Mini-Link 6366 Outdoor Unit Commissioning Guide

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 52
At a glance
Powered by AI
The document outlines the commissioning process for the Mini-Link 6366 Outdoor Unit including initial setup, configuration of basic network elements, protocols, radio links, ethernet, QoS and security.

The steps to perform initial setup are to start the node, wait for the LEDs to stabilize, login via the default IP 192.168.0.1 using the admin_user credentials, and configure the basic network elements.

The user roles are admin_user, control_user, oper_user, and view_user with default passwords of ericsson for each.

Click icon to add a bright image

Mini-Link
6366 Outdoor Unit
Commissioning Guide
Contents
1. Overview.
2. Prerequisites.
3. Node Commissioning.
i. Performing an Initial Setup
ii. Configuring Basic NE
iii. Protocol Settings
iv. Configuring FTP Manager
v. Performing Software Upgrade
vi. Backup and Restore
vii. Managing Licenses
viii. Security
ix. Configuring Radio Link
x. Configuring ETHERNET
xi. Configuring QoS
xii. Configuring 1588 PTP Sync

2019-03-19 | | Page 2
Mini-Link 6366/4 Hardware Overview
HW IP 66
291 x 310 x 70 mm (H x W x D), High density outdoor connectors
Usability Simple installation with respect to outdoor connectors and small box
Interfaces 1 x -48V (power i/f)
1 x RJ-45, 100/1000 BASE-T (O&M i/f)
1 x RJ-45, 100/1000 BASE-T (Traffic i/f)
2 x SFP/SFP+ 1000/2500 BASE-X (Traffic i/f)

Traffic (o)
Traffic (e)

Earthing (o)
Traffic (o)
O&M (e)

RA 1

RA 2
-48V

2019-03-19 | | Page 3
Prerequisites
This section includes information about required preparation before performing an initial setup.
• Node Planning data Required before commissioning (DCN/LB/Traffic routing)
• Baseline Software
• Login Cable (LAN)
• Windows Laptop with LAN support, make sure Firewall and Antivirus are disabled.
• FTP server (Filezilla or BFTP) required for Software Upgrade.
• License
Note: To perform some tasks, for example, to set the general NE parameters such as name, IP address, date, and time, the
user must have the admin_user privilege to the NE for First time commissioning.

User Role User Type Default Password


System Admin admin_user ericsson
Network Admin control_user ericsson
Operator oper_user ericsson
Guest view_user ericsson
Login using internet explorer, via WEB GUI use default 192.168.0.1 for first time login
2019-03-19 | | Page 4
Performing an Initial Setup
Start the node and wait for a few minutes until the Red LED off and the Green LED stable on the node . Login via
LAN cable and open Internet Explorer for WEB GUI login, Initial IP is 192.168.0.1 . Use User: admin_user and
Password: ericsson for initial setup

2019-03-19 | | Page 5
First Login Page

2019-03-19 | | Page 6
Basic NE Configuration
Path: Unit MINI-LINK 6366/4  Configure  Basic NE

2019-03-19 | | Page 7
Basic NE Configuration

We can configure below parameter under Configure basic NE window


• NE name (NE ID)
• NE location,
• NE contact,
• IPV4 management address,
• IPV6 management address,
• Select Time zone
• Configure NTP server
• Configure Date & Time.

2019-03-19 | | Page 8
Protocol Settings
Path: Unit MINI-LINK 6366/4  Security  Protocol Settings

2019-03-19 | | Page 9
Protocol Settings
Enable SNMP V1/V2 write access & extended read access by checking SNMP permissions as shown in
picture.

2019-03-19 | | Page 10
Protocol Settings
Additional setting like CLI protocol can be used Default FTP protocol can be used as FTP or SFTP
with telnet and SSH

2019-03-19 | | Page 11
Configuring FTP Manager
Configuring FTP Manager
Path Unit  MINI-LINK 6366/4  Tools  FTP Manager

2019-03-19 | | Page 12
Configuring FTP Manager
After opening FTP manager add new FTP Server, give laptop IP address as server Ip address and configure
username and password same as configured in FileZilla server & save details

2019-03-19 | | Page 13
Configuring FTP Manager
Note: After starting FTP Server as shown in snap shot, it should come OK.

2019-03-19 | | Page 14
Performing Software Upgrade
Path: Unit MINI-LINK 6366/4  Tools  Software Upgrade
To check current SW version

2019-03-19 | | Page 15
Start SW Upgrade: After starting FTP server follow below mentioned path
Unit  MINI-LINK 6366/4  Tools  Software Upgrade
Select the SW package you want to upgrade, refer picture attached below. After selecting package, click Next.

2019-03-19 | | Page 16
After Selecting desired choices Node will show summary
After selecting Package select process how you want
about choices made, if all choices are as per our
to activate and confirm Software Upgrade. After
requirement, select Start Upgrade option or Back option
selecting your choice click next.
to correct choices.

