SAFETY STANDARDS
Date: 5th January 2004
No. RERC/ Secy/ Safety Standards
0.1
0.2
In exercise of powers conferred on it by Section- 9 (1) (l) of the
Rajasthan Power Sector Reforms Act, 1999 and all powers enabling it in
that behalf the Rajasthan Electricity Regulatory Commission (RERC) makes
the Safety Standards.
Short title, Commencement and Scope:
(i) These standards shall be called Safety Standards.
(ii) These shall be followed to the extent applicable by all licencees and
generating companies operating in the State of Rajasthan.
(iii) They shall come into force on the date of their publication in the
Rajasthan Gazette.
Definitions:
i
‘Act’ shall mean the Rajasthan Power Sector Reforms Act 1999.
ii
‘Commission’ shall mean Rajasthan Electricity Regulatory
Commission.
iii
‘Electrical Inspector or Inspector’ shall have the meaning assigned
to it in the Indian Electricity Rules 1956.
iv
“EHV” means Extra High Voltage (132 kV and above)
v
“GRID CODE” means the code prepared by the Licensee in
accordance with clause 12 of the Transmission and Bulk Supply
Licence
vi
“GSS” means Grid Sub Station i.e. Sub Station of system voltage
exceeding 33 kV
vii
‘Licencee’ shall mean utilities engaged in the business of
transmission of energy and / or supply of energy to the licencees or
consumers.
viii
“NREB” means Northern Regional Electricity Board
ix
“NRLDC” means Northern Regional Load Dispatch Centre
x
‘Officer’ shall mean Officer of Licensee.
xi
“PTW” means Permit to Work
xii
“RULES” means the Indian Electricity Rules, 1956.
xiii
‘RVPN’ shall mean Rajasthan Rajya Vidyut Prasaran Nigam Limited
i.e. transmission & bulk supply licensee.
xiv
“SLDC” means State Load Dispatch Centre
1
Last Updated : 30-06-2006
xv
xvi
xvii
“SSGS” means State Sector Generating Stations
“Sub -Transmission” means ele ctrical system where voltage exceeds
650 Volt and does not exceed 33000 Volts.
VVNL-shall mean distribution licensee.
Other terms used in these standards shall have meaning as defined in the
Reforms Act & Rules & Regulations framed there under.
0.3
Scope:
(i)
Safety of consumers and maintenance staff of the utilities is of prime
importance from hazards of electric shock, which may be caused in the
transmission & distribution system. These standards aim at ensuring safety
for construction and maintenance personnel of the Licensee as also other
personnel including personnel of contractor, Generation Companies and
members of general public from hazards of electric shock, which may be
caused while working with Licencee’s systems. The Licensee shall pr epare
a Safety Manual based on these Standards for internal use. The Safety
Manual shall be prepared such that all the aspects and safety procedures
to be followed are covered in a complete manner without inviting
reference to any other Codes or Standards. Any references if required, be
appended to the manual. Details of working zones and necessary
isolations required for working on each equipment/line shall be clearly
furnished in the Safety Manual. The Safety Manual shall also lay down
foolproof procedures for issue of necessary permits and clearances
(hereinafter called as “Permit to Work” or PTW) to the designated officer
seeking such permits. The designated officer authorized to issue and
receive such permits, shall be notified from time to time. A draft
procedure for issue of PTW for inter-user boundary is appended at
Annexure-A
It is the duty of all persons who may be connected with the installation,
operation and maintenance of electric lines and apparatus to make
themselves thoroughly conversant with the regulations and safety rules
governing the work they may have to undertake on these lines and
apparatus.
These standards are in addition to or an elaboration of the Indian
Electricity Act, 1910 and Indian Electricity Rules, 1956, to be complied with
by licensee, generator, owners of premises and consumers.
Safety instructions laid down by electricity supply undertakings in the form
of safety rules or standing orders for guidance of staff employed in
connection with the execution of work on or near electric lines and
apparatus and for their operation and maintenance should be in
consonance with IE Act, IE Rules & these standards and should be strictly
(ii)
(iii)
(iv)
2
Last Updated : 30-06-2006
(v)
(vi)
complied with at all times.
It shall be the responsibility of the designated officer to interpret and
explain correctly the rules and regulations to all concerned staff and to
ensure that the staff thoroughly understands the same.
For the purpose of these standards, a competent person is one who had
been certified so by the State Government, for specific category of
electrical work, as laid down in Rule 45 of the IE Rules 1956.
(vii)
Transmission or Distribution licensee or generating company, shall arrange
regular training/ refresher courses to specified percentages of operating
staff (including Junior Engineer) every year on operational aspects,
including safety. In addition, periodical field level meetings shall be held
to educate operating staff about the requirement of safety.
0.4
Reporting of Accidents:
(Rule No. 44A of IE Rules 1956)
(i)
If any accident occurs in connection with the generation, transmission,
supply or use of energy in or in connection with any part of electric supply
lines or other works of any person and the accident results in or is likely to
have resulted in loss of human or animal life or in any injury to a human
being or an animal, such person or any authorized person of the RVPN/
VVNLs/supplier, not below the rank of Junior Engineer or equivalent shall
send to the Inspector a telegraphic report within 24 hours of the
knowledge of the occurrence of the fatal accident and a written report in
a form set out in annexure-XIII of IE Rules within 48 hours of the knowledge
of the occurrence of the fatal accident and all other accidents. Where
practicable a telephonic message should also be given to the Inspector
immediately the accident comes to the knowledge of authorized offer of
RVPN/ VVNLs/ Supplier or other person concerned. A draft of accident
reporting procedure is attached at Annexure-B.
Irrespective of enquiry by electrical Inspector duly authorized officer of
licensee (not below the rank of Executive Engineer) shall conduct a
detailed enquiry into every electrical/mechanical accident within a
period not exceeding fifteen days, to guard against the possibility of
destruction or disappearance of material evidence being presented and
to escape responsibility. Non-operation of protective relay shall be
deemed to be cause of electrical accident and shall also be enquired.
The enquiry in general shall fix the responsibility for the accident but it is
more important that enquiry shall spell out technical and other reasons
which caused electrical accident including failure of protective relays, in
adequate clearance, deficiencies in licensee’s stand ards/codes/standing
instruction etc. to prevent recurrence of such accident. Remedial
measures to be adopted to avoid its reoccurrence shall also be
(ii)
3
Last Updated : 30-06-2006
suggested.
0.5
These Standards consist of six Sections:
Section 1: General Precautions and Grounding measures
Section 2: Safety measures in construction and maintenance
works in Transmission & Distribution Lines.
Section 3: Safety measures in construction and maintenance
works in Sub Stations.
Section 4: Safety measures in operation of sub-stations,
transmission & distribution lines.
Section 5: Additional Safety requirements in generating stations (to be
added later on)
Section 6: Public Safety
0.6
Review
0.6.1
This standard shall be reviewed as and when:-
(i)
(ii)
(iii)
CEA notifies rules/ code/ standards (referred to as ‘safety code’)
specifying measures for safety under section 53 and section 177 (2) (b) of
the Electricity Act 2003.
Any change is effected in ‘Safety Code’ or Indian Electricity Rules or
Indian Standards referred to in these standards or with the issue of new
Indian Standards relevant to safety.
Any difficulty is encountered in enforcing these standards or any
deficiency is observed during its implementation.
0.6.2 For the contingencies mentioned at clause 0.6.1, the Commission may
suo-moto or on the application made by any utility or any person initiate
proceedings for review and effect amendments to these standards. Any
change in Indian Electricity Rules or ‘Safety Code’ or rele vant Indian
Standards shall be brought to the notice of the Commission by the utility
within 30 days with the proposed amendments to these standards. In the
meanwhile, revised provisions of Indian Electricity Rules or Safety Code
shall prevail.
4
Last Updated : 30-06-2006
SECTION-1
GENERAL PRECAUTIONS AND GROUNDING MEASURES:
1.1
1.2
1.3
All conductors and equipment in the vicinity and not covered by
PTW, shall be treated as energized. The designated officer shall
ascertain the following conditions before permitting workmen to
commence work:
(a) The lines or equipment are de-energized and grounded,
(b) Any hazards of induced voltages are not present,
(c) Adequate clearance as per clause 1.15 are maintained or other
means are implemented to prevent contact with energized lines
or equipment, and or line / equipment under PTW.
