Environ Dev Sustain (2014) 16:769–796
DOI 10.1007/s10668-013-9494-5
CASE STUDY
Hydrogeomorphic variability due to dam constructions
and emerging problems: a case study of Damodar River,
West Bengal, India
Sandipan Ghosh • Sanat Kumar Guchhait
Received: 9 March 2013 / Accepted: 26 September 2013 / Published online: 8 October 2013
Ó Springer Science+Business Media Dordrecht 2013
Abstract In the first multipurpose river valley planning of India, the vast resources of
Damodar River Basin (DRB) (eastern India) are not only to be envisioned in their entirety
but also to be developed in a unified manner where the water, land, and people are
simultaneously bounded in a seamless web. Four large dams (Konar, Tilaiya, Maithon, and
Panchet), Durgapur barrage, and Tenughat reservoir are built to tamp the flood-prone
Damodar River using water resource in an integrated method. The functionality of
Damodar fluvial system is controlled by dams, barrage, weirs, sluices, embankments, and
canals, maintaining a dynamic equilibrium between fluvial processes and anthropogenic
processes. Carrying more than 50 years of legacy, the existing drainage and flood control
system of Damodar Valley Corporation has aggravated a number of hydrogeomorphic
problems especially in lower DRB, viz. siltation of river bed and reservoirs, uncontrolled
monsoonal stream flow, declining carrying capacity of lower course, drainage congestion,
low-magnitude annual floods, channel shifting, de-functioned canals, decay of paleochannels, decline of ground water level, and less replenishing of soils with fresh silts. The
present paper is mainly tried to investigate the pre-dam and post-dam hydrogeomorphic
variability in relation to flood risk and drawbacks of Damodar Valley Multipurpose Project. Specifically, the annual peak flow of Damodar shifts from August to September due to
dam construction and reservoir storage. Applying the annual flood series of log Pearson
type III distribution, we have estimated post-dam 5-year peak discharge of above
5,300 m3 s-1 and 100-year flood of above 11,000 m3 s-1. Due to siltation, the bankfull
discharges of sample segments are gradually declined up to 4,011 m3 s-1, 2,366 m3 s-1,
S. Ghosh (&) S. K. Guchhait
Department of Geography, The University of Burdwan, P.O. Rajbati, Burdwan 713104, West Bengal,
India
e-mail: sandipanghosh19@gmail.com
S. K. Guchhait
e-mail: guchhait.sanat37@gmail.com
Present Address:
S. Ghosh
Baburbag, Paschim Para, P.O. Rajbati, Burdwan 713104, West Bengal, India
123
770
S. Ghosh, S. K. Guchhait
and 1,542 m3 s-1, respectively, having recurrence interval of 1.18–3.18 years only. With
the regulation of monsoon flow, the standard sinuosity index is gradually increased
downstream, having high dominance of hydraulic factors in respect of topographic factors.
The upstream section of study area (Rhondia to Paikpara) now shows the dominance of
aggradational landforms, braiding, avulsion, high width–depth ratio, breaching of right
bank, and valley widening, but downstream of Barsul the phenomena of bank erosion,
confined sinuosity, low width–depth ratio, and narrowness are more pronounced.
Keywords
Dam Hydrogeomorphology Flood Paleochannels DVC DRB
1 Introduction
Large dams and development are interrelated, and this acquaintance may be implemented in
an integrated way to boost up the economy of backward region using mainly the water,
mineral, and power resources. Development has been defined as a dynamic process of
growth, expansion, or realization of potential, bringing regional resources into full productive use (Husain 2011). Regional development emphasizes on re-organizing the space for
its comprehensive development with a view to providing ideal living conditions to all human
communities in all regions of human occupance not in isolation from each other but in
integration with each other (Chandna 2008). In India, one of the earliest outcomes of
comprehensive regional planning was enacted as the multipurpose river valley project,
constructing large dams on major rivers (focusing on flood mitigation, irrigation and hydropower). Importantly, the first river valley project of India was jointly implemented in
Damodar River Basin (DRB) by the states of Jharkhand (then Bihar) and West Bengal under
the great leadership of first Prime Minster, Pandit Jawaharlal Nehru. The most significant
geographical aspect of this developmental program is the modification of natural spatial unit,
i.e., drainage basin, which is the fundamental unit of geomorphic and hydrological study.
Under the Damodar Valley Multipurpose Project (DVMP), the vast resources (water, minerals, coals, forest, and alluvial soils) of DRB are not only to be envisioned in their entirety
but also to be developed in an integrated way where the water, land, and people are simultaneously bounded in a seamless web (Krik 1950; Saha 1979). The large-scale modification
of river basin is enacted by the fluvial engineering structures, including dams, barrages,
weirs, sluices, canals, and embankments, to regulate stream flow and to use water resource in
productive ways (Mishra 2001). However, river basins are considered an important repository of neo-tectonic, hydrological, climatic, and anthropogenic changes because the fluvial
system is the most sensitive elements of the earth’s surface, and any shift in environmental
conditions instigates a rapid response from the fluvial system (Sridhar 2008; Singhvi and
Kale 2009). So the construction of dams and other structures on the river demolishes its
previous natural entity and compels the fluvial system to enter into a new phase of equilibrium with changing aggradation and degradation processes.
Up to 1900, there were only 81 dams in India, while in 1950 and 2012, the number
jumps into 302 and 4,818, respectively (Indian Central Water Commission 2012). As the
dam construction has increased in India and other developed country, the number of
publications on the effects of dam construction on physical and socio-economic environment around the world has also increased. The assessment of general effects of dams and
response of fluvial system can be found in the writings of Morris and Fan (1997), Barrow
(1987), and Xu (1990). The geomorphic downstream effects of dams have been studied by
123
Hydrogeomorphic variability due to dam constructions
771
Williams and Wolman (1984), Graf (2006), Brandt (2000a, b), Grant et al. (2003), Hupp
et al. (2009), and Wildi (2010). The effects of Damodar Valley Project (DVP) on the river
are precisely analyzed by Bhattacharya (1959), Chatterjee (1969), Bagchi (1977), Saha
(1979), Sen (1985, 1991), Choudhury (1995), Chandra (2003), Lahiri-Dutt (2006), Rudra
(2002, 2010), Mukhopadhyay and Dasgupta (2010), Ghosh (2011), and Bhattacharyya
(2011). On the basis of reviews of the previous literatures and the empirical observations,
the main aim of this study is to synthesize the new-fangled information and significant
findings about the downstream hydrogeomorphic impacts and variations (in relation to
flood risk) due to DVP. The objectives are set forth as follows:
1. To understand the impact of infrastructures on the floodplain of Damodar River,
2. To analyze the dam-induced geomorphic and hydrologic changes in the Damodar
River, and
3. To estimate pre-dam and post-dam flood frequency including potential bankfull
discharges.
2 Materials and methods
The study about fluvial dynamics, river morphology, and floods always incorporates an
interdisciplinary approach of earth science, including modern methods and advanced techniques of hydrology, fluvial geomorphology, quaternary geology, remote sensing, and
Geographic Information System (GIS). The study area includes the lower segment of
Damodar River in between Rhondia (23°220 800 N, 87°280 2500 E) and Paikpara (23°000 5800 N,
87°570 4100 E) having length of 82 km (Fig. 2). Downstream of Asansol, the river crosses the
hindrances of Durgapur Barrage (at Durgapur) and Anderson Weir (at Rhondia), and then, it
flows almost straight up to Barsul and Palla with a conspicuous bed toward south. Downstream of Paikpara, it subsequently bifurcates into two main distributaries, Damodar (left)
and Mundeswari (Right). This segment of channel belt has lots of paleogeomorphic significance because the fault-guided course of lower Damodar (Singh et al. 1998) was previously shifted many times during extreme floods and left many paleochannels on
Quaternary fan-deltaic sedimentary units of western Bengal Basin (Niyogi et al. 1970;
Niyogi 1975; Acharyya and Shah 2007). Selecting this spatial unit and incorporating the
secondary information, toposheets, satellite images, quantitative techniques, and GIS, an
attempt is made here to employ the approach of ‘‘hydrogeomorphology’’ which is the earth
science relating to the geographical, geological, and hydrological aspects of water bodies and
changes to these in response to flow variations and to natural and human-caused events
(Scheidegger 1973; Babar 2005). Hydrogeomorphology also includes the interplay in
between ability of streamflow to transport sediments and incoming sediment flux (Grant et al.
2003). We have collected secondary data and information mostly from the writings of
Chatterjee (1967) and Bhattacharyya (2011), official Web sites of Irrigation and Waterways
Dept. of West Bengal (www.wbiwd.gov.in/), West Bengal State Marketing Board (www.
wbagrimarketingboard.gov.in/), Indian Meteorological Department of India (www.imd.gov.
in/), published reports of Geological Survey of India (Bhattacharya and Dhar 2005), Google
Earth, SRTM (Shuttle Radar Topographic Mission) data (www.srtm.csi.cgiar.org/), and
different research articles relating to Damodar River. We have also used the toposheet NF
45-C of the United States Army Corps of Engineers (USACE) (1922–43), toposheets
(1969–74) of Survey of India (SOI) (73 M/7, M/11, M/12, M/15, M/16, N/13 and 79 A/4),
Global Land Cover Facility (GLCF) (www.glcf.umd.edu/) satellite images of Landsat MSS
123
772
S. Ghosh, S. K. Guchhait
(1972–73), Landsat TM (1990 and 2006), and Landsat ETM ? (2000). The methodology of
this research is depicted in a flowchart (Fig. 1).
