NEIGHBOURHOOD

PLANNING PROPOSAL
Planning studio-I (CE 637)
2009-10
CONTENTS
 Introduction
 Neighbourhood theory
 T.C.P.O. Norms
 Design approach
 Site features and analysis
 Development of proposal
 Estimate of neighbourhood proposal
 Conclusion
INTRODUCTION

•This assignment of planning is an attempt to help neighbourhoods to


assess their strengths; identify their vision of a vibrant community.

•The developed environment in this project demonstrates how integrating


social, cultural, economic and environmental objectives can create
alternative urban experiences that would not otherwise be achieved under
current planning policies.

Overview of the problem

Aim: To prepare a Neighbourhood plan for a part of city in order to give


it the best possible benefits.
LOCATIONAL FEATURES

Located in a coastal region in western India.


Well connected with Railways, Roads and Air transportation.
Annual rainfall 45 to 50 inches.
Temperature ranging from 22 to 40 degree Celsius.
High humidity.
Black cotton soil throughout the city.
The city has a major perennial river as water source.

ECONOMICAL FEATURE

Major business center on western India corridor.


Major textile industries center.
Major diamond business center.
Major center for basic industries.
Having well defined Industrial Corporation.
ECONOMICAL PROFILE
Total population = 8500
INCOME GROUP (%) INCOME FAMILY SIZE

Economical weaker 20 5000 5


section
Lower income group 30 5000 - 5
8000
Lower middle income 25 8000 - 4.5
group 13000
Upper middle income 15 13000 - 4.2
group 18000
Higher income group 10 18000 - 4
25000
CITY DEVELOPMENT FEATURES

Total city area is 300 sq. km.


The city is divided in CBD and NONCBD areas
The development in last two decades in the form of town planning schemes.

SITE

Area 50 to 70 hectors
Distance from central zone 7 to 9 km.
Distance from industrial area 4 to 5 km.
Distance from railway and city bus stand 10 to 12 km.
Located in western part of the city.
Land price approximate 3000 to 4000 per sq. mt
Road linkage – well connected with majority activity areas and industrial areas
having facilities for mass urban transportation.
OBJECTIVES OF PROBLEM

To conduct field study for data collection and analysis through site visit.
To prepare neighborhood layout alternatives to identify the
implementable option.
To prepare proposals for residential as well as public buildings to select
best solution.
To design cluster level and neighborhood level open space.
To prepare estimate for proposed neighborhood.
NEIGHBOURHOOD PLANNING

The concept of neighborhood unit was evolved due to the advent of


industrial revolution and degradation of the city environment caused due
to high congestion, heavy traffic movement through the city, insecurity to
school going children, distant location of shopping and recreation
activities, etc.

Planning a town with the smallest unit, which can stimulate the community
life and a sense of neighborhood among the inhabitants, is called the
Neighborhood unit. Purpose of neighborhood planning is to provide
opportunities to people for social cohesiveness.
The main objectives of Neighborhood planning.

To create social contacts and physical unity between families and
community.
To make the people socialize with one and another.
To provide a better environment with respect to beauty, health and
convenience.
To provide the basic day - to - day requirements to inhabitants.
To make the provision for life without friction.
To enhance the feelings of neighborliness
To enable the inhabitants to share the public amenities and recreational
facilities.
To support a safe and healthy environment within the neighborhood.
To provide safety and efficiency to road users and pedestrians.
To provide adequate parking facility for residents as well as visitors.
To support a local commercial Centre that maintains the
neighborhood character.
To maintain, enhance, and improve area for recreational activities.
To improve walking opportunities and ensure safe and pleasant
pedestrian use of recreational areas.

ELEMENTS OF NEIGHBOURHOOD

School
Shopping facilities
Community centre
Medical facilities
Parking and open spaces
Neighbouring landscape
T.C.P.O NORMS
Density Distribution

sr. Type medium density high density


no. (ppha) (ppha)

i. Neighborhood density 250 – 300 550 – 800

ii. Sector density 175 – 200 550 – 750

iii. Town density 125 – 175 250 – 400


Land Use structure for Neighborhood (Population 4000)

Sr. No. LAND USE NEIGHBOURHOOD


LEVEL (%)

i. Residential 60 – 65
ii. Commercial 01 – 03
iii. Light industries Nil
iv. Public / Semi public 10 – 12
v. Circulation 13 – 15
vi. Recreation 10 – 12
DESIGN APPROACH
PRIMARY DESIGN OBJECTIVES

•Walk ability
•Variety
•Place making
•Conservation
•Connectivity
•Transit supportive
•Safety
•Balance
•Livability
Steps Involved To Develop The Proposal

Step1:
Decision regarding area
Visit to the site
Survey of the site and surrounding area
Trend analysis

Step 2:
Conceptual drawing
Comparison of the conceptual layouts (options prepared by each member
of the group)
Finding positive and negative issues and points of each layout.
Preparation of final conceptual layout
Step3:
Calculation of areas of each income group (EWS, LIG, LMIG,
UMIG, HIG)
Area requirement table formulation.
Layout to get built up area of each income group
Norms for NB planning study
Development over conceptual layout based on software.

