Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
146 views

Load Calculation

This document provides calculations for sizing cables, circuit breakers, transformers and feeders for an electrical load distribution system. It calculates the total load, current, circuit breaker size and cable size for various parts of the system including lighting panels, power panels, bus bars, main distribution panels, and transformers. The system has two main distribution panels fed by two 1000KVA transformers with secondary feeders consisting of 7 runs of 630mm2 cable. Voltage drop calculations are also provided for various feeder runs.

Uploaded by

albertoooooo
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views

Load Calculation

This document provides calculations for sizing cables, circuit breakers, transformers and feeders for an electrical load distribution system. It calculates the total load, current, circuit breaker size and cable size for various parts of the system including lighting panels, power panels, bus bars, main distribution panels, and transformers. The system has two main distribution panels fed by two 1000KVA transformers with secondary feeders consisting of 7 runs of 630mm2 cable. Voltage drop calculations are also provided for various feeder runs.

Uploaded by

albertoooooo
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

1

LPMTI
Load

I
C.B. Size
C.B. Size

11375

VA 100%

= 29.85
== 5337.3
/ 0.8 Amps
= 66
= 53
50 /A0.8 = 66

3ph

Cable
= 44x16
X 25mm2
mm, 16 10mm2
mm G G
L
15
VD/A/L
FOR 4X10mm2
3.35
VD
3.35X25.22X15
VD%
3.35X25.22X15
1.267=0.5%

LPMT2
Lighting Load
= 8500 VA
Other Load
= 36220 VA
1st.10,000 100%
Remaining:26220x0.4= 10488
10448VA
VA

_ _ _ _ _ _ _ _ _ (1)

Total Demand

= 8500 + 10000 +10448 VA


= 28948 VA
W/20% SPARE
3473760.00%
I
= 91 Amps
C.B. Size
= 91 / 0.8 =113.9
= 150 Amp
Cable
= 4 x70 mm,35 mm G
L
15
VD/A/L
FOR 4X70mm2
0.547
VD
.547X91X15
VD%
.547X91X15 1.267=0.5%
LPMT3
Load

I
C.B. Size

= 6900 VA 100%
= VA /3 V
=
18.1 Amps
= 53
30 /A0.8 = 66 3ph

Cable
= 44x6
X 25
mm2
mm, 16 6mm2
mm GG
L
15
VD/A/L
FOR 4X6mm2
3.35
VD
3.35X25.22X15
VD%
3.35X25.22X15
1.267=0.5%

_ _ _ _ _ _ _ _ _ (1)

PP1
Total outlet Load
1st.10,000 100%
Remaining 0.4
Total Demand

I
C.B. Size
Cable

= 36000 VA
= 10000 VA
= 10400 VA
= 20400 VA
= 30.9 Amps
= 50 A
== 4 x4 16mm
x 16mm , 10mm G

_ _ _ _ _ _ _ _ _ (1)
_ _ _ _ _ _ _ _ _ (2)

LPG

Lighting Load
Other Load

= 13700 VA 100%
= 8160 VA 100%

Total Demand

I
C.B. Size
Cable

21860 VA

= 33.2 Amp
= 33.2/0.8 = 41
=
50 A 3 Ph
= 4 x 16 mm, 10 mm G

LPM

Lighting Load
Other Load
1st.10,000 100%
Remaining x 0.4

= 18900 VA 100%
= 33000
=
10000 VA
=
9200 VA

Total Demand

= 1+2+3
= 18900+10000+9200
= 33184

57.88 Amps

C.B. Size

80 Amps

Cable

= 4 x 25 mm, 16 mm G

PPIV

Total connected Load


Demand Factor
=

= 121050

Total Demand Load =

121090

= 183.9

_ _ _ _ _ _ _ _ _ (1)
_ _ _ _ _ _ _ _ _ (2)
_ _ _ _ _ _ _ _ _ (3)

C.B. Size

= 183.9/08
=
229
= 250 A 3 Ph

Cable

= 4 X 150 mm, 70 mm G

PP2V

Total connected Load


Demand Load
=
Total Demand Load =

= 50400
1
50400

C.B. Size

Cable

= 4 X 35 mm, 16 mm G

765 Amps
100 A

PPS

Total connected Load


Demand Load
=

= 145970
1

Total Demand Load =

145970

C.B. Size

Cable

= 4 X 240 mm, 70 mm G

221 Amps
300 A

LPS

Lighting Load
A/C Load
Other Load
Total Demand

= 22271 VA 100%
= 7000 VA 100%
=
2460 VA 100%
= 31720 VA

48 Amps

C.B. Size

80 A 3 Ph

Cable

= 4 X 25mm, 10 mm G

Voltage Drop
PPS --- LPS

I = 48 Amps
L
=
5 ms
Cable
4.16 mm
VDKM/A =
2.11
VD
0.45
VD% =
0.11%
1, 3, 5 --------- LPS
L
=