Bare wires of telecommunication lines if any, on power lines or
structures, which are not protected by insulating materials shall be
treated as energized.
The following procedure shall be adopted for deenergizing lines
and equipment in cases where means of disconnection from
electricity supply is not visibly open:
(a) The Particular section of line or equipment to be deenegized
shall be clearly identified and isolated from all sources of
voltage.
(b) For each transmission line/equipment, the designated authority
authorized to issue a PTW shall take the following precautions:
(i) The circuit breakers and associated isolators through which there
is a possibility of supply of electrical energy to the particular
section of the line or equipment to be worked upon shall be kept
open. In addition to circuit breakers, its associated isolator need
always be opened before taking up any work on deenergised
line/ system.
(ii) Caution Boards indicating “Men at Work” shall be fixed on
panels from which all the above circuit breakers and isolators
are operated.
(iii) If design of circuit breakers and isolators permit automatic
operation or operation from a remote place, the same shall be
rendered inoperable.
(iv) Isolators / grounded switches are usually provided with
padlocking arrangement for both open and closed positions.
Where such facility exists, normally isolators are padlocked in
5
Last Updated : 30-06-2006
1.4
1.5
1.6
1.7
1.8
open and ground switch in closed position before issuing
permit to work (PTW) to avoid inadvertent operation.
(c) Once all the required circuit breakers and switches have been
opened and rendered inoperable, visual inspection shall be
carried out to ensure physical separation from energized system
or otherwise ascertaining through communication from other
end of line. Grounding of the line / equipment shall be made
and only thereafter testing for voltage be conducted before
accessing the line or equipment. Testing of de-energized and
grounded line / equipment can be safely carried out by normal
“multimeter” as grounding ensures practically no voltage on line
/ equipment.
(d) Protective grounds shall be provided to the disconnected lines
or equipment to be worked on. If there is any grounding switch
available in disconnected portion, the same shall be closed.
(e) Guards or barriers duly mounted cautioned marks/plates shall
be erected wherever found necessary to the adjacent
energized lines.
(f) When more than one independent crew requires PTW for the
same line or equipment, each one should obtain separate PTW.
The designated officer/official in charge (for each such
independent crew) shall place a “Work in Progress” board on all
line or equipment or its control gear.
On completion of work on de-energized lines or equipment, each
crew in charge shall ensure the following:
(a) All the employees in his crew are clear off the work site and
accounted for, and
(b) Only after ascertaining that protective grounds installed by his
crew have been removed, the crew in charge shall report to
the holder of PTW that all tags demarcating the work area may
be removed.
When attaching grounds, the ground end shall be attached first,
and then the other end shall be attached to the equipment or line
by means of insulated tools or other suitable devices.
While removing the grounds after completion of work, the
attachment at the conductor or line end shall be removed by
means of insulated tools or other devices before the grounding at
ground end is removed.
While working on line or sub-station equipment, grounding provided
on tower / pole or sub-station should be used. Such grounds should
be made/ remixed by means of insulated tools or devices.
In some cases establishing a ground connection to any equipment
may become impracticable or the conditions resulting there-from
would be more hazardous. In such cases working on lines or
6
Last Updated : 30-06-2006
1.9
1.10
1.11
1.12
1.13
(a)
(b)
equipment without grounding such equipment may be permitted
and the ungrounded line or equipment shall be treated as
energized for working purposes even though they may have been
disconnected from the source of electric supply.
Grounds may be temporarily removed only when necessary for test
purposes. Extreme caution shall be exercised during such test
procedures.
The ground electrodes shall have a resistance to ground as low as
possible so that they may not cause any danger or harm to the
working personnel due to induced voltages. In case of any
accidental contact with live conductors, either the voltage rise shall
be too small to cause any shock hazards or the same shall result
isolation of the circuit causing the voltage rise by fast acting relays.
The minimum size of ground lead shall be 70 sq.mm PVC insulated
aluminum or 2 SWG copper. The earth electrodes for temporary
earths shall be of mild steel rods of at least 20mm diameter and
1524mm length. These shall have clean metal surfaces, free from
rust or any coating of paint or other poor conducting material and
be driven to a depth of at least one meter in a spot considered to
give good earth. The earth leads shall be connected to the ground
rod using an appropriate crimped terminal for the lead and through
suitable bolts and nuts to the ground rod. Earthingchains, used for
grounding overhead lines up to 33kV voltage, shall be made of
brass wire rods of dia 1.5 mm. The length of each chain shall be 9
meters and it shall be provided with a electro plated steel ball
weight at one end and a brass clip (like battery terminal) at the
other end. The brass ball shall be round in shape and shall be of 30
gms. approximately. The weight of each link shall be 15 gms.
approximately. The weight of complete chain shall be approx. 400
gms.
Grounding of generating stations, grid sub stations & sub stations
shall be checked periodically.
Fire Protection & First Aid
In addition to fire extinguishers suitable for dealing with electric fires
fire buckets filled with clean dry sand and ready for immediate use
for extinguishing fires, shall be conspicuously marked and kept in all
generating stations, enclosed sub-stations and switch stations at
convenient situations. The fire extinguishers shall be tested for
satisfactory operation at least once a year and record of such tests
shall be maintained.
First-aid boxes or cupboards, conspicuously marked and equipped
with such contents as the State Government may specify, shall be
provided and maintained in every generating station enclosed substation and enclosed switching station so as to be readily accessible
7
Last Updated : 30-06-2006
during all working hours. Except in the case of unattended substations and switch stations, all such boxes and cupboards shall be
kept in charge of responsible persons, who are trained in first-aid
treatment. One of such person shall be available during working
hours.
(c)
Instructions to avoid electrocution, provisions of first aid and safety
against spillage/ fumes of electrolytes (acid or alkali) of battery are
to be displayed in each sub station.
(d)
Safety devices like insulated pliers, hand gloves, helmets, insulated
shoes, safety belts, insulated crimping tools, insulated mats should
be provided for employees / operators working at generating
station/ sub station/ grid sub-stations.
(e)
No employee shall be allowed to work without using safety devices
like insulated pliers, hand gloves, helmets, and insulated mat etc.
1.14 Wherever infringement of clearances, with respect to provisions of
rule 79 & 80 of IE Rules are observed during inspection or otherwise,
action as per Rule 79 of IE Rules will be taken and rectification will
be effected at owner’s cost & if owner’s responsib ility could not be
fixed then at supplier’s cost (Ref rule 79).
1.15 The following minimum safety working clearances shall be
maintained for the bare conductors or live parts of any apparatus in
outdoor sub-stations, excluding overhead lines of HV and EHV
installations.
-----------------------------------------------------------------------------------------------------------Highest System Voltage (KV)
Safety working clearances (Meters)
(As per rule 64 (2) (a) (ii) of IE Rules)
-----------------------------------------------------------------------------------------------------------12
2.6
36
2.8
72.5
3.1
145
3.7
245
4.3
420
6.4
-----------------------------------------------------------------------------------------------------------Notes: (1) The above values are valid for altitude not exceeding 1000 meter
(m). A correction factor of 1.25 per cent per 100m is to be applied
for increasing the clearance for altitudes more than 1000m and up
to 3000m.
(2) The above safety working clearances are based on an insulation
height of 2.44 m which is the height of lowest point on the insulator
(where it meets the earthed metal) from the ground.
(3) “Safety Working Clea rance” is the minimum clearance to be
8
Last Updated : 30-06-2006
maintained in air between the live part of the equipment on one
hand and earth or another piece of equipment or conductor on
which it is necessary to carry out the work, on the other.
(4) The “Highest System Voltage” is de fined as the highest rms phase to
phase voltage which occurs under normal operating conditions at
any time and at any point of the system. It excludes voltage
transients (such as those due to system switching) and temporary
voltage variations due to abnormal system conditions (such as
those due to fault conditions or the sudden disconnection of large
loads).
1.16
While working at night, operation area will be well lighted by
torches/focused lights etc.
9
Last Updated : 30-06-2006
SECTION-2
SAFETY MEASURES IN CONSTRUCTION AND MAINTENANCE WORKS OF
TRANSMISSION /SUBTRANSMISSION/ DISTRIBUTION LINES
(A)
TRANSMISSION/ SUBTRANSMISSION & DISTRIBUTION LINES
2.1
The excavation for pad or pile type foundations in excess of 1.5 mtr,
depth located on unstable earth, shall be either sloped to the angle
of repose or shored if entry is required. Ladders shall be provided for
access to pad or pile type-footing excavations in excess of 1.2 mtr.
