This project is based on the planning and progress control of the construction of the civil works of the Water Treatment Plant for The Aurora District, for the development of this, the general information of the project was provided by... more
This project is based on the planning and progress control of the construction of the civil works of the Water Treatment Plant for The Aurora District, for the development of this, the general information of the project was provided by the Municipal GAD of Daule, once all the information received had been analyzed, the analysis of the unit prices was carried out to obtain the general budget for the work. As part of the methodology, the Gantt chart was made with the MS Project software, which identifies the time it takes to perform each activity with its respective costs and resources, once this is obtained, the valued project schedule. As a final step, we proceed to use the BIM 5D methodology, it begins with the development of the 3D modeling, and then using the Navisworks software we integrate the 3D modeling with the Gantt chart, once these two elements are entered, we have our model as a result 5 D. Finally, we proceed to carry out the simulation of the construction process of the civil works of the project, in which we can see how the activities and costs of the work are developed in the planned times.
This project is based on the planning and control of the progress of the construction of the Children's Park in the Corozal Precinct, to carry out the planning of this work, the information was provided by the district administration of... more
This project is based on the planning and control of the progress of the construction of the Children's Park in the Corozal Precinct, to carry out the planning of this work, the information was provided by the district administration of Isisdro Ayora, and after a thorough review, we proceeded to calculate the quantities of work, the analysis of unit prices which was used to develop the budget of the project. Then the Gantt chart was drawn up using the Ms Project software, which shows us the time it takes to carry out each activity with its cost and resources, after which the valued schedules of the team and staff were made. To use the BIM 5D methodology, the 3D model was made using the Revit 19 software, after obtaining the 3D model, the other two dimensions are integrated by the Navisworks software, in which we integrate the 3D Model with the Gantt Diagram of the Project, obtaining a Model in 5D. Finally, a simulation of the progress of the project is made, which reflects the time and cost of the work.
The following paper provides a comparative analysis between a concrete manufactured with gray water, from the washing of the mixers of the Technical Center of Concrete and the Concrete Plant San Eduardo de Holcim SA and a conventional... more
The following paper provides a comparative analysis between a concrete manufactured with gray water, from the washing of the mixers of the Technical Center of Concrete and the Concrete Plant San Eduardo de Holcim SA and a conventional concrete, based on the designs of the new hospital of IESS-Los Ceibos, Guayaquil, using samples designed with 100% potable water and varied percentages of recycled water. For this analysis, 5mm x 5mm probes were made with "Grey Water" with 60% AAPP-40% Grey Water, 65% AAPP-35% Grey Water and 70% AAPP-30% Grey Water, the results obtained were evaluated according to the specifications detailed in the NTE INEN 1855 standard. This analysis promotes the optimization of concrete recycling within an integral strategy of sustainable development.
In recent years the influence of cemented bases in the construction of pavements in Ecuador has been indispensable in order to improve the mechanical strength of the structure and its physical properties. In this work, an evaluation will... more
In recent years the influence of cemented bases in the construction of pavements in Ecuador has been indispensable in order to improve the mechanical strength of the structure and its physical properties. In this work, an evaluation will be carried out to assess the contribution of Abacá vegetable fibre in those bases to verify if the results are beneficial for the construction of pavements. The research work is directly oriented to the study of the incorporation of a vegetable fibre of abaca to a granular base improved with cement. The length of the vegetable fibre plays an important role in the strength of the compound, which was verified that for a length of 20 and 25 mm a uniform mixture and greater adhesion in the particles of the soil, while an excessive length of the same, causes loss of the mechanical properties of the compound and difficulty in working. The percentage of fibre attachment to the weight of the material was 0.5% and 1%, for a percentage of 1% a decrease in resistance was found not meeting the minimum resistance required with the technical specifications. The incorporation of cement and fiber contribute to the carrying capacity of the soil but produces a loss of the resistance to bending and compression of the material.
Resumen-Esta investigación propone una programación o planificación para la construcción de la estructura de hormigón armado de los pabellones de mínima seguridad del Centro de Privación de Libertad en la Ciudad de Esmeraldas. Para llegar... more
Resumen-Esta investigación propone una programación o planificación para la construcción de la estructura de hormigón armado de los pabellones de mínima seguridad del Centro de Privación de Libertad en la Ciudad de Esmeraldas. Para llegar a una programación óptima se deben analizar todos los factores que intervienen al momento de la construcción, como lo son; el presupuesto final de la obra, el tiempo de ejecución del proyecto, los recursos necesarios para el desarrollo del mismo y los costos indirectos. El análisis se lo realizó con el método de la cadena de trabajo, este método se divide en tres; método sucesivo, paralelo y en cadena, en base a los resultados, se escoge el método apropiado para la construcción del Centro de Privación de Libertad de Esmeraldas, considerando el más conveniente tanto en costos como en tiempo de ejecución de la obra.
Palabras Claves-Programación de obra, tiempos de construcción, recursos de obra, cadena de trabajo.
Abstract-This research proposes a programming or planning for the construction of the reinforced concrete structure of the minimum-security pavilions of the deprivation of freedom center in the city of Esmeraldas. To achieve an optimal programming, all the factors that intervene at the time of construction must be analyzed, as they are; the final budget of the work, the time of execution of the project, the necessary resources for its development and the indirect costs. The analysis was done with the chain of work method, this method is divided into three; successive, parallel and chain method, based on the results, the appropriate method is chosen for the construction of the deprivation of freedom center of the city of Esmeraldas, considering the most suitable in terms of costs and time of execution of the work.
