Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Combined Footings

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 17

Design of Combined Footing :Project No.

:
Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

700 mm
400 mm

400 mm
700 mm

674.25 KN
2327.25 KN

465.00 KN
1605.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

3.50 m
5.00 m
600 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF1

172 Kn/m2
411 KN/m

OK

1.76 m
1.46 m
109 Kn/m2
455 Kn/m2
131.48
446.32

1/17

3500

5000

600

20

150

20

100

20

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

3001.50 KN
2.06 m
0.44 m
1.51 m
0.99 m

171.51
364.61
297.31
83.72
34.91
1.81
82.15

Column 2
Footing No.

229 KN/m
187 KN/m
127 KN/m
19 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :467 mm
600 mm
3.50 m
3.72 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

354 KN/m
311 KN/m
23 KN/m
169 KN/m

V1 =
V2 =
V3 =
V4 =

1.95 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF1

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
133 Kn/m2

Project No. :

401.4
297.3
OK

592.1
446.3
OK

592.1
446.3
OK

196.0
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

700 mm
400 mm

400 mm
700 mm

635.10 KN
2360.60 KN

438.00 KN
1628.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

3.50 m
5.00 m
600 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF1

171 Kn/m2
411 KN/m

OK

1.76 m
1.46 m
103 Kn/m2
462 Kn/m2
123.85
452.72

2/17

3500

5000

600

20

150

20

100

20

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

2995.70 KN
2.09 m
0.41 m
1.54 m
0.96 m

171.18
372.65
304.64
79.44
32.21
1.85
78.64

Column 2
Footing No.

233 KN/m
193 KN/m
133 KN/m
15 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :471 mm
600 mm
3.50 m
3.77 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

357 KN/m
317 KN/m
17 KN/m
165 KN/m

V1 =
V2 =
V3 =
V4 =

1.95 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF1

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
132 Kn/m2

Project No. :

401.4
304.6
OK

592.1
452.7
OK

592.1
452.7
OK

196.0
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

900 mm
700 mm

850 mm
500 mm

2189.50 KN
4186.15 KN

1510.00 KN
2887.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

3.00 m
8.50 m
800 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF3

250 Kn/m2
566 KN/m

OK

2.36 m
2.16 m
309 Kn/m2
646 Kn/m2
178.69
504.70

3/17

3000

8500

800

20

100

20

100

20

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

6375.65 KN
2.92 m
1.33 m
2.55 m
1.70 m

250.03
1062.87
823.02
360.93
195.07
2.67
174.91

Column 2
Footing No.

460 KN/m
398 KN/m
11 KN/m
131 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :645 mm
800 mm
3.00 m
8.48 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

729 KN/m
666 KN/m
305 KN/m
425 KN/m

V1 =
V2 =
V3 =
V4 =

3.89 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF3

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
192 Kn/m2

Project No. :

826.9
823.0
OK

826.9
504.7
OK

826.9
504.7
OK

271.1
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

900 mm
700 mm

850 mm
500 mm

2189.50 KN
4186.15 KN

1510.00 KN
2887.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

3.00 m
8.50 m
800 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF3

250 Kn/m2
566 KN/m

OK

2.36 m
2.16 m
309 Kn/m2
646 Kn/m2
178.69
504.70

4/17

3000

8500

800

20

100

20

100

20

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

6375.65 KN
2.92 m
1.33 m
2.55 m
1.70 m

250.03
1062.87
823.02
360.93
195.07
2.67
174.91

Column 2
Footing No.

460 KN/m
398 KN/m
11 KN/m
131 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :645 mm
800 mm
3.00 m
8.48 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

729 KN/m
666 KN/m
305 KN/m
425 KN/m

V1 =
V2 =
V3 =
V4 =

3.89 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF3

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
192 Kn/m2

Project No. :

826.9
823.0
OK

826.9
504.7
OK

826.9
504.7
OK

271.1
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

800 mm
800 mm

500 mm
500 mm

5524.50 KN
6279.95 KN

3810.00 KN
4331.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

5.50 m
9.00 m
1000 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF4

238 Kn/m2
722 KN/m

OK

2.66 m
2.66 m
378 Kn/m2
429 Kn/m2
1180.05
1341.41

5/17

5500

9000

1000

20

100

25

100

25

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

11804.45 KN
2.96 m
1.54 m
1.76 m
2.74 m

238.47
1041.60
778.74
898.06
655.35
1.83
641.24

Column 2
Footing No.

