LINE SIZING
Liquid Phase Case
Chemical Engineer
Juan Pablo Hernández Castillo
PROCESS ENGINEERS TASKS
 Process engineers play an important role in the design of plants.
Some of the most common activities process engineers do are relating to:
1. Design of pipelines
2. Design of equipments
3. Design of instruments, such as control and safety relieve valves.
4. P&ID’s construction
5. Design of control strategy of differents parts of the plant.
6. Checking As Built’s
7. Design of the philosophy of operation of a particular section of the plant.
Among others…
Today, i would like to share with all of you, the steps taken into account when
designing pipelines.
Currently, one the most known international standard to design pipelines is
provided by the American Petroleum Institute.
API 14E. Recommended Practice for Design and Installation of Offshore
Production Platform Piping Systems.
API 14E design for the following states:
1. Liquid phase
2. Single Phase Gas
3. Gas-Liquid Phase lines.
DESIGN OF PIPELINES
Considerations
 API 14E stablish that in order to have a accurate pipe design, two main
conditions must be met: Velocity and Pressure Drop
 Velocity: In order to avoid
Sedimentation of particles 𝟑
𝐟𝐭
𝐬
Erosion (due to high velocity) 15
𝐟𝐭
𝐬
 Pressure Drop: In order to meet pressure drop conditions.
API stablish 1
𝒑𝒔𝒊
𝟏𝟎𝟎 𝒇𝒕
<
Flow Diagram
Example
 A process engineer is asked to design a pump
which can transport water from one deposit to
another.
PARAMETER SYMBOL VALUE UNIT
TEMPERATURE T 77 °F
VISCOSITY µ 1,85E-05 lb/(ft.s)
DENSITY ρ 1,92 slugs/ft3
SPECIFIC GRAVITY s 1
VOLUMETRIC FLOW RATE 2 ft3/s
30776,9031 barrels/day
PIPE LENGHT L 60 ft
PIPE ROUGHNESS ε 1,50E-04 ft
PUMP EFICCIENCY %
POTENTIAL HEAD ∆z 50 ft
SPECIFIC WEIGHT γ 62,2 lb/ft3
Q
INITIAL DATA
Assumptions
 The area in which the system is located : Industry sector
 1 Month= 30 days
 The system works 24h/30 days/1 year
 Average kWh (according to CREG) =$599,722 COP
 Suction and discharge same pipe size
 Comercial Steel Schedule 40 and Schedule 80 design try
 Pipeline lenght of 60 ft
Results
For Schedule 40 Comercial Steel:
For Schedule 80 Comercial Steel:
V(ft/s) Elbows Valves Line
1 231,41 1154,72 6543,42 10836,53 18534,6789 18584,6789 19417 3134,56224 $ 4.901.665 $ 18.136.160.855
2 59,60 63,28 358,57 312,51 734,354596 784,354596 560 132,292212 $ 200.029 $ 740.108.907
3 27,05 12,35 69,99 40,35 122,686563 172,686563 72,29 29,1259687 $ 42.695 $ 157.971.260
4 15,71 3,93 22,29 9,97 36,1998787 86,1998787 17,87 14,5387975 $ 20.832 $ 77.077.751
5 10,00 1,50 8,50 3,15 13,1419988 63,1419988 5,64 10,6497683 $ 15.063 $ 55.733.044
6 6,92 0,67 3,82 1,24 5,7340002 55,7340002 2,22 9,40030725 $ 13.223 $ 48.925.559
8 4,00 0,21 1,19 0,31 1,7113024 51,7113024 0,56 8,72182383 $ 12.229 $ 45.247.677
10 2,54 0,08 0,48 0,10 0,6638566 50,6638566 0,18 8,54515766 $ 11.972 $ 44.295.237
Nominal Diameter(in)
hL(ft)
∑hL(ft) ha(ft) $COP$(USD)PA(kW)∆P(psi)
∆P(psi) PA(kW) $(USD) $COP
Elbows Valves Line
1 278,05 1666,98 9446,25 17548,38 28661,6114 28711,6114 31443,67 4842,60896 $ 7.610.740 $ 28.159.736.856
2 67,73 81,71 463,04 435,91 980,66872 1030,66872 781,08 173,836484 $ 264.039 $ 976.943.993
3 30,28 15,47 87,67 53,97 157,10938 207,10938 96,70 34,9318513 $ 51.469 $ 190.435.597
4 17,40 4,82 27,33 12,95 45,1058345 95,1058345 23,21 16,0409097 $ 23.076 $ 85.381.495
5 10,99 1,81 10,27 4,01 16,0918776 66,0918776 7,18 11,147306 $ 15.800 $ 58.461.385
6 7,67 0,83 4,69 1,61 7,12831215 57,1283121 2,88 9,63547718 $ 13.570 $ 50.208.479
8 4,38 0,25 1,43 0,39 2,07145528 52,0714553 0,70 8,78256857 $ 12.318 $ 45.576.435
10 2,78 0,10 0,58 0,13 0,8053278 50,8053278 0,23 8,56901872 $ 12.006 $ 44.423.454
ha(ft)V(ft/s)Nominal Diameter
hL(ft)
∑hL(ft)
Analysis
 From the previous results, it must be highlighted that the only schedule pipe which met the
velocity-pressure drop requierements was the Schedule 40.
Schedule 40
 Despite the velocity was aceptable from 5 to 8 in nominal diameter. It was noted that the only
diameter which met the requierement of pressure drop(∆P= below 0,6 psi) was the 8 in pipe.
 In the other hand, it was seen that the proper selection of the pipe size does affects the cost of
operation.
 If for example: A process engineer had chosen a 6 inch pipe without taking into account the
requirements, then the cost of operation would have exceed 994 USD per year of operation.
Schedule 40
 Although 5, 6 and 8 inch diameter did meet the velocity requirements, the pressure drop conditions
were not reached.
Bad decisions during the piping design and pump selection can lead to years of unnecessarily high
cost of operation.
Schedule 40- Conditions analysis
Schedule 40- Cost analysis
REFERENCES
[1] R. Mott, Mecánica de fluidos, Dayton: Pearson, 2006.
[2] A. 14E, Recommended Practice for Design and Installation of Offshore Production Platform
Piping Systems., Washington: American Pretroleum Institute, 1991.
[3] C. d. R. d. E. y. G. (CREG), «TARIFAS DE ENERGÍA ELÉCTRICA ($/kWh) REGULADAS POR LA
COMISIÓN DE REGULACIÓN DE ENERGÍAY GAS (CREG) JUNIO DE 2020,» ENEL CODENSA, 2020.
[4] B. d. l. R. d. Colombia, «Tasa Representativa de Mercado (TRM-Peso por dolar),» Banco de la
Republica de Colombia, Colombia, 2020.
¡THANKS FOR
WATCHING!
 Juan Pablo Hernández Castillo
Contact:
Email: juanpaheca@outlook.es
Cel: +57 304 395 5569
LinkedIn:
www.linkedin.com/in/juanhdezcastillo

