Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Sustainable Solid Waste Management System

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 17

Sustainable solid Waste Management System

In Dhaka City
The current method of Solid Waste Management practices in Dhaka city

Non-segregated manner DCC collects wastes from-


Primary community bins • Secondary Disposal Sites
Collection Collection through vans • Transfer stations
Payment basis • Handover Points

City authority transfers the wastes to the Ultimate Disposal


Sites from SDS
Transportation
Garbage Trucks & Carriers
USD owned by Dhaka City Corporation

Filling low lying lands by wastes


Final Disposal Dressing & compaction of dumping sites
Bull-Dodger Tire-Dodger Pay-Loader Excavators

Mobile purchasers Compost


Recycling Scavengers Plastic factories
Recycle waste dealer
Domestic
Wastes
Demolition Commercial Wastes
Waste a Waste

7%
Street Industrial Residential
Sweeping Wastes Waste 24%
Commercial
Industrial
48% Clinical

21%

Construction Clinical
Waste Waste
Institutional
Waste
Segregated Wastes

1. Veg & fruits peels 1. Polythene bags 1. Tetra packs of


2. Egg shells 2. Disposable plastic beverages milk, juice
3. Leftover food cutlery, cups, plates 2. Soap, shampoo,
4. Newspaper 3. Cosmetic products detergent bottles
5. Magazines tubes 3. Glass bottles
6. Paper bags 4. Aluminum foil 4. Food & beverage
7. Paper towel 5. Sanitary pads containers
8. Tissue Paper 5. Toys
6. Cardboards
Relevant Stakeholders
Keep waste management in priority
Municipalities

Lead the ‘Clean City’


campaign & work in Keep waste management
Politicians City planners in mind while developing
unison towards the
interest of a Clean city city plans

Follow the requirements Ensure that the waste is


Hospitals Vendors
bio-medical rules properly put in a nearby
garbage bin

Public
Practice source reduction
& source segregation
Initiatives already adopted & their proceedings

Initiatives

1. Formulating a master 3R (Reduce, Reuse,


plan of Dhaka City Recycle) can play a
Japan 3R Strategy
International vital role to protect the
2. Developing by Department of
Cooperation environment from
capabilities and Environment (DoE)
Agency (JICA) & Ministry of greenhouse gas
management skills of emission & convert
Environment and
the Dhaka City in 2005 waste into invaluable
Forestry of the
Corporation Govt. in 2010 resources
Loopholes

Lack of Insufficient Inadequate


institutional financial waste
arrangement resources collection

Absence of by- Lack of


Lack of source
laws and awareness
separation
standards among citizens

Lack of
Organic waste Emission of
partnership
is left Greenhouse
between
unutilized Gas
stakeholders
Negative effects of illegally dumped rubbish
Only 40-50% of the solid waste produced is collected by DCC

The uncollected waste is primarily dumped illegally in the


Neighborhood’s streets
Wastewater drains
Ponds
Lakes etc

Problems

Uncollected waste has been recognized as


the root of inferior environment such as

Scattered Offensive Drain Water Flies & Unsanitary Health Water-


garbage odor clogging pollution Mosquitoes conditions hazards logging
Our Plan
1.Large number of dustbin must be
provided to enable proper collection
1.Glass, aluminum, tin, paper can be of solid wastes according to
easily recycled. So these things categories
should be kept separated from other Recycle
wastes 2.There should be two categories of
waste all around the city.
Collection The categories are- organic waste
of waste and recyclable waste.

Final
1.Before the final disposal the solid
disposal
wastes should be processed to recover
the usable resources.
Transportation
2.The organic wastes can be disposed
through landfills and other wastes
should be reused or recycled. 1.The vehicle used for wastes should not be overloaded.
2.The organic waste and the recyclable waste should be
transported in separate vehicle.
Process
Market/street Apply
Organic Waste storage: Waste collection: Waste transport:
waste sorting
system
Temporary 1. Community bin Separated
according to
Household/ storage at the system modern hauled
organic &
commercial source of 2. Demountable close trucks
inorganic Inorganic
waste container
waste generation
3. House to house
collection
Housewives recover refuse of
higher market value & sell
them to street hawkers Transfer the organic
wastes at landfill
site
Recycling dealers

Organic wastes will


Intermediate processing like Separates materials Appropriate be converted into
washing, drying and sorting in proper form processing factories compost/fertilizer
5R Strategy

Refuse
At first we should refuse
Reduc non-viable materials
e

Reuse We should reduce the uses

We can reuse the same thing again


Repair and again if it is possible
If it is broken, we should repair it
Recycle
At last if it is of no use then we can go for recycle
Implementation
Strict government rules for waste management
Two separate bins-one for organic wastes and
another for recyclable wastes. If it is not obeyed
then one should be fined Targets monitored monthly and reported to the
appropriate authorities
Expand sanitary waste disposal and landfill
management
Develop infrastructure for waste utilization
Integrate waste management and social inclusion

Promote innovation in waste collection services


Ensure and implement integrated waste
management systems
Support development of market economy for waste
recycling
Use digital mapping to manage solid waste
Implementation
Organic
Sustainability & Effectiveness

New plan
Current overview
Steps
Organic & Recyclable wastes
All the wastes are
will be collected separately
Collection collected together

The wastes are Separate vehicles will be used for


Transport different kinds of wastes
transported all together

Open burning, dumping A part of Organic wastes will be


Disposal used for compost and non-organic
landfills or kept in an open
place wastes will be recycled or reused
Only paper, glass, Organic wastes will be recycled &
Recycle
metal & plastic is generate biogas & composts.Non-
recycled organic wastes will be scientifically
reused in the factories
Tentative Timeline
Find two spots for making two recycling centers in the both Within 2020
regions of Dhaka City Corporation

Pass a special bill/ordinance/act for the new waste Within 2022


management plan

Import some new trucks and dustbin for collecting the two Within 2025
different types of wastes separately

Finish the construction recycling centers Within 2027

We will notice the changes in waste management system Within 2030


Conclusion

Obstacles Recommendations

Corruption Strong apply of law

Unawareness & apathy Awareness campaigns & conscience


Bureaucracy Patriotism
THANK YOU

ANY QUESTION?

You might also like