Taking all raster layers, we have reprojected the maps and images in UTM WGS-84
projection system in ArcGIS 9.3 and Erdas Imagine 9.1 software to minimize error in
images mosaic and superimposition of layers. Observing the direction of valley, sudden
change in plan-form, and bed topography, we have subdivided Damodar River into few
segments for detailed analysis of geomorphic indexes. To get parametric values of sinuosity index (Mueller 1968), braiding index (Brice 1964), braid-channel ratio (BR) (Friend
and Sinha 1993), and other quantitative index for geomorphic analysis, we have created
vector layers on five geo-referenced images in MapInfo 11.0 software on by one, digitizing
the river and both banks. To locate the sites of fluvial degradation and aggradation, we
have superimposed the vector layers of channel in GIS to get comparable picture. The
sectional profile of Damodar River is derived from the GPS survey (Garmin GPS 76CSx
device, ?3\ error \-3) with UTM Projection and WGS-84 datum, and the vulnerable
locations of bank erosion are verified in the field using GPS locations. The employed
techniques are summarized as follows.
The sinuosity index of Mueller (1968) can be written as
HSI ðHydraulic Sinuosity IndexÞ ¼ % equivalent of ðCIVIÞ = ðCI1Þ
ð1Þ
TSI ðTopographic Sinuosity IndexÞ = % equivalent of ðVI1Þ=ðCI1Þ
ð2Þ
SSI ðStandard Sinuosity IndexÞ = CI / VI
ð3Þ
where CI is channel index (CL/Air), VI is the valley index (VL/Air), CL is the length of the
channel (thalweg) in the stream under study, VL is the valley length along a stream, the
length of a line which is everywhere midway between the base of the valley walls (in this
Fig. 1 Flowchart of adapted methodology
123
Hydrogeomorphic variability due to dam constructions
773
case, one half of total length of right and left banks of a reach), and Air is the shortest air
distance between the source and mouth of the stream (in this case shortest air length of a
reach) (Mueller 1968; Prasad 1982).
Brice’s braiding index can be defined as
X
ð4Þ
BI = 2
Li =Lr
where Li is the length all islands and bars in the reach and Lr is the length of the reach
measured midway between the banks of the channel belt (Brice 1964).
Braid-Channel Ratio of Friend and Sinha (1993) has been measured as follows
B ¼ Lctot =Lcmax
ð5Þ
where Lctot is the sum of mid-channel lengths of all the segments of primary channels in a
reach and Lcmax is the mid-channel length of widest channel through the reach (Friend and
Sinha 1993).
To estimate the carrying capacity (m3) of a particular segment and threshold level of flood
discharge or bankfull discharge (m3 s-1), we have calculated mean cross-sectional area (m2)
and mean maximum length of the reach (m) of three selected channel segments of Damodar
River, viz. (1) Rhondia to Jujuti segment, (2) Jujuti to Chanchai segment, and (3) Chanchai to
Paikpara segment, using SRTM data and Global Mapper 13.0 software (3D path profile tool).
After collecting the results, we have employed different statistical analysis and graphs, viz.
mean, standard deviation (r), coefficient of determination (R2), Pearson product moment
correlation (r), regression, log Pearson Type III probability distribution, Gumbel distribution,
etc., for hydrological interpretation of stream flow data. In flood frequency analysis of stream
flow data, the exceedence probability (P) can be defined by Gumbel distribution as
P ¼ 1eey ¼ 1=Tr
ð6Þ
where Tr is return period, y [here, y = a (x-xf)] is called reduced variate, a and xf (a
reference value of x) are the parameters of the distribution which can be obtained from
sample statistics through the method of moments (Reddy 2011). If XT denotes the magnitude of the flood with return period of Tr years,
XT ¼ Xmean þ KT :r
ð7Þ
where KT is the ‘‘frequency factor’’ (yT-ymean/rn), yT is the reduced variate, ymean is the
mean of reduced variate, and rn is standard deviation of reduced varites (calculating these
from table value of Gumbel’s distribution) (Reddy 2011).
Logarithmic Pearson Type III distribution (LP3) of flood frequency has advantage of
providing a skew adjustment and if the skew is zero, the log Pearson distribution is
identical to the log Normal distribution (Rao and Hamed 2011; Raghunath 2011). The
probability density function for type III (with origin at the mode) is
f ð xÞ ¼ fo ð1x=aÞc expðcx=2Þ
ð8Þ
where
a ¼ ðc = 2Þðl3 =l2 Þ; b ¼ l23 =l22
fo ¼ ðn=aÞ ccþ1 =ec Cðc þ 1Þ
c ¼ 4=b 1;
ð9Þ
ð10Þ
123
774
S. Ghosh, S. K. Guchhait
where l2 is the variance, l3 is third moment about the mean (r6g), E is the base of the
Napierian logarithms, C is the gamma function, n is the number of years of record, g is the
skew coefficient, and r is the standard deviation (Rao and Hamed 2011). The United State
Water Resource Council (USWRC 1967) and Haan (1977) adopted that distribution to
achieve standardization of procedures. The values of x for various recurrence intervals are
computed from
log x ¼ log xmean þ KT rlog x
ð11Þ
where KT is the frequency factor, tabulated in respect of skew coefficient and recurrence
intervals (Haan 1977).
3 Damodar River Basin
The Damodar River rises in the Khamarpat Hills of Chotanagpur Plateau (near Chandwa in
Palamau district, Jharkhand) approximately at 23°370 N and 84°410 E (Sen 1985; Ghsoh
2011; Bhattacharyya 2011). For the first 45 km, the river is known as Deonad. The
Damodar—the name originating from dam ? udar (the river with a fiery belly, possibly
symbolizing the existence of coal in its valley) as claimed by the agricultural settled caste
Hindus who belong to the upper crust of modern Indian society, or dah ? modar (sacred
water) as claimed by local adivasi (i.e., tribe) folklore (Lahiri-Dutt 2003).
The Damodar River is a tributary of the Bhagirathi-Hooghly River system of West
Bengal, carrying coarse sediments from Chotanagpur Plateau to the western part of Bengal
Basin (Fig. 2). Its funnel-shaped basin area is about 23,300 km2, in the states of Jharkhand
(73.7 % of basin area) and West Bengal (26.3 % of basin area) (Majumder et al. 2011).
Near Palla village (close to Chanchai rail station), the lower reach of Damodar takes a
sharp southerly 90° bend (fault guided) and below Paikpara, the Damodar River bifurcates
into the Kanki-Mundeswari and the Amta Channel-Damodar and joins with Hooghly River
at Falta some 48.3 km south of Kolkata City (Bhattacharyya 2011; Ghosh and Mistri
2012a). Damodar River had been deeply incised in the faulted Gondowana uplands of
Jharkhand, following Raniganj coal belts and lateritic Rarh Plain of West Bengal, and after
which it had formed older alluvial plain of Late Pleistocene and Early Holocene ages
(Sijua Morpho-stratigraphical unit), respectively, in the lower valley, developing a fandelta toward east (Acharyya and Shah 2007).
For field investigation (sample study), we have selected the lower flood-prone segment
(23°000 –23°220 N and 87°280 –88°010 E) of Damodar River (82 km length) in between
Rhondia and Andersion Weir below Durgapur Barrage (west) and Paikpara below Jamalpur (east) (Fig. 1). Based on channel dimensions (i.e., width–depth ratio, sinuosity,
entrenchment, braiding, river cross-sections, etc.) the channel is subdivided into four broad
segments for fled study, viz. (1) Rhondia to Kashpur, (2) Kashpur to Idilpur, (3) Idilpur to
Chanchai), and (4) Chanchai to Paikpara. Using Landsat satellite image and GPS device
(UTM projection and WGS-84 datum), the field cross-profiles of Damodar River are drawn
in selected points to delineate channel shifting, and the vulnerable locations of bank
erosion are also revisited through GPS survey and Google Earth imagery. The GPS survey
is started from a control base point of known bench mark nearer to the Damodar River, and
the elevations of sample nodes are sequentially stored in the device, plotting these in
Landsat image and Google Earth to analyze the survey path.
123
Hydrogeomorphic variability due to dam constructions
775
Fig. 2 Location map of DRB including study area
In lower DRB, the records of floods for the period between 1878 and 1912 are not
complete, but few written documents of furious floods were reported in 1882, 1890, 1898,
1901, 1902, 1903, 1905, and 1907 (Peterson 1997). The flash floods of 1823, 1840, 1913,
1935, 1941, 1958, 1959, and 1978 had peaks of more than 16,992 m3 s-1 (Mukhopadhyay
and Dasgupta 2010; Bhattacharyya 2011). The flood of Damodar River comprises two
main phases, viz. ‘‘the land phase’’ where prolong rainfall and infiltration excess overland
flow generate flood and ‘‘the channel phase’’ which follows the land phase closely and
starts when surface runoff enters the stream channels. Ordinarily when speaking of floods,
we mean the channel phase is the most spectacular and on the whole the most destructive
(Sarma 2002).
