Excel de Costos

Descargar como xlsx, pdf o txt
Descargar como xlsx, pdf o txt
Está en la página 1de 10

COSTOS Y PRESUPUEST

SENCICO
2017

PARTIDA : Sobreciminento de 0.15 m de ancho, 1:8 con 25% UNIDAD :


P.M.

Rend. 1 Rend. 2 Rend. 3 Rend. 4


Rend. (m2/dia) 10 1 1 1
Jornada (horas / dia) 8 0 0 0

Descripcion Unidad Cuadrilla 1 Cuadrilla 2 Cuadrilla 3 Cuadrilla 4


1. Mano de Obra
Operario hh 1
Oper. De maq. Liviana hh 1
Oficial hh 2
Peon hh 8
2.Materales
Cemento bolsa
Hormigon m3
Pieda mediana m3
Agua m3
3. Equipo y Herramienta
herramientas manuales 3% %mo
Mezcladora hm

PARTIDA : UNIDAD :
Falso piso de 2"

Rend. 1 Rend. 2 Rend. 3 Rend. 4


Rend. (m2/dia) 100 200 1 1
Jornada (horas / dia) 8 8 0 0

Descripcion Unidad Cuadrilla 1 Cuadrilla 2 Cuadrilla 3 Cuadrilla 4


1. Mano de Obra
Operario hh 1 2
Oper. De maq. Liviana hh 1
Oficial hh 1
Peon hh 3 6
2.Materales
Cemento bolsa
Hormigon m3
Agua m3
3. Equipo y Herramienta
herramientas manuales 3% %mo
Regla de madera p2
Mezcladora hm

PARTIDA : UNIDAD :
Encofrado y desencofrado de sobrecimiento

Rend. 1 Rend. 2 Rend. 3 Rend. 4


Rend. (m2/dia) 40 14 28 1
Jornada (horas / dia) 8 8 8 0

Descripcion Unidad Cuadrilla 1 Cuadrilla 2 Cuadrilla 3 Cuadrilla 4


1. Mano de Obra
Operario hh 1
Oficial hh 1 1
Peon hh 1 2
2.Materales
Madera tornillo p2
Clavos de 3" Kg
Alambre negro N° 8 Kg
3. Equipo y Herramienta
herramientas manuales 3% %mo
PRESUPUESTOS

ENCICO

UNIDAD :

Cantidad Costo Parcial TOTAL


155.33
0.80 S/. 18.30 S/. 14.64
0.80 S/. 18.70 S/. 14.96
1.60 S/. 17.30 S/. 27.68
6.40 S/. 15.32 S/. 98.05
185.46
3.7 S/. 24.00 S/. 88.80
0.85 S/. 70.00 S/. 59.50
0.42 S/. 85.00 S/. 35.70
0.160 S/. 60.00 S/. 1.46
S/. 17.16
0.03 S/. 155.33 S/. 4.66
0.8 S/. 15.63 S/. 12.50

COSTO UNITARIO TOTAL = S/. 357.95

UNIDAD : m2

Cantidad Costo Parcial TOTAL


11.72
0.16 S/. 18.30 S/. 2.93
0.04 S/. 18.70 S/. 0.75
0.04 S/. 17.30 S/. 0.69
0.48 S/. 15.32 S/. 7.35
8.59
0.18 S/. 24.00 S/. 4.32
0.06 S/. 70.00 S/. 4.20
0.008 S/. 9.00 S/. 0.07
S/. 1.16
0.03 S/. 11.72 S/. 0.35
0.06 S/. 3.00 S/. 0.18
0.04 S/. 15.63 S/. 0.63

COSTO UNITARIO TOTAL = S/. 21.47

UNIDAD : m2

Cantidad Costo Parcial TOTAL


37.11
0.57 S/. 18.30 S/. 10.46
0.86 S/. 17.30 S/. 14.83
0.77 S/. 15.32 S/. 11.82
18.66
4.83 S/. 3.50 S/. 16.91
0.13 S/. 3.50 S/. 0.46
0.260 S/. 5.00 S/. 1.30
S/. 1.11
0.03 S/. 37.11 S/. 1.11

COSTO UNITARIO TOTAL = S/. 56.88


TEMA PARTIDA UNIDAD METRADO COSTO UNITA
I. ESTRUCTURAS
I.I. MOVIMIENTO DE TIERRASS
I.I.I EXCAVACION M3 532.5 35.7
I.I.2 RELLENO M3 52.5 17.2
2 ARQUITECTURA
3 IISS
4 IIEE

COSTO DIRECTO = 82541.27


GASTOS GENERALES (12%)= 9904.95
UTILIDAD (8%) = 6603.30

99049.52
SUB TOTAL O SUPUESTO VALOR REFERENCIAL

IGV (18% ) 17828.91

TOTAL DE LA OBRA 116878.43


PARCIAL TOTAL
52345.83

19010.25
903
23528.32
1345.78
5321.34
82541.27