-
A high-resolution, low-latency, bunch-by-bunch feedback system for nano-beam stabilization
Authors:
D. R. Bett,
N. Blaskovic Kraljevic,
T. Bromwich,
P. N. Burrows,
G. B. Christian,
C. Perry,
R. Ramjiawan
Abstract:
We report the design, operation and performance of a high-resolution, low-latency, bunch-by-bunch feedback system for nano-beam stabilisation. The system employs novel, ultra-low quality-factor cavity beam position monitors (BPMs), a two-stage analogue signal down-mixing system, and a digital signal processing and feedback board incorporating an FPGA. The FPGA firmware allows for the real-time int…
▽ More
We report the design, operation and performance of a high-resolution, low-latency, bunch-by-bunch feedback system for nano-beam stabilisation. The system employs novel, ultra-low quality-factor cavity beam position monitors (BPMs), a two-stage analogue signal down-mixing system, and a digital signal processing and feedback board incorporating an FPGA. The FPGA firmware allows for the real-time integration of up to fifteen samples of the BPM waveforms within a measured latency of 232 ns. We show that this real-time sample integration improves significantly the beam position resolution and, consequently, the feedback performance. The best demonstrated real-time beam position resolution was 19 nm, which, as far as we are aware, is the best real-time resolution achieved in any operating BPM system. The feedback was operated in two complementary modes to stabilise the vertical position of the ultra-small beam produced at the focal point of the ATF2 beamline at KEK. In single-BPM feedback mode, beam stabilisation to 50$\pm$5 nm was demonstrated. In two-BPM feedback mode, beam stabilisation to 41$\pm$4 nm was achieved.
△ Less
Submitted 5 January, 2022;
originally announced January 2022.
-
A sub-micron resolution, bunch-by-bunch beam trajectory feedback system and its application to reducing wakefield effects in single-pass beamlines
Authors:
D. R. Bett,
P. N. Burrows,
C. Perry,
R. Ramjiawan,
N. Terunuma,
K. Kubo,
T. Okugi
Abstract:
A high-precision intra-bunch-train beam orbit feedback correction system has been developed and tested in the ATF2 beamline of the Accelerator Test Facility at the High Energy Accelerator Research Organization in Japan. The system uses the vertical position of the bunch measured at two beam position monitors (BPMs) to calculate a pair of kicks which are applied to the next bunch using two upstream…
▽ More
A high-precision intra-bunch-train beam orbit feedback correction system has been developed and tested in the ATF2 beamline of the Accelerator Test Facility at the High Energy Accelerator Research Organization in Japan. The system uses the vertical position of the bunch measured at two beam position monitors (BPMs) to calculate a pair of kicks which are applied to the next bunch using two upstream kickers, thereby correcting both the vertical position and trajectory angle. Using trains of two electron bunches separated in time by 187.6~ns, the system was optimised so as to stabilize the beam offset at the feedback BPMs to better than 350~nm, yielding a local trajectory angle correction to within 250~nrad. The quality of the correction was verified using three downstream witness BPMs and the results were found to be in agreement with the predictions of a linear lattice model used to propagate the beam trajectory from the feedback region. This same model predicts a corrected beam jitter of c.~1~nm at the focal point of the accelerator. Measurements with a beam size monitor at this location demonstrate that reducing the trajectory jitter of the beam by a factor of 4 also reduces the increase in the measured beam size as a function of beam charge by a factor of c.~1.6.
△ Less
Submitted 3 November, 2020; v1 submitted 28 August, 2020;
originally announced August 2020.