4 Damodar Valley Project
Conceived in 1945 on the lines of Tennessee Valley Authority (TVA), the Damodar Valley
Corporation (DVC) was formed in 1948 (Bhattacharya 1959). After the devastating flood
of 1943, the British Bengal Government set up a ‘‘Damodar Flood Enquiry Committee,’’
which advised that nothing less than a complete catchment-basin scheme could prevent
further destructive flooding by the Damodar in West Bengal (Krik 1950; Saha 1979). It was
decided that the scheme had to be implemented through eight large dams at eight sites, viz.
Tilaiya, Maithon and Balpahari on the Barakar River; Bokaro on the Bokaro River; Konar
on the Konar River, and the Panchet, Aiyer, and Bermo detention dams (Krik 1950;
Chandra 2003). But in the first phase, only four dams (Fig. 3, 4), viz. Tilaiya (1953), Konar
(1955), Maithon (1957) and Panchet (1959), had been constructed by DVC (Table 1).
123
776
S. Ghosh, S. K. Guchhait
Fig. 3 Present form of DVC controlled structures on DRB (after Keshri et al. 2012)
Fig. 4 a Panchet dam on Damodar River, b Maithon dam on Barakar River, and c Anderson weir on
Damodar River at Rhondia (daily discharge measuring station in Lower Damodar Valley)
Then, one more reservoir, Tenughat (1974) on Damodar under control of Jharkhand and
Durgapur barrage (including main left bank and right bank irrigation canals) (1955) under
control of West Bengal are constructed (Chandra 2003).
5 Influence of infrastructures on hydrogeomorphology of Damodar River
Since ancient times, the river flood and control structures have been the basis for riverine
civilizations of riparian landscapes (Bagchi 1977; Bhattacharyya 2011). One can argue that
civilization as we know it would not have arisen without river control. Dams continue to
act as bulwarks against catastrophic flood destruction all over the world, and river control
structures have formed the mainstay of planning program and self-reliance in developing
countries (Bhattacharyya 2011). Despite the enormous benefits but short-term sustainability, these structures violate the environmental ethics and natural balance in the fluvial
system. The drastic modifications of DRB have arisen a number of problems which are
linked with hydrogeomorphic responses, intensifying the downstream flood propensity at
present (Sanyal et al. 2013). The following analysis is mainly centered on changes in
stream flow, bank erosion, channel shifting, channel planform, paleochannels, siltation of
reservoirs, and river and flood risk, etc., that have occurred in response to river regulation,
123
Hydrogeomorphic variability due to dam constructions
777
derived from comparisons of data observed during the pre-dam era (1933–57) and the postdam era (1958–2007) (Fig. 5).
5.1 Embankments and responses of river
In the southern part of West Bengal, the history of earthen embankments predates to
British rule (Bhattacharyya 2011). According to Bhattacharya (1959), these embankments
are more than 1,000 years old. The agricultural prosperity of Damodar floodplain has
continued for centuries (renowned as ‘‘Rice Bowl of West Bengal’’), and these earthen
embankments (locally known as Boro Bandh) were intended to save the paddy crop, as
well as to protect the towns and villages in monsoon season (Bhattacharyya 2011). The left
bank embankment of Damodar River was constructed from 93 km away of Dishergarh
(confluence point of Barakar and Damodar), and its height is increased downstream in
post-dam period. After devastating flood of 1885, the height of left side embankment
around Barddhaman town was further increased and the embankment of right bank was
demolished (Bhattacharya 1959). Lower Damodar Scheme (sanctioned in 1971) was
developed to mitigate the monsoonal flood problems and to improve drainage condition in
the trans-Damodar area (includes the districts of Barddhaman, Hooghly and Howrah). This
scheme remodeled the left embankment by boulders and sand bags, including longitudinal
and transverse dykes. Part of the valley is still inundated when earthen embankment of
right bank is frequently breached or the flood water is overtopped. This phenomenon
expresses the power of Damodar flood, and it gives birth to several spill channels, locally
known as ‘‘hanas’’ (e.g., Deb Khal) (Fig. 6).
Embankments constrict the active floodplain in lower DRB and compel the river dissipate its energy within the narrow sandy bed. In the post-dam period, the controlled flood
discharge of the braided Damodar River is unable to access floodplain and deposition takes
place on the river bed itself, forming longitudinal bars, mature point bars, and islands (e.g.,
Bara Mana, Majher Char, Fatepur Mana, etc.). According to Bhattacharya (1959) carrying
a large volume of coarse sediments from the Archean plateau and Raniganj coal belt, the
Damodar River is now in aggradational phase within embanked river bed and the siltation
raises the elevation of bed in respect of adjacent less flooded alluvial plain. It has been
estimated that in a year, 3.10 tons of sediments is carried by Damodar River up to
Anderson Weir, Rhondia (Rudra 2010). It should be remembered that this amount of
sediments is reached to that location after crossing the big burdens of five upstream
reservoirs and Durgapur Barrage (Rudra 2010). Therefore, the threshold level of bankfull
discharge is getting lower and lower in this segment. In between the stretch of Jujuti
(23°150 2200 N, 87°440 0300 E) and Hatsimul (23°120 1700 N, 87°530 3000 E), the height of
embankment ranges from 7 to 13 m from local datum level (using GPS survey). Side by
side the river deposits sands with a thickness of 4.5–7.5 m from the base of previous
embankment. So it has been found that in some areas of lower DRB, the present river bed
(adjacent to bank) is increased up to 2–3 m from the adjoining floodplain. Again increasing
the length of bars and islands, growth of vegetation on these, and stabilization of dunes and
point bars signify the degree of siltation and low limit of activeness of river in the post-dam
period. Since the right bank is not protected, there is continuous deposition in the floodplain of right bank and the altitude of levee is increased step by step (Fig. 6). As a
consequence, the right bank floodplain has become higher, and it forces the shifting of
thalweg to move northward in high discharge period, creating more pressure on left
123
778
123
Table 1 Summary of DVC dams in the DRB
Dams/barrage
District and state
River
Year
Type
Height
(m)
Length
(m)
Power generation
(MW)
Irrigation storage
(million m3)
Flood storage
(million m3)
Tilaiya
Koderma, Jharkhand
Barakar
1953
Concrete gravity dam
30.28
366
2 9 2 MW
141.86
177.63
Maithon
Dhanbad, Jharkhand
Barakar
1957
Concrete gravity dam
50
4789
3 9 20 MW
611.84
542.76
Panchet
Dhanbad, Jharkhand
Damodar
1959
Earthen dam with
concrete spillways
45
6777
2 9 40 MW
228.21
1086.8
Konar
Hazaribagh, Jharkhand
Konar
1955
Concrete gravity dam
48.77
4535
–
220.81
55.51
Tenughata
Bokaro, Jharkhand
Damodar
1978
Composite masonry
cum concrete
spillways
55.0
5000
–
–
–
Durgapur Barrageb
Barddhaman, West Bengal
Damodar
1955
Concrete and 34 gates
including sluice
12.0
692
–
–
–
Source: DVC (2013), www.dvcindia.org/
a
Total live storage of Tenughat dam is 224 million m3 (without provision of flood storage); blengths of left and right bank irrigation canal of Durgapur barrage are 136.8 km
and 88.5 km respectively
S. Ghosh, S. K. Guchhait
Hydrogeomorphic variability due to dam constructions
779
Fig. 5 Dominant factors of monsoonal floods and associated hydrogeomorphic changes in the DRB
Fig. 6 Glimpses of spill channels in lower Damodar River denoting the sites of embankment breaching on
right bank and paths of spill channels, and a cross-profile (inset) denotes rising height of right-side
floodplain than left (after Bhattacharyya 2011)
embankment. This is evident from bank line shifting in Borsul, Palla, Hatsimul, etc. It is
found that near Belkash, the Damodar River has shifted its permanent course up to 1 km
toward right bank, creating an alluvial terrace at left bank (Fig. 7). Alongside other impacts
of embankments are discussed in the later sections.
123
780
S. Ghosh, S. K. Guchhait
Fig. 7 Development of wide floodplain, spill channels, chute, sloughs, and point bars showing the high
degree of aggradational landforms of Damodar River (FCC of Landsat ETM ? , 2000) and Garmin GPS
cross-profile (2012) showing post-dam expanse of river shifting and deposits of thick layered sands (stretch
of 1.03 km) near Jahapur Bazar (previous embankment) in post-dam period
6 Results
6.1 Variation in stream flow
From the hydrographs based on the year-wise and month-wise stream flow data
(1934–2007), it is cleared that at Rhondia, the Damodar River experiences a ‘‘Tropical
Single Maximum with a Long Low Water’’ (AW) regime or hydrological region (Beckinsale 1969). In the pre-dam period, the peak flows are observed in the month of August
(on an average 1,238 m3 s-1) but after construction of dams the peak shifts from August to
September (on an average 1,247 m3 s-1) (Fig. 8a). The main reason of that shifts is the
installation of flood storage system of DVC. The dams temporarily store inflow runoff and
streamflow till late August but due to continuation of unexpected heavy rainfall and critical
reservoir storage limit, the dams are compelled to release water in September when the
123
Hydrogeomorphic variability due to dam constructions
781
alluvial soils of lower DRB are gained full moisture and excess water adds with this
streamflow. That is why now the flood probability or chances are more common in between
September and October.
