Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Quotation For Office Work at Ahamadbad Mohnalal

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

To,

Date : 26/02/2015
Project Name :
Site Location : Ahamadbad
SUB. : Quotation for Civil & Interior Works for Parul Hospital at AHAMADBAD.

Sr. no.

Description

Unit

Approx.
Qty

Rate

Demolition work

Sft

1500

15

P/F 100mm thk. Brick work

Sft

1850

65

P/F 150mm thk. Brick work

Sft

200

75

P/A Plaster work

Sft

6000

35

P/F of Vitrified Flooring Tiles (Basic cost of Tiles of


Rs.65/- sft)

Sft

1500

110

P/F of Vitrified Skirting

Rft

400

85

P/F of Tiles Dado (Basic cost of Tiles of Rs.65/- sft)

Sft

1500

110

P/A POP Punning on Wall

Sft

27

TOTAL

Date : 26/02/2015
Project Name :
Site Location : Ahamadbad

Civil & Interior Works for Parul Hospital at AHAMADBAD.

Amount

22,500.00
120,250.00
15,000.00
210,000.00
165,000.00

34,000.00
165,000.00

731,750.00

You might also like