Bty Charger 5.6KW
Bty Charger 5.6KW
Bty Charger 5.6KW
TS1
ARM
IL2
0- 230V
TR
45-50-
1 2 3 4 5 6 7
55HZ
230V
B
AVRSR-7/3
XX U2 SC1 SC2
Y HR V1 F
IL1
X FS
U1
100K S2
U2 X PTO
X
1 MFD R1 4A FS 5
SUPPRESOR
S2 MCB
HR HOUR COUNTER SC4
POWER TERMINAL
IL1- GEN RUN LAMP 10Ω/
IL2 – SUP ON LAMP 25 W
TS1- TOGGLE SW
ENGINE CONTROL CIRCUIT DIAGRAM OF 5.6KW BTY CHARGING SET
8 STP TS2
7
FOS
HOOTER
6 STP SHUNT
SOLENOID
STPE
BTY STARTER
STRE
5
STPE A
35A STR SO
4
+ SC3
FST
- 3
HCTS TS3
2
LOP SW
0-15A FS 4
BTY CHG BTY CHG
0-25A FS 3
BTY CHG
0-25A FS 5
0-150V A 0-150V
A A 0-150V
V2 V2
V2
RES-2
RES-1
RES-3
C4
R1 R2 C3 R3 R4
C1 C2 C5 R5 C6 R6
OFF OFF OFF OFF OFF
OFF
132V
150V
110V
90V
72V
54V
18V
36V
115
36V
54V
132V
9V
110V
150V
72V
18V
9V
90V
115
0V
A2 A2
A1 A1
A3
A3 OFF OFF OFF
OFF OFF OFF
S3 S4 S4 S5 S5
S3
220V AC INPUT
FLANG PLUG
SWITCH BOARDS
GENEREAL :
1. ENSURE THAT THE INSTRUMENTS, METERS,
FUSES, TERMINALS, SWITCHES & PLUGS ETC. HAVE NOT
SUFFERED BY DAMAGE. TIGHTEN THEN IF NECESSARY.
2. ENSURE THAT MECHANICAL OPEN OF
SWITCHES KNOBS, PUSH BUTTONS ETC. IS SATISFACTORY.
3. ENSURE THAT ALL ELECTRICAL
CONNECTIONS ARE TIGHT.
4. ENSURE THAT ALL INSTRUMENTS ARE
FUNCTIONING AS PER SPECIFICATION.
5. ENSURE THAT THE SWITCH BOARDS WITH
STAND WITHOUT ANY BREAK DOWN OR DAMAGE TO THE
RECOMMENDED SPECIFICATIONS.
LIMITS FOR SAFE OPERATION :
OVER SPEED : 20% FOR 50HZ (1800 RPM)
OVER LOAD : 110% OF RATED VALUE FOR ONE HR. AT THE INTERVAL
OF EVERY SIX HOUR.
ELECTRICAL FEATURES :
CLASS ‘H’ INSULATION AS STANDARD.
MOTOR STARTING CAPABILITY : THE ALTERNATOR IS CAPABLE TO
START 1.0 HP INDUCTION MOTOR FOR ATS EACH KVA RATING WITH DOL.
MOTOR STARTING APPLICABLE FOR ONLY FOR S1 DUTY.