Sr. No. Item/Particulars Material Required Qty Actual Qty
Sr. No. Item/Particulars Material Required Qty Actual Qty
Sr. No. Item/Particulars Material Required Qty Actual Qty
Aggregate
und Work/Footing
llenious Work
Paintings
Dead Stock Register
Upto Plinth Level
Total Cost Available Total Cost Material Consumpt Available Material Consumpt Available
Consumption Material Available Required ion Material Required ion Material
228 137
11.66 8.01
6.5 3.45
1.85
4200 3700
Stock Regist
Date Cement Sand Metal 20 mmMetal 10mm Crushed Sand 8 mm steel
5 1 2 1 1 1
10 1 1 1 2 2
2 2 1 1
1
Upto Plinth 15 4 5 3 5 3
1 1 2 2 2 2
2 2 2 22 2 2
2 2 2 2
2
Upto 1st
Slab 5 5 6 24 8 4
2 2 2 2 2
2 2 2 2 2
2 2 2
Upto 2nd
Slab Slab 6 4 4 6 6
Stock Register
10 mm steel 12 mm steel 16 mm steel Murum Bricks 4" Bricks 6" Murum
1 1 1 1 1 1
2 2 2 2 2 2
0 2
2
3 3 3 3 5 5
2 2 2 2 2 2
2 2 2 2 2 2
2 2
4 4 4 4 6 6
2 2
2 2
2 2
6 6
Purpose Men Power