Marble Floor and Wall and Civil Work
Marble Floor and Wall and Civil Work
Marble Floor and Wall and Civil Work
To,
Patel & Associates
406, Sahyadri Apts,
Malkani Estate
Opp Times of India
Malad East
Mumbai 97
Sub : QUOTATION FOR LABOUR CHARGES FIXING OF ITALIAN
MARBLE FLOOR AND WALL AND CIVIL WORK
N
O
DESCRIPTION
RATE
UNIT
1)
115.00
SFT
2)
85.00
RFT
3)
145.00
SFT
4)
120.00
RFT
5)
65.00
SFT
6)
85.00
SFT
7)
90.00
RFT
8)
65.00
SFT
9)
85.00
SFT
55.00
RFT
11.
65.00
SFT
85.00
SFT
45.00
SFT
55.00
SFT
30.00
RFT
35.00
SFT
55.00
SFT
150.00
RFT
15.00
RFT
1000.0
0
PER
NOS
25.00
PER
NOS
LS
LS
NOTE :
1) ELECTRICAL AND WATER SUPPLY BY OWNER
2) PAYMENT WILL BE RELEASE 15 DAYS
PROPRIETOR
To
The Dy. Controller of Rationing
D Reg
Santacruz East
Mumbai
Empty barrel
200 litre
Per nos
40.00
per nos
15.00
Per litre
1.50
Per nos
30.00
205 Nos
Pipe plastic
2 Nos
Can 10 Litre
3 Nos
Per Nos
2.25
Can 5 Litre -
63 Nos
Per nos
1.25
litre
- 2 Nos
Thanking you
Industrial Esters & Chemicals Pvt Ltd
Authorized Signatory
To
The Dy. Controller of Rationing
D Reg
Santacruz East
Mumbai
Sub: Quotation for used waste oil
Respected Sir.
As per S.P.L L.A.C /26/2016, the oil seized by department as we saw
the goods and in seized in the condition and we take in same condition as
quotation as under.
1)
2)
Empty barrel
m.s and plastic
litre
Per litre
1.86
200 litre
Per nos
45.00
Per nos
35.00
205 Nos
3)
- 2 Nos
4)
Pipe plastic
2 Nos
per nos
20.00
5)
Can 5 Litre -
63 Nos
Per nos
1.50
6)
Can 10 Litre
3 Nos
Per Nos
2.50
Thanking you
Yours faithfully