Step4:
Preparation of landscape layout
Estimation of the individual units.
Preparation of service drawings
Street landscaping-
Preparation of the cross sectional elevation through the site.

Step 5:
Total cost of the project (estimation)
SITE STUDY
The site is situated in the west
zone of Surat city. It is under
T.P. scheme no. 46.
Ramnagar is the closest
junction which is around 4 km
and most developed.
There is state highway which
connects site to the Surat city
from its western side.
There is 9 m wide road on the
northern edge of the site which
is proposed as a 60 m wide ring
road.
Tapi River is flowing on the
eastern side of the site.
Neighbourhood Land Proposed Ring Road

Adjoining River bank High-rise Development nearby site


The area of site is 474351 sqm. There are very few plantations or any
type of vegetation on the site it is almost barren land.

There are few residence near jahangirpura junction like houses of workers.
They have to depend on commercial area of Ramnagar junction for their
daily needs. Hence we arrive at decision that neighborhood planning is
feasible on this site.
SURVEY ANALYSIS

15% Building types


8% 39%
row house
duplex
23% high rise
15%
LAND USE
SH OWING LAND USE FEATURES FEATURES

ASHARAM ASHRAM

D
STAN
BUS-
AT
SUR
TO
127

TIMBER HOUSE

IAV
VAR
TO
IAV
VAR
TO
TRA
KSHE
tra KURU
kshe
kuru
y to
wa

AT
SUR
TO

B.NO.20/P
HARIOM ASHRAM

B.NO.19
HARIJANVAS

RAMMADHI ASHRAM
D
BUN

B.NO.8
ISCON TEMPLE

HALPATIVAS
D
BUN

B.NO.1

JAHANGIRPURA GROUP CO-OP-COTTON MILL


LAND USE STRUCTURE

SR. USE AREA IN AREA (%)


NO. SQM.

1. Open spaces 57575 12.13


2. Public spaces 3287 6.9
3. Commercial 10245 2.2
4. Road 81449 20.84
5. Residential 292212 61.6
Conceptual Drawings
Conceptual Drawings
Conceptual Skyline
Final Conceptual Drawing

The proposal is worked out based on the basic principle of Neighbourhood planning
where the psychological and sociological aspects of the expected occupants are
considered.
The school has been centrally located in order that the children can approach the
school from their respective homes without the fear of accidents and the intrusion of the
vehicular movement.
The clusters for the dwelling units have been placed around the courtyards so that it
provides the environment and space to develop maximum contacts within the families.
Types of Buildings for Different Groups

SR.NO. GROUPS TYPE OF Plot Area in


BUILDINGS Sqm.

1. HIG Bunglow 440


Low Rise 360

2. UMIG Duplex 389


Low Rise 140

3. LMIG Low Rise 92


4. LIG Row House 75
Low Rise 70

5. EWS Low Rise 65


45.18
50.12
66
105
HIG
220 Sq.m.
HIG (LOW RISE)
190 Sq.m.
Material Proposed

 Building materials that include roof and overhangs, entry porches,


verandahs, balconies and terraces: materials, finishes, fixtures, patterns,
fenestrations, colors and detailing: the location and proportion of openings.
Materials used for the building units are basic materials like bricks, RCC,
wood, aluminum frames for doors and windows, glass, etc.

Public Buildings

 Civic center
 School and playground
 Shopping center

Roads

 Roads should be located in such a way that all public and residential
buildings are at a walk able distances. Major roads of (15, 12 m) and minor
roads of (7.5m) are provided.
STREETSCAPE
Cost Assumption
Sr. No. Item Construction
cost per Sqm

1. HIG Sr. No. Item Cost per Sqm


Bunglow 7500
1. Land 4000
Low-Rise 7500
2. Roads (15 m) 825.0
2. UMIG
3. Roads (12m) 800.0
Duplex 5000
4. Roads (7.5 m) 750.0
Low-Rise 5000
5. Roads (6m) 750.0
3. LMIG
Low-Rise 4500
6. Walkway (3m) 600.0