389 KN/m
121 KN/m
34 KN/m
338 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :803 mm
1000 mm
5.50 m
8.93 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

705 KN/m
437 KN/m
350 KN/m
654 KN/m

V1 =
V2 =
V3 =
V4 =

3.30 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF4

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
188 Kn/m2

Project No. :

1061.7
778.7
OK

1632.5
1341.4
OK

1632.5
1341.4
OK

346.3
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

800 mm
800 mm

500 mm
500 mm

4799.50 KN
6056.65 KN

3310.00 KN
4177.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

5.50 m
9.00 m
1000 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF4

219 Kn/m2
722 KN/m

OK

2.66 m
2.66 m
328 Kn/m2
414 Kn/m2
1025.18
1293.71

6/17

5500

9000

1000

20

100

25

100

25

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

10856.15 KN
3.04 m
1.46 m
1.84 m
2.66 m

219.32
1014.13
764.89
775.27
559.56
1.98
584.21

Column 2
Footing No.

376 KN/m
144 KN/m
1 KN/m
293 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :785 mm
1000 mm
5.50 m
8.30 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

667 KN/m
434 KN/m
289 KN/m
583 KN/m

V1 =
V2 =
V3 =
V4 =

3.30 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF4

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
175 Kn/m2

Project No. :

1061.7
764.9
OK

1632.5
1293.7
OK

1632.5
1293.7
OK

346.3
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

500 mm
800 mm

800 mm
500 mm

551.00 KN
4706.70 KN

380.00 KN
3246.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

4.00 m
5.50 m
700 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF6

239 Kn/m2
489 KN/m

OK

1.76 m
2.06 m
78 Kn/m2
571 Kn/m2
100.18
874.65

7/17

4000

5500

700

20

125

25

125

25

125

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

5257.70 KN
2.55 m
0.20 m
1.70 m
1.05 m

238.99
777.54
552.81
131.52
76.31
2.37
104.82

Column 2
Footing No.

365 KN/m
322 KN/m
322 KN/m
42 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :675 mm
700 mm
4.00 m
5.18 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

610 KN/m
567 KN/m
-113 KN/m
251 KN/m

V1 =
V2 =
V3 =
V4 =

1.90 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF6

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
182 Kn/m2

Project No. :

572.4
552.8
OK

877.5
874.7
OK

877.5
874.7
OK

233.6
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

700 mm
700 mm

500 mm
500 mm

1850.20 KN
2950.75 KN

1276.00 KN
2035.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

2.80 m
8.00 m
700 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF6

214 Kn/m2
489 KN/m

OK

1.96 m
1.96 m
337 Kn/m2
538 Kn/m2
222.93
355.54

8/17

2800

8000

700

20

125

20

150

20

150

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

4800.95 KN
2.69 m
1.31 m
2.09 m
1.91 m

214.33
775.28
586.64
391.07
260.89
2.23
243.68

Column 2
Footing No.

368 KN/m
268 KN/m
42 KN/m
200 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :522 mm
700 mm
2.80 m
6.82 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

576 KN/m
477 KN/m
251 KN/m
409 KN/m

V1 =
V2 =
V3 =
V4 =

3.40 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF6

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
165 Kn/m2

Project No. :

572.4
586.6
Unsafe

479.7
355.5
OK

479.7
355.5
OK

233.6
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

700 mm
700 mm

500 mm
500 mm

1856.00 KN
3060.95 KN

1280.00 KN
2111.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

2.80 m
8.00 m
700 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF6

220 Kn/m2
489 KN/m

OK

1.96 m
1.96 m
338 Kn/m2
558 Kn/m2
223.63
368.81

9/17

2800

8000

700

20

125

20

150

20

150

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

4916.95 KN
2.72 m
1.28 m
2.12 m
1.88 m

219.51
809.97
614.71
389.32
258.06
2.26
247.59

Column 2
Footing No.