There is marked difference of annual peak flow (Fig. 8b) in between pre-dam
(1933–1957) and post-dam period (1958–2007). A peak flow of above 18,000 m3 s-1 has
been recorded three times in August 1913, 1935 and October 1941 (Saha 1979; Bhattacharyya 2011). In post-dam period, the highest combined outflow from Maithon and
Panchet dams had been generated a huge discharge of 21,070 m3 s-1 on September 27,
1978, at Durgapur barrage. At present, extremely abnormal floods (8,496–12,744 cumec)
are disappeared but the frequency of subnormal floods (below 5,664 cumec) is still
remained high in lower DRB (Bhattacharyya 2011).
Fig. 8 a Annual hydrograph showing shift of peak flow from August (pre-dam) and September (post-dam)
and b temporal variation of flood peaks (1934–2007) including two critical limits of bankfull discharge (at
Rhondia) of 7,075 cumec (estimated by Voorduin in the time of dam construction) and 4,011 cumec
(estimated by authors), respectively
123
782
S. Ghosh, S. K. Guchhait
Implementing log Pearson Type III Distribution in annual stream flow data of pre-dam
period (1934–57), the peak discharge of 18,112 cumec (1935) has attained a return period
of 50 years with 2 % of probability of occurrence. Alongside the selected peak discharges
of 12,002 cumec (1938), 11,012 cumec (1951), and 10,811 cumec (1942) have attained
only 6.7 years (15 %), 4.9 years (20.4 %), and 4.6 years (22 %) return periods, respectively. This signifies the low recurrence interval of high magnitude floods in the lower
valley in between 1934 and 1955. Implementation of Damodar River Valley Project has
radically altered the peak discharge value and recurrence interval through controlled
regulation of water from last two terminal big dams (Fig. 9). Based on 50 years of database
(1958–2007), the peak flood discharge of 10,919 cumec (1978) has attained a return period
of 124 years with only 0.81 % of probability of occurrence, but it was only 4–5 years
(22 % of probability) in pre-dam period. It signifies the performance of DVC in flood
regulation. Now the return period of 2–2.7 years (50–37 % probability of occurrence) is
associated with peak discharge of 2,811–3,855 cumec. Before the construction of DVC
dams, the flood peaks were unusually high but the duration was small (late August to
September). The dams have now moderated the peaks but increased duration of floods
(August to October).
6.2 Changing channel pattern
To understand the influence of dams on the river, two indexes have been used—(1)
sinuosity index and (2) braiding index. The hydrogeomorphic dynamics of river and other
external factors directly distort its course from pervious path, and it is well measured by
sinuosity index (Babar et al. 2012). The major attractiveness of Mueller’s component of
sinuosity index is that it accounts for what percentage of a stream channel’s departure from
a straight line course is due to either hydraulic factor within the valley or to topographic
Fig. 9 Pre-dam and post-dam change in annual flood peaks and its associate recurrence intervals signifying
the performance of DVC flood regulation system
123
Hydrogeomorphic variability due to dam constructions
783
interference. Mueller’s sinuosity index (1968) includes the hydraulic sinuosity (i.e., that
freely developed by the channel uninfluenced by valley-wall alignment) and topographic
sinuosity (i.e., that imparted by the geometry of the valley) (Mueller 1968).
The Standard Sinuosity Index (SSI) (Fig. 10) varies from 1.01 (pre-dam) to 1.16 (postdam) in between Rhondia and Paikpara (Table 2). The most important thing is that in predam period (1922–43), Hydraulic Sinuosity Index (HSI) of four reaches is gradually
decreased downstream from 48 percent to 13 percent, alongside Topographic Sinuosity
Index (TSI) is increased downstream from 51 to 87 %. It signifies that in pre-dam phase
(prevailing almost natural condition) sinuosity of Damodar River is mainly controlled by
the topographic factors of floodplain, viz. fault-guided valley alignment (Singh et al. 1998),
cohesive bank materials, less number of bars, coarse bed configuration, or neo-tectonic
activity, not by solely monsoonal flood discharge and other hydraulic factors. But in postdam period (especially in between 2001 and 2006), the sinuous pattern of Damodar River
is achieved from downstream to upstream direction, and the most significant fact is that
HSI is radically increased downstream in all four reaches (62–93 %) compared to TSI
(7–38 %). Surprisingly in between Idilpur (23°14°5300 N, 87°47°5800 E) and Chanchai
(23°17°3800 N, 88°010 0000 E), HSI has contributed 92 percent influence on sinuosity, and in
between Chanchai and Paikpara, it is 85 percent. Geomorphologically the straight stretches
often occur in conjunction with or between bends or along braided reaches (Knighton
1998). Even stretches with straight embanked banks have a sinuous thalweg pattern with
asymmetrical shoals and point bars alternating along either bank, just like lower Damodar
River. As in the studies done by Sen (1985, 1991), Garde (2006), Ghosh (2011), and
Bhattacharyya (2011), now the infrequent bankfull discharge, variable flow velocity,
fluctuating monsoonal flow regime, high width–depth ratio, high hydraulic radius of
channel, channel bed roughness, turbulent monsoonal river flow including eddies, coarse
sand bed and vegetation growth on bars and banks, low sediment supply due to trap
efficiency of upper catchment reservoirs, sand quarrying, elevated concrete embankments
and flow diversion through canals are the dominant hydraulic factors to deviate channel
sinuosity in the downstream section (Ghosh and Mistri 2012b).
Brice’s Braiding Index (BI) is a measure of the sum of island or bar lengths in a reach
and hence of the increase in bank length that results from braiding (Brice 1964). The
Fig. 10 Significant deviation of SSI (increasing value of sinuosity) in the four segments of Damodar River
(Rhondia to Paikpara) in between pre-dam and post-dam periods
123
784
S. Ghosh, S. K. Guchhait
Table 2 Temporal variation of Mueller’s Sinuosity indexes in Damodar River
Bend I (Rhondia
to Kashpur)
Bend II (Kashpur
to Idilpur)
Bend III (Idilpur
to Chanchai)
Bend IV (Chanchai
to Paikpara)
Years
SSIa
HSIb
(%)
TSIc
(%)
SSI
HSI
(%)
TSI
(%)
SSI
HSI
(%)
TSI
(%)
SSI
HSI
(%)
TSI
(%)
1922–43
1.05
48
51
1.08
39
61
1.02
34
66
1.02
13
87
1969–74
1.17
92
08
1.10
51
49
1.02
12
88
1.04
32
68
1990
1.10
59
41
1.09
60
40
1.02
72
28
1.02
13
87
2001
1.11
65
35
1.15
60
40
1.10
74
26
1.01
04
96
2006
1.18
71
29
1.16
62
38
1.13
93
07
1.15
85
15
a
Standard Sinuosity Index
b
Hydraulic Sinuosity Index
c
Topographic Sinuosity Index
degree of braiding as displayed in the satellites images is well established by BR which is
devised by P.F. Friend and R. Sinha (1993). Landsat TM images of 1990 and 2006 are used
to calculate BR and BI in the selected segments (Table 3), viz. (1) Rhondia to Kashpur, (2)
Kashpur to Idilpur, and (3) Idilpur to Chanchai. BI of 1990 and 2006 ranges from 5.31 to
2.87 and 4.40 to 3.30, respectively. Similarly, BR of 1990 has a highest value of 2.75 on
bend II and lowest value of 2.04 on bend III. Again BR of 2006 has a highest value of 2.13
on bend I and lowest value of 1.37 on bend III. As the values of BR do not reach to unity
(1), therefore, it identifies that three reaches have glimpses of braiding pattern (Knighton
1998). The decreasing temporal variation of BI and BR is due to water level or stages of
active channel area in 1990 and 2006. It appears that braiding of Damodar River is a type
of hydraulic adjustment that may be made in a channel possessing a particular or coarse
bank material in response to a debris load too large to be carried by a single channel (Garde
2006; Bhattacharyya 2011). Braiding and avulsion are interlinked in the alluvial floodplains. It is observed that Damodar River had been shifted its course further south ([1 km)
near Rhondia and Idilpur, forming mature islands and bars on left side (Fig. 7).
6.3 Fluvial aggradation and degradation
The paleoclimatic studies of India indicate that in the last 100 years, the periods of
aggradation of Peninsular Rivers are linked to periods of weaker southwest monsoon and
reduced sediment supply (Singhvi and Kale 2009). As the natural flow is regulated by DVC
dams, the transportational energy of Damodar River is lost gradually in the immediate
downstream of Durgapur barrage, and it also affects the sedimentation profile of bars
Table 3 Index of Braiding (1990 and 2006) in selected bends of lower Damodar River
Bend I (Rhondia to Kashpur)
Bend II (Kashpur to Idilpur)
Bend III (Idilpur to Chanchai)
Year
BIa
BRb
BI
BR
BI
BR
1990
5.31
2.47
4.72
2.75
2.87
2.04
2006
4.4
2.13
3.91
2.08
3.03
1.37
a
Braiding Index
b
Braid-channel Ratio
123
Hydrogeomorphic variability due to dam constructions
785
(Bhattacharyya 2011). Few intra-bedded brown clayey silt and sandy silt deposits (near
Rhondia) of recent Hooghly Morpho-stratigraphical Unit (HMU) (Acharyya and Shah
2007) signify infrequent extreme flood events (high level discharge) but thick deposit of
clay and mud carries (Fig. 11) the indication of slow deposition (post-dam waning flood
deposits) in more sub-humid monsoon climate. Disappearance of iron nodules and high
proportion of silt in top lithofacies of Fm (Miall 1985) signifies the younger (post-dam
period) fluvial deposits under stagnant water condition (suspended load) in the mature
point bars of left bank. The facies of fine sand with clay partings (Sh) and small size gravel
base (Miall 1985) carry the sign of lateral accretion and avulsion toward right bank of
Damodar. It is evident that from Anderson Weir of Rhondia, the river was opened up much
wider and its active channel had been maintained toward far left side in 1922–1943. After
dam construction, the river now shifts toward far right bank side (evident in Landsat
images), developing alluvial terraces and point bars on left bank side (Fig. 12). Close to
Deulpara (23°170 5800 N, 87°340 2300 E), in between 1973 and 2006, thalweg of Damodar
River shifts far north (left bank side) compared to position of 1922–1943. Near Silla
(23°170 3800 N, 87°340 2300 E), thalweg again shifts toward right bank (meandering channel
way) in 2006. For that reason, Damodar River gives birth of many longitudinal bars
(locally named as ‘‘char’’) and islands (locally named as ‘‘mana’’) in mostly middle-left
side, viz. Kasba Mana (23°200 3500 N, 87°300 4800 E), Fatepur Mana (23°150 3900 N,
87°360 2500 E), Sadpur Mana (23°200 0600 N, 87°320 0900 E), etc.
Near Satyanandapur (23°150 2200 N, 87°460 3800 E), in 1972–1974, the river was more
constricted toward its right side, but in 1990 and 2006, channel shifts to north nearer of left
side embankment. After that, it tends toward right side bank creating elongated Majher
Char (23°140 2100 N, 87°400 0400 E). The most vulnerable locations of bank erosion are
Ghoradanga (23°170 4800 N, 87°320 3000 E), Baikuthapur (23°140 1500 N, 87°360 0100 E), Somsar
(23°130 2900 N, 87°380 2700 E), Beldanga (23°130 3000 N, 87°390 4100 E), Dadpur (23°070 1600 N,
87°390 4100 E) (Bankura district), and Lakshmipur village (23°050 4900 N, 87°590 2800 E)
(Barddhaman district). The flow is restricted near Sadarghat (23°120 4400 N, 87°500 5600 E)
due to construction of Krishak Setu or Bridge (Fig. 13). But after crossing the bridge, it
opens up widely and erodes its right bank at Bangachha village, near Jamalpur
(23°030 4000 N, 87°590 3400 E). Then, the river erodes its left bank near Hatsimul and Belna
(23°110 5700 N, 87°560 1000 E) (Fig. 10). Within its narrow active space of elevated
embankments (from Barsul to Paikpara), the river alters its active thalweg frequently in a
Fig. 11 Litho-unit (Hooghly
Morpho-stratigraphical Unit) of
left river bank of Damodar at
Rhondia, showing fluvial
succession of bottom fine to
medium sand (Sh), thick
overbank brownish clayey silt
(Fsc), and fine sand with top
clayey silt layer (Fm)
123
786
S. Ghosh, S. K. Guchhait
Fig. 12 Glimpses of widely active floodplain (up to 5 km width), spill channels, avulsion, alluvial terraces
(now used as arable land), and mature point bars showing the high degree of lateral oscillation and
aggradation of Damodar River in the immediate downstream of Rhondia (FCC of Landsat ETM ? , 2000)
meandering pattern and changes its aggradational and degradational processes in slip-off
slope and cutoff slope, respectively. In 44 years (1972–2006), the lands lost, due to bank
erosion of Damodar, are 0.73 km2 (Natu), 1.36 km2 (Idilpur), 1.10 km2 (Hatsimul),
0.12 km2 (Jankull), 2.23 km2 (Dadpur), and 1.93 km2 (Mohanpur), respectively. The
present study reveals that the river in between Rhondia and Barddhaman shows dominance
of aggradational landforms, braiding, erosion of right bank, and valley widening but
downstream of Barsul (23°110 0200 N, 87°570 5600 E) and Chanchai the bank erosion, high
sinuosity and narrowness are more pronounced.
6.4 Post-dam change in Flash-Flood Magnitude Index
Flash floods are usually caused by heavy or excessive rainfall in a short period of time,
generally less than 6 hours and are characterized by raging torrents after heavy downpours
that rip through the river beds, agricultural fields, urban streets or hilly tracts sweeping
everything before them (Ward 1978; Allaby 2006). Recent disastrous flash flood of Uttarakhand and Himachal Pradesh (14–17 June, 2013), due to cloud burst and breaking of
moraine dam, is forced to think about the magnitude, extremity, and time of occurrence of
sudden floods in the heavy monsoon and rainstorm-dominated region of India, like West
Bengal and eastern part of Jharkhand (Kale 2003; Dhar and Nandargi 2003; Nandargi and
Dhar 2003). While floods in the major rivers cause extensive destruction in their floodplains, intense rainfall in the comparatively small catchments of many rivers, especially in
the sub-mountainous or plateau scarp regions, cause flash floods (Singh et al. 1974). The
giant volume of excess runoff is getting speed and momentum when the Damodar River
has crossed the scarp of Chotanagpur Plateau, along Panchet and Maithon dams. In a
123
Hydrogeomorphic variability due to dam constructions
787
Fig. 13 Temporal change of Damodar River banks from Sadarghat to Palla (1972–2006)
monsoon-dominated and cyclonic-affected region, the higher contributing drainage network and the lower distributing drainage network (found in DRB) aggravate the chances of
flash floods (Sengupta 2001), and abrupt relief difference (i.e., break of slope) along
Maithon and Panchet dams (Saha 1979) provides additional power to flood flows. In old
records, the Damodar River has always been referred to as a ‘‘river of sorrow’’ for to its
recurrence extreme floods due to heavy rainfall. To describe the flood ferocity and adamant
nature of Damodar, W. W. Hunter in 1876 wrote that during monsoon floods, the rainwater
used to pour off the hills through hundreds of channels with such suddenness that water
heaped up to form dangerous head waves known as ‘‘harkaban’’ (i.e., flash flood) (LahiriDutt 2006; Bhattacharyya 2011).
The absolute flood discharge of a river is not as important with regard to geomorphic
change as the ratio between peak discharge and mean annual discharge (Patton and Baker
1976; Kochel 1988). Floods likely to result in significant geomorphic change are those that
produce discharges many times above that normally experienced by the river, that is, those
with high maximum peak discharge to mean annual discharge (Kochel 1988). Kochel
(1988) and Kale (2003) have applied a parameter called the Flash-Flood Magnitude Index
(FFMI) which is employed here for annual peak discharge analysis of lower Damodar
Basin to understand the change in pre-dam and post-dam period at Rhondia (Table 4).
The FFMI is calculated from the standard deviation of the logarithms of annual maximum discharge as illustrated (Kochel 1988).
FFMI = X 2 =ðN1Þ
where X = Xm - M, Xm = annual maximum discharge, M = mean annual discharge,
N = number of years of record, and X, Xm, and M = logarithms.
The index nearer to 1.0 or above indicates the high degree of flash flood with some
geomorphic change within the basin (Kochel 1988). Log deviation from mean discharge to
extreme peak value is exponentially (Yc = 0.1525 9 2.04) related to FFMI (Fig. 14a). It
means the episodes of high degree of deviation between Xm and X are associated with high
FFMI and extreme floods in Damodar River, having coefficient of determination of 0.96.
FFMI gained maximum value in between 1950 and 1957 (pre-dam phase) and consecutively in between 1958 and 1969 (post-dam phase) (Table 4). Then, 33 years (1970–2003)
123
788
S. Ghosh, S. K. Guchhait
Table 4 Calculation of FFMI for Damodar River at Rhondia (1934–2007)
Year
Xma
Date of Xmb
M
X
FFMI
1934–41
4.258
12/07/1935
2.422
1.836
0.482
1942–49
4.254
10/08/1942
2.577
1.677
0.402
1950–57
4.042
11/09/1951
1.321
2.721
1.057
1958-69
3.944
02/10/1959
1.164
2.780
1.104
1970–77
3.724
13/10/1973
2.392
1.332
0.253
1978–87
4.038
27/09/1978
2.190
1.849
0.488
1988–95
2.549
29/09/1995
2.278
0.272
0.011
1996–2003
3.805
23/09/2000
2.370
1.435
0.294
2004–07
3.949
25/09/2007
2.300
1.649
0.907
Bold portions are identified as major high FFMI period in between 1934 and 2007
a, b
Data source Bhattacharyya (2011)
of record shows that FFMI was significantly low than pervious, that is why in these years
no extreme floods (except 1978) had been occurred. But the last FFMI (2004–07) is
approaching toward one which signifies forthcoming flash-flood episodes following the
years of 2006 (7035 m3 s-1) and 2007 (8853 m3 s-1). It is important to note that the floods
of peak flow of 8,496 cumec or more had been occurred 37 times between 1823 and 2007
(Bhattacharyya 2011). Average FFMI of Damodar River is getting value of 0.56 which is
much greater than world average 0.278 and other Indian Rivers, viz. Narmada, Ganga,
Godavari, Brahmaputra, Teesta, and Tapi. (Kale 2003). In general, the streams with
extremely high FFMI occur in semi-arid region but interestingly in this monsoonal climate
we have observed glimpse of flashiness in respect of other Indian rivers (Fig. 14b).
6.5 Declining carrying capacity and flood hazard
After installations of dams and barrage, unpredictably the lower DRB is not safe from
floods. This statement can be validated from the acute flood years of 1959, 1978, 1995,
1999, 2000, 2003, 2006, 2007, 2009, and 2011 (Sanyal et al. 2013). It reflects that lower
segment of Damodar River (including Amta channel and Mundeswari) has lost its previous
carrying capacity to accommodate huge volume of flood flow in monsoon. Bankfull volume of a segment can be expressed in one cumec day (m3) (Reddy 2011). If this total
volume of water passed from a reach having a rate of 1 m3 s-1 is regarded as 1 cumec
day = 1 9 24 9 60 9 60 = 86,400 m3, it can be assumed that in a day 86,400 m3 of water
is passed having a flow rate of 1 m3 s-1 in a particular segment of the river. Reddy (2011)
has developed the following expressions.
Carrying capacity (m3) = Mean cross-sectional area 9 Mean maximum length of a
reach.
Bankfull flood discharge (m3 s-1) = Carrying capacity of a reach 9 1 m3 s-1/86,400.
Importantly we have estimated three bankfull discharges of aforesaid segments which are
4,011 m3 s-1, 2,366 m3 s-1, and 1,542 m3 s-1, respectively (Table 5). Considering the
DVC mentioned critical discharge limit of 7,079 m3s-1, it is very essential to find out the
probable return periods of the four bankfull discharges (flood discharges) using the post-dam
annual flood series and the methods of flood frequency analysis (Gumbel distribution, log
Pearson Type III distribution, Chow’s method and Stochastic method) (Table 5). From the
123
Hydrogeomorphic variability due to dam constructions
789
Fig. 14 a Deviation from mean discharge to extreme peak value is exponentially related to FFMI, i.e., high
degree of log deviation is ultimately transformed into high magnitude of flash floods in lower Damodar
River in post-dam period (1958–69 and 2004–07), b comparing FFMI (Y) and Qmax/Qm ratio (X) of
Damodar with other Indian rivers, reflecting high degree of FFMI (after Kale 2003)
table, it has been found that the return period of 7,079 m3 s-1 discharge ranges from 8.55 to
14 years at Rhondia. Similarly, the other return periods of three discharges range from 1.18 to
3.18 years. So it is clear that the threshold level of peak discharge (with short time span) is
very small in respect of the post-dam annual flood series and carrying capacity of Damodar
River. For that reason whenever the last two terminal dams (Panchet and Maithon) released
123
790
S. Ghosh, S. K. Guchhait
Table 5 Predicted return periods of probable bankfull discharges in Damodar River
Bankfull discharge
in cumec
Estimated return
period in years
Gumbel
LP3a
Chow
7079
14.0
13.2
14.2
Stochastic
8.55
4011
2.90
2.92
2.91
3.18
2366
1.45
1.56
1.48
1.87
1542
1.21
1.18
1.23
1.44
a
LP3 is the log Pearson Type III Distribution
excess water, inevitably the riparian tracts of Barddhaman, Hooghly, and Howrah Districts
(covering lower DRB) had been experienced monsoonal floods for long days. Alongside high
settlement density in adjoining floodplain, drainage congestion, and decaying of paleochannels have aggravated the problem into misery. The capacity of Amta channel (present
lower Damodar) and Mundeswari is now restricted to 849 m3 s-1 and 2,832 m3 s-1,
respectively. In view of the above, moderation of 28,317 m3 s-1 flood or the known floods
with a peak flow of 18,406 m3 s-1 to the present safe carrying capacity of 3,681 m3 s-1 of the
channels in the lower Damodar is not possible at present (Keshri et al. 2012). Therefore, the
good effects of the dams are not being felt by the population of the area. If the annual flood
series follows the trend of post-dam period, the 5-year flood will be above 5,300 m3 s-1 and
100-year flood will be above 11,000 m3 s-1. As the rainfall, runoff, and flood flow are purely
random phenomenon and the flood controlled system has certain limitations (in terms longterm sustainability), we cannot expect that the peak discharge of 10,919 m3 s-1 or more
(1978) will not happen in the forthcoming years.
7 Discussion
7.1 Siltation of reservoirs
The proposed project of DVC was set forth to provide a controlled storage capacity of
6,500 million m3 but only four dams and Tenughat reservoir provide a maximum storage
capacity of 3,591 million m3, only 55 % of storage capacity originally envisaged (Saha
1979). The last two terminal dams, Maithon and Panchet, are located close to break of
topographic slope in the border of Jharkhand and West Bengal. So, the upstream tributaries
of Damodar and Barakar bring heavy sediment laden water to these reservoirs, and the
siltation of reservoirs is emerging as a major problem to affect the downstream flood
control measures (Basu 2011). According to Lal et al. (1997), the siltation rate of Maithon
and Panchet reservoirs is 1310.0 and 1059.0 m3 km-2/year, respectively. A recent study
shows that the sedimentation of Panchet (on the basis of Landsat TM images of 1990 and
2005) occurs approximately at a rate of 0.041–0.047 cm per year, whereas it was 0.033 to
0.034 cm per year in 1990 (Majumder et al. 2012). If we consider the overall capacity
(including dead zone, live zone, and flood zone), the loss of capacity of Maithon and
Panchet reservoirs is 22.1 % (up to 1994) and 14.1 % (up to 1996), respectively (Rudra
2002; Bhattacharyya 2011). The temporal variation of flood moderation by Panchet and
Maithon dams shows that there is now a declining trend of flood controlling performance
till 2007 (Ghosh and Mistri 2013c). It is a reality that DVC dams cannot attain their
123
Hydrogeomorphic variability due to dam constructions
791
Fig. 15 a Paleochannels of Damodar fan-delta downstream of Barddhaman (after Niyogi 1975; Acharyya
and Shah 2007) and b spatial extent of high magnitude floods (1959 and 1978) distributed through
paleochannels to signify the potential area of getting silts and water (after Sen 1991)
previous capacity to accommodate flood water due to siltation. In the post-dam period
when DVC dams suddenly had released excess water to save structure of dams, the floods
were occurred in 1959, 1978, 1995, 1999, 2000, 2003, 2006, and 2007. Recently, due to
heavy cyclonic rainfall (145 mm on 7 to 8.08.2011) over Jharkhand and Chhattisgarh from
August 7, 2011, Tenughta, Panchet, and Maithon reservoirs released 454 m3 s-1, 510
m3 s-1, and 481 m3 s-1, respectively. On August 8, 2011, that had a cumulative effect on
Durgapur Barrage when 1,275 cumec water released through main channel and canals
(Ghosh and Mistri 2013c). As a result on August 13, 2011, the numbers of total flood
affected blocks of West Bengal were reached up to fifteen, and sixteen million people were
directly affected from flood inundation (Ghosh and Mistri 2013c).
7.2 Decay of paleochannels
In the past, furious Damodar River (known as ‘‘Sorrow of Bengal’’) opened a number of
distributaries or paleochannels (Fig. 15a), e.g., Banka, Sapjala, Gangur, Behula, Ghea,
Kana Damodar, etc., in Damodar fan-deltaic plain (Acharyya and Shah 2007; Ghsoh 2011).
Now due to holding back of water in DVC reservoirs and diversion of water from the
Durgapur barrage through left and right bank main canals for irrigation purpose, these
paleochannels are gradually delinked and deteriorated since Rennel’s time (1,783) till
today (Ghsoh 2011). Constructions of sluices, canals, high embankments, roads, Eastern
Railways, settlements, and intensive river bed agriculture have restricted the monsoonal
flow in these channels and now they bear the previous signs as Khals, Kana Nadi, abandoned dry channel, and sinuous arrangement of ponds. But importantly these paths (if
123
792
S. Ghosh, S. K. Guchhait
rejuvenated) can be served as major distributaries net of lower DRB in the time of floods as
done in past to recharge surface and sub-surface water resources and to replenish the soils
with silt (Fig. 15b).
The blocks of Memari I, Memari II, Bhatar, Pandua, etc. (situated in lower DRB) are
facing the problem of declining ground water level. In recent periods, the monsoon rainfall
(June–September) is not enough (while annual average 1,300–1,500 mm) for recharging
ground water resource and storing adequate quantity of water in the upstream reservoirs to
provide irrigation water (Ghsoh 2011). It forces the farmers to depend entirely on shallow
tube wells and deep tube wells. Recent studies of Damodar floods reveal that as the
frequent bankfull discharge and floods are more uncommon (due to burden of dams and
embankments), the surface water bodies and ground water do not get ample quantity of
monsoon flood water for long days. This problem is more aggravated with decaying of
paleochannels and increasing population pressure.
The floodplain of lower DRB is made up of Chotangapur Plateau wash sediments (rich
in minerals) carried down by the tributaries of Damodar which spread over this area as
thick layer of clayey loam to silty loam soils with a reddish hue (Ghsoh 2011). With the
control of repeated normal river floods, inevitably replenishing of new fertile alluvial soil
has virtually been stopped.
8 Conclusion
The aforesaid analysis has brought into light new information about the influence of dams
on Damodar River in relation to flood. The constructions of large dams create anthropogenic hindrances to maintain the previous natural entity and flood ferocity of Damodar
River but the hydrogeomorphic processes are not radically altered at all, only its working
magnitude is changed in respect of prescribed stimuli (external force). Due to loss of
sufficient flow energy, the fluvial aggradation is more pronounced at downstream of
Durgapur Barrage. It has been found that in few segments of lower Damodar River, the
active channel bed is increased up to 2–3 meter from the adjoining floodplain. In post-dam
era, the sinuous pattern (with confined meander) of Damodar River is achieved from
downstream to upstream direction and the HSI is radically increased downstream compared to TSI. Braiding and avulsion are interlinked in the active floodplains in between
Rhondia and Barddhaman, developing mature elongated islands and bars. The occurrences
of clayey silt and silty clay on the top sedimentary facies of mature islands and banks
reflect infrequent extreme flood events and low-magnitudes waning flood deposits in more
sub-humid monsoon climate. FFMI of Damodar is increased due to high deviation of peak
discharge from mean discharge in the monsoon period. Downstream of Borsul the Damodar River alters its active sinuous thalweg frequently in a confined meandering valley and
changes its erosional and depositional processes subsequently in slip-off slope and cutoff
slope, respectively. In between 1972 and 2006 (44 years), the adjoining lands of active
floodplain are lost (averagely 0.12–2.23 km2 at selected segments) due to bank erosion,
which are more pronounced in between Palla and Paikpara. Alongside, the downstream
channel capacity and bankfull discharges are gradually declined from 4,011 to 1,542
m3 s-1, reflecting high chances of overflow. The recurrence interval of this discharge
ranges from 1.18 to 3.18 years only. If the annual flood series follows the trend of postdam period, every 5-year flood or peak discharge will be greater than 5,300 m3 s-1 and
100-year flood will be above 11,000 m3 s-1. Constructions of sluices, canals, high
embankments, roads, Eastern Railways, settlements, and intensive river bed agriculture
123
Hydrogeomorphic variability due to dam constructions
793
have restricted the monsoonal flow, and the paleochannels are gradually delinked and
deteriorated at present. This phenomenon has restricted the floodplain of Damodar to
recharge groundwater and to get fresh silts occasionally.
After dam construction (more than 60 years), the channel capacity of Damodar must
ultimately be governed by a balance between the erosive forces associated with high
discharges and the aggradational processes together with vegetational growth associated
with lower discharges. Depending on the locations of upstream reservoirs, the trapping of
sediment, especially in monsoon region with prevalent soil erosion, frequently disturbs the
fluvial system of Damodar, both upstream and downstream from the reservoirs. It is
evident that the river becomes narrower and shallow as we go from Anderson weir toward
Amta channel which carries maximum bankfull discharge of only 849 m3 s-1. Up to
Barsul, development of dunes, islands, and mature point bars and frequent shifts of thalweg
reaffirm that the river are still adjusted with infrequent monsoonal flow and riverine
anthropogenic activities, viz. river bed agriculture, embankment, and rigorous sand quarrying. It is a reality that after constructing DVC dams and associated structures, we do not
control heavy inflow and overflow in lower DRB (trans-Damodar and Mundeswari area) in
the time peak monsoon and cyclonic rainfall. The main problem is that the focus is in
trying to control the river dynamics (strong natural force) in spate and not of making use of
the flood water and sediment in the best possible way. We cannot expect long-term
sustainability from the DVC dams and drainage system; the life spans of these structures
are reduced gradually. It is the right time to think different and alternatives to use flood
water employing modified drainage engineering and traditional knowledge. The main
emphasis should be centered on the following sections: (1) managing sedimentation of
reservoirs and river, (2) rejuvenating the paleochannels linked with five-years planning
program and 100 days work, (3) linking these channels with Damodar River to maintain
regular flow, (4) recharging surface and sub-surface water resources in monsoon, (5)
improving drainage network (including canals) to disseminate flood water slowly to
improve soil fertility, (6) delimiting flood risk zones and avoiding any type of construction
within the active flood zone, (7) adapting with periodic inundation (precise flood forecasting and good number of flood shelters), and (8) alternative agricultural practices in
lower DRB. Above all, the resources of a basin (mainly river) should be treated at first as
ecological assets and then as economic assets. We cannot escape from the natural calamity,
but we can effectively integrate the dams, embankments, river, agriculture, industry, and
riparian communities to use flood water as a resource.
Acknowledgments We are sincerely grateful to Department of Geography, The University of Burdwan,
for providing the necessary supports to do this work. We are very much thankful to editor in chief and
reviewers of Environment, Development and Sustainability, Springer, for providing great suggestions and
comments.
References
Acharyya, S. K., & Shah, B. A. (2007). Arsenic-contaminated Groundwater from Parts of Damodar FanDelta and West of Bhagirathi River, West Bengal, India: Influence of fluvial geomorphology and
quaternary morphostratigraphy. Environmental Geology, 52, 489–501.
Allaby, M. (2006). Floods. New Delhi: Viva Books Private Limited.
Babar, M. (2005). Hydrogeomorphology: Fundamentals, Applications and Techniques. New Delhi: New
India Publishing Agency.
Babar, M., Chunchekar, R., Madhusudan, G. Y., & Ghute, B. (2012). Quaternary geology and geomorphology of Terna River Basin in west central India. Quaternary Science Journal, 61(2), 156–167.
123
794
S. Ghosh, S. K. Guchhait
Bagchi, K. N. (1977). The Damodar Valley development and its impact on the region. In A. G. Noble & A.
K. Dutt (Eds.), Indian Urbanization and Planning: Vehicles of Modernization (pp. 232–241). New
Delhi: Tata McGraw-Hill Publishing Co. Ltd.
Barrow, C. (1987). Water Resources and Agricultural Development in the Tropic. New York: Longman.
Basu, S. (2011). Soil Erosion and Environmental Problems. New Delhi: APH Publishing Corporation.
Beckinsale, R. P. (1969). River Regimes. In R. J. Chorley (Ed.), Water, Man and Earth (pp. 455–470).
London: Methuen and Co.
Bhattacharya, K. (1959). Bangladesher Nad—Nadi o Parikalpana (Rivers of Bangladesh and Planning).
Calcutta: Bidyadoya Library Ltd.
Bhattacharya, A. K., & Dhar, N. (2005). A report on geo-environmental appraisal in Barddhaman urban
agglomeration and its environment for sustainable developmental activities. Kolkata: Geological
Survey of India.
Bhattacharyya, K. (2011). The Lower Damodar River, India: Understanding the human role in changing
fluvial environment. New York: Springer.
Brandt, S. A. (2000a). Classification of geomorphological effects downstream of dams. Catena, 40,
375–401.
Brandt, S. A. (2000b). Prediction of downstream geomorphological changes after dam construction: A
stream power approach. International Journal of Water Resources Development, 16(3), 343–367.
Brice, J. C. (1964). Channel patterns and terraces of the Loup Rivers in Nebraska. Geological Survey
Professional Paper, 422-D, Washington DC, D2–D41.
Central Water Commission (2012). National register of large dams. Retrieved from http://www.cwc.gov.in/
main/webpages/NRLD%20FORMAT%202012.pdf on 21st Feb 2013.
Chandna, R. C. (2008). Regional planning and development. New Delhi: Kalyani Publishers.
Chandra, S. (2003). India: Flood Management-Damodar River Basin. Retrieved from www.apfm.info/pdf/
case_studies/cs_india.pdf on 13th Oct 2011 at 9:35 am.
Chatterjee, S. P. (1967). Damodar Valley Planning Atlas. Calcutta: NATMO.
Chatterjee, S. P. (1969). Damodar Valley Planning Atlas. Calcutta: NATMO.
Choudhury, J. (1995). Barddhaman Jelar Itihash o Smanskriti (History and Culture of Burdwan District).
Kolkata: Pustak Biponi.
Dhar, O. N., & Nandargi, S. (2003). Hydrometeorological aspects of floods. Natural Hazards, 28, 1–33.
Friend, P. F., & Sinha, R. (1993). Braiding and meandering parameters. In J. L. Best & C. S. Bristow (Eds.),
Braided Rivers (pp. 105–111). Washington: Geological Society Special Publications No.75.
Ghosh, S., & Mistri, B. (2012a). Hydrogeomorphic Significance of Sinuosity Index in relation to River
Instability: A Case Study of Damodar River, West Bengal, India. International Journal of Advances in
earth Sciences., 1(2), 49–57.