Wherever the foundation is being constructed on unstable earth,
the workmen shall not be permitted to enter the excavated pit
unless shoring is used to protect them.
Only responsible and skilled employees shall be deployed for
directing mobile equipment adjacent to footing excavation.
No workmen shall be permitted to remain in the excavated pit
where concreting is done using machinery.
The mobile equipment shall be located only on leveled earth to
ensure stability.
Sufficient care shall be taken during tower erection to see that
more than the minimum number of workmen is not deployed. This
will minimize exposure of falling objects on workmen, when working
at two or more levels. Proper protection such as use of helmets,
safety belts etc., shall be taken.
Tie ropes shall be used wherever necessary for maintaining steel
sections or other parts in position to reduce the possibility of tilting
etc.
Adequate supports shall be provided for the tower members and
sections of panels during assembly.
The construction of Transmission towers, erection of poles, tools and
machinery being used for the work shall meet the requirements of
the relevant Indian Standard Specifications and Code of Practices
along with the CBIP manual on Transmission Lines. The wire ropes,
pulley blocks etc., shall be of tested quality and inspected by a
responsible employee for its fitness before commencing the work.
Other than the supervisory staff and such of the workmen required
to guide and assist the section being erected, no one else shall be
permitted to come under a tower being erected.
If hoisting equipment are used for erection of towers adjacent to
existing transmission lines, the lines shall be de-enegized wherever
possible. When this is not practicable, extraordinary precautions
shall be exercised to maintain the minimum clearances required
including those mentioned in sub clause 1.15 of section-1.
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
10
Last Updated : 30-06-2006
2.12
2.13
2.14
2.15
2.16
2.17
(a) All practical steps shall be taken to prevent operating the earth
moving, lifting and housing machinery in dangerous proximity to a
live overhead power line. In particular, any part (s) of such
machinery shall not be permitted to approach as per clause 3.1.5.1
of IS 7293-1974 within the following distance of overhead power
lines:
11kv and below
1.40m
33kv and below
3.60m
132kv and below
4.70m
220kv and below
5.70m
400kv and below
6.50m
(b) If it becomes necessary to operate the machinery with
clearances less than those specified in (a), it shall be ensured that
the overhead power lines are invariably shut off during the period of
operating of the machinery. Location of any underground power
cables in the area of operation shall also be ascertained and
necessary safety precautions taken.
(c) Wherever cranes are used for erection, the same shall be set on
firm foundations. The outriggers of the cranes shall be used
wherever available. The wheels shall be locked in position to
prevent dislocation during handling. While working with cranes it is
necessary that ‘Load’ to be lifted or moved does not cross ‘tipping
load’ of crane for boom length and radius at which operation is
being performed.
Suitable tie ropes shall be used to maintain control of tower sections
being raised and positioned wherever possible and proper care
shall be taken to see that they do not create any hazard. The wire
rope used for carrying the section shall not be detached before the
section is adequately secured.
The erection or maintenance work shall not be carried out during
high wind, thunderstorms and heavy rainfall, which would make the
work hazardous, except during emergency restoration procedure.
The designated officer shall keep maintained all the equipment,
tools and plant in safe operating conditions.
Adequate traffic control shall be maintained wherever erection
work is being carried out at highway crossings. The permissions
required from the concerned authorities, such as department of
highway, police etc., shall be obtained before commencement of
work. Similarly, for erection work at railway crossing, the permission /
Railway block shall be obtained from railway authorities before
commencing the work.
The designated officer shall ensure the required clearance to be
maintained while equipment moving under or near the energized
11
Last Updated : 30-06-2006
2.18
2.19
2.20
2.21
2.22
2.23
lines. While moving under or near an energized line, moving
equipment needs to be earthed by earthing chain(s) etc. and it is
to be ensured that no part of earthed equipment is at a height of
2.44 meters (i.e. 8 feet) above the ground. While operating an
equipment from a fixed position, the section safety working
clearance as per section-1 shall be maintained from operating foot
in/ on earthed equipment.
Before commencing the stringing operations or removal of
conductors a briefing shall be held by the supervisor with the
workmen setting forth the following:
(a) Plan of operation.
(b) The type of equipment, tools, and plant to be used.
(c) Grounding devices and procedures to be followed.
(d) Crossover methods to be employed, and
(e) The clearance authorization required.
Wherever there is a possibility of the conductor being handled
coming in contact with an energized conductor, or there is a
possibility of a dangerous voltage build up due to induction, the
conductor being handled shall be grounded, unless a provision is
made to insulate or isolate the employee. If the existing line is deenegized, a PTW shall be obtained and the line grounded on both
sides of the cross over. In case the PTW cannot be obtained, the line
shall be considered as energized for all practical purposes.
While executing the work of crossing over an existing line, suitable
guard structures with rope nets shall be installed to isolate the
conductors and workmen coming within the required minimum
clearances specified for the voltage. If there is any auto reclosure
installed on the energized line, the same shall be made inoperative.
In addition, the line being handled shall be grounded on either side
of the cross over.
The conductors being strung or removed shall be kept under control
by using adequate reels, guard structures, tie line, or any other
appropriate means to prevent accidental contact with energized
wires.
The guard structure shall have sufficient strength and have
adequate dimensions and supported adequately.
The wire ropes, come along clamps, anchors, guys and hoists shall
have ample capacity to prevent failure/ accident. The load rating
specified by the manufacturers for stringing equipment, pulley
blocks, all other load bearing hardware and tools shall not be
exceeded during operations. These shall be inspected regularly and
replaced/ repaired when found damaged or when its
dependability is doubtful.
12
Last Updated : 30-06-2006
2.24
2.25
2.26
2.27
2.28
Come along clamps designed for the specific conductor range
only shall be used. During stringing or removal of conductors, no
workmen shall be permitted to come directly under overhead
operations, or on the cross arms. The dead end points of the
conductors at section towers shall be adequately anchored before
commencing operations. The grounds provided to the conductor
shall be maintained intact until the conductors are hooked on to
the insulators.
The reel handling equipment, including pulling and braking
machines having ample capacity to operate smoothly, shall be
leveled and aligned in accordance with the manufacturer’s
operating instructions. Reliable communication between the
operator of these machinery and the stringing operators shall be
provided.
Each conductor shall be dead-ended at both ends before
commencing stringing of the conductor in the next section.
The sequence of stringing of conductors and ground wires shall
strictly follow the design conditions of erection loads considered for
the structure. The method of erection shall not impose loads in
excess of design loads on the structure.
In addition to the above before commencing the stringing or
releasing operations of any conductor adjacent to an energized
line, the following precautions shall be observed:
(a) The possibility of dangerous voltages due to induction,
particularly during switching and fault conditions, shall be
investigated.
(b) The tension stringing method or such other methods, which
preclude unintentional contact between the lines being pulled
and the employee, shall only be used.
(c) Specific provisions for tension stringing:
(i) All the pulling and tensioning equipment shall be isolated,
insulated, or effectively grounded.
(ii) A ground rod shall be installed between the tensioning reel
setup, and the first structure in order to ground each bare
conductor, sub-conductor, or overhead ground wire during
stringing operations.
(iii) The grounds shall be left in place until the conductor installation
is completed.
(iv) These grounds shall be removed at the last phase of cleanup
operations.
(v) These grounds shall be placed or removed only with a Hot Stick.
(d) During stringing or unstringing operations, each conductor or
ground wire shall be grounded at the first tower adjacent to
both the tensioning and pulling setup and in increments so that
13
Last Updated : 30-06-2006
no point is more than 2 KM apart. For lines of 132 kV & higher
voltage, these shall not exceed 3 KM.
(e) Conductor and ground wires shall be grounded at all dead- end
points.
(f) A ground shall be located at each side and within 3 Mtr. of
working areas where conductors, or ground wires are being
jointed at ground level. The two ends to be jointed shall be
bounded to each other. The jointing shall be carried out either
on insulated platform or on a conductive metallic grounding
mat bounded to grounds. When grounding mat is used, the
same shall be barricaded and an insulated walk way provided
for access to the mat.
(g) All the conductors and ground wire shall be bonded to the end
tower where the work is to be completed. At the dead end
tower, the de-energized line shall be grounded.