4. LIG
Row House 3500
Low-Rise 3500
5. EWS
Tenement 3500
Estimation of Residential Buildings
SR Building Built Cost Total Plot Land Total Total No. of Total cost
NO. type up of const. area in cost land cost units in lacs
area const. cost in Sqm per cost in per
in per lacs Sqm lacs unit in
Sqm Sqm lacs
1. HIG
Bunglow 220 7500 16.5 440 4000 17.6 34.1 85 2898.5
Low-Rise 190 7500 14.25 200 4000 8.0 22.25 120 2670
2. UMIG
Duplex 105 5000 5.25 389.0 4000 7.78 13.03 162 2110.86
Low- Rise 66 5000 3.3 112 4000 4.48 7.78 144 1120.32
3. LMIG
Low-Rise 55 4500 2.47 80 4000 3.2 5.67 528 2993.76
4 LIG
Low-Rise 45.18 3500 1.58 72.27 4000 2.89 4.47 216 965.52
Row 50.12 3500 1.75 95.4 4000 3.82 5.57 315 1754.55
House
5. EWS
Tenement 37.21 3500 1.30 65.33 4000 2.61 3.91 352 1376.32
Total 15889.83
Estimation of Public Buildings

Area in Construction Total In


No Description
SqMt. Cost Lacs

1 School 3902 6000 774.84


2 Civic Centre 4110 6000 246.60
3 Commercial 10245 6000 625.47
4 Local shops 1000 6000 60.0
5 Recreational Space 10184.7 6000 731.08
Total 2438
Estimation of Roads
Excavating the ground up to 475mm; Ramming, Leveling and re-filling the
excavating part into three layers.

• 150mm sand cushion filling.


• 250mm rubble soling layer.
• 50mm W.B.M. layer.
• 25mm carpeting with 18mm thick seal coat.

Road Width Cost in Rs. / Cost of Road In


Area in sq. mt.
in mt. sq. mt. lacs.

15mt 10225.95 825.00 84.36


12mt 17436.64 800.00 139.49
7.5mt 52499.72 750.00 393.75
6mt 1659.06 750.00 12.45
3mt 937.59 600.00 5.6
Total 635.65
Development Cost for Water Supply

Running Cost / Cost of Water


TYPE
mt. Rmt Supply in lacs.

Main Pipe: 300mm Ø 798.1 3000 29.95


Subsidiary Pipe: 150
7324.3 1500 109.87
mmØ
Total 139.82

Development of Drainage Service


Cost of
Length In
Type Cost / R.mt. Drainage In
Mt.
lacs.
Main Pipe: 450mm Ø 798.1 700 5.52
Subsidiary Pipe: 300
7324.3 400 29.30
mm Ø
Total 34.89
Gas line connection Cost

Nos. of Gas Line


Total Cost Of
No. Dwelling Costs Per
Gas line Rs.
Units Unit

1 1928 15000 289.2

Telephone connection Cost

Cost Of
Nos. of Telephone
Telephone
No. Dwelling Connection
Connection
Units Per Unit
Rs.

1 1928 500 9.64


Cable connection Cost

Nos. of Cable
Cost Of Cable
No. Dwelling Connection Per
Connection Rs.
Units Unit

1 1928 500 9.64

Development Cost for Street Light


 Erecting the MS – steel pole with concrete foundation having Tube Light; the
height of poles being 7.5mt with a spacing of 25mt and 5mt with a spacing of 25mt.
Sr. Particulars. No. of Cost in Cost of
No. Poles. Rs. / Street
Pole. Lighting Rs
in lacs.
1 Road width (15, 12, 525 11,000 57.75
7.5,3 Mts.)
Total Cost 57.75
Development of Common Open Plot

Cost in
Sr. Area in
Open Space. Rs. / sq. Cost in lacs.
No. sq. mt.
mt.
Open space in public
1 74450 300 226.35
garden
Total 226.35

Estimation of compound wall


Sr. Item Length of Cost per Cost in lacs
no. wall in m running meter

1. Compound 2929.6 3000 87.88


wall
Total 87.88
Total Project Cost

Description Total cost of individual in lacs

Residential buildings 15889.93

Public buildings 2438

Infrastructure 1198.2

Open space 226.35

Compound wall 117.88

Land cost 8916.3

Total 28786.66
Total Project Cost
Conclusion

Perfection is something constantly striven for yet rarely


achieved. All we can do is try our hardest and learn from the
experience. The project on Neighbourhood planning is done to
an extent that it can be used as a guideline for future
development of Jahangirpura. This project gave an experience
of several shortcomings which can be diluted only with further
innovative thoughts and practical experience. The
neighbourhood project proposed is a systematic approach from
its conceptual layout to the final design and estimate.
THANK YOU