Design Shell and Tube
Design Shell and Tube
Disusun Oleh :
Ghaida Gusrinisa
14 2012 020
Adli Azharuddin 14 2012 023
Ahmad Maskur 14 2012 030
Dosen :
Carlina D. Ariono, Ir., M.T
2014
PERFORMANCE OF UNIT
Unit
Fluid Name
Cooling Water
Total Fluid Entering
kg/hr
115400
Vapor
kg/hr
0
Liquid
kg/hr
115400
Steam
kg/hr
0
Nonkg/hr
0
Condensable
Fluid Vaporizer or
kg/hr
0
Cond.
Steam Condensed
kg/hr
0
Spesific Gravity
kg/m3
990
Viscosity
Cp
0,99
o
Thermal Conductivity
W/m C
0,630
Specific Heat
J/kg.oC
4180
o
Temperature in
C
35
o
Temperature out
C
45
Operating Preasure
kPa
101,33
Number Passes per
1
Shell
Velosity
m/s
Preasure Drop
Negleted
Fouling Resistance
Negleted
Heat Exchanged
1742 kW
Heat Transfer Rate Service
716,916 W/m 2 o C
30,72 oC
No 5/8 in O.D.
12 BWG
20 ft Lenght
13/16 in Pitch
Tubeheet : triangular
Fixed tube
2 Pass Tube
Steel 1% carbon
19,25 in O.D.Shell
I.D.Shell
Type E
1 Pass Shell
Fornt End Stationary Head Type A
Rear End Head Type M
0,733 m Picth
25 % Cut
Horizontal Singe
Segmental Baffle
Page 1 of 15
LAMPIRAN A PERHITUNGAN
Qh=mh C p T h
h
Qh= 30,556
kg
J
1900
( 8555 ) K
s
kg . K
)(
Qh=1, 742.10 6 W
Q=Qc =Q h=1,742. 106 W
FT )
85
55
T1
45
T2
32
LMTD=
T 1 T 2
T1
ln
T2
R=
T h T h
T c T c
a
S=
T c T c
T h T c
b
Page 2 of 15
LMTD=
( 8545 ) (5532)
( 8545 )
ln
(5532)
z=
85 55
45 32
z=2,3077
H=
45 32
85 32
H =0,2453
LMTD=30,72
dan
yang sudah
W
m .
2
minimal
adalah
Q=Uo . Ao . LMTD . FT
W
( Ao )( 30,72 ) ( 0,9256 )
m .
2
A o minimal =98,064 m2
Di=0,407 0,01 m
D o=5 /8 0,016 m
Panjang tube
L=20 ft=6,096 m
Jumlah Tube
n=323
Page 3 of 15
Ao
yang sedikit lebih besar atau sama dengan luas perpindahan panas
outside minimal (Ao minimal).Dimana perhitungan
A o menghasilkan :
A o = . Do . L . n
A o = .(0,016 m). (6,096 m) .323
2
A o =98,200 m
A o A o minimal
Tube yang digunakan akan membuat aliran fluida didalam tube adalah
turbulen sesuai dengan perhitungan dibawah ini :
n
A cs = . . Di2
2 4
A cs =
G=
323
. . ( 0,01 m)2
2 4
A cs =0,014 m2
mh
A cs
v=
kg
s
G=
0,014 m2
mh
2
h . . Di
4
30,556
G=2,254.10
30,556
v=
kg
m2 . s
kg
s
v =2,783
m
s
Dimana Acs adalah total cross section tube dan G adalah laju alir massa
persatuan luas total cross section maka bilangan reynold Nre diperoleh :
N tube =D i .
G
h
kg
2
m .s
N tube =( 0,01 m )
3 kg
2,3.10
m.s
2,254 .10
N tube =1,013.10 4
Nre yang diperoleh melebihi 2300 maka aliran dinyatakan turbulen
Page 4 of 15
D s=19,25 0,489 m
Pitch Buffel
P=0,5 D s=0,733
p=
Pitch Tube
25 cut
Opened Buffel
13
0,021 m
16
sehingga
f b=0,1955
mc =
ho )
qc
Cp Tc
c
mc =
1, 742.10
J
4180
. ( 4532 )
kg . K
mc =32,051
kg
s
mc =115400
kg
h
N b=n. f b
N b=( 323 )( 0,1955 )
N b=63,147 64
. D s2
. D o2
S b=f b .
