Rapport de Controle Par Ressuage: Liquid Penetrant Examination Report
Rapport de Controle Par Ressuage: Liquid Penetrant Examination Report
Rapport de Controle Par Ressuage: Liquid Penetrant Examination Report
Validation / Approval
Inspecteur Maitre de l'ouvrage/
Approuvé ParApproved By Contractant/ contractor
inspector company
Nom/Name Achref Medara Walid Lassoued
Date/Date 07/11/2020 07/11/2020
Signature/Signature