B Rank Issue PPT (2) eXAMPLE
B Rank Issue PPT (2) eXAMPLE
B Rank Issue PPT (2) eXAMPLE
Rahul /
xxxx xxxx xxxx Purchase Balram San
Mukesh San
Quality
Conditions for occurrence (phenomenon details . of reporting cases of occurrences . counter plan details)
Provide
segregation
details
Conclusion:
summarize a treatment content / check results
Understanding of actual condition (Check results of component ・ Factor analysis ・ Quality status of part)
● Understanding the actual cause – 1 Comparison of drawings and parts
Check results of parts ※find parts of problem areas
Receive 2356
Carting 2356
Receive 2356
Shipping 2356
Supplier
Inspection 2356
Receive 2356
(Sub Sup)
Shipping 2356
■ Defect has occurred from supplier production worth of day/month ( Sub Supplier )
Understanding of actual condition (Check results of component ・ Factor analysis ・ Quality status of part)
● Understanding the actual cause – 2 (Process Flow)
Sub Supplier : ****** Supplier : *****
Sampling Inspection. Lot Qty
Receiving of Material 2 Finall inspection Receiving inspection -500 Nos /20 nos
Inspection 3
Spot Welding Gauging Sub Supplier : MARUTHI FAB
・ Find the occurrence process / outflow process
(Plate L/R + Stopper Bkt)
Rework of welding
1 Tack weld
4 Rework of Material
Sub Assly Welding Gusset Bkt Welding
(Pipe Assly +Spring Bkt)
5 Inspection
Sub Assly Welding Full Welding 100 % Final inspection
(Pipe Assly +Plate R)
3
Receiving inspection ○
4 Summarized the
Rework of Material ×
problem point
5 Summarized the
100 % Final inspection △
problem point
(Summary)
Conclusion
Occurrence causes
Outflow causes
●Countermeasure
Cause Countermeasure Tgt. Dt. Status
<Occurrence >
<Outflow>
To confirm the effectiveness of countermeasure (Actual results)
countermeasure effectiveness
※Periodic confirmation of the countermeasure effectiveness
●Feedback
● Applicable : Yes/No
If Yes, then –
・ Part Name : *****
・ Model : ****
・ Part No. :******
・ Parts name : ******
・ Implementation Timing Plan :
Part Reponsi Plan Vs Month -
Sl.No Task Name Name ble Actual
Remarks
4 5 6 7 8 9 10 11 12 1 2 3
Plan
1
Actual
Plan
2
Actual
Plan
3
Actual
Plan
4
Actual
- Plan
- Done
Abbreviations: - In Progress
Sr. No Name - Delayed
Standardization: