T1 Transforemer Stability Test Report
T1 Transforemer Stability Test Report
T1 Transforemer Stability Test Report
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 1 10
Feeder name- Bay- E03 at 132kV side and Bay K09 at 11kV side RATING WINDING RATED POWER(MVA) ONAN/ONAF HV MV SW 31.5/40 31.5/40 10.5/13.3 RATED VOLTAGE (KV) 132 11.5 8 RATED CURRENTS (A) 137.8/175.0 1581/2008 757.7/962
IMPEDANCE VOLTAGE WINDING IMPEDANCE VOLTAGE HV-LV POWER AT 40MVA HV VOLTAGES(KV) Tap1151.8 Tap13---132.0 Tap25---112.2 The CT T1 used For Differential protection (F87T) CT ratio for 132kV Line side CTs = 300/1A CT ratio for 11kV Line side CTs = 2500/1A The CT T3 used For REF protection at HV side (F64HV) Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy Witnessed by Approved by Relay- RET670- ABB % 19.51 17.69 16.28
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 2 10
CT ratio for 132kV Line side CTs = 300/1A CT ratio for HV neutral side= 300/1A
The CT5 used For REF protection at MV side (F64MV) CT ratio for 11kV Line side CTs = 2500/1A CT ratio for MV neutral side= 2500/1A The CT1 used For SBEF protection at HV Neutral side (F51NHV ) CT ratio for HV neutral side= 300/1A Relay- REF615- ABB Relay- RET615- ABB
The CT4 used For SBEF protection at MV neutral side (F51NMV) CT ratio for MV neutral side= 2500/1A Relay- REF615- ABB
The CT9 used For SBEF protection at tertiary side (F51NT) CT ratio for Tertiary neutral side= 300/1A Relay- REF615- ABB
The CT T1 used For O/C & E/F protection at HV Line side (F51/51NHV) CT ratio for 132kV Line side CTs = 300/1A Relay used for Over Voltage protection (F59) VT Ratio 11kV/3/110V/3 Relay- REF615- ABB Relay- REF615- ABB
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
Approved by
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 3 10
PHASE
Relay Display Measurement (A) 132kV 34.17 34.55 33.98 11kV 392 392 387
CT Terminals Sec Current (A) 132kV 0.103 0.107 0.104 11kV 0.186 0.192 0.187
R Y B N
1b) UNSTABLE CONDITION (132kV side CT Bypassed by closing the Earth switch Q8 ) a)Three phase voltage injected in 11kV side thru Bay K09(I/C-1)**and all CTs are Normal PHASE Primary current (A) 132kV R Y B N 1c) STABLE CONDITION (132kV BB2 Earth Q25 Closed) Three phase voltage injected in 11kV side thru Bay K09(I/C-1)** and all CTs are normal PHASE Primary current (A) 132kV R Y B N
REMARKS:
Relay Display Measurement (A) 132kV 3.2 3.1 3.0 11kV 393 390 385
CT Terminals Sec Current (mA) 132kV 9.6 9.2 9.0 1.6 11kV 153 152 149 5.1
10 8 10
Test Plug (A) 132kV 110 111 110 11kV 151 153 151 -
Relay Display (A) 132kV 34.2 34.2 33.0 11kV 193 389 388 -
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor Neutral CT Ratio Relay Setting (Is) Stabilizing resistor (final setting) Stabilizing resistor set at Transformer Tap position Primary current measured : : 13 : A
ENERGO
Name of the Equipment Name of the Feeder Manufacturer Date : 300/1 A :. A :_ Ohm Ohm
Page 4 10
(132kV Earth switch Q25 (BB2 ESW) Close (BUSBAR -2 under Shutdown)
XA:21
XA:22
XA:23
XA:24
XA: 11&12
R Ph & Neut. Normal Y Ph & Neut. Normal B Ph & Neut. Normal RYB
100
31.0
29.0
37.5/ 37.2
31.2
104.1
31.2
28.8
39.2/ 40.0
47.8
47.3
30.2
31.1
99.1
37.2
37.6/ 37.7
43
44.2
110
102
109
18.9
18.9
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 5 10
Descript ion
XA:21
XA:22
XA:23
XA:24
XA: 11&12
93.7
38.4
37.9
18.9
29.9/ 29.6
30.2
30.1
48.2
15.0
48.1
37.7
96.7
38.9
20.5
31.8/ 31.8
32.5
32.5
51.3
16.2
51.9
37.8
37.9
92.5
19
28.7/ 29.6
30.3
30.3
48.4
14.9
48.4
XA:21
XA:22
XA:23
XA:24
XA: 11&12
100
31.4
31.3
37.8
37.6/ 37.5
19
90
31.2
104.3
31.2
39.8
40.1/ 40.1
44
44
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
Approved by
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 6 10
30.7
30.5
100.2
36.9
37.3 / 37.6
42.5
42.5
REMARKS:
(132kV Earth switch Q25 (BB2 ESW) Close (BUSBAR -2 under Shutdown)
183
183.5
183/ 181.7
35.5
187
187
187.9/ 187.8
105
105
181
179.8
178.9 /
23
22
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
Approved by
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor Neut. Normal RYB 152 152 149 0 0 0 24.5 25.5 0 0 0
ENERGO
Page 7 10
MV REF NCT (mA) XA: 18&19 177.8/ 179 184/ 181.4 175.1/ 178.2
R Ph Y Ph B Ph
179 0 0
5.1 184 0
2.9 0 178
MV REF NCT (mA) XA: 18&19 181.2/ 180.4 188.1/ 187.8 179.8/ 180
R Ph Y Ph B Ph
183 0.1 0
0.1 187 0
0 0 0
0 0 0
0 0 0
REMARKS:
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
Approved by
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 8 10
RN YN BN RYB F51/51NHV Display (A) R Y B N IL1 IL2 IL3 IL4 31.8 9.9 9.9 11.9 9.9 32.6 9.9 12.6 9.8 9.8 31.5 11.9 34.5 34.9 34.5 0
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
Approved by
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 9 10
D4.
CT Details
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor IN 0.47
ENERGO
Name of the Equipment Name of the Feeder Manufacturer Date 0.47 0.47 0
Page 10 10
LCC Y
0/48 30/157 0/47 30/167
RCC B
0/47 0/48.2 30/152 30/166
Main Tariff B
0/47 0/48 30/151 30/163
Check Tariff B
0 0
N
-
R
30/150 0/46 0/47 30/162
Y
0/47 30/153 0/47 30/164
N
-
R
0.5 0 0 0.4
Y
0 0.5 0 0.4
R
0.5 0 0 0.4
Y
0 0.5 0 0.4
B
0 0 0.5 0.4
0.5 0.4
RTU R R Y
153 47
Y
47 157
B
47 48
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
Approved by
ENERGO
20.02.2013 Mohammad Rasheed
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor
ENERGO
Page 11 10
B RYB
47 164
47 168
152 165
Remarks -:- CT circuits for Tr Diff.Stability, HV & MV REF stable confirmed. ** Three phase generator voltage injected through K11 spare bay at 11kV side
Tested by ABB Transmission & Distribution Date Name Signature 20.02.2013 R.Krishna Murthy
Witnessed by
Approved by
ENERGO
20.02.2013 Mohammad Rasheed