Green Building PMP
Green Building PMP
Green Building PMP
2
Introduction
What is a "Green" Building?
5
Importance of Green Building
9
Green building concept
10
Economical building
The used materials should be natural and
environmental-friendly.
The impact on the environment with regards
to manufacturing, distribution, construction,
renovation and demolition is relatively small.
Minimum quantity of chemicals necessary to
prepare the material for construction is used.
The material can be recycled.
11
Project Initiation Request
Document control Information
Settings Value
Document Author: <Shaimaa Sakr – Ibrahim Ali – Iman Mostafa – Samah Shaaban – Nora Khaled
>
Project Owner: Mohsen
Date: 11/01/2023
Project Title: Green Building
Context / Situation (Business Need/ Problem / Opportunity)
In order to fulfil with sustainable developments goals, a great concern to
environmental and climatic changes. Goal No. 13 lighten the spot on the opportunity
for all to take action and help reverse such harm.
The organization should take steps to eliminate pollution resources through defined
initiatives
Legal Basis
Egyptian law for environment No. 4 for 2009.
UN 17 Sustainable development goals.
Outcomes (high level)
Decrease emission of CO2 inside organization facilities and affiliates.
Prohibit all type of smoking inside organization facilities and affiliates.
Decrease paper consumption inside organization facilities and affiliates
Impact (high level)
Creating a green organization will directly influence organization costs reduction
through decreasing energy consumptions, creating a clean environment and be an
effective part of 17 goals for sustainable development.
Success Criteria
1. Management support is mandatory
2. Worker’s involvement and awareness of this concept
3. Costs
Assumptions (high level)
the organization will:
Decrease the cost of travelling.
Decrease the energy consumption inside facilities.
Create an eco-friendly work place by
Eliminate paper waste.
Forbid smoking.
Constraints (high level)
To save energy, online concept and digitalization should be applied, this puts some constraints like:
- Time schedule for workers should be well stablished
- Schedule transportations days and hours
- Creating shifts and rotations days between employees to have equal workload either online or at site work.
- Costs to buy a well-developed network system and have well trained and expert IT team always ready to
solve problems and bugs (VPN or remote work system)
To create a clean environment and healthy workplace, non-smoking rules should be implemented, and this
could be strongly rejected by employees.
Risks (high level)
Instability of prices due to devaluation.
People resistance and anxiety.
Network breakdown during working from home.
Business Case
Executive Summary
The Sustainable Development Goals (SDGs) are a United Nations initiative, formally adopted by the United
Nations General Assembly on 25 September 2015 in a resolution entitled Transforming our world: the 2030
Agenda for Sustainable Development. The SDGs build on and succeed the Millennium Development Goals.
They include 17 goals and 169 targets to be achieved over the next 15 years, with the aim to “end poverty, protect
the planet, and ensure prosperity for all as part of a new sustainable development agenda”.
Sustainable Development Goal 13 is about climate action and the official mission statement of this goal is to "Take
urgent action to combat climate change and its impacts"
The UN explains: Affordable, scalable solutions are now available to enable countries to leapfrog to cleaner, more
resilient economies. The pace of change is quickening as more people are turning to renewable energy and a range
of other measures that will reduce emissions and increase adaptation efforts.
Therefore, and in order to meet sustainable developments goals, a great concern to environmental and climatic
changes. Goal No. 13 lighten the spot on the opportunity for all to take action and help reverse such harm.
The organization should take steps to eliminate pollution resources through defined initiatives.
Proposed initiatives are defined as follow:
Build a green eco-friendly building by applying the following:
Decrease the on-site workforce and adopt working from home concept.
Prohibit all type of smoking inside organization facilities and affiliates.
Decrease paper consumption inside organization facilities and affiliates
Business case details
Project Name Green Building
1. The proposal
Build a green eco-friendly building by applying the following:
Decrease the on-site workforce and adopt working from home concept.
Prohibit all type of smoking inside organization facilities and affiliates.
Decrease paper consumption inside organization facilities and affiliates
26
Project charter
SCOPE DEFINITION: Green Building promotes the
efficiency of buildings with regards to the use of water,
energy and materials while reducing the building’s impact
on individual’s health and the environment through better
design, construction, operation, maintenance and
removal.
The project will include: Energy, waste, emissions
management approaches
27
Project charter
28
Project charter
29
Project charter
30
Project charter
RELATED DOCUMENTS
LEED requirements, similar implemented projects and
procurement proposals.
31
Project handbook
Project workplan
Quality Management plan
Quality of the project
Quality objectives:
37
Quality of the project
Quality Process:
38
Quality of the project
39
Quality of the project
Quality assurance :
40
Quality of the project
Quality Control:
The purpose of this step is to monitor and consolidate results
from the quality assurance activities in order to assess
compliance and performance, recommend necessary changes,
and plan new or refine existing quality assurance activities.
Quality monitoring & controlling is performed throughout the
project by the Project Manager (PM).
41
Quality of the project
Other Quality Control Activities:
42
Quality of the project
Other Quality Control Activities:
43
Quality of the project
44
Quality of the project
QUALITY ACCOUNTABILITY
-The Project Manager (PM) is the overall accountable of the
quality assurance activities within the project. The Project
Manager (PM) is also responsible for scheduling and initiating
all formal project audits or reviews.
-The quality assurance activities will be performed by the
Project Core Team (PCT), by Externally: e.g. outsourcing
audits to external entities/auditors when necessary.
45
Quality of the project
QUALITY RECORDS
46