Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

KMG - KAC - Cummins Parts Support - Update

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 20

1

PRODUCT KNOWLEDGE

Komatsu Mining Germany (KMG)


Komatsu America Corporation (KAC)
Cummins Product

Content :
I. KMG
Machine History, Product Range KMG, Populasi Unit
II. KAC
Company Profile, Product Range, Populasi Unit
III. Parts Support
IV. Parts Ordering
V. Principal Support
STRATEGIC PARTS MARKETING DEPARTMENT
As Of Mei 2016

Strategic Parts Marketing


Komatsu Group Dept.
H : Mirwan Agus Jamaludin

PA : M. Ismail
Komatsu Big KLTD.
SA : Catur Waluyo
DH : Kristian Ari N
PA : Dedy Yudi

PA : Gugum
Komatsu Small &
Forest SA : Yayang Zikry
DH : Ady Maulana
PA : M. Rudiyanto

KAC, KMG &


Cummins SA : M. Arifin PA : Rahman Hakim
DH : Tri Warsono
INTRODUCTION

http://www.komatsuamerica.com
730E 830E
KOMATSU
AMERICA
CORP.

190-200 ton
Cummins
240 ton
K2000E QSK60C
HD1500-5/7
2000 HP 2500 HP
930E

QSK45C QSK60C
1487 HP 2700 HP

150 ton
K1500E QSK60C 320 ton
1260 HP ALTRAK 1875 HP
http://www.altrak1978.co.id

PC3000-6 PC4000-6

OW 250 ton , BH 15 M3 OW 350 ton , BH 22 M3


http://www.komatsu-mining.de
I. Komatsu Mining Germany 4

Komatsu Mining Germany (KMG) adalah Komatsu Manufacturing facility untuk


superlarge hydraulic mining excavator bertempat di Düsseldorf - Jerman.

Hystory KMG :
• 1907 Company : Carlshütte AG
• 1925 Di beli oleh DEMAG (Deutsche Maschinenfabrik AG)
• 1996 DEMAG Komatsu GmbH (joint venture company
Mannesmann DEMAG dan Komatsu Limited Japan )
• 1999 Komatsu Mining Germany GmbH.

Address :
Komatsu Mining Germany GmbH
Buscherhofstrasse 10
40599 – Düsseldorf
Germany
Machine Hystory 5
Product Range KMG 6
Populasi Unit Indonesia 7
Site BKJ & Biu
Batukajang Site Bendili-Sangatta
Customer PAMA : Customer PAMA :
PC3000-1 = 1 unit PC3000-1 = 3 unit
PC3000-6 = 3 unit PC3000-6 = 2 unit
Customer BUMA: PC4000-6 = 5 unit
PC4000-6 = 4 Unit
Site Bontang
Site Adaro Customer PAMA :
Customer PAMA: BNT (West Block)
PC3000-1 = 3 unit PC3000-6 = 3 unit->
PC3000-6 = 3 unit Move BDI
PC4000-6 = 6 unit BNE (EastBlock) :
PC3000-1 = 1 unit
Site Tanjung-Adaro PC3000-6 = 3 unit->
Customer SIS: Move BDI 2
PC3000-6 = 5 unit
PC4000-6 = 1 unit Site Jembayan
Customer BUMA : Customer PAMA :
PC4000-6 = 3 unit PC3000-6 = 3 unit

Site Rantau Site Separi


Customer PAMA: Customer Leighton :
PC3000-6 = 1 unit - PC3000-1 = 1 unit
>Move ADR PC3000-6 = 3 unit
• PC3000 = 36 unit
• PC4000 = 24 unit Total KMG Produt :
• Plan Delivery = 7 x 60 unit
PC3000-6E PTBA
II. Komatsu America Corporation 8

Company Profile
Komatsu mulai beroperasi di America tahun 1960, kemudian di tahun 1970 Komatsu North America memulai
visi baru di bidang industrial. Komatsu America memproduksi dan menjual construksi equipment dari yang
kecil sampai terbesar untuk alat berat mining.
Address : Komatsu America Corp.
2300 N.E. ADAMS STREET
PEORIA IL 61639

Unit Model
KAC product line : hydraulic excavators, wheel loaders, crawler dozers, off-highway trucks, motor graders, skid
steer loaders, tractor loaders and backhoe loaders

Populasi Unit di Indonesia


- Haulpak 530E, HD1500, 630E, 730E, 830E, 930E
Product Range KAC – Haulpak Truck 9
Product Range KAC All Model 1
0

Product Line
KAC Mining Division History Timeline 1
1

1957:The first Haulpak 2004: Peoria


1935: R.G. LeTourneau Operations
off-highway truck, the
began building scrapers became the
& bulldozer attachments
LW32, was produced 1984: Dresser
Industries purchased Mining Division of
1994:Komatsu Komatsu America
WABCO purchased Corporation.
Dresser’s share
of the joint
venture

