Pressure and
Temperature
Survey
Agenda
• Introduction.
• Objectives and Uses of BHPT Survey.
• Common Types of BHPT Survey and Test Ideal
Conditions.
• Pressure Profiles (FG/BU/SG).
• Field Practices.
• Maximum Efficiency Rates tests.
Introduction to
BHP&T Survey
• There are variants of well tests and the type of well tests carried out
depends on the objective of the test.
“Some tests such as MER such that the rates in the wells are varied and measured
create no problems during analysis since they can be referenced”
On the other hand, tests such as drawdown, where the pressure changes
constantly with time, accounting for the flowrate with each time changes would
make the analysis complex
Effect Of Shut-in Times
• FG/BU/SG BU – Build Up
• FG/DD/BU/SG DD – Drawdown
Flowing Gradient
Drawdown tests