More Related Content

What's hot

Shell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparisonShell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparison
Juan Pablo Hernandez
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526
Vijay Sarathy
 
Pipe sizing
Pipe sizingPipe sizing
Pipe sizing
Ajay Kumar Sharma
 
Pressure Relief Systems
Pressure Relief Systems Pressure Relief Systems
Pressure Relief Systems
Gerard B. Hawkins
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenation
sumit handa
 
Psv scenario-and-calculation
Psv scenario-and-calculationPsv scenario-and-calculation
Psv scenario-and-calculation
ChingLuh Nike
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
ernestvictor
 
Hydrogen Compressors
Hydrogen CompressorsHydrogen Compressors
Hydrogen Compressors
Gerard B. Hawkins
 
Basics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizingBasics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizing
Vikram Sharma
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API Based
Vijay Sarathy
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
Héctor Nguema Ondo
 
Heat exchanger: Shell And Tube Heat Exchanger
Heat exchanger: Shell And Tube Heat ExchangerHeat exchanger: Shell And Tube Heat Exchanger
Heat exchanger: Shell And Tube Heat Exchanger
Akshay Sarita
 
HTRI PRESENTATION.pdf
HTRI PRESENTATION.pdfHTRI PRESENTATION.pdf
HTRI PRESENTATION.pdf
ssuserbd5784
 
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Vikram Sharma
 
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide
Gerard B. Hawkins
 
The Design and Layout of Vertical Thermosyphon Reboilers
The Design and Layout of Vertical Thermosyphon ReboilersThe Design and Layout of Vertical Thermosyphon Reboilers
The Design and Layout of Vertical Thermosyphon Reboilers
Gerard B. Hawkins
 
Pressure Relief Systems Vol 2
Pressure Relief Systems   Vol 2Pressure Relief Systems   Vol 2
Pressure Relief Systems Vol 2
Gerard B. Hawkins
 
Tube Wall Temperature Measurement On Steam Reformers - Best Practices
Tube Wall Temperature Measurement On Steam Reformers - Best PracticesTube Wall Temperature Measurement On Steam Reformers - Best Practices
Tube Wall Temperature Measurement On Steam Reformers - Best Practices
Gerard B. Hawkins
 
