Flushing Procedure For Chilled Water System Chemical Treatment Method Statement HQ
Flushing Procedure For Chilled Water System Chemical Treatment Method Statement HQ
Flushing Procedure For Chilled Water System Chemical Treatment Method Statement HQ
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
Search
Listen to music
Home Disclaimer Construction Method Statements Plumbing Piping Electrical HVAC Duct Works HVAC Piping Testing & Commissioning Pump Installation Method Statement Template Inspection Checklists Request A Method Statement Health & Safety Sample Forms & Formats
Tw eet
Like
0
Email Share
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html 1/8
8/25/13
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
Tw eet Like 0
Share
This method statement describes the methodology and procedure for flushing of chilled water system and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and Project Documents and Specification. Scope of Works
This method statement is intended to outline the activities and the methods used in cleaning and flushing of chilled water system and its chemical treatment. All activities will be carried out in accordance with the contract details and in full compliance to the project specifications. All work within the rights-of-way of the standards and specifications will be done in compliance with requirements issued by authorities. Required Tools/Equipment Tool box Tool kit Meters/gauges Power Tools Temporary pump
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html
2/8
8/25/13
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
8/25/13
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
of water as per applicable requirements in the contract. Open the drain valves in the main lines and drain the water completely. Clean the strainers During the above flushing process the drain valves shall be kept open while the pump is running, until the water appears clean. Close all the drain valves Cleaning With Cleaning Chemical Desired water quality should be achieved before adding the chemical. Refill the system with clean water and add cleaning chemical in required quantities as per Specialist suppliers instructions i.e. 1Kg per cubic meter of system volume. Once the cleaning process is started, samples of solution shall be collected from various parts of the system to ensure the chemical solution has reached all parts of the system. Run the pump and circulate the water (with chemicals added) for a minimum period of 24 hours as per specialist suppliers recommendations. Samples to be taken and tested in 3rd party laboratory. The water quality must be achieved as per the requirements agreed in the contract or as applicable Specialist contractor shall collect samples and conduct tests until satisfactory results are obtained as required which is a condition when no increase in iron level is observed and a level of iron less than 1ppm is achieved and the water is clear, colourless and odourless. After the cleaning process is completed as described above the cleaning solution shall be flushed out. Addition of Corrosion & Scale Inhibitors The entire system is re-filled with fresh and clean water and treated with corrosion and scale inhibiting treatment chemical at the rate of 3Kg per cubic meter of the system volume or as applicable depending upon the chemical concentration. After 24 hours of circulation samples are taken to ensure the concentration levels i.e. 800-100 ppm as NaNo2 Biological Control Biological control chemical, shall be dosed at the agreed rate per cubic meter using the manual dosing pot. This is a shock dosing which shall be done after every three months. Inspection The inspection request shall be raised for consultant to witness the flushing and cleaning process at different stages and results shall be noted on checklists.
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html
4/8
8/25/13
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
Tags: Chemical Treatment of chw piping, chw piping cleaning, Flushing Procedure For Chilled Water System METHOD STATEMENT FOR CONCRETE SAMPLING AND TESTING Sample Forms & Checklists For HVAC Installation Testing & Commissioning
Search Search
Electrical Installation
www.siemens.ae/green-buildings Siemens Green Buildings - Save up to 60 percent of consumed energy!
Like Us To Support Us
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html
5/8
8/25/13
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
Methodstatementhq
Like One person likes Methodstatementhq.
Welding Method Statement August 13th, 2013 There are many different welding processes, but the most commonly used in the construction industry [...]
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing August 13th, 2013 The purpose of this method statement is to lay down the systematic procedures for the various activi[...]
Method Statement For Installation Testing & Commissioning Of BMS Building Management System August 1st, 2013 Scope of Work This method statement is applicable for Installation, Testing & Commissioning of [...]
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html 6/8
8/25/13
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
Chilled Water Balancing For HVAC System Method Statement July 31st, 2013 The aim of chilled water balancing is to apply a disciplined procedure of adjustment to water flow r[...]
Method Statement For Air Balancing Of HVAC System FCU AHU Exhaust Fans & Pressurization Unit July 31st, 2013 Air Balancing Method Statement Air Balancing For Fan Coil Units Check that all automatic contro[...]
Inspection Checklists / Forms For Electrical Works Installation Testing & Commissioning July 31st, 2013 Below are the links for downloading the sample inspection and testing check sheets and forms which y[...]
Sample Forms & Checklists For HVAC Installation Testing & Commissioning July 31st, 2013 You can download the sample forms and checklists for different activities which you can then customi[...]
METHOD STATEMENT FOR CONCRETE SAMPLING AND TESTING July 29th, 2013 This method statement is applicable for collecting samples for concrete before and during concrete p[...]
METHOD STATEMENT FOR TESTING & COMMISSIONING OF PRESSURIZATION UNIT July 29th, 2013 The purpose of this procedure is to define the step by step method to implement the correct practice[...]
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html 7/8
8/25/13
Flushing Procedure For Chilled Water System Chemical Treatment | Method Statement HQ
blank performa blank proforma BMS Testing Procedure Building Management System BMS
hvac
Accessories
method statement for Installation Method Statement For PVC Conduit Installation In Concrete Slab Method Statement Template MST MST For
For Drainage Piping method statement for drainage works Method Statement For GI Box & Conduit Installation
BMS
of Piping Installation Procedure pressure pumps PVC uPVC Underground Above Ground Piping Risk
Assessment
Home Privacy Policy Disclaimer Copyright 2011 - 2012 MethodStatementHQ.Com. All Rights Reserved.
methodstatementhq.com/flushing-procedure-for-chilled-water-system-chemical-treatment.html
8/8