Cable

140ms
4.74 Amps
4 x 6 mm

VD/KM/A (4x6mm) = 5.49


VD =
VD% =
7, 9, 11 --------- LPS
L
=

3.64 V
0.90%

311ms
5.69 Amps

_ _ _ _ _ _ _ _ _ (1)
_ _ _ _ _ _ _ _ _ (2)
_ _ _ _ _ _ _ _ _ (3)

Cable

4 x 6 mm

VD/KM/A (4x6mm) = 5.49


VD =
VD% =

9.72 V
2.5%

13, 15, 17

5.69 Amps
L
=
138 ms
Cable
4 x 6 mm
VDKM/A =
5.49
VD
7V
VD% =
19, 21, 23

I = 9.25 Amps
L
=
148 ms
VDKM/A = (4.10mm)
3.32
VD =
3.32 x 148/100 x 9.25
=
4.54011
VD% =
1.196

2, 4, 6
L

VD =
VD% =

130ms
VD/KM/I (4x6mm) = 5.49
3.41 Amps
3.41 x 130/1000 x 5.49 = 2.43
0.6%

8, 10, 12
L

VD =
VD% =

155ms
VD/KM/I (4x6mm) = 5.49
4.33 Amps
4.33 x 155/1000 x 5.49 = 3.68
0.96%

PPA/C
Total Connected Load
ACCU Load
=
AHU Fan Load

= 276000
160800 VA ---------(1)
3.75 KW X 4

Total Demand

C.B. Size

18750 VA ---------(2)

=
1+2
= 179550 VA
= 272.8 Amps

= 272.8/08 = 341
= 400 A

Bus Bar # 1

Total Connected Load

15 + 25 + 180 + 260 + 12
+ 34 + 8 + 40
= 574 KW

Demand Factor

Total Demand

= 344.4 KW
= 430.5 KW
= 654 A

C.B. Size

= 800 A

Cable

0.6

= 2 [4 X 300 mm, 120 mm G]

Bus Bar # 2

Total Connected Load = 7.5 + 25 + 40 + 40 + 15


+ 60 + 100 + 60 + 30 + 15
+ 15 + 3 + 22 + 10 + 6
= 484.5 KW
Demand Factor

Demand Load

= 269.1 KW
= 336.375 KVA
= 511 A

I
Main C.B. Size
Cable

0.6

= 800 A
= 2 [4 X 300 mm, 120 mm G]

BB4

Total Connected Load = 50 + 20 + 60 + 110 + 50 + 20 +


10 + 75 + 10 + 6 + 6
=
417 KW
Demand Factor

Demand Load

I
C.B. Size
Cable

0.6
312.75 KVA

= 475 A
= 800 A
= 2 [4 X 300 mm, 120 mm G]

BB5

Total Load

= 30 KW
=
=

Main C.B. Size


Cable

37.5 KVA
56.9 Amps

= 100 A
= 4 x 35 mm, 16 mm G]

MDP1

Total Load

= LP1 + LP2 + LP3 + PP1 + LP6 +


LPM + PPIV + PPS + BB1
= 42.0072 + 36.204 + 16780 + 20.400 + 21860 +
33050 + 121050 + 145970 + 430000
= 866.6 KVA

I
C.B. Size

= 136.7 Amps
= 1600 A

Transformer - 1

Total Load = 866.6 VA


With derating 15% = 996.59
Transformer Site

= 1000 KVA
= 34.5 KV - 380/220V

Primary Feeder

Fuse

1000000/34500 x 3

16.7 Amps

85 A

Cable

4 x 70mm, 25mm G

Secondary Feeder

= 1519.3 Amps

C.B. Size
Cable

1600 A

7 x 1C x 630mm, 120mm G

MDP2

Total Load

= BB2 + BB4 + BB5 + PPA/C + PP2V +


= 336.3 + 312.75 + 37.5 + 179.5 + 50.4
= 916.45 KVA

I
C.B. Size

= 1392 Amps
= 1600 A

Transformer - 2

Total Load = 916.45 VA


With derating 15% = 1053.9
Transformer Site

= 1000 KVA
= 34.5 KV - 380/220V

Primary Feeder
=

1000,000/34.5 x 3

16.7 Amps

Fuse

85 A

Cable

4 x 70mm, 25mm G

Secondary Feeder

I
C.B. Size
Cable

= 1519.3 Amps
=

1600 A

7 x 1 x 630mm, 120mm G