Node B Integration
Node B Integration
1
1.1
1.2
1.3
1.4
UMTS Architecture....................................................................................................................... 2
Design Team:
........................................................................................................... 2
Radio Planning Team:
........................................................................................................... 3
Onsite Commissioning Team.......................................................................................................3
Node B Integration Team: ........................................................................................................... 3
1.4.1
OAM & Hardware Scripts:................................................................................................3
1.4.2
ARW Script:
........................................................................................................... 3
1.4.3
Add Cell Network Scripts:.................................................................................................4
2. Add RBS Wizard
........................................................................................................... 4
2.1
CCR TOOL
..........................................................................................................11
2.2
CCR Tool - Workflow
..........................................................................................................11
2.3
CCR Tool - Create CCR-Form Template....................................................................................11
2.4
Loading Add_Cell Network Scripts:............................................................................................14
3. IUB Script:
......................................................................................................... 25
4. Loading License.................................................................................................................................. 28
5. Adjust License..................................................................................................................................... 31
6. Update Parameters
......................................................................................................... 33
7.
Create back CV and set as startable on NodeB:........................................................................34
8. Software Upgrade using SMO ......................................................................................................... 36
9. Conclusion
......................................................................................................... 40
INTRODUCTION:
This document will describe the NodeB integration process flow which will be used when integrating a
new node B, as well as demonstrating the CCR process from the delivery of data fill to the production
and loading of XML and MO script.
1.1
UMTS Architecture
Design Team:
The integration team should be provided and updated with the LLD (Low Level Design) for the 3G Node
B integration from the design team
LLD.xls
1.2
Has to generate the two CCR forms (excel sheet) one for Hardware Scripts and other for Cell Network.
1.3
Responsible for the installation and commissioning the NodeB, Loading OAM and External Hardware
scripts
1.4
After loading OAM and Hardware script. The integration team can start the integration
To generate the XML files required for the WDCMA RAN integration, a CCR web based tool is used.
1.4.1
Both scripts are generated by referring to the LLD .Those two scripts will be emailed to the onsite
commissioning team to load it on to NodeB.
1.4.2
ARW Script:
Integration team will generate and load the ARW script on to the OSS Common Explorer by using the
ARW (Add RBS Wizard) tool.
1.4.3
From the AddCellNetworkP7.xls CCR form, Cell scripts are generated and loaded on to the OSS
Common Explorer by creating Planned Area and importing the.xml files to the planned areas.
Open OSS
Go to WCDMA RAN Explorer
Use your favourite FTP client to transfer files to OSS
Upload the ARW script to : /var/opt/ericsson/nms_umts_arw_reg/dat/xml/import
Open new planned configuration
Enter the name of the planned configuration then click ok
Change the RNC SUBRACK related to your site, then click next until you reach the
end of the wizard
.12
CCR TOOL
CCR Tool is the official internal tool that is used in producing .xml scripts.
2.2
to
Import the
following Scripts
in following order
ar
e
a
s.
x
m
l
ad
d
_
c
el
l.xml
add_hsdsch.xml
add_eul.xml
coveragerelation.xml
cell update
Go to moshell and check if the cells and the channels are created
add_gsmcell.xml
gsmcell_relations.xml
cell_relations.xml
add_extcell.xml
extcell_relations.xml
3. IUB Script:
4. Loading License
Password: xxxxxxxx
Ip Address: IP address of the master server
sFile: /var/opt/ericsson/integration/xml_scripts/lkf/licensename.xml
(license directory in the node)
Then execute
5. Adjust License
Go to configuration Manage HW and SW inventory software management organizer
6. Update Parameters
Open element manager tools run command file
Parameter_Setting_2_Carriers.mo
Also check the RBS parameter IubDataStreams, maxHsRate must be modified depending on the
number of E1s
Change the following parameter using Moshell
numHsCodeResources
numEulResources
maxTotalOutputPower
After creating the CV we unlock the IUB and the site name
9. Conclusion
Once the upgrade is completed we list the iub status for the node ( lst . site name), we print the traffic
status (get radiol), we check the license status (license lkf), we print the list of the active alarm (alt)