlege Base
O
N
rro
ho
Bo
In
2 Props
Module Quality Check 3
Who created the lesson module
3
Lesson Modules
3 3
Do Ar Po Pa
Exams No e
pa or rt i Instructor Experience
St al
tE r tia ru ly
xis lly ct co In Bo
t ou ur m ho rro
e pl us
3 td e te we
at d e d
ed
Homework fie
ld
en
gi
ne
e r
1
Student Feedback Form
We Do Not Train
As Effectively
As Possible
3
Tr
Time of Year ain 3
in Lab
g
As
s ig
ve
nm La Is
rri
ta
en b th
Technology Advancement Eq e
no
3 ts ui re
es
pm tim
Part of Class Become 4
do
en e
in
&
CBT t sc
w
Obselete
rro
he
n
e
w
av
bo
du
do
H
l
to
Fu e
s
ot
k
e
N
ea
n
av
de
Br
3
H
m
Not Enough Time To en
t al 3
Teach Material s
Lab equipment
2
Classic Lecture Style
3 1
Re
Not Enough Prep Time lie Classroom Equip. Does Not Work
s
on
Le O Sl Pr
ve id oj
cs
s so rh e e
Enviroment Methods Machines
Pi
n ea Pr ct
or
l
oj
ita
M d e
od
ig
Pr ct Impact
D
or
in
ul oj
vs
po
e ec Low High
t
er
s
e
w
id
Po
Sl
1 3
vs
Low
Difficulty
ds
ea
rh
2 4
ve
High
O
1 Introduction to Instructor 1
2 Learning Objectives 2
4 Lesson Plan 1
5 Presentation Materials 2
9 Homework 99
12 Lab Set Up 99
13 Lab Equipment 99
15 References (Instructors) 7
17
18
g Project Summary - Measure GE Power Systems
Start
NO
Is Module still valid for
Remove Module from PES
this Program?
YES
YES
YES
YES
Instruct Class
NO
Are Business & Student
Feed Back Positive?
YES
End
g Project Summary - Analyze GE Power Systems
Input Fields
D Total Number of Defects
U Total Number of Units
OP Number of Opportunities
Shift Sigma Shift (Default: 1.5)
Calculated Fields
TOP U*OP
DPU D/U
DPO D/TOP = D/(U*OP)
DPMO DPO * 1000000
Sigma-L White Book 11.10
Z.B. (Sigma-L)+Shift version 3.0
g Project Summary - Improve GE Power Systems
• Object
– Evaluate the overall Customer Training 7FA Gas Turbine-Generator
Operations Program for existence and completeness of individual
modules
• Procedure
– Annual audit of Program Evaluation Scorecard by a
Customer Training 7FA Gas Turbine-Generator
Operation Course Training Panel.
• Metric
– Program modules and individual module contents
• Owner
– Customer Training Program Leader