(h) The grounds can be removed on completion of the work
making sure that the line is not left open circuited at any tower
at which the work is carried out.
(B) SPECIFIC PROVISIONS FOR HOT LINE MAINTINANCE WORKS ON
TRANSMISSION & SUB-TRANSMISSION LINES
2.29
The following precautions shall be taken for Hot-Line bare hand
work in addition to all other applicable precautions specified in
these Standards:
(a) Only qualified and trained employees, trained for Hot-Line barehand technique and the pertinent safety requirements thereto,
shall be permitted for the work.
(b) The following checks shall be made before commencing HotLine bare hand work on energized high-voltage conductors or
equipment:
(i) The voltage rating of the circuit on which the work is to be carried
out,
(ii) The clearance to ground of the line and other energized parts
on which work is to be carried out,
(iii) The voltage limitations of the aerial-lift equipment intended to
be used.
(c) The Hot Line equipment to be used shall be of proper design
and tested.
(d) Only a person trained and qualified to carry out Hot-Line barehand work shall supervise the work.
14
Last Updated : 30-06-2006
(e) If any automatic re-closing feature is available on the circuit
breakers or switches, the same shall be made inoperative
before commencing the work on any energized Line or
equipment.
(f) The work shall not be carried out during thunderstorms.
(g) A conducting Bucket liner or any other suitable conducting
device shall be provided for bonding the insulated aerial
device to the energized Line or equipment.
(h) The employee shall be connected to the Bucket liner through
conducting shoes, leg clips or by any other suitable means.
(i) Adequate electrostatic shielding for the rated voltage of the line
or equipment on which work is being carried out shall be
provided to the workmen wherever necessary or conducting
clothing shall be provided.
(j) Only tools and plant intended for hot Line bare-hand work shall
be used, and these shall be kept clean and dry.
(k) The out riggers on the aerial truck shall be extended and
adjusted to stabilize the body of the truck before the boom is
elevated. The body of the truck shall be bonded to an effective
ground or barricaded and considered as energized equipment
for all purposes.
(l) All the controls at ground level and bucket available in the truck
shall be checked and tested to determine their proper working
condition before moving.
(m) Every day, and each time, before commencing the work, “arm
current tests” shall be carried out. Aerial buckets used for hotLine bare-hand work shall also be subjected to these tests. This
test shall be carried out by placing the Bucket in contact with
an energized source equal to the voltage to be worked upon
for a minimum period of three (3) minutes and the leakage
current shall not exceed one (1) microampere per kilo-volt of
nominal line-to line voltage. The work shall be suspended
immediately if any indication of a malfunction in the
equipment is noticed.
(n) All the aerial lifts shall have dual controls (lower and upper) as
follows:
(i) The upper control shall be within easy reach of the employee in
the basket. If a two-basket type lift is used, access to the controls
shall be within easy reach from either basket.
(ii) The lower set of controls shall be located near the base of the
boom that will permit over-ride operation of the equipment at
any time.
15
Last Updated : 30-06-2006
(o) Ground level lift control shall not be operated without the
permission of the employee in the lift, except in case of
emergency.
(p) The conducting Bucket Liner shall be bonded to the energized
conductor by means of a reliable connection before the
employee contacts the energized part. This shall remain
attached to the energized conductor until the work is
completed.
(q) Minimum clearance as per recommendations of hot line
equipment supplier, corresponding to basic impulse level and
switching surge level of the line shall be maintained from all
grounded objects and from lines and equipment at a different
voltage, to which the insulated aerial device is bonded, unless
such grounded insulated guards cover objects or other lines
and equipment. These distances shall be maintained when
approaching, leaving, and when bonded to the energized
circuit.
(r) The above minimum distance shall be maintained between all
parts of the insulated boom assembly and any grounded parts
including the lower arm or portions of the truck, while
approaching, leaving or bonding to an energized circuit.
(s) The above table shall be printed on a plate of durable nonconducting material, mounted in the Buckets or its vicinity in
such a position that the same is clearly visible to the operator of
the boom. Insulated measuring sticks only shall be used to verify
the clearances.
(t) During positioning the bucket alongside an energized bushing or
an insulator string, the minimum line-to-ground clearances
indicated in the above table must be maintained.
(u) The use of handlines between buckets, booms, and ground is
prohibited.
(v) No conducting material longer than 0.9 meter, other than the
jumpers of appropriate length, armor rods, and tools shall be
placed in the bucket.
(w) Non-conductive type handlines may be used from line to
ground only when the same is not supported from the bucket.
(x) The bucket and the upper insulated boom shall not be over
stressed by attempting to lift or support weights in excess of the
manufacturer’s rating.
(c) INSPECTION & TESTING
2.30
Inspection & testing shall be carried out as provided in section 6 of
safety code.
16
Last Updated : 30-06-2006
SECTION-3
SAFETY MEASURES IN CONSTRUCTION & MAINTENANCE WORKS IN SUB
STATIONS
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
Before commencement of a construction or maintenance work in
an energized substation, appropriate authorization and the PTW
shall be obtained from the designated, authorized person.
Before commencing the work, the protective equipment shall be
checked for satisfactory performance and necessary precautions
for safety of the personnel shall be ensured.
Extraordinary caution shall be exercised in handling bus bars,
structures, and equipment in the vicinity of the energized facilities.
No employee/ operator shall be permitted to approach or take any
conductive object, without a suitable insulating handle, closer to
exposed energized parts than the minimum clearance as per
recommendations of hot line equipment supplier, corresponding to
basic impulse level and switching surge level of the line to which
exposed energized part is connected.
The minimum working distance stated in the above table shall not
be normally violated. These clearances can be curtailed only under
the following conditions:
(a) The employee is insulated or guarded from the energized part or
(b) The energized part is insulated or guarded from him and other
conductive object is at a different potential, or
(c) The employee is isolated, insulated, or guarded from any other
conductive object (as during hot-line bare handwork).
When it is necessary to deenergize the equipment or lines for
protection of employees the requirements of Clause-2.29 of section
2 shall be complied with.
Barricades or barriers shall be installed to prevent accidental
contact with energized lines or equipment. Where appropriate,
signs indicating the hazard shall be pasted near the barricade or
barrier.
Only designated employees shall be permitted to work on
equipment under PTW or adjacent control panels. All precaution
shall be taken to avoid accidental operation of relays or other
protective devices due to jamming, vibration, or improper wiring.
Designated employees shall at all time control the use of vehicles,
cranes, and other equipment in restricted and hazardous areas.
All mobile cranes and derricks shall be effectively grounded when
being moved or operated in close proximity with energized lines or
17
Last Updated : 30-06-2006
3.11
3.12
3.13
3.14
3.15
equipment. If this is not possible, the equipment shall be considered
energized.
When a substation fence is to be expanded or removed for
construction purposes, a temporary fence affording similar
protection, like the site is unattended, shall be provided. Adequate
interconnection with ground shall be maintained between
temporary and permanent fences.
All gates in all the unattended substations shall be locked when the
work is in progress.
Safety precautions against fire hazards in sub-station may be
considered same as mentioned section-1.
It should be ensured that all tool/equipment are within its prescribed
capability.
Clearances:
(a) The licencee/ utility/ company shall draw its standards of line
construction taking into considerations, the relevant factors like,
structure type, (i.e. its height, mechanical strength etc.),
conductor type (i.e. ACSR, AAC, line type (single circuit, double
circuit, composite with/without shield /earth wire), conductor
configurations span etc. All clearance will be based on 75 Deg.
C conductor temperature to take into account the direct solar
heating. Wherever, during inspection or otherwise clearances
are less than such standards, the remedial measures will be
taken with first priority attached to line crossing the road/
electrical line.
(b) Guarding shall be provided wherever required to maintain
electrical clearance. Minimum vertical clearance between
ground & guarding of lines across or along the road or
otherwise shall not be less than minimum clearance for low &
medium voltage lines for similar case under rule 77, 77 (1) (a),
77 (2) (a) respectively. The horizontal clearance between
guarding & any portion of building or structure shall be as
decided by the Electrical Inspector in each case but shall not
be less than that for high voltage line as per rule 80. Clearance
between guard & lower line shall be as mutually agreed by
owners of the lines.
3.16 INSPECTION & TESTING
Inspection & testing shall be carried out as provided at section
6 of safety code.