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Gerard B. Hawkins
 
Pressure relief system_design
Pressure relief system_designPressure relief system_design
Pressure relief system_design
Rahul Tewari
 

What's hot (20)

Shell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparisonShell and tube heat exchanger design comparison
Shell and tube heat exchanger design comparison
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526
 
Pipe sizing
Pipe sizingPipe sizing
Pipe sizing
 
Pressure Relief Systems
Pressure Relief Systems Pressure Relief Systems
Pressure Relief Systems
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenation
 
Psv scenario-and-calculation
Psv scenario-and-calculationPsv scenario-and-calculation
Psv scenario-and-calculation
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
 
Hydrogen Compressors
Hydrogen CompressorsHydrogen Compressors
Hydrogen Compressors
 
Basics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizingBasics of two phase flow (gas-liquid) line sizing
Basics of two phase flow (gas-liquid) line sizing
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API Based
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
 
Heat exchanger: Shell And Tube Heat Exchanger
Heat exchanger: Shell And Tube Heat ExchangerHeat exchanger: Shell And Tube Heat Exchanger
Heat exchanger: Shell And Tube Heat Exchanger
 
HTRI PRESENTATION.pdf
HTRI PRESENTATION.pdfHTRI PRESENTATION.pdf
HTRI PRESENTATION.pdf
 
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
Two-phase fluid flow: Guideline to Pipe Sizing for Two-Phase (Liquid-Gas)
 
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide
 
The Design and Layout of Vertical Thermosyphon Reboilers
The Design and Layout of Vertical Thermosyphon ReboilersThe Design and Layout of Vertical Thermosyphon Reboilers
The Design and Layout of Vertical Thermosyphon Reboilers
 
Pressure Relief Systems Vol 2
Pressure Relief Systems   Vol 2Pressure Relief Systems   Vol 2
Pressure Relief Systems Vol 2
 
Tube Wall Temperature Measurement On Steam Reformers - Best Practices
Tube Wall Temperature Measurement On Steam Reformers - Best PracticesTube Wall Temperature Measurement On Steam Reformers - Best Practices
Tube Wall Temperature Measurement On Steam Reformers - Best Practices
 
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
 
Pressure relief system_design
Pressure relief system_designPressure relief system_design
Pressure relief system_design
 

Similar to Line sizing

Group-12-1.pptx for chemical engineering
Group-12-1.pptx for chemical engineeringGroup-12-1.pptx for chemical engineering
Group-12-1.pptx for chemical engineering
karangandhi295
 
Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2
Fiena Azmi
 
Project Management
Project ManagementProject Management
Project Management
Palash Mahind
 
line sizing-mustang.pdf
line sizing-mustang.pdfline sizing-mustang.pdf
line sizing-mustang.pdf
ZeeshanAlam90
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx
Abubakar171727
 
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Karl Kolmetz
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing Design
SteveMillerPE
 
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
ahmedeng10
 
Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)
Nikhilesh Mane
 
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsHeat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Process Ecology Inc
 
Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008
ITTGRINNELL
 
Compare cryogenic process
Compare cryogenic processCompare cryogenic process
Compare cryogenic process
simachem
 
Chemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptxChemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptx
KaifyEngineer
 
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
Piping Technology & Products, Inc.
 
Richard-Hock
Richard-HockRichard-Hock
Richard-Hock
Richard Hock
 
Engineering design guideline hx rev 3
Engineering design guideline  hx rev 3Engineering design guideline  hx rev 3
Engineering design guideline hx rev 3
huynhthanhtamga
 
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw PumpStudy of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
IJMERJOURNAL
 
Refrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdfRefrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdf
ssuser642327
 
My role in industry as process engineer
My role in industry as process engineerMy role in industry as process engineer
My role in industry as process engineer
Sushant Labhasetwar
 
My Role In Industry as Process Engineer
My Role In Industry as Process EngineerMy Role In Industry as Process Engineer
My Role In Industry as Process Engineer
Sushant Labhasetwar
 

Similar to Line sizing (20)

Group-12-1.pptx for chemical engineering
Group-12-1.pptx for chemical engineeringGroup-12-1.pptx for chemical engineering
Group-12-1.pptx for chemical engineering
 
Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2
 
Project Management
Project ManagementProject Management
Project Management
 
line sizing-mustang.pdf
line sizing-mustang.pdfline sizing-mustang.pdf
line sizing-mustang.pdf
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx
 
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
Piping Hydraulics Fluid Flow Selection, Sizing and Troubleshooting
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing Design
 
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
07-ENGINEERING_DESIGN_GUIDELINES_instrumentation_sizing_and_selection_rev_web...
 
Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)
 
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS DynamicsHeat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
Heat Exchanger Tube Rupture Scenario Evaluation using Aspen HYSYS Dynamics
 
Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008
 
Compare cryogenic process
Compare cryogenic processCompare cryogenic process
Compare cryogenic process
 
Chemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptxChemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptx
 
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
 
Richard-Hock
Richard-HockRichard-Hock
Richard-Hock
 
Engineering design guideline hx rev 3
Engineering design guideline  hx rev 3Engineering design guideline  hx rev 3
Engineering design guideline hx rev 3
 
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw PumpStudy of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
 
Refrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdfRefrigerant Piping Handbook.pdf
Refrigerant Piping Handbook.pdf
 
My role in industry as process engineer
My role in industry as process engineerMy role in industry as process engineer
My role in industry as process engineer
 
My Role In Industry as Process Engineer
My Role In Industry as Process EngineerMy Role In Industry as Process Engineer
My Role In Industry as Process Engineer
 

Recently uploaded

paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 
VLSI_Static_Timing_Analysis_Intro_Part_1.pdf
VLSI_Static_Timing_Analysis_Intro_Part_1.pdfVLSI_Static_Timing_Analysis_Intro_Part_1.pdf
VLSI_Static_Timing_Analysis_Intro_Part_1.pdf
AmrAdel939309
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
dulbh kashyap
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
yogita singh$A17
 
Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰
Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰
Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰
AK47
 
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book NowKandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
SONALI Batra $A12
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
shourabjaat424
 
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
rupa singh
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
kamka4105
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Poonam Singh
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 

Recently uploaded (20)

paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 
VLSI_Static_Timing_Analysis_Intro_Part_1.pdf
VLSI_Static_Timing_Analysis_Intro_Part_1.pdfVLSI_Static_Timing_Analysis_Intro_Part_1.pdf
VLSI_Static_Timing_Analysis_Intro_Part_1.pdf
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
 
Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰
Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰
Call Girls In Rohini (Delhi) Call 9711199012 ∰ Escort Service In Delhi ∰
 
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book NowKandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
 