N b .
4
4
G b=
mc
Sb
( 0,489 m )2
( 0,016 m )2
S b= ( 0,1955 )
( 64 )
4
4
Page 5 of 15
kg
s
G b=
2
0,024 m
S b=0,024 m2
32,051
Gb=1,333 . 103
S c =P . D s . 1
Do
p
Gc =
S c =( 0,733 m ) ( 0,489m ) 1
( 0,016 m )
( 0,021m )
kg
2
m .s
mc
Sc
kg
s
Gc =
0,074 m2
32,051
S c =0,074 m
Gc =433,343
kg
m2 . s
G e = G b . G c
Ge = 1,333 . 103
kg
kg
433,343 2
2
m .s
m .s
)(
kg
m2 . s
Ge =760,089
N shell =Do .
Ge
c
N Pr shell =C p
c
kc
kg
J
m2 .Ns
N shell =( 0,016 m )
Pr shell = 4180
kg . K
kg
0,99. 103
m.s
N shell =1,219.104
760,089
(0,99.10 m.kgs )
) 0,63 W
( m.K )
3
N Pr shell =6,569
Page 6 of 15
N
kc
Do
0,6
h o=0,2.( N shell )
.( Pr shell)0,33 .
4 0,6
0,33
( 0,63 mW. K )
( 0,016 m )
W
m .
2
n
A cs = . . Di2
2 4
A cs =
G=
323
. . ( 0,01 m)2
2 4
mh
A cs
kg
s
G=
2
0,014 m
30,556
A cs =0,014 m2
G=2,254.103
Cp
2
3
kg
2
m .s
1
3
h
Di . h0,47
hi=1,422 . 103
hi )
0,2
kg
m2 . s
0,8
) (
. 0,117
W
m.K
2
3
1900
J
kg . K
1
3
0,47
W
m .
2
Page 7 of 15
k m =45
x w=
Uo
W
m.
U o=
Do
( h1 )( ) ( )( D )+( h1 )
i
U o=
1
Do
xw
+
Di
km
1
1,422 . 103
W
m .
2
U o=716,765
W
m .
U o=126,229
BTU
o
ft . F .h
0,016 m
2,769 . 103 m
+
0,01 m
W
45
m .
m
1
+
( 0,016
)
0,013 m
4,178 .10
W
m .
2
Evaluasi Design
-
126,229
BTU
ft . o F . h dan
2
U o yang diperoleh
BTU
ft . oF . h
2
Page 8 of 15
Q=1, 742.10 6 W
dan
QHE =U o . Ao . LMTD. F T
QHE = 716,765
W
( 98,200 m2 ) ( 30,72 )( 0,9256 )
m .
2
QHE Q
SYMBOLS
LMTD
FT
Th
Th
Tc
Tc
Uo
Ao
Di
Do
Panjang tube
Jumlah tube
A cs
Page 9 of 15
mh
N tube
mc
Cp
Cp
Th
Tc
Baffle pitch
Tube pitch
Ds
Diameter shell
fb
Nb
Sb
Sc
Gb
Gc
Ge
N shell
N Pr shell
kc
ho
hi
km
xw
L
D
Page 11 of 15
Page 12 of 15
Page 13 of 15
DAFTAR PUSTAKA
Byrne, Richard C. 1999. Standards of The Tubular Exchanger
Manufacturers Association 8th ed. New York : Tubular Exchanger
Manufacturers Association, Inc.
Edward, John E. 2008. Design and Rating for Shell and Tube Heat
Exchangers. Teesside : P & I Design Ltd
McCabe, Warren L., Julian C. Smith, Peter Harriot. 2005. UNIT
OPERATION OF CHEMICAL ENGINEERING. Singapore: McGraw-Hill
Richard, dkk. 2008. Perrys Chemical Engineers Handbook 8th ed
Section 11 Heat-Transfer Equipment. New York: McGraw-Hill
Serth, Robert W. 2007. Process Heat Transfer: Principles and
Applications 1st ed. Texas : Elsevier Ltd.
Page 14 of 15