18
Last Updated : 30-06-2006
SECTION-4
SAFETY MEASURES IN OPERATION OF SUB-STATIONS, TRANSMISSION AND
DISTRIBUTION LINES
4.1
Operational Safety Measures
The objectives of operation and maintenance management of a
transmission system can be broadly defined as follows:
(a)to ensure safety
(b)to ensure maximum availability and high reliability
(c)to reduce maintenance costs
Painted banners including following be fixed in yards entry, working room
of workers, common places and offices;
(a)Safety Saves Life
(b)Use of hand gloves and safety measures saves your life.
The following operational safety measures should be taken during
operation and maintenance on a transmission lines and sub-station:
4.2
Use of Gloves & Insulated shoes
Rubber gloves & insulated shoes should invariably be worn in all cases
while operating gang operating switches controlling high tension lines and
equipment where accidental contact of operating personnel with live
parts are likely. While working near live lines and equipment and working
on live low-tension lines and equipments, gloves should be worn.
4.3
Use of Safety Belts
Safety Belts should invariably be used in all cases while working on
overhead system like transmission lines, Bus Bars, Sub-station equipment
etc.
4.4
Use of rubber mats in Control Room/Switch Yard
Tested rubber mats should be kept in front of operating panels / switches
etc. They should be checked for condition periodically and replaced as
necessary.
19
Last Updated : 30-06-2006
4.5
Yard up-keeping
Grass, tree, and shrubs etc. should not be allowed to developed in the
GSS yard. The land of yard should be treated with such chemicals, which
prevents land fertility in the yards permanently. Periodically all shrubs and
grass be cut from the yards particularly before rains and after rains. All
branches of tree extending upto 2 meters from yard fencing should be
trimmed before and after rains. The yard should be laid with stone gravel
layer of 100 –150 mm thick with grit of 25 to 35 mm size.
4.6
Grounding of Yard Fence
(i) The station fence should generally be far outside the sub-station
equipment and grounded separately from the station ground.
The station ground and the fence ground should not be interlinked.
(ii) To avoid any risk to a person walking near the fence inside the
station, no metal part connected to the station ground, should
be nearer to the fence than 1.5 meter. It is desirable to cover a
strip about 3 meter wide inside the fence by a layer of crushed
stone which keeps its high resistively even under wet conditions.
(iii) If the distance between the fence and the station structures
cannot be increased to atleast 5 feet and if the fence is too
near the sub-station equipment structure etc. the station fence
should be connected to the station ground as otherwise a
person touching the fence and the station ground through
structure etc. simultaneously would be subjected to a very high
potential under fault conditions. When the fence is connected to
the station ground the danger zone will be outside the fence.
4.7
Sub-Station layout diagram & equipment numbering
(i) A list should be prepared and put at a prominent place in the
GSS Control Room showing all essential safety equipment and
T&P to be maintained by all GSS.
(ii) The numbering and identification of sub-station equipment and
bus arrangement should be standardized and used consistently.
All equipments shall have number and identification according
to the scheme only. The numbering in the switchyard and in the
control panels should be same to avoid possibility of any
misunderstanding. The single line diagram in the control room
shall have same numbering arrangement
(iii) Single line schematic diagram (SLD) of the sub-station shall be
put in the control room at prominent position. The SLD should
indicate the bus and feeder arrangements with all associated
20
Last Updated : 30-06-2006
equipment in the GSS. The single line diagram shall be updated
for any change /addition in the GSS.
(iv) Seminars, demonstrations etc. be arranged from time to time for
safety measures to be adopted. The workers be also explained
that in 400 kV yards, because of electrostatic charge
accumulation on sharp corners; nuts / bolts, structures and other
items should be firmly gripped. The workers may feel discharge
of charge from even earthed structure etc.
4.8
First Aid & Relief Measures
(i) First Aid Box shall be maintained at each sub-station. These
should be checked periodically and refilled or items replaced as
necessary.
(ii) Chart for providing relief and treatment of person-electrocuted
should be displayed prominently at suitable places in the substations. These should be checked for condition periodically and
replaced as and when necessary.
4.9
4.10
Fire Fighting
(i) Every licencee/ utility/ company shall carryout exercise of
training, satisfactory operation of fire extinguishers once every
year and maintain its record (Ref: Rule 43.)
(ii) Fire fighting equipments such as fire buckets filled with sand and
fire extinguishers for both electrical and oil fires should be
maintained and kept at easily accessible place in sub-station
and other working places requied as per law. Fire fighting
equipments are required to be inspected and maintained as per
relevant legislation.
Circuit Breaker Operation
Make sure while doing maintenance work on circuit breaker:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
Breaker is open before opening disconnects
Line and bus isolators have been checked open
There is no back feed from potential transformers
Main fuses at the switchboard/panel have been removed and D.C.
voltage is disconnected from breaker mechanism
Tools and equipment are in safe working condition.
In outdoor HV or EHV breakers work must be done from ladders or
platforms along side the breaker. Energized overhead conductors
are dangerous for workmen to stand on these breakers. Essential
work may be done from the top of the breaker only if protective
barriers have been installed.
21
Last Updated : 30-06-2006
(vii)
(viii)
(ix)
(x)
(xi)
4.11
Do not operate the breaker by solenoid or other operating
mechanism without oil in the tank, as this will damage the breaker
mechanism.
When working on the mechanism with the breaker-closed, wire the
trip latch or block the breaker closed so that it cannot be tripped
accidentally.
Be sure that auto-reclosure feature has been by-passed during
maintenance work.
In case of ABCB and other pneumatically operated circuit breakers
the circuit breakers should be closed after opening the isolators on
both sides, to prevent fall of pneumatic pressure.
After maintenance work is over the breaker should be operated by
relay operation as test check. This ensures safety of the system for
future faults.
Isolator Operation & Earth Switch Operation
(i) The isolators should not operate (open or close) on load in any
case.
(ii) The isolators should not be operated (open or close) on charged
line / transformer in any case.
(iii) After opening isolator be sure that there is no pole stuck and all
three poles of the isolators have been opened fully.
(iv) After closing isolator be sure that all three poles of the isolators
have been closed.
(v) The isolator should be locked with pad lock and key after
opening on PTW and should be closed when PTW is returned
properly.
(vi) When PTW is given for work on line the Earthing switch is closed
after opening the isolator and both should be Locked in position
till returned of PTW properly.
4.12 Precaution while Maintenance of Battery
(a) While preparing electrolyte for initial filling up the new battery
remember that the acid should be poured into water slowly and not
the water into acid as it may splash acid on face or eyes.
(b) Water should not be poured in concentrated acid as this will lead to
chemical explosion.
(c) If the acid is splashed in the eyes, immediately flush eyes with water
followed by Olive Oil. If irritation does not subside bathe eyes with zinc
and rose water lotion in eye glass.
(d) If the acid is drunk by mistake, take a drink of soap suds and backing
soda in a glass of water and get medical advice as soon as possible.
(e) Don’t take open flame near the battery especially while it is being
charged.
22
Last Updated : 30-06-2006
4.13 While carrying / transporting any metal object in a sub station, no
part of the object, shall be at a height exceeding 2.44 mtrs. (i.e 8 feet).
Mobile crane will always be moved below energized bus with boom
brought down to be below 2.44 mtrs.
4.14 Earthing :
(a)
(b)
(i) Earth resistance: Licensee/ utility/ company shall draw standards
for earth resistance of the GSS and shall maintain record of
measurement of earth resistivity & earth resistance carried out
before the commissioning of Grid sub-station or lines of above
33 KV voltage or each earthed structure of 33KV and lower
voltage lines.
(ii) The licencee/ utility/ company shall also carry our periodic
measurement of earth resistance and will maintain its record. The
periodicity will be as specified below. In case of any significant
deviations the detailed investigations will be undertaken and
requisite rectification will be carried out.
Each manned sub-station/guarding
Once every year.
Other sub-station/line towers.
5% randomly selected
locations every year.
(iii) Earthing resistance shall be measured with reference to other
electrode/earthmat at a distance at least 10 times the highest of
length
or
breadth
or
depth
of
the
earthing
rod/electrode/earthmat.
For
such
measurements,
lead
resistance will be subtracted.
4.15 Protection for EHV Sub Station:
(i) The licencee/ utility/ company shall provide & maintain
appropriate protective relays at 132kV GSS or above on all 33 KV
& higher voltage transmission lines. The protective relays will also
be provided on 11 KV outgoing feeders from GSS.
