GARBAGE CHUTE

REPORT

SUBMITTED BY:
SAHIL MALIK
16BAR1066

SUBMITTED TO:
AR. SHADAB
AR. VIVEK
Garbage Chutes
Intake Door
• Intake door are self-closing, with a positive latching system.
• The front is fabricated of polished stainless steel with matt
steel backs.
• Steel angle frame with 3-1/2” steel extensions.
• Integral polished stainless steel trim, with top side embossed,
designating the use of the chute.
• Pivot type hinge welded to the door frame
•Door equipped with chrome plated kye locking “C” handle
latching assembly.

Material of construction
1, Stainless steel S.S. 430 / S.S. 304
2, GI - Galvanized Iron
3, M.S. ORCRC
Thickness of chutes - 1mm/ 1.2mm / 1.6mm as per diameter.

Venting
1. This for removing foul smells and gases generated in
garbage chute.
2. Vents are made the same diameter or reducing diameter
of chute and extend 4ft above roof of the building.
3. Exhaust system in the top to remove decomposed smell
and gases with a fan of average speed.
4. 300 CFM-900 CFM depends on the number oors.
5. Ventilation is operated automatically (Time base) by electrically
operated control penal.
Discharge
• Chute shall directly discharge into trolley or compactor.
• Diversion shall not to be allowed. Max diversion of 15 with
vertical allowed as per codes.

Discharge end / door


1. Simple discharge hopper.
• When a door is not required, we provide conical hopper to avoid
GARBAGE
TROLLEY spoiling of garbage and it is directly connected collection trolley

2. Segregation “Y” hopper


• It is specially design for separation of wet and dry garbage.
• Mechanically operated rotating ap is provided to
divert Dry garbage.
• This system is operated by electrical control panel

WET / DRY WET / DRY

3. Fire door Sliding type


•Standard sliding disharge door is mounted on bearing in
sloping position and held open with a 79° U.L. approved
fusible link. in case of re in garbage room, fusible link
melts and door shuts mouth of chute and restricting heat
transfer. Mainly used in Garbage Chutes. control panel.
GARBAGE
TROLLEY

4. Top hinger type :-


• Top hinge Type discharge door is held horizontally
against gravity by 79 C. fusible link in Case of re,
fusible link melts and re door closes the upward
path of chute restricting heat transfer mainly used
in Linen Chutes.
GARBAGE
TROLLEY
WATER
SOURCE
Chute Cleaning
WEATHER

•Cleaning of the chute from inside is very important procedure to


KAUL
SANITATION
EXHAUST UNIT

maintain hygiene.
ROOF FAN
SLAB

For cleaning chute we provide Two options


CPVC
PIPES

DOOR
FRAME

1. Normal Cleaning
• This Cleaning has been done by normal water coming from
STRUCTURAL
overhead water tank and it is operated and controlled by
electrically operated valve, This valve is tted at top of chute
BRACKET
FLOOR SLAB

DIA,OF CHUTE

SPRINKLER
and outlet of water tank. this system operated on manual mode
as well as automatic modealso.
HEAD

INTAKE
DOOR

2. Disinfecting and Sanitizing unit


• This cleaning has been done by normal water with disinfectants
FLOOR
SLAB
and it is added in line by Motorized Pump. This system is
DISCHARGE
operated and controlled by electrically control panel. This unit is
installed at roof level. This system operated on manual mode as
DOOR
CONTROL
PANEL

GARBAGE
TROLLEY well as automatic mode also.
GROUND
FLOOR

General requirments for chute installation at site


Required Minimum Duct Size for Installation
CHUTE DIAMETRE DUCT SIZE / SLAB OPENING
450mm 600mm x 600mm
600mm 750mm x 750mm
750mm 900mm x 900mm

•Front well shall be constructed after the erection of Chute.


•Provide proper single phase power point with earthling for
control panel in Garbage Room.
• Provide prede ned water connection with isolation valve.
•Provide 1” wet riser from re protection system for total building
height inside.
•Chute duct (OPTIONAL)

Material of construction
• Room shall be air tight non ventilated room.
• No windows or louvers shall be provide in room.
• Provide wall tiles (min. 1.8mtr. high) & oor tiles.
• Floor to have proper slope with drainage.
•Provide proper single phase power point with suf cient Lighting
arrangement in Garbage Room.
• Provide outside opening ush door to garbage room.
• Chute duct slab to be closed in garbage room after installation
of chute.
Garbage Room Sizes Required
TYPE OF CHUTE SIZE OF GARBAGE ROOM
- L W H
STANDARD CHUTE 1500mm 1500mm 2500mm
SEGREGATION CHUTE 2100mm 1500mm 2500mm
ELECTRICAL VENT PIPE
VALVE WITH

SANITATION

EXHAUST FAN

R.L.

CLEANING
SPRINKLER

HOPPER WITH
INTAKE DOOR INTAKEDOOR

MOUNTING
BRACKET
F.L.

900MM
F.L.

DISCHARGE
DOOR

CONTRLPANEL GARBAG GARBAG GARBAG


E E E
TROLLEY TROLLEY TROLLEY

GARBAGEROOM
Segregation System
As per Municipal norms segregation of “DRY”(Recycling)& “WET”
(Biodegradable) garbage is required and shall be collected in
separate collection Bins.
We provide facilitates to segregate and collection of garbage by
using one chute.
It is fully automatic and one user at a time.

•Press any button “DRY” or “WET”

• Busy indicator and hoppers remain locked for all other oors.

• Chute converts to respective mode “DRY” or “WET” by rotatiw


ap door in the garbage room.

• Operated hopper unlocked with indication of selected garbage.

•Open hopper manually & drop respective garbage bag.


This bag goes to appropriate trolley.

•Auto closing hopper resets the system for next use.


Total change over time of 10 seconds.

WET
GARBAG DRY WET
GARBAG DRY
TROLLEY
E TROLLEY
E