1935 ’40s ’50s ’60s ’70s ’80s ’90s 2000 2009

1953: Westinghouse 2008: 860E-1K (280


Air Brake Company 1967:The first electric 1988: Dresser 1996:The
drive Haulpak truck, Industries and world’s largest sT) & 960E-1 (360s.T)
purchased the
the 120B, was Komatsu Ltd. formed truck, the 320 ton is introduced at
business and renamed
produced American a 50/50 joint venture, 930E was MineExpo 2008 in Las
it LeTourneau-
Standard acquired the Komatsu Dresser introduced Vegas
Westinghouse
Company business and formed Company, of which
the WABCO Haulpak was a major
Construction and division
Mining Group
Central Parts Operation (Ripley) 1
2
• 56 acre site
Rack and Bin Pick Areas
• 584,000 square feet inside storage
• 150,000 square feet outside storage
• 75,000 square feet of mezzanine
• 185,000 bin locations
• 53,000 rack locations
• 32 dock doors
• 60 inbound/outbound trucks per day
• Inbound material is prepared by 3PP
• Limited inspection capabilities
• Major components tracked by SN
• RF used for binning, picking, cycle counting
• Multiple shifts cover 24 hours
• Daily afternoon peak on emergency orders
• Stock orders are picked early AM or at night Shipment Preparation
• Binning (put away) is done primarily at night

3rd Party Preparation Center


Product Line - Trucks 1
3

Gross Power (HP)


930E – 4SE
320 s.T
960E -1
3500 360 s.T

860E – 1K AC
280 s.T
ULTRA
930E - 4 CLASS
2700 MECHANICAL 320 s.T
ELECTRIC
DRIVE TRUCKS TRUCKS

2500
830E - 1AC
730E-07 240 s.T
200 s.T
2000 ELECTRIC DRIVE
HD1500-7 TRUCKS
150 s.T
1500
HD785-7
100 sT

1200

366 550 715 850 1110 1270 Max. GVW


( 000 lbs)
Populasi Unit KAC Product 1
4

BONTANG BNE– PAMA :


HD1500-7 X 22

BIU BATUKAJANG – PAMA :


HD1500-7 x 10

FREEPORT
930E-1 x 34
930E-2 x 16
Populasi Unit KAC Product 1
5
III. Parts Support KMG & KAC Product 1
6
UT
- Back up parts base on LIB (List Item Backup)
- Back up Maintenance Planning (Overhaul, Component PTA & R&I)
- Service Project (Standarisasi cylinder, FCH etc)
- Rebuild Center Undercarriage KMG product (UT SMD)
UTR SANGATTA
- Overhaul komponent KMG (Swing Gearbox, PDG/PTO, Travel Gearbox)
- Overhaul komponent KAC (electric komponent : Wheel Motor,Main Alternator)
UTR BALIKPAPAN
- Overhaul Cylinder KAC & KMG Product
KRA
- Overhaul KAC Product (Transmission & Differential)
KRI
- Overhaul Mainpump PC3000-6 via KMSI (KMG Product)
ALTRAK
- Overhaul engine Cummins & parts related engine KMG & KAC produt
KMG : - Engine PC3000 (Cummins K1500E)
- Engine PC4000 (Cummins QDK60)
KAC : - Engine 530E (Cummins KTA50)
- Engine HD1500 (Cummins QSK45)
- Engine 730E (Cummins K2000E)
- Engine 930E (Cummins QSK60) -> Back Up by Cummins Australia
IV. Parts Ordering 1
7
Stock Order
- Proses pemenuhan stock spare parts berdasarkan LIB (List Item Backup) dilakukan setiap bulan
- Type order : Sea Freight
- Lead Time supply Stock Order : KMG 3 Bulan, KAC 3 Bulan
note : start agustus 2010, vendor KAC change to KMSI
: start November 2011, vendor KMG change to KMSI
- Untuk Cummins Parts policy adalah UT tidak stock order, transaksi UT create Purchase Order direct ke
Altrak (Single Billing Rate)
Emergency Order
- Proses pemenuhan demand customer order atas stock yang tidak available di UT, order type by Air Freight
- Lead Time Supply jika available di supplier : KMG 11 hari, KAC 12 hari
- KAC via KMSI ada 2 type EO : Emergency Order (2x24) dan Critical Order/Machine down (1x24 jam)
- KAC type Packaging : Tropical Packaging / Without Tropical Packaging
- Overweight regulation : Jika berat > 60 Kg ada biaya tambahan yang di bebankan customer (sharing cost)
- Policy Order EO KAC :
> Untuk E/O (Emergency Order) maksimum Order Quantity per 1 nomor Purchase Order adalah 4
x Machine Quantity.
> Untuk C/O (Critical Order) maksimum Order Quantity per 1 nomor Purchase Order adalah
1 x Machine quantity.

Annual Return Supplier


- Return parts ke supplier setahun sekali untuk parts non moving/dead stock.
V. Principal Support 1
8

Online system
– Untuk melihat stock di supplier, status order, interchange part number
• KMG : ecomerce online
• KAC : Main Frame Access + extranet (invoice KAC)
• KMSI : P-mate

Linkone parts catalog


– Untuk melihat part number by model unit by serial number di komputer.

Parts Consignment (KMG)


– Barang / spare parts status punya Supplier yang lokasi nya di UT untuk backup unit, jika terpakai
UT bayar ke supplier.

Parts Warranty
- 3000 Hours

Technical Engineer :
– KMG-KMSI : Chris Tomlinson (HO), Saharudin, Selo Y (KMSI BPN)
– KAC-KMSI : Arrijit Chatterji (HO), Marwan (KMSI BPN)
KMG Components in REMAN Program 2
0

Spare Parts and Core Handling

1 5
Core
Component Return to
fails
storage Germany

OEM
6
Replacement Overhaul
unit

2 Restocking in 7
Parts Centre
8 Core Credit

Local 3 Order
Stock
Delivery
4 Parts Centre Düsseldorf

OEM = Original Equipment Manufacturer


2
1

Thank you
for Your Attention

You might also like