(ii) All protective relays shall be tested for their proper operations
atleast once every year & record of such testing will be
maintained.
(iii) Record of mal-operations or non-operations of all protective
relays shall be maintained. After every such mal-operation
investigation for its causes will be carried out & remedial
measures will be taken.
23
Last Updated : 30-06-2006
4.16 Safety devices:
(i) The licencee/ utility/ company shall maintain record of issue of safety
items, like gloves, rubber shoes, safety belts, ladders, earthing device,
first aid boxes, gas masks, to operators. Their availability at accessible
place, periodic inspection by the inspector or officer & their deposit
when found unserviceable/defective shall also be maintained.
(ii) Instructions in English and Hindi shall also be affixed for restoration of
persons suffering from electric shock. The supplier shall submit to the
Commission the list of manned above 33kV Grid sub-station provided
with artificial respirator and schedule of providing these at each
manned GSS and not provided with such facility.
4.17 Joints:
Joints between conductors of overhead lines shall be mechanically and
electrically secure under the conditions of operation. The ultimate
strength of the joint shall not be less than 95 per cent of that of the
conductor and the electrical conductivity not less than that of the
conductor. (Provided that no conductor of an overhead line shall have
more than two joints in a span).
4.18 General Safety Requirement:
(i) The licensee/utility/company shall comply with provisions of Indian
Electricity Rules 1956 in respect of various safety requirements (specially
as provided at Rule 29, 35, 36, 42, 43, 44, 64, 74 to 80, 87 & 92 & in case
of Distribution licensee rule 30, 33, 40, 48, 61, 61A)
(ii) For the safety of the public all equipments / lines shall be so installed
that ground clearance shall be maintained from foot of a person at a
position upto which he can approach unhindered.
(iii) A compensation shall be provided by licencee/utility/company where
loss of life/injury to human being or animals occurs on account of
electrical accident due to their default.
4.19 Voltage:
The supplier shall maintain hourly log of manned 11kV, 33kV, 132kV, 220kV
& 400kV bus voltage at the manned sub-stations and randomly selected
tail end points as may be notified from time to time by RERC which shall
not be less than 5 per circle at 11kV.
4.20 Frequency profile
24
Last Updated : 30-06-2006
The supplier shall maintain frequency profile log (at 15 minutes interval) for
the integrated system and additional one point in each of the islanded
system.
4.21 Current Profile:
The supplier shall maintain hourly log of current at manned 11kV, 33kV,
132kV, 220kV & 400kV transformers & transmission lines. The current
unbalance, i.e. neutral current shall not exceed 3%.
4.22 Inspection & Testing
Inspection & testing shall be carried out as provided at section 6 of safety
code.
25
Last Updated : 30-06-2006
SECTION-5
ADDITIONAL SAFETY REQUIREMENTS IN GENERATING STATIONS
(To be added later)
26
Last Updated : 30-06-2006
SECTION-6
PUBLIC SAFETY
6.1 It is essential that safety should be adhered all times in the installation,
operation and maintenance work. The safety instructions contained in this
section, should be followed as normal routine duty.
6.1.1 This Section of the Code shall be read in conjunction with the
following: (i) The Indian Electricity Rules 1956
(ii) IS: 5216 Recommendations on safety procedures and practices in
electrical work.
(a) Part 1 1982 General
(b) Part 2 1982 Life saving techniques
(iii) IS: 2551-1982 Specification for danger notice plates
(iv) IS: 8923-1978 Warning symbol for dangerous voltages
6.1.2 Save as otherwise provided in these rules, the relevant code of
practice of the Bureau of Indian Standards including National Electrical
Code if any may be followed to carry out the purposes of this rule and in
the event of any inconsistency, the provision of these rules shall prevail.
6.2 INSPECTION & TESTING
6.2.1 The licensee shall carry out periodic inspection and testing of his
electric supply lines (including underground cables), wire fittings,
apparatus, cutouts etc., to ensure compliance of rule 30, 31, 39, 46, 47, 49,
57, 61, & 65 of IE Rules, 1956 & licensee shall maintain record of such
inspection & testing.
6.2.2 Inspection & testing of consumer’s installation shall be carried out by
the licensee at the time of service connection & thereafter periodically, as
per schedule approved by RERC. Licensee shall maintain records of such
inspections. Periodicity of inspection shall not normally exceed 6 months
for HT consumers and 3 years for LT consumers.
6.2.3 Wherever, any deficiency is observed during inspection & testing, it
shall be rectified within 3 months.
6.3 GENERAL SAFETY REQUIREMENTS
6.3.1Construction, installation, protection, operation and maintenance of
electric supply lines and apparatus shall be in confirmation to rule 29 of IE
Rules.
27
Last Updated : 30-06-2006
6.3.2 The licensee shall ensure that in accordance with rule 31 & 32 of the
IE Rules, cut out or MCB on consumer’s premises shall be provided in fire
proof box and shall be provided at each point of junction of service line
of two or more consumers. No cut out, link or switch shall be provided on
neutral or earthed neutral conductor except where linked switch are
provided to operate simultaneously with live conductor.
6.4 ACCESSIBILITY OF BARE CONDUCTORS
Bare conductors shall not be used in a building for electric supply or
wiring. Where it is not feasible the owner of such conductors shall follow
provisions of rule 34 and get the installation approved by the electrical
inspector before energisation. Owner shall ensure that such wiring can not
be accessed without rendering them dead.
6.5 EARTHING
6.5.1 All metal supports, all reinforced and prestressed cement concrete
supports of overhead lines and metallic fittings attached thereto, shall be
permanently and efficiently earthed. For this purpose a continuous earth
wire shall be provided and securely fastened to each pole and
connected with earth ordinarily at three points in every km. The spacing
between the points shall be as nearly equidistance as possible.
Alternatively, each support and the metallic fitting attached thereto shall
be efficiently earthed or metallic bearer wire used for supporting insulated
wire of low and medium voltage overhead service lines and each staywire shall be permanently & efficiently earthed as per rule 90 of IE Rules.
For stay wire with proper insulator provided at a height not less than 3.0
meters from the ground, this provision shall not apply to position of stay
wire at a height above 3.0 meters & on other side of insulator. Earthing of
first three poles from the substation only shall be carried out.
6.5.4 Earthing shall effected as per code of practice for earthing. For sub
station provided with earthing mat, IEEE guidelines for substation earthing
shall be followed.
6.5.5 Earthing conductor shall have short time rating of three second
equal to short circuiting rating of overhead lines, electrical equipment etc
as standardised by the licensee for that voltage class & in no case be less
than 8 SWG GI wire for earthing of the metal support & 70 sq mm for
earthing the equipments and if made of iron or steel, shall be galvanised.
6.6 General conditions as to transformation and control of Energy
6.6.1 Where energy at high or extra-high voltage is transformed,
converted, regulated or otherwise controlled in sub stations or switch
28
Last Updated : 30-06-2006
stations (including outdoor substations and out door switch stations) or in
street boxes constructed underground, the provisions of rule 68 of IE Rules
shall be followed.
6.6.2 Where a substation is provided with fencing as per rule 68 (b) of IE
Rules, distance of live part measured up to top of fencing & then along
the height of fencing shall not be less than safety clearance vide clause
1.15 of this code. Fencing shall be effectively earthed.
6.7 SAFETY AND PROTECTIVE DEVICES
6.7.1 Every overhead line, (not being suspended from a dead bearer wire
and not being covered with insulating material and not being a trollywire) erected over any part of street or other public place or in any
factory or mine or on any consumers’ premises shall be protected through
protecting relays and/ or shields for rendering the line electrically harmless
in case it breaks.
6.7.3 The licensee shall make adequate arrangements to prevent
unauthorized persons from ascending any of the supports of any
overhead lines which can be easily climbed upon without the help of a
ladder or special appliances. Rails, reinforced cement concrete poles
and pre-stressed cement concrete poles without steps, tubular poles,
wooden supports without steps, I-sections and channels shall be deemed
as supports which cannot be easily climbed upon for the purpose of this
rule.
6.8 GUARDING
6.8.1 Where guarding is required to be provided under IE rules, it shall be
provided as per rule 88 of IE Rules. In addition every guard wire shall be
connected with earth at each pole/ support.
6.8.2 Every guard wire or cross connected system of guard wires shall have
short circuit current carrying capacity equal to protective switch gears
with no risk of its fusing.
