Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Sr. No. Item/Particulars Material Required Qty Actual Qty

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 11

Sr. No.

Item/Particulars Material Required Qty Actual Qty

Engineers /Architectural Services


1 Architectural Plan
2 Working Drawing Plan
3 3D Plan/Drwaing
4 Furniture Detail Plan
5 Plumbing Detail Plan

6 Complete Structural Detail Plan(Footing,


Column, Beam, Slab, StairCase)
7
Engineers Supervision , Planning, Execution
8 Site Cleaning /Marking Layout Cement Sand Aggregate Cement Sand
Underground Work/Footing
1 EXCAVATION IN BC Soil/ Piling
2 RCC work for Piling
Work Below the Plinth
1 RCC WORK BELOW PLINTH
2 FOUNDATION
3 STUB COLUMN
4 1ST LEVEL TIE BEAM
5 COLUMN ABOVE 1ST LEVEL TIE BEAM
6 PLINTH BEAM
7 BBM from Ground Beam To Plinth Beam
8 Plastering/single Coat /Charre for BBM
9 Murum Filling upto Plinth Level
10 Dhummas Machine for Murum
11 PCC /Bed Concrete for Plinth
Work Below 1st Slab
1 COLUMN PLINTH TO 1ST SLAB
2 STAIRCASE Plinth to 1st SLAB
3 1st Slab RCC Work
4 BRICK WORKGrnd FLOOR
5 Internal Plastering including Staircase
6 External Plastering
7 Window frame
8 Door Frame
9 Bathroom and WC Tile Work
10 Dado Tiles Fixing
11 FLOORING WORK Ground Floor
12 Plumbing Work
13 Electrical Work
Work Below 2nd Slab
1 COLUMN 1st TO 2nd SLAB
2 STAIRCASE
3 2nd Slab RCC Work
4 BRICK WORK1st FLOOR
5 Internal Plastering including Staircase
6 External Plastering
7 Window frame
8 Door Frame
9 FLOORING WORK 1st Floor
10 Plumbing Work
11 Electrical Work
Work Above the 1st and 2nd Slab
1 COLUMN 1st TO Parapet
2 COLUMN 2nd TO Parapet
3 STAIRCASE
4 Water proofing for 1st slab
5 Water proofing for 2nd slab
6 BRICK WORK1st FLOOR slab to Parapet
7
BRICK WORK 2nd FLOOR slab to Parapet
8 Plastering to Parapet 1 and 2
Miscellenious Work
1 OHWT providing and Fixing
2 Providing And Fixing Doors
3 Providing And Fixing Sliding Windows
4
Providing And Fixing M.S. Fabricated Grills
Providing And Fixing M.S. Fabricated Safety
5
Gates
6
Providing and Fixing Railings on Staircase
7
Providing and Fixing Railings on Gallery
8 Providing and Fixing Sanitory Fittings
Plinth protection PCC 3" X 1.5 ft
9
Surrounding Building
Pavement Blocks front side of Building(Max
10
Dim 13'x10')
11 Providing and Fixing U Sewage Tank
Paintings
Providing and Applying Painting Primer
1
Internal
Providing and Applying Painting Primer
2
External
Providing and Applying Painting 2 Coats
3
Internal
Providing and Applying Painting 2 Coats
4
External
Difference Material Total Total
Planned Actual Labour
Actual Qty Between Cost Material Labour
Date Date Cost/Unit
Qty /Unit Cost Cost
rchitectural Services

Aggregate
und Work/Footing

elow the Plinth

Below 1st Slab


Below 2nd Slab

the 1st and 2nd Slab

llenious Work

Paintings
Dead Stock Register
Upto Plinth Level

Material Total Cost


Material Description Units Rate Consumption
Required M.R.

Cement Bags 250 103.5 15


Sand Brass 7300 5.57 4
Metal 20mm Brass 2400 4.42 5
Metal 10 mm Brass 2400 3
Crushed sand Brass 4500 5
8 mm steel Ton 46000
10 mm steel Ton 46000
12 mm steel Ton 46000 1.542
16 mm steel Ton 46000
Murum Brass 2200 45
Binding Wire Kg 50
BBM 4" Nos 5 360
BBM 6" Nos. 8.5
Dead Stock Register
o Plinth Level Upto First Slab Upto 2nd Slab

Total Cost Available Total Cost Material Consumpt Available Material Consumpt Available
Consumption Material Available Required ion Material Required ion Material

228 137
11.66 8.01
6.5 3.45

1.85

4200 3700
Stock Regist
Date Cement Sand Metal 20 mmMetal 10mm Crushed Sand 8 mm steel
5 1 2 1 1 1
10 1 1 1 2 2
2 2 1 1
1

Upto Plinth 15 4 5 3 5 3
1 1 2 2 2 2
2 2 2 22 2 2
2 2 2 2
2

Upto 1st
Slab 5 5 6 24 8 4
2 2 2 2 2
2 2 2 2 2
2 2 2

Upto 2nd
Slab Slab 6 4 4 6 6
Stock Register
10 mm steel 12 mm steel 16 mm steel Murum Bricks 4" Bricks 6" Murum
1 1 1 1 1 1
2 2 2 2 2 2
0 2
2

3 3 3 3 5 5
2 2 2 2 2 2
2 2 2 2 2 2
2 2

4 4 4 4 6 6
2 2
2 2
2 2

6 6
Purpose Men Power

You might also like