TRAINING REGULATION

TILE-SETTING NCII

CIVIL WORKS (CONSTRUCTION SECTOR)


CURRICULUM
TILE-SETTING
NC II
TILE-SETTING NCII  

TRAINING STANDARDS  

Curriculum Design
- Basic Competencies
- Common Competencies
- Core Competencies  

Training Delivery  

Trainee Entry Requirements  

List of Tools, Equipment and Materials


 

Training Facilities  

Trainer's Qualifications  

Institutional Assessment  

NATIONAL ASSESSMENT AND CERTIFICATION


ARRANGEMENTS  
The Tile-Setting NC II Qualification consists of competencies that a
person must achieve to enable him / her to lay and repair floor and wall
tiles, tile corners and curved surfaces
BASIC COMPETENCIES
Units of Competency
Participate in workplace communication
Work in a team environment
Practice career professionalism
Practice occupational health and safety procedures

COMMON COMPETENCIES
Units of Competency
Prepare construction materials and tools
Observe procedures, specifications and manuals of
instruction
Interpret technical drawings and plans
Perform mensurations and calculations
Maintain tools and equipment

CORE COMPETENCIES
Units of Competency
Lay and repair floor and wall tiles
Tile corners
Tile curved surfaces
LIST OF TOOLS, EQUIPMENT AND MATERIALS
FOR TILE SETTING NC II
EQUIPMENT MATERIALS

TOOLS

QTY. ITEM QTY. ITEM QTY. ITEM


5 pcs. Notched trowel 5 pcs. Angle grinder 25 boxes Glazed wall tiles (20 cm x 20
cm)
5 pcs. Tile cutter 25 sets PPE 25 boxes Vitrified floor tiles (20 cm x
20 cm)
25 pcs. Metal tape 150 pcs. Mosaic tiles (12” x 12”)

5 pcs. Nipper 30 kilos Tile adhesive

5 pcs. Plumb bob 1 bag Tile plastic spacer


5 pcs. Spirit level 5 pcs. Carburandum
5 pcs. Tri-square 25 pcs Pencil
5 pcs. Plier 5 kilos Tile grout
5 pcs. Rubber squeegee 25 pcs. Foam
5 pcs. Rubber mallet 10 pcs. Tile trim
5 rolls Nylon string
1 kilo Cotton rags
5 pcs. Water pail
TRAINING FACILITIES

Area in Total Area in


Space Requirement Size in Meters
Sq. Meters Sq. Meters

Contextual Learning
40 40
Laboratory / Lecture Room

Learning Resource
20 20
Center

Tool Room/Storage 10 10

Wash room 20 20

Circulation area 50 50

Shop room 60 60

TOTAL AREA 200


TRAINER’S QUALIFICATION FOR TILE SETTING NC
II
•Must have undergone training on Training Methodology
II (TM II)
•Must be a holder of National Certificate Level II or its
equivalent
•Good moral character
•Must be computer literate
•Must be physically and mentally fit
•*Must have 1 year industry experience and/or teaching
experience
INSTITUTIONAL ASSESSMENT

Institutional assessment is undertaken by


trainees to determine their achievement of units
of competency. A certificate of achievement is
issued for each unit of competency.