6.9 Consumers, owners, occupiers, electrical contractors, electrical
workmen and suppliers shall carry out electrical installation works as per
Rule 45 of IE Rules.
6.9.1 Electrical installation work which has been carried out in
contravention of rule 45 of IE Rules and which has not complied with any
other rule (including rule 50) shall neither be energized nor connected to
the works of any licencee. If connected, it shall be disconnected on
serving a 7 days notice.
6.10 Earth leakage protective device
29
Last Updated : 30-06-2006
The supply of energy to every electrical installation other than low
voltage installation below 5KW, service lines, metering system, licencee’s
control gears & effectively earthed overhead lines with protective devices
as per rule 91 of IE rules, shall be controlled by an earth leakage
protective device so as to disconnect the supply instantly on the
occurance of earth fault or leakage of current. Earth leakage relay shall
be single or three phase as per electrical supply to the installation.
6.11 The consumer/ owner shall comply with IE Rules specifically the
following:
Rule No. 35 Danger Notices
Rule No. 36 Handling of electric supply lines and apparatus.
Rule No. 37 Supply to vehicles, cranes, etc.
Rule No. 38 Cables for portable or transportable apparatus.
Rule No. 39 Cables protected by bituminous materials.
Rule No. 42 Accidental Charge.
Rule No. 50 Supply and use of energy
Rule No. 50A Additional provisions for supply and use of energy in multi
storeyed building (more than 15 meters in height)
Rule No. 51 Provisions applicable to medium, high or extra high voltage
installations.
Rule No. 79 Clearances from buildings of low and medium voltage lines
and service lines.
Rule No. 80 Clearances from buildings of high and extra high voltage lines.
Rule No. 81 Conductors at different voltages on same supports.
Rule No. 82 Erection of or alteration to buildings, structures, flood banks
and elevation of roads.
6.12 SAFETY PRACTICES
In all electrical works, it is very necessary that certain elementary safety
practices are observed. It has been found that quite a large number of
accidents occur due to the neglect of these practices. The details of such
practices are given in Appendix C of IS : 5216 (Part 1)-1982 and
reproduced at annexure ‘C’.
6.13 Equipment, Devices and Appliances- General guidelines regarding
the same as given in IS : 5216 (Part 1)-1982 shall be followed.
6.14 Capacitors
The provisions of rule 70 in respect of automatic discharge of every static
capacitor on the disconnection of supply shall be enforced on
30
Last Updated : 30-06-2006
consumer’s premises except where rule 71 is not infringed and or where
access to capacitor requires opening of appliance, e.g. Sodium vapour
light fittings, fans, electronic devices etc.
6.15 Compensation for damage, injury, electrocution etc.
(i) A compensation shall be provided by licencee/utility/company where
loss of life/injury to human being or animals occurs on account of
electrical accident due to their default.
(ii) A licensee shall cause as little damage, detriment and inconvenience
as may be, and shall make full compensation for any damage,
detriment or inconvenience caused by him or by any one employed
by him.
6.16 Complaint center where public can report unsafe installations shall
be notified by distribution, transmission licencee & generation companies:
6.17 ACCIDENTS AND TREATMENT FOR ELECTRIC SHOCK
IS : 5216 (Part 2)-1982 shall be followed for safety procedures and
practices in electrical work. Licencee / utilities/company shall ensure
display of detailed instructions for safety precautions & procedure of
operation of first aid boxes, safety devices etc.
6.18 Day and night visual aids (i.e. marking) for flight safety shall be
provided as per IS 5613-1989. Within a radius of 20 Km from nearest air
force station, all transmission lines and structures with height 45 meter or
more shall be provided with day and night marking and beyond this
distance, all structures with height of 45 meter or more shall be provided
with day marking.
31
Last Updated : 30-06-2006
ANNEXURE-A
DRAFT PROCEDURE FOR ISSUE OF PERMIT TO WORK
1.
SAFETY COORDINATION PROCEDURE
1.1
INTRODUCTION
This document lays down the procedure to be followed when work is
required to be carried out on the line/equipment connected to state
transmission system and defines the responsibility for the safety of persons
working on the EHT net work to be established and maintained.
1.2
OBJECTIVE
The objective of this RVPN internal procedure is to ensure that work on
inter-user boundary is carried out in safe and coordinated manner thus
obviating any mis-happening /accident due to any misunderstanding in
any form.
Through proper implementation of this procedure and RVPN safety code,
the accidents to persons working on the EHV grid system will be reduced.
1.3
SCOPE
This procedure applied to all lines and sub-stations of SSGS, RVPN, and
each Discom connected to the State Transmission System.
1.4
RESPONSIBILITY
Designated Officers (not below the level of Junior Engineers) of SSGS,
RVPN and Discom, as the case may be shall be responsible for
coordination and issue of PTW to ensure safety precautions.
1.5
METHODOLOGY
1.5.1
Designated Officers
i.
RVPN, SSGS and each Discom connected to the Rajasthan State
Transmission System shall nominate suitably authorized persons to
32
Last Updated : 30-06-2006
be responsible for the co-ordination of safety across that
company boundary before taking up the work involving interboundary. These persons shall be referred to as Designated
Officers.
ii.
The names of Designated Officers shall be circulated to the
other party/ other effected user with his designations and
telephone numbers for issue of PTW (Permission to Work).
1.5.2
i.
WORK AUTHORISATION
Whenever work on any transmission line/equipment connected
to the State Transmission System is to be carried out the
Designated Officer of the constituent
(which may be RVPN),
wishing to carry out work shall personally contact the other
relevant Designated Officer for permission to work.
ii.
If the permission to work cannot be obtained personally, the
designated officers shall contact through telephone and
exchange ‘code words’ to ensure correct identification of both
parties.
iii.
Should the work extend over more than one shift the
Designated Officer shall ensure that the Designated Officer of
the new shift is fully briefed on the nature of the work and the
code words for PTW return.
iv.
The Designated Officers shall co-operate to establish and
maintain the precautions necessary for the required work to be
carried out in a safe manner.
v.
The line under PTW should be earth form both the ends, where
such facilities exist.
vi.
Work shall not be commenced until the Designated Officer of
the User (who may be RVPN) is satisfied that all the safety
precautions have been established. This Designated officer shall
33
Last Updated : 30-06-2006
issue agreed safety documentation (PTW) to the working party
to allow work to commence.
vii.
The PTW in respect of ISTS and specified EHV lines/ICT shall be
issued with the consent of SLDC in coordination with NRLDC if
required.
viii.
The SLDC shall issue Code for ‘switching in’ and ‘switching off’
such lines/ICT.
ix.
After completion of work and safety precautions are no longer
required, the Designated Officer who has been responsible for
the work being carried out shall make direct contact with the
other Designated Officer to return the PTW and removal of those
safety precautions.
x.
The line/equipment shall only be put back to service when all
safety precautions are confirmed as removed, by direct
communication using code word contact between the two
Designated Officers, and return of agreed safety documentation
(PTW) from the working party has taken place.
xi.
SLDC shift-in-charge shall make relevant entries as per data
logging procedure in the Outage/Shut-down Register.
34
Last Updated : 30-06-2006
ANNEXURE-B
1.
1.1
DRAFT ACCIDENT REPORTING PROCEDURE
INTRODUCTION
This document describes the RVPN internal procedures for reporting
accidents causing serious injury or death of an employee or
member of the public or any animal to the appropriate authorities.
1.2
OBJECTIVE
The implementation of this procedure will result in a clear,
consistent, unambiguous communication throughout RVPN of each
and every accident; so that lessons can be learned from the
accident to avert recurrence of the accidents in future and
observing legal requirement of intimation in prescribed manner to
Electrical Inspector in accordance with the Indian Electricity Rules,
1956, (Rule 44-A).
1.3
SCOPE
This procedure applies to all SSGS, RVPN and each Discom
connected to the Rajasthan State Transmission System.
1.4
RESPONSIBILITY
Shift Engineer, SLDC is responsible for monitoring and observing the
reporting process of fatal and non-fatal accident.
Officer-in-charge (not below the rank of Junior Engineer) of the
concerned RVPN sub-station/ line where accident took place shall
be responsible for sending the reports of accident.
However, it should be noted that the first priority in the event of an
accident is to provide relief and rescue operations for affected
persons rather than writing of reports.
1.5
METHODOLOGY
35
Last Updated : 30-06-2006
i.
ii.