Ghosh, S., & Mistri, B. (2012b). Investigating the causes of floods in Damodar River of India: A geographical perspective. Indian Journal of Geomorphology, 17(1), 37–49.
Ghosh, S., & Mistri, B. (2013). Performance of DVC in flood moderation of lower Damodar River, India and
emergent risk of flood. Eastern Geographer, 19(1), 55–66.
Ghsoh, S. (2011). Hydrological changes and their impact on fluvial environment of the lower Damodar
Basin over a period of fifty years of damming the mighty Damodar River in Eastern India. Procedia
Social and Behavioral Sciences, 19, 511–519.
Grade, R. J. (2006). River Morphology. New Delhi: New Age International Limited.
Graf, W. L. (2006). Downstream hydrologic and geomorphic effects of large dams on American rivers.
Geomorphology, 79(3), 336–360.
Grant, G. E., Schimdt, J. C., & Lewis, S. L. (2003). A geological framework for interpreting downstream
effects of dams on rivers. In J. E. O’connor & G. E. Grant (Eds.), A Peculiar River–Geology, geomorphology and hydrology of the Deschutes River, oregon, water science and Application, Vol.7 (pp.
203–219). Washington, D.C.: American Geophysical Union.
Haan, C. T. (1977). Statistical methods in hydrology. Ames: Iowa State University Press.
Hupp, C. R., Pierce, A. R., & Noe, G. B. (2009). Floodplain geomorphic processes and environmental
impacts of human alteration along coastal plain rivers, USA. Wetlands, 29(2), 413–429.
Husain, M. (2011). Human Geography. Jaipur: Rawat Publications.
Kale, V. S. (2003). Geomorphic effects of monsoon floods on Indian rivers. Natural Hazards, 28, 65–84.
Keshri, K.N., Jain, R.K., Roy, V.D. (2012). Role of DVC dams in flood management. Retrieved from http://
indiawaterweek.water.tallyfox.com/documents/role-dvc-dams-flood-management on 11th Jan, 2013.
Knighton, D. (1998). Fluvial forms and processes. Arnold: London.
Kochel, R. C. (1988). Geomorphic impact of large floods: Review and new perspectives on magnitude and
frequency. In V. R. Baker, R. C. Kochel, & C. R. Patton (Eds.), Flood geomorphology (pp. 169–188).
New York: Wiley.
123
Hydrogeomorphic variability due to dam constructions
795
Krik, W. (1950). The Damodar Valley-‘‘Valley Opima’’. Geographical Review, 40(3), 415–443.
Lahiri-Dutt, K. (2003). People, power and rivers: experiences from the Damodar River, India. Water Nepal,
9(1), 251–267.
Lahiri-Dutt, K. (2006). State and the community in water management case of the Damodar Valley Corporation, India. International Symposium on Community Activities for the Conservation of Water
Environment—Lessons Learned from Community Activities. Bangkok: Institute for Global Environmental Strategies.
Lal, V.B., Banerji, S., Narayanan, J., 1997. Sediment Yield in relation to Drainage Basin Characteristics in
some Indian River Valley Projects. Retrieved from www.iahs.info/redbooks/a122/iahs_122_0093.pdf
on 17th Jan, 2012 at 02:23 pm.
Majumder, M., Roy, P., & Mazumder, A. (2011). An introduction and current trends of Damodar and
Rupnarayan River network. In B. K. Jana & M. Majumder (Eds.), Impact of climate change on natural
resource management (pp. 461–480). New York: Springer.
Majumder, A., Ghosh, S., Dsagupta, A., & Seth, D. (2012). Analyzing reservoir sedimentation of Panchet
Dam, India using remote sensing and GIS. PANCHAKOTeSSAYA, 2(3), 82–95.
Miall, A. D. (1985). Architectural element analyses: A new method of analyses applied to fluvial deposits.
Earth Science Reviews, 22, 261–308.
Mishra, D. K. (2001). Living with floods: People’s perspective. Economic and Political Weekly, 36(29),
2756–2761.
Morris, G. L., & Fan, J. (1997). Reservoir sedimentation handbook. New York: McGraw Hill.
Mueller, J. R. (1968). An introduction to the hydraulic and topographic sinuosity indexes. Annals of the
Association of American Geographers, 58(2), 371–385.
Mukhopadhyay, S. C., & Dasgupta, A. (2010). River dynamic of West Bengal: Physical aspects. Kolkata:
Prayash.
Nandargi, S., & Dhar, O. N. (2003). High frequency floods and their magnitudes in the Indian rivers. Journal
Geological Society of India, 61, 90–96.
Niyogi, D. (1975). Quaternary geology of the coastal plain in West Bengal and Orissa. Indian Journal of
Earth Sciences, 2, 51–61.
Niyogi, D., Sarkar, S.K. and Mallick, S. (1970). Geomorphic mapping in plains of West Bengal, India. In:
Selected Paper on Physical Geography (Vol.1) 21st International Geographical Congress edited by
Chatterjee SP and Das Gupta SP.(pp 89–94)National Committee for Geography: Calcutta.
Patton, P. C., & Baker, V. R. (1976). Morphometry and floods in small drainage basins subject to diverse
hydrogeomorphic controls. Water Resource Research, 12(5), 941–952.
Peterson, J. C. K. (1997). Bengal District Gazetteers–Burdwan. Calcutta: Govt. of West Bengal.
Prasad, N. (1982). Some aspects of meandering streams of the barakar basin and their sinuosity indexes. In:
H. S. Sharma (Ed.), Perspectives in geomorphology (Vol. 4): Essay on Indian geomorphology (pp.
93–102). New Delhi: Concept Publishing Company.
Raghunath, H. M. (2011). Hydrology—principles, analysis and design. New Delhi: New Age Internationals
Publishers.
Rao, A. R., & Hamed, K. H. (2011). Flood frequency analysis. Boca Raton: CRC Press.
Reddy, P. J. R. (2011). A Textbook of Hydrology. Bangalore: University Science Press.
Rudra, K. (2002). Floods in West Bengal, 2000—causes and consequences. In S. Basu (Ed.), Changing
environmental scenario (pp. 326–347). Kolkata: acb publications.
Rudra, K. (2010). Banglar Nadikatha (Account of Rivers of Bengal). Kolkata: Sahitya Samsad.
Saha, S. K. (1979). River-Basin planning in the Damodar Valley of India. Geographical Review, 69(3),
273–287.
Sanyal, J., Carbonneau, P., & Densmore, A. L. (2013). Hydraulic routing of extreme floods in large
ungauged river and the estimation of associated uncertainties: A case study of the Damodar River,
India. Natural Hazards, 66, 1153–1177.
Sarma, S. S. (2002). Floods in West Bengal- nature, analysis and solution. In S. Basu (Ed.), Changing
environmental scenario (pp. 315–325). Kolkata: acb publications.
Scheidegger, A. E. (1973). Hydrogeomorphology. Journal of Hydrology, 20(2), 193–215.
Sen, P. K. (1985). The genesis of floods in the Lower Damodar Catchment. In P. K. Sen (Ed.), The concepts
and methods in geography (pp. 71–85). Burdwan: The University of Burdwan.
Sen, P. K. (1991). Flood hazards and river bank erosion in the Lower Damodar Basin. In H. S. Sharma (Ed.),
Indian geomorphology (pp. 95–108). New Delhi: Concept Publishing Company.
Sengupta, S. (2001). Rivers and floods: With special reference to floods in West Bengal. Breakthrough, 9(2),
2–8.
Singh, P., Ramanathan, A.S. and Ghanekar, V.G. (1974). Flash floods in India. Retrieved from www.
ks360352.kimsufi.com/redbooks/a112/iahs_112_0114.pdf. on 12th June, 2013 at 3:25 pm.
123
796
S. Ghosh, S. K. Guchhait
Singh, L. P., Parkash, B., & Singhvi, A. K. (1998). Evolution of the Lower Gangetic Plain landforms and
soils in West Bengal, India. Catena, 33, 75–104.
Singhvi, A.K., Kale, V.S. (2009). Palaeoclimatic studies in India: Last Ice Age to the Present. IGBP-WCRPSCOPE-Report Series. 41–30.
Sridhar, A. (2008). Fluvial palaeohydrological studies in western India: A synthesis. Earth Science India,
1(1), 21–29.
United State Water Resource Council (1967). A uniform technique for determining flood flow frequencies.
Retrieved from www.water.usgs.gov/osw/bulletin176/Bulletin_15_1967.pdf accessed on 27th Nov,
2012 at 11:15 am.
Ward, R. C. (1978). Floods: A geographical perspective. New York: John Wiley and Sons.
Wildi, W. (2010). Environmental hazards of dams and reservoirs. Terre at Environnement, 88, 187–197.
Williams, G.P., Wolman, M.G. (1984). Downstream effects of dams on alluvial rivers. Geological Survey
Professional Paper, 1286, Washington DC, pp. 1–83.
Xu, J. (1990). An experimental study of complex response in river channel adjustment downstream from a
reservoir. Earth Surface Processes Landforms, 15(1), 43–53.
123