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 

Line sizing

  • 1. LINE SIZING Liquid Phase Case Chemical Engineer Juan Pablo Hernández Castillo
  • 2. PROCESS ENGINEERS TASKS  Process engineers play an important role in the design of plants. Some of the most common activities process engineers do are relating to: 1. Design of pipelines 2. Design of equipments 3. Design of instruments, such as control and safety relieve valves. 4. P&ID’s construction 5. Design of control strategy of differents parts of the plant. 6. Checking As Built’s 7. Design of the philosophy of operation of a particular section of the plant. Among others…
  • 3. Today, i would like to share with all of you, the steps taken into account when designing pipelines. Currently, one the most known international standard to design pipelines is provided by the American Petroleum Institute. API 14E. Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems. API 14E design for the following states: 1. Liquid phase 2. Single Phase Gas 3. Gas-Liquid Phase lines. DESIGN OF PIPELINES
  • 4. Considerations  API 14E stablish that in order to have a accurate pipe design, two main conditions must be met: Velocity and Pressure Drop  Velocity: In order to avoid Sedimentation of particles 𝟑 𝐟𝐭 𝐬 Erosion (due to high velocity) 15 𝐟𝐭 𝐬  Pressure Drop: In order to meet pressure drop conditions. API stablish 1 𝒑𝒔𝒊 𝟏𝟎𝟎 𝒇𝒕 <
  • 6. Example  A process engineer is asked to design a pump which can transport water from one deposit to another. PARAMETER SYMBOL VALUE UNIT TEMPERATURE T 77 °F VISCOSITY µ 1,85E-05 lb/(ft.s) DENSITY ρ 1,92 slugs/ft3 SPECIFIC GRAVITY s 1 VOLUMETRIC FLOW RATE 2 ft3/s 30776,9031 barrels/day PIPE LENGHT L 60 ft PIPE ROUGHNESS ε 1,50E-04 ft PUMP EFICCIENCY % POTENTIAL HEAD ∆z 50 ft SPECIFIC WEIGHT γ 62,2 lb/ft3 Q INITIAL DATA
  • 7. Assumptions  The area in which the system is located : Industry sector  1 Month= 30 days  The system works 24h/30 days/1 year  Average kWh (according to CREG) =$599,722 COP  Suction and discharge same pipe size  Comercial Steel Schedule 40 and Schedule 80 design try  Pipeline lenght of 60 ft
  • 8. Results For Schedule 40 Comercial Steel: For Schedule 80 Comercial Steel: V(ft/s) Elbows Valves Line 1 231,41 1154,72 6543,42 10836,53 18534,6789 18584,6789 19417 3134,56224 $ 4.901.665 $ 18.136.160.855 2 59,60 63,28 358,57 312,51 734,354596 784,354596 560 132,292212 $ 200.029 $ 740.108.907 3 27,05 12,35 69,99 40,35 122,686563 172,686563 72,29 29,1259687 $ 42.695 $ 157.971.260 4 15,71 3,93 22,29 9,97 36,1998787 86,1998787 17,87 14,5387975 $ 20.832 $ 77.077.751 5 10,00 1,50 8,50 3,15 13,1419988 63,1419988 5,64 10,6497683 $ 15.063 $ 55.733.044 6 6,92 0,67 3,82 1,24 5,7340002 55,7340002 2,22 9,40030725 $ 13.223 $ 48.925.559 8 4,00 0,21 1,19 0,31 1,7113024 51,7113024 0,56 8,72182383 $ 12.229 $ 45.247.677 10 2,54 0,08 0,48 0,10 0,6638566 50,6638566 0,18 8,54515766 $ 11.972 $ 44.295.237 Nominal Diameter(in) hL(ft) ∑hL(ft) ha(ft) $COP$(USD)PA(kW)∆P(psi) ∆P(psi) PA(kW) $(USD) $COP Elbows Valves Line 1 278,05 1666,98 9446,25 17548,38 28661,6114 28711,6114 31443,67 4842,60896 $ 7.610.740 $ 28.159.736.856 2 67,73 81,71 463,04 435,91 980,66872 1030,66872 781,08 173,836484 $ 264.039 $ 976.943.993 3 30,28 15,47 87,67 53,97 157,10938 207,10938 96,70 34,9318513 $ 51.469 $ 190.435.597 4 17,40 4,82 27,33 12,95 45,1058345 95,1058345 23,21 16,0409097 $ 23.076 $ 85.381.495 5 10,99 1,81 10,27 4,01 16,0918776 66,0918776 7,18 11,147306 $ 15.800 $ 58.461.385 6 7,67 0,83 4,69 1,61 7,12831215 57,1283121 2,88 9,63547718 $ 13.570 $ 50.208.479 8 4,38 0,25 1,43 0,39 2,07145528 52,0714553 0,70 8,78256857 $ 12.318 $ 45.576.435 10 2,78 0,10 0,58 0,13 0,8053278 50,8053278 0,23 8,56901872 $ 12.006 $ 44.423.454 ha(ft)V(ft/s)Nominal Diameter hL(ft) ∑hL(ft)
  • 9. Analysis  From the previous results, it must be highlighted that the only schedule pipe which met the velocity-pressure drop requierements was the Schedule 40. Schedule 40  Despite the velocity was aceptable from 5 to 8 in nominal diameter. It was noted that the only diameter which met the requierement of pressure drop(∆P= below 0,6 psi) was the 8 in pipe.  In the other hand, it was seen that the proper selection of the pipe size does affects the cost of operation.  If for example: A process engineer had chosen a 6 inch pipe without taking into account the requirements, then the cost of operation would have exceed 994 USD per year of operation. Schedule 40  Although 5, 6 and 8 inch diameter did meet the velocity requirements, the pressure drop conditions were not reached. Bad decisions during the piping design and pump selection can lead to years of unnecessarily high cost of operation.
  • 11. Schedule 40- Cost analysis
  • 12. REFERENCES [1] R. Mott, Mecánica de fluidos, Dayton: Pearson, 2006. [2] A. 14E, Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems., Washington: American Pretroleum Institute, 1991. [3] C. d. R. d. E. y. G. (CREG), «TARIFAS DE ENERGÍA ELÉCTRICA ($/kWh) REGULADAS POR LA COMISIÓN DE REGULACIÓN DE ENERGÍAY GAS (CREG) JUNIO DE 2020,» ENEL CODENSA, 2020. [4] B. d. l. R. d. Colombia, «Tasa Representativa de Mercado (TRM-Peso por dolar),» Banco de la Republica de Colombia, Colombia, 2020.
  • 13. ¡THANKS FOR WATCHING!  Juan Pablo Hernández Castillo Contact: Email: juanpaheca@outlook.es Cel: +57 304 395 5569 LinkedIn: www.linkedin.com/in/juanhdezcastillo