382 KN/m
283 KN/m
35 KN/m
199 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :534 mm
700 mm
2.80 m
6.97 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

596 KN/m
497 KN/m
249 KN/m
413 KN/m

V1 =
V2 =
V3 =
V4 =

3.40 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF6

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
168 Kn/m2

Project No. :

572.4
614.7
Unsafe

479.7
368.8
OK

479.7
368.8
OK

233.6
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

400 mm
600 mm

700 mm
1400 mm

1899.50 KN
1986.50 KN

1310.00 KN
1370.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

3.00 m
5.20 m
700 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF7

249 Kn/m2
489 KN/m

OK

1.66 m
1.86 m
381 Kn/m2
356 Kn/m2
252.22
113.92

10/17

3000

5200

700

20

100

20

100

20

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

3886.00 KN
1.60 m
1.00 m
1.05 m
1.55 m

249.10
318.03
209.83
300.03
227.69
1.06
178.02

Column 2
Footing No.

168 KN/m
34 KN/m
41 KN/m
181 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :413 mm
700 mm
3.00 m
5.08 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

398 KN/m
264 KN/m
247 KN/m
387 KN/m

V1 =
V2 =
V3 =
V4 =

2.05 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF7

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
189 Kn/m2

Project No. :

709.5
227.7
OK

709.5
252.2
OK

709.5
252.2
OK

233.6
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

500 mm
800 mm

800 mm
500 mm

1754.50 KN
2117.00 KN

1210.00 KN
1460.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

3.00 m
5.20 m
700 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF7

248 Kn/m2
489 KN/m

OK

1.76 m
2.06 m
332 Kn/m2
343 Kn/m2
201.04
267.62

11/17

3000

5200

700

20

100

20

100

20

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

3871.50 KN
1.53 m
1.07 m
1.29 m
1.31 m

248.17
291.35
159.09
213.50
139.87
1.31
78.03

Column 2
Footing No.

126 KN/m
71 KN/m
42 KN/m
108 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :414 mm
700 mm
3.00 m
5.06 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

380 KN/m
325 KN/m
259 KN/m
326 KN/m

V1 =
V2 =
V3 =
V4 =

2.36 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF7

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
188 Kn/m2

Project No. :

709.5
159.1
OK

709.5
267.6
OK

709.5
267.6
OK

233.6
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

800 mm
700 mm

375 mm
500 mm

1015.00 KN
5338.90 KN

700.00 KN
3682.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

3.60 m
7.20 m
800 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF8

245 Kn/m2
566 KN/m

OK

2.26 m
2.16 m
125 Kn/m2
687 Kn/m2
162.19
824.76

12/17

3600

7200

800

25

125

20

100

20

100

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

6353.90 KN
3.22 m
0.38 m
2.02 m
1.58 m

245.14
1268.16
1007.20
307.29
171.64
2.83
284.29

Column 2
Footing No.

525 KN/m
431 KN/m
382 KN/m
112 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :745 mm
800 mm
3.60 m
7.06 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

789 KN/m
695 KN/m
-106 KN/m
388 KN/m

V1 =
V2 =
V3 =
V4 =

2.40 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF8

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
188 Kn/m2

Project No. :

1024.2
1007.2
OK

826.9
824.8
OK

826.9
824.8
OK

271.1
0.0
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

800 mm
500 mm

550 mm
700 mm

3175.50 KN
4321.00 KN

2190.00 KN
2980.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

4.00 m
7.50 m
700 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF9

250 Kn/m2
489 KN/m

OK

2.06 m
1.76 m
385 Kn/m2
614 Kn/m2
573.37
835.51

13/17

4000

7500

700

20

125

25

125

25

125

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

7496.50 KN
2.02 m
1.73 m
2.36 m
1.39 m

249.88
509.40
391.07
243.08
123.65
2.30
-153.75

Column 2
Footing No.

286 KN/m
357 KN/m
189 KN/m
92 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :657 mm
700 mm
4.00 m
7.35 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

505 KN/m
576 KN/m
445 KN/m
349 KN/m

V1 =
V2 =
V3 =
V4 =

4.09 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF9

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
189 Kn/m2

Project No. :

572.4
391.1
OK

877.5
835.5
OK

877.5
835.5
OK

233.6
153.8
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

800 mm
500 mm

550 mm
700 mm

3770.00 KN
5249.00 KN

2600.00 KN
3620.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

4.80 m
7.50 m
800 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF10

251 Kn/m2
566 KN/m

OK

2.26 m
1.96 m
348 Kn/m2
558 Kn/m2
784.66
1172.35

14/17

4800

7500

800

20

125

25

125

25

125

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

9019.00 KN
2.06 m
1.69 m
2.36 m
1.39 m

250.53
530.06
409.05
243.04
123.50
2.31
-137.13

Column 2
Footing No.