-
Design and operation of a prototype interaction point beam collision feedback system for the International Linear Collider
Authors:
R. J. Apsimon,
D. R. Bett,
N. Blaskovic Kraljevic,
R. M. Bodenstein,
T. Bromwich,
P. N. Burrows,
G. B. Christian,
B. D. Constance,
M. R. Davis,
C. Perry,
R. Ramjiawan
Abstract:
A high-resolution, intratrain position feedback system has been developed to achieve and maintain collisions at the proposed future electron-positron International Linear Collider (ILC). A prototype has been commissioned and tested with a beam in the extraction line of the Accelerator Test Facility at the High Energy Accelerator Research Organization in Japan. It consists of a stripline beam posit…
▽ More
A high-resolution, intratrain position feedback system has been developed to achieve and maintain collisions at the proposed future electron-positron International Linear Collider (ILC). A prototype has been commissioned and tested with a beam in the extraction line of the Accelerator Test Facility at the High Energy Accelerator Research Organization in Japan. It consists of a stripline beam position monitor (BPM) with analogue signal-processing electronics, a custom digital board to perform the feedback calculation, and a stripline kicker driven by a high-current amplifier. The closed-loop feedback latency is 148 ns. For a three-bunch train with 154 ns bunch spacing, the feedback system has been used to stabilize the third bunch to 450 nm. The kicker response is linear, and the feedback performance is maintained, over a correction range of over $\pm$60 μm. The propagation of the correction has been confirmed by using an independent stripline BPM located downstream of the feedback system. The system has been demonstrated to meet the BPM resolution, beam kick, and latency requirements for the ILC.
△ Less
Submitted 20 December, 2018;
originally announced December 2018.
-
The Compact Linear Collider (CLIC) - 2018 Summary Report
Authors:
The CLIC,
CLICdp collaborations,
:,
T. K. Charles,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
M. Volpi,
C. Balazs,
K. Afanaciev,
V. Makarenko,
A. Patapenka,
I. Zhuk,
C. Collette,
M. J. Boland,
A. C. Abusleme Hoffman,
M. A. Diaz,
F. Garay,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu,
X. Wang,
J. Zhang
, et al. (671 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the…
▽ More
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
△ Less
Submitted 6 May, 2019; v1 submitted 14 December, 2018;
originally announced December 2018.
-
Updated baseline for a staged Compact Linear Collider
Authors:
The CLIC,
CLICdp collaborations,
:,
M. J. Boland,
U. Felzmann,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
C. Balazs,
T. K. Charles,
K. Afanaciev,
I. Emeliantchik,
A. Ignatenko,
V. Makarenko,
N. Shumeiko,
A. Patapenka,
I. Zhuk,
A. C. Abusleme Hoffman,
M. A. Diaz Gutierrez,
M. Vogel Gonzalez,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu
, et al. (493 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-q…
▽ More
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-quark measurements. Subsequent stages will focus on measurements of rare Higgs processes, as well as searches for new physics processes and precision measurements of new states, e.g. states previously discovered at LHC or at CLIC itself. In the 2012 CLIC Conceptual Design Report, a fully optimised 3 TeV collider was presented, while the proposed lower energy stages were not studied to the same level of detail. This report presents an updated baseline staging scenario for CLIC. The scenario is the result of a comprehensive study addressing the performance, cost and power of the CLIC accelerator complex as a function of centre-of-mass energy and it targets optimal physics output based on the current physics landscape. The optimised staging scenario foresees three main centre-of-mass energy stages at 380 GeV, 1.5 TeV and 3 TeV for a full CLIC programme spanning 22 years. For the first stage, an alternative to the CLIC drive beam scheme is presented in which the main linac power is produced using X-band klystrons.
△ Less
Submitted 27 March, 2017; v1 submitted 26 August, 2016;
originally announced August 2016.
-
Present status and first results of the final focus beam line at the KEK Accelerator Test Facility
Authors:
P. Bambade,
M. Alabau Pons,
J. Amann,
D. Angal-Kalinin,
R. Apsimon,
S. Araki,
A. Aryshev,
S. Bai,
P. Bellomo,
D. Bett,
G. Blair,
B. Bolzon,
S. Boogert,
G. Boorman,
P. N. Burrows,
G. Christian,
P. Coe,
B. Constance,
Jean-Pierre Delahaye,
L. Deacon,
E. Elsen,
A. Faus-Golfe,
M. Fukuda,
J. Gao,
N. Geffroy
, et al. (69 additional authors not shown)
Abstract:
ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, Europe…
▽ More
ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described.
△ Less
Submitted 5 July, 2012;
originally announced July 2012.