Final
Final
Final
PLANNING PROPOSAL
Planning studio-I (CE 637)
2009-10
CONTENTS
Introduction
Neighbourhood theory
T.C.P.O. Norms
Design approach
Site features and analysis
Development of proposal
Estimate of neighbourhood proposal
Conclusion
INTRODUCTION
ECONOMICAL FEATURE
SITE
Area 50 to 70 hectors
Distance from central zone 7 to 9 km.
Distance from industrial area 4 to 5 km.
Distance from railway and city bus stand 10 to 12 km.
Located in western part of the city.
Land price approximate 3000 to 4000 per sq. mt
Road linkage – well connected with majority activity areas and industrial areas
having facilities for mass urban transportation.
OBJECTIVES OF PROBLEM
To conduct field study for data collection and analysis through site visit.
To prepare neighborhood layout alternatives to identify the
implementable option.
To prepare proposals for residential as well as public buildings to select
best solution.
To design cluster level and neighborhood level open space.
To prepare estimate for proposed neighborhood.
NEIGHBOURHOOD PLANNING
Planning a town with the smallest unit, which can stimulate the community
life and a sense of neighborhood among the inhabitants, is called the
Neighborhood unit. Purpose of neighborhood planning is to provide
opportunities to people for social cohesiveness.
The main objectives of Neighborhood planning.
To create social contacts and physical unity between families and
community.
To make the people socialize with one and another.
To provide a better environment with respect to beauty, health and
convenience.
To provide the basic day - to - day requirements to inhabitants.
To make the provision for life without friction.
To enhance the feelings of neighborliness
To enable the inhabitants to share the public amenities and recreational
facilities.
To support a safe and healthy environment within the neighborhood.
To provide safety and efficiency to road users and pedestrians.
To provide adequate parking facility for residents as well as visitors.
To support a local commercial Centre that maintains the
neighborhood character.
To maintain, enhance, and improve area for recreational activities.
To improve walking opportunities and ensure safe and pleasant
pedestrian use of recreational areas.
ELEMENTS OF NEIGHBOURHOOD
School
Shopping facilities
Community centre
Medical facilities
Parking and open spaces
Neighbouring landscape
T.C.P.O NORMS
Density Distribution
i. Residential 60 – 65
ii. Commercial 01 – 03
iii. Light industries Nil
iv. Public / Semi public 10 – 12
v. Circulation 13 – 15
vi. Recreation 10 – 12
DESIGN APPROACH
PRIMARY DESIGN OBJECTIVES
•Walk ability
•Variety
•Place making
•Conservation
•Connectivity
•Transit supportive
•Safety
•Balance
•Livability
Steps Involved To Develop The Proposal
Step1:
Decision regarding area
Visit to the site
Survey of the site and surrounding area
Trend analysis
Step 2:
Conceptual drawing
Comparison of the conceptual layouts (options prepared by each member
of the group)
Finding positive and negative issues and points of each layout.
Preparation of final conceptual layout
Step3:
Calculation of areas of each income group (EWS, LIG, LMIG,
UMIG, HIG)
Area requirement table formulation.
Layout to get built up area of each income group
Norms for NB planning study
Development over conceptual layout based on software.
Step4:
Preparation of landscape layout
Estimation of the individual units.
Preparation of service drawings
Street landscaping-
Preparation of the cross sectional elevation through the site.
Step 5:
Total cost of the project (estimation)
SITE STUDY
The site is situated in the west
zone of Surat city. It is under
T.P. scheme no. 46.
Ramnagar is the closest
junction which is around 4 km
and most developed.
There is state highway which
connects site to the Surat city
from its western side.
There is 9 m wide road on the
northern edge of the site which
is proposed as a 60 m wide ring
road.
Tapi River is flowing on the
eastern side of the site.
Neighbourhood Land Proposed Ring Road
There are few residence near jahangirpura junction like houses of workers.
They have to depend on commercial area of Ramnagar junction for their
daily needs. Hence we arrive at decision that neighborhood planning is
feasible on this site.
SURVEY ANALYSIS
ASHARAM ASHRAM
D
STAN
BUS-
AT
SUR
TO
127
TIMBER HOUSE
IAV
VAR
TO
IAV
VAR
TO
TRA
KSHE
tra KURU
kshe
kuru
y to
wa
AT
SUR
TO
B.NO.20/P
HARIOM ASHRAM
B.NO.19
HARIJANVAS
RAMMADHI ASHRAM
D
BUN
B.NO.8
ISCON TEMPLE
HALPATIVAS
D
BUN
B.NO.1
The proposal is worked out based on the basic principle of Neighbourhood planning
where the psychological and sociological aspects of the expected occupants are
considered.
The school has been centrally located in order that the children can approach the
school from their respective homes without the fear of accidents and the intrusion of the
vehicular movement.
The clusters for the dwelling units have been placed around the courtyards so that it
provides the environment and space to develop maximum contacts within the families.
Types of Buildings for Different Groups
Public Buildings
Civic center
School and playground
Shopping center
Roads
Roads should be located in such a way that all public and residential
buildings are at a walk able distances. Major roads of (15, 12 m) and minor
roads of (7.5m) are provided.
STREETSCAPE
Cost Assumption
Sr. No. Item Construction
cost per Sqm
4. LIG
Row House 3500
Low-Rise 3500
5. EWS
Tenement 3500
Estimation of Residential Buildings
SR Building Built Cost Total Plot Land Total Total No. of Total cost
NO. type up of const. area in cost land cost units in lacs
area const. cost in Sqm per cost in per
in per lacs Sqm lacs unit in
Sqm Sqm lacs
1. HIG
Bunglow 220 7500 16.5 440 4000 17.6 34.1 85 2898.5
Low-Rise 190 7500 14.25 200 4000 8.0 22.25 120 2670
2. UMIG
Duplex 105 5000 5.25 389.0 4000 7.78 13.03 162 2110.86
Low- Rise 66 5000 3.3 112 4000 4.48 7.78 144 1120.32
3. LMIG
Low-Rise 55 4500 2.47 80 4000 3.2 5.67 528 2993.76
4 LIG
Low-Rise 45.18 3500 1.58 72.27 4000 2.89 4.47 216 965.52
Row 50.12 3500 1.75 95.4 4000 3.82 5.57 315 1754.55
House
5. EWS
Tenement 37.21 3500 1.30 65.33 4000 2.61 3.91 352 1376.32
Total 15889.83
Estimation of Public Buildings
Cost Of
Nos. of Telephone
Telephone
No. Dwelling Connection
Connection
Units Per Unit
Rs.
Nos. of Cable
Cost Of Cable
No. Dwelling Connection Per
Connection Rs.
Units Unit
Cost in
Sr. Area in
Open Space. Rs. / sq. Cost in lacs.
No. sq. mt.
mt.
Open space in public
1 74450 300 226.35
garden
Total 226.35
Infrastructure 1198.2
Total 28786.66
Total Project Cost
Conclusion