100 A Request For Proposal Lessons Learned
100 A Request For Proposal Lessons Learned
INPUTS
100-A Confirm Scope/ Schedule/Budget Prepare Scope of Work and Estimate 200-A Basis of Design Finalize Electrical load data
Review Submittals
Programming
Construction Documents
Site Observations
Project Planning
Site Visits
WORKFLOW
Basis of Design
O&M Manuals
Pipe/Valve Specifications 400-B Software Test Plan and Procedures Develop Construction Cost Estimate
Develop Control System Architecture
Punch List
Pre-start-up Inspection
Constructability Review
Hardware Specification
Provide Training
Initial Inputs/Outputs List Develop Construction Cost Estimate Constructability Review 300-B Design Studies Design Calculations Update Electrical Load Data
Software Implementation
Punch List
600-A
Approve Shop Drawings for Long Lead Equipment, Instruments and Materials
Record Drawings Instrument Wiring Diagrams and Loop Sheets Pneumatic Connection Diagrams Instrument Installation Details
200-C
Project Close-out
300-A
Control System Hardware Selection Develop Control System Functional Spec Cable Schedule and Conduit Routing
Key Process Step External Input Review/Approval Cost Estimate Check Constructability Review
Construction Specifications