All accidents fatal or non-fatal shall be promptly reported by the
Shift-in-Charge of the concerned RVPN sub-station/line where
accident occurred.
It should be determined if the accident has resulted in serious
injury; whether the injury is fatal or non-fatal, whether the injured
includes animal (s) and person (s), and the number (s) of each in
initial and final written reports as per the Appendices mentioned
herein.
iii.
Intimation of accidents shall be in accordance with the Indian
Electricity Rules, 1956, Rule 44-A to the Electrical Inspector.
iv.
All accidents identified for intimation under Rule 44A of IE Rules
shall be reported within 24 hours of the knowledge of the
occurrence of the fatal accident.
v.
The written report of fatal and non-fatal accidents shall be sent
within 48 hours of the knowledge of the occurrence of the fatal
accident in the prescribed Form No. XIII of IE Rules (Appendix-A)
1.6
APPENDIX
1. IE Rules Form No. XIII – Appendix- A
36
Last Updated : 30-06-2006
Annexure ‘C’
GENERAL SAFETY PRACTICES IN ELECTRICAL WORK
1 EXERCISE CARE
(a) Place yourself in a safe and secure position to avoid slipping, stumbling
or moving backward against live conductors or apparatus. Do not rely for
protection upon the care assumed to be exercised by others.
(b) In the event of near approach of a lightning storm, all out door work
on electrical system should cease.
(c) Make a habit of being cautious. Be on the lookout for danger notice
plates, danger flags, warning boards and signals, etc. Warn others when
they seem to be in danger near live conductors or apparatus.
2 PERSONAL APPAREL
(a) Use of overalls, dungarees, jumpers and coats having metal buttons,
metal straps and similar metal fittings should be avoided. Bone buttons
may be used. Buttons should be sewed in place with thread. Loose
clothing should not be worn.
(b) While working on live conductors, do not roll up sleeves as dry cloth
gives some protection against shocks.
(c) Do not wear shoes with nailed soles. Shoes should have sewn soles, or
preferably rubber soles.
(d) Do not wear suspenders and armbands with metal buckles or other
metal parts. These might come in close proximity to live parts and cause
serious, if not fatal, injury.
(e) Metal key chains, or metal keepers for key rings or watch chains should
not be worn on the outside of clothing. There is always a possibility that
they may come in contact with live conductors or live apparatus.
(f) While welding wear goggles, safety glasses or any other eye protection
as instructed by the person-in-charge depending upon the type of work
handled.
3 TREAT EVERYTHING AS LIVE
Treat all electrical conductors and apparatus always as live and
consequently dangerous to human life, unless it is positively known to be
dead and properly earthed and take precautions accordingly.
4 THINK BEFORE YOU ACT
(a) Think carefully before you act. Make sure you are right. Watch out for
the other man and make sure he is right.
(b) Never speak to any person working upon live mains or apparatus,
37
Last Updated : 30-06-2006
unless the person doing the work is aware of your presence.
5 DANGEROUS VOLTAGES
(a) All voltages are dangerous. It shall be borne in mind that even low
voltage shock may be fatal.
(b) Every person-in-charge of work on any mains or apparatus shall ensure
himself that the same is free from dangerous leakage or induction and
has been effectively earthed locally before permitting men to work upon
it.
6 DANGEROUS AREA
When working in areas that contain or may contain live mains and
apparatus, fix danger notice plates, barriers, rails or other guarding
arrangement for the working area. Do not store materials within high
voltage enclosures or low voltage areas.
7 WARNING BOARDS
Warning boards shall be placed by the person-in-charge on all switchgear
before men are permitted to work and should only be removed by the
person who has placed them. It is desirable that the person issuing the
permit shall place one warning board on the switch energizing the mains
for each permit issued so that he can be sure that all the permits-to work
are returned when he has to charge the mains.
8 VISITORS AND UNAUTORIZIED PERSONS
Visitors and unauthorized persons shall not be allowed to proceed in the
vicinity of live mains and apparatus, unless accompanied by an
authorized person whose responsibility it shall be to ensure that his
instructions regarding safety are strictly complied with.
9 WORKING IN DAMP SITUATIONS
Extra precautions should be taken when working in abnormally damp
area.
10 USE OF TONG OR CLIP-ON AMMETERS
These shall not be used on high voltage conductors, unless the
conductors are lead- sheathed. On low voltage conductors, all persons,
not accustomed to the handling of tong or clip-on ammeter, shall be
warned of the necessary precautions to be observed before being
allowed to use it.
11 WARNING THE PUBLIC
When, either accidentally or otherwise, live mains and apparatus
constitute a danger to persons in a public place, a person shall be
38
Last Updated : 30-06-2006
detailed to stand by and personally warn the public until the danger has
been removed.
12 PORTABLE ELECTRICAL APPARATUS
(a) All portable electrical apparatus shall be regularly examined, tested
and maintained to ensure that the apparatus and leads are in good
order.
(b) Ensure that all portable appliances are provided with 3-pin plug and
socket connections and that metal work of the apparatus is effectively
earthed.
(c) All loose wiring, such as flexible cables for portable lamps, tools and
trailing cables and other portable and transportable apparatus, shall be
tested regularly at frequent intervals to ensure safety.
APPENDIX-A
THE INDIAN ELECTRICITY RULES, 1956
(ANNEXURE-XIII)
FORM FOR REPORTING ELECTRICAL ACCIDENTS
(SEE RULE 44-A)
1.
Date and Time of Accident
2.
Place of accident
(Village/Town, Tehsil /Thana, District and State)
3.
System and voltage of supply
(Whether EHV/HV/LV line, sub-station/generating station
/consumer’s installations/ service lines/other
installations).
4.
Designation of the Officer-in-charge (in whose
Jurisdiction the accident occurred).
39
Last Updated : 30-06-2006
5.
Name of owner/user of energy in whose premises the
accident occurred.
6.
Details of victim (s)
(a)
Human
S.NO.
1
(b)
NAME
FATHER’S
NAME
SEX OF
VICTIM
2
3
4
FULL
APPORX. FATAL/NONPOSTAL
AGE
FATAL
ADDRESS
5
7
Animal
S.No.
Description
of Animals
Number (s)
Name (s)
of owner
(s)
1
2
3
4
7.
6
Address (es) Fatal/Nonof owner (s)
Fatal
5
In case the victim(s) is are employee(s)
(a)
Designation of such person (s)
(b)
Brief description of the job undertaken, if any.
40
Last Updated : 30-06-2006
6
(c)
Whether such person/persons was/were allowed to work on
the job?
8.
In case the victim(s) is/are employee (s) of a licensed contractor
(a)
Did the victim(s) possess any electric workman’s permits,
supervisor’s c ertificate of competency issued under Rule 45?
If yes give number and date of issue and the name of issuing
authority.
(b)
Name and designation of the person who assigned the duties
of the victim (s).
9.
In case of accident in the suppliers system, was the Permit To Work
(PTW) taken?
10.
(a)
Describe fully the nature and extent of injuries, e.g. fatal
/disablement (permanent or temporary) of any portion of the
body or burns or other injuries.
(b)
11.
In case of fatal accident, was the post mortem performed?
Detailed causes leading to the accident
(To be given in a separate sheet annexed to this form)
12.
Action taken regarding first-aid, medical attendance etc.
immediately after the occurrence of the accident (give details)
13.
Whether the District Magistrate and Police Station concerned have
been notified of the accident (if so, give details)
14.
Steps taken to preserve the evidence in connection with the
accident to the extent possible.
15.
Names and designation(s) of the person(s) assisting, supervising the
person (s) killed or injured.
16.
What safety equipments were given to and used by the person(s)
who met with this accident (e.g. rubber gloves, rubber mats, safety
belts, and ladders etc.)?
41
Last Updated : 30-06-2006
17.
Whether isolating switches and other sectionalizing devices were
employed to deaden the section for working on the same?
Whether working section was earthed at the site of work?
18.
Whether the work on live lines was undertaken by authroised
person(s)? If so, the name and the designation of such person(s)
may be given.
19.
Whether the artificial resuscitation treatment was given to the
person(s) who met with the electric accident? If yes, how long was
it continued before its abandonment?
20.
Names and designations of persons present at and witnessed the
accident.
21.
Any other information remarks.
Place: Time: Date: Signature
Name
Designation
Address of the person reporting
42