Ee 2353 High Voltage Engineering Faculty Name: A.JAIBUNISHA Faculty Code: EE 58 Designation: LECTURER Department: EEE
Ee 2353 High Voltage Engineering Faculty Name: A.JAIBUNISHA Faculty Code: EE 58 Designation: LECTURER Department: EEE
Ee 2353 High Voltage Engineering Faculty Name: A.JAIBUNISHA Faculty Code: EE 58 Designation: LECTURER Department: EEE
com
3
TESTS OF INSULATORS
POWER FREQUENCY TESTS
(a) Dry and wet flashover tests:
a.c voltage of power frequency is applied across the insulator
and increased at a uniform rate of 2% per second of 75%of
ther estimated test voltage.
If the test is conducted under normal conditions without any
rain –dry flashover test.
If the test is conducted under normal conditions of rain –wet
flashover test
(b) Dry and wet withstand tests(one minute)
The test piece should withstand the specified voltage which
is applied under dry or wet conditions.
4
IMPULSE TESTS ON INSULATORS
6
IMPULSE VOLTAGE TESTS ON
BUSHING
Full wave Withstand Test
The bushing is tested for either polarity voltages,5
consecutive full wave is applied, If the test object has
withstood the subsequent applications of standard
impulse voltage then it is passed the test.
7
IMPULSE VOLTAGE TESTS ON
BUSHING
THERMAL TESTS ON BUSHING
Temperature Rise and Thermal Stability Tests
Temperature rise test is done at temperature below
400C at a rated power frequency.The syteady
temperature rise should not exceed 450C .
Thermal st6ability tets is done for bushing rated for
132 kV above.
8
TESTING OF ISOLATORS AND CIRCUIT
BREAKERS
Dielectric tests
Overvoltage withstand test of power frequency,lightning and
switching impulse voltages.
9
TESTING OF ISOLATORS AND CIRCUIT
BREAKERS
10
SYNTHETIC TESTS
ON CIRCUIT BREAKER AND ISOLATOR
( f ) Testing Procedure
The C.B are tested for their breaking capacity B and making capacity
Mand it is tested for following duty cycle
(1) B-3-B-3-B at 10%of the rated symmetrical breaking capacity
(2) B-3-B-3-B at 30%of the rated symmetrical breaking capacity
(3) B-3-B-3-B at 60%of the rated symmetrical breaking capacity
(4) B-3-MB-3MB-MB0 at 10%of breaking capacity with the recovery
voltage not less 95% of the rated service voltage
(g ) Asymmetrical Tests
One test cycle is repeated for the asymmetrical breaking capacity
in which the d.c component at the instant of contact separation is not
less than 50% of the a.c component
13
TESTING OF CABLES
Different tests on cables are
(i) mechanical tests like bending test,dripping and drainage test,
and fire resistance and corrosion tests
(ii) Thermal duty tests
(iii) Dielectric power factor tests
(iv) Power frequency withstand voltage tests
(v) impulse withstand voltage tests
(vi) Partial discharge test
(vii) Life expectancy tests
14
TETSING OF TRANSFORMERS
15
TETSING OF TRANSFORMERS
17
TESTING OF SURGE DIVERTERS
20
HIGH CURRENT IMPULSE TEST ON
SURGE DIVERTERS
22
INSULATION CO-ORDINATION
23