2019-03-19 | | Page 17
After completion of SW download node will ask for Activation of New Package. You can
Activate package by selecting Activate Upgrade tab.

2019-03-19 | | Page 18
After activation of SW package node will take After Activation of SW, node will ask for Confirmation.
Select “Yes” to activate new Software package or “No”
restart option to revert on Old package in case of any issues

2019-03-19 | | Page 19
After Confirmation node will show successful upgrade of new Software package.

2019-03-19 | | Page 20
Backup and Restore
For Backup
Unit  MINI-LINK 6366/4  Configure  Restore/Backup configuration
You can Backup your configurations . You can download locally through NE or with FTP through EMS.

2019-03-19 | | Page 21
After this click on Backup, after clicking you will get option to save
configuration, save it to your desired folder

2019-03-19 | | Page 22
For Restore
Unit  MINI-LINK 6366/4  Configure  Restore/Backup configuration
You can restore configuration from previous running configurations . You can upload locally
through NE or with FTP through EMS.
Click on Browse option and select configuration file which you want to restore by clicking ‘Open’

2019-03-19 | | Page 23
When file will be uploaded it will show you the revesion which are going be loaded. If you want the
same file to be loaded press ‘Save’.
After saving Node will ask for your final confirmation, press ‘Yes’ to confirm.
Node will restart, after restart configurations will be modified as per configuration file loaded by us.

2019-03-19 | | Page 24
License
To check status of License
Unit  MINI-LINK 6366/4  Tools  License  License overview

2019-03-19 | | Page 25
Create License Request for features as per planning, select Create License Request
Path: Unit  MINI-LINK 6366/4  Tools  License  Create License Request

2019-03-19 | | Page 26
You can download the file for license required using FTP through EMS or locally through NE. Share the
downloaded file with Backend team to generate License as per requirement

2019-03-19 | | Page 27
For Installing License select Install license option, choose file which you want to install, you can
upload license using FTP through EMS or locally through NE
Path: Unit  MINI-LINK 6366/4  Tools  License  Install licenses

2019-03-19 | | Page 28
After clicking on choose file you will get option to select file, select license file
you want to upload and after selecting click ‘Open’
After clicking ‘Open’, node will start installing license

2019-03-19 | | Page 29
Security
Unit  MINI-LINK 6366/4  Security  Local user password
There are four default users:
admin_user, control_user, oper_user & view_user
We can change passwords for all the users as per planning.

2019-03-19 | | Page 30
Configuring Radio Link
Path: Radio  Radio links  configure  radio link terminal

2019-03-19 | | Page 31
Configuring Radio Link
Configure Terminal id, far end expected Terminal id & Mode we want to use, refer snapshot

2019-03-19 | | Page 32
Configuring Radio Link
Configure Carrier Termination 1/1/1 (CT1/1/1) as per design team, Select CT1/1/1 and configure channel spacing, configure Max
& Min modulation, Reference SEC , Carrier Id, Polarization, Tx and Rx Frequency, Max and Min power & turn on the transmitter.
For ATPC: Configure Minimum Power, Maximum Power & Target Input power as per design team

2019-03-19 | | Page 33
Configuring Radio Link
In Advanced configuration, configure RF input power alarm threshold and BER alarm threshold, select Auto
removal of loops. Using reset buttons, you can reset CT configuration.
Same procedure will apply for CT-2

2019-03-19 | | Page 34
Configuring Radio Link
XPIC enable.

2019-03-19 | | Page 35
Configuring ETHERNET
Configure LAN & WAN port Unit SFP  LAN 1/0/5 Configure  General

2019-03-19 | | Page 36
Configuring ETHERNET

Unit Link Name WAN 1/1/1  Configure General

2019-03-19 | | Page 37
Configuring ETHERNET
Configure VLAN Packet Ethernet  Configure  VLAN

2019-03-19 | | Page 38
Configuring QoS
Packet  LAN Interfaces  LAN 1/0/5  Configure  Interface QoS

2019-03-19 | | Page 39
After selecting Trusted priority, link will be created open link to map user priority.

2019-03-19 | | Page 40
After this create bandwidth profile

2019-03-19 | | Page 41
After this assign profile to the traffic port, select UNI + User priority

2019-03-19 | | Page 42
 Open the Link with Traffic port policing.

2019-03-19 | | Page 43
 Map User priority

2019-03-19 | | Page 44
After this configure QoS on Ethernet Packet  Ethernet  Configure  QoS
Select Network priority to user mapping as user defined

2019-03-19 | | Page 45
Configure Scheduling profile

2019-03-19 | | Page 46
Create new scheduling profile as per planning

2019-03-19 | | Page 47
Edit parameters of scheduling profile as per plan

2019-03-19 | | Page 48
After configuring scheduler select that scheduling profile

2019-03-19 | | Page 49
 Change Network priority mapping as per plan . To change Network priority mapping select
User defined network priority mapping.

2019-03-19 | | Page 50
 Change Network priority mapping as per plan

2019-03-19 | | Page 51
Thank you

2019-03-19 | | Page 52