271 KN/m
334 KN/m
155 KN/m
67 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :738 mm
800 mm
4.80 m
7.50 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

515 KN/m
578 KN/m
436 KN/m
349 KN/m

V1 =
V2 =
V3 =
V4 =

4.05 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF10

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
192 Kn/m2

Project No. :

666.3
409.1
OK

1024.2
1172.3
Unsafe

1024.2
1172.3
Unsafe

271.1
137.1
OK

Design of Combined Footing :Project No. :


Column 1
Column 2
Footing No.

Input :Column No. 1


Column No. 2
fc'
fy

J08-12500-B01

Check Shear :-

DIR. 2

Ult. Load

Wrk. Load

900 mm
900 mm

1125 mm
1125 mm

4394.95 KN
4393.50 KN

3031.00 KN
3030.00 KN

2.5

Final Footing Width =


Final Footing Length =
Final Footing Depth =

4.50 m
8.20 m
800 mm

(Punching Check ACI 11-12)

OK

OK

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

0
CF2

238 Kn/m2
566 KN/m

OK

2.36 m
2.36 m
414 Kn/m2
414 Kn/m2
589.23
589.04

15/17

4500

8200

800

20

150

25

125

25

125

16

200

12

200

16

200

Capacity Moment
Acting Moment
Case

8788.45 KN
2.07 m
2.03 m
2.02 m
2.08 m

238.17
512.57
314.33
512.90
314.59
2.02
24.41

Column 2
Footing No.

214 KN/m
202 KN/m
203 KN/m
214 KN/m

fVn=

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Result :546 mm
800 mm
4.50 m
7.84 m

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

494 KN/m
482 KN/m
482 KN/m
494 KN/m

V1 =
V2 =
V3 =
V4 =

4.05 m
200 Kn/m2

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

J08-12500-B01

Column 1

CF2

DIR. 1

30 Mpa
Spacing Between Column
415 Mpa
Beariing Capacity
ACTUALL STRESS =
183 Kn/m2

Project No. :

557.9
314.6
OK

1024.2
589.2
OK

1024.2
589.2
OK

271.1
0.0
OK

Design of Combined Footing :-

Input :Column No. 1


Column No. 2
fc'
fy

Project No. :

#REF!

Column 1
Column 2
Footing No.

#REF!
#REF!
#REF!

DIR. 1

DIR. 2

Ult. Load

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

Spacing Between Column


Beariing Capacity

Calculation :Min. Footing Depth =


Assumed Footing Depth =
Assumed Footing Width =
Min. Footing Length =

#REF!
#REF!
#REF!
#REF!

Final Footing Width =


Final Footing Length =
Final Footing Depth =

#REF!
#REF!
#REF!

R (Pu1 + Pu2)=
X1 =
X2 =
X3 =
X4 =

#REF!
#REF!
#REF!
#REF!
#REF!

* Longitudinal Direction :qu (Ult. Soil Stress) =


M1 =
Md1 =
M2=
Md2 =
YPoint of zero shear =
Md3=

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

* Transversal Direction :Lc1 =


Lc2 =
Qu1 =
Qu2 =
Md4 =
Md5 =

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

(Punching Check ACI 11-12)

#REF!

#REF!

#REF!
#REF!

Check Shear :-

#REF!
#REF!
#REF!
#REF!

V1 =
V2 =
V3 =
V4 =
2.5

Vd1 =
Vd2 =
Vd3 =
Vd4 =

Project No. :

#REF!

Column 1

#REF!

Column 2
Footing No.

#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
fVn=

#REF!

Result :-

###
A

a
f

b
S

c
S

e
S

#### #### #### ### ### ### ### ### ###


Capacity Moment
Acting Moment
Case

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

16

200

12

g
S

200 ### ###


#REF!
#REF!
#REF!

You might also like