El hormigón aplicado en losas de pavimentos rígidos con módulo de rotura de 4,5 MPa con adición de fibras de acero ha obtenido un importante prestigio por su gran desempeño frente a requisitos cada vez más exigentes del sector de la... more
El hormigón aplicado en losas de pavimentos rígidos con módulo de rotura de 4,5 MPa con adición de fibras de acero ha obtenido un importante prestigio por su gran desempeño frente a requisitos cada vez más exigentes del sector de la construcción. El Hormigón Reforzado con Fibra de Acero (HRFA), no es más que hormigón hecho a partir de cementos hidráulicos, áridos finos, áridos gruesos, agua, aditivos y fibras discretas discontinuas (Dramix 80/60), que conlleva a mejoras en el comportamiento físico-mecánico. El presente trabajo ha considerado las características tanto del hormigón como de las fibras, y se basará en los lineamientos de las normas nacionales MTOP 2002, NEVI 12, INEN e internacionales ASTM, ACI. Su caracterización experimental se basa en determinar una resistencia de concreto específica (f'c= 350 kg/cm2) con tamaño máximo nominal de agregado 3/4" y adición de fibra (Dramix 80/60) en probetas cilíndricas y prismáticas (viga), con el objetivo de comprobar el comportamiento físico-mecánico de estos elementos. Para la ejecución del muestreo se realizó 15 especímenes con diferentes cantidades de adición (5, 10, 20, 30, 40) Kg. de fibras Dramix 80/60. Para la propuesta de la dosificación del hormigón, se analiza las diferentes metodologías de diseño como indica la norma ACI, además mediante investigación bibliográfica y experimental, se comprobará la eficiencia en el uso del HRFA.
Keywords-Hormigón, Hormigón Reforzado con Fibra de Acero, Ensayos de Hormigón, Pavimentos Rigidos.
DOI: 10.18687/LACCEI2019.1.1.363
El objetivo del presente libro es guiar al lector en el desarrollo para la medición y determinación experimental del perfil de velocidad de una corriente de superficie libre en movimiento absolutamente turbulento y la constante relativa... more
El objetivo del presente libro es guiar al lector en el desarrollo para la medición y determinación experimental del perfil de velocidad de una corriente de superficie libre en movimiento absolutamente turbulento y la constante relativa de la pared en un canal de laboratorio caracterizado por una elevada rugosidad del fondo.
La elevada rugosidad del fondo puede encontrarse no sólo en los cursos de agua naturales, sino también en los canales revestidos artificialmente, como ocurre hoy en día con el desarrollo de la ingeniería naturalista. El conocimiento del perfil de velocidad en estas situaciones juega un papel muy importante, para la determinación de las tensiones tangenciales que actúan sobre el fondo y el posible desencadenamiento de fenómenos de erosión, transporte sólido y depósitos.
Hay muchos tipos de intervenciones para mitigar el riesgo hidráulico, pero la elección de la intervención depende de un estudio relativo a la determinación de la sección necesaria para que el caudal determinado para un tiempo de retorno dado fluya dentro de ella. Debido a la presencia de zonas fuertemente urbanizadas en la llanura, pero sobre todo en las zonas de montaña y piedemonte, es necesario realizar intervenciones para protegerlas de eventos como inundaciones, erosión, grava, etc. En los últimos años se ha tendido a no invadir los cursos de agua mediante obras de ingeniería naturalista a través de obras de protección que salvaguardan los hábitats a lo largo de los ríos utilizando materiales inertes y/o vivos.
La falta de planificación es muy evidente en el entorno urbano de nuestro país, lo que ha provocado que los pobladores implanten sus viviendas en lugares no idóneos. Considerando esta variable y la aplicación de los criterios de la Norma... more
La falta de planificación es muy evidente en el entorno urbano de nuestro país, lo que ha provocado que los pobladores implanten sus viviendas en lugares no idóneos. Considerando esta variable y la aplicación de los criterios de la Norma Ecuatoriana de Construcción NEC-2015, se determinó que las zonas de nuestro litoral se encuentran en una situación de muy alta peligrosidad sísmica. La población de estudio está definida espacialmente en el contexto de la Zona 3 de Anconcito-Ecuador, donde los pobladores tienen viviendas con más de tres décadas de existencia según las encuestas formuladas in situ y que estructuralmente no están bien definidas, aumentando la situación de vulnerabilidad y peligro. La metodología para determinar la situación actual de las viviendas del sector se realiza mediante el método de inspección visual del FEMA-P154 que representa un índice de vulnerabilidad mediante formularios requeridos para la zona.
Este documento se basa en datos adquiridos en la obra Hospital del IESS de Durán, donde la maquinaria pesada estudiada desempeñó sus trabajos de movimiento de tierra, los cuales fueron identificados y detallados para poder calcular el... more
Este documento se basa en datos adquiridos en la obra Hospital del IESS de Durán, donde la maquinaria pesada estudiada desempeñó sus trabajos de movimiento de tierra, los cuales fueron identificados y detallados para poder calcular el rendimiento de cada uno de estos equipos de manera individual, así como un conjunto de trabajo, es decir, agrupados. En el presupuesto del proyecto se utilizó un rendimiento teórico, basado en una agrupación de factores (datos que se obtienen de los libros de ingeniería), por otra parte, para la investigación se utilizó los datos obtenidos “in situ”, cada uno de estos valores fue ingresado en una fórmula teórica, dando como resultado un rendimiento teórico – práctico, apegado a la realidad. Una vez que se ha realizado el análisis del rendimiento de los rubros de movimiento de suelos del proyecto, se determinó el conjunto de maquinarias que trabajará de forma eficiente, permitiendo una mayor productividad en obra y así, no desperdiciar recursos de horas - máquina, evitando la subutilización o sobrestimación de equipos, mejorando el costo unitario de la actividad y por ende procurando mayor ingreso económico a la empresa constructora encargada de la ejecución del proyecto.