Proposed 5-Storey Building With Roof Deck
Proposed 5-Storey Building With Roof Deck
Proposed 5-Storey Building With Roof Deck
BILL OF QUANTITIES
ITEM
1
DESCRIPTION
Concrete
Steel Reinforcements
UNIT
RATE
Backfill
Gravel Bedding
580.11
82.84
cu.m
cu.m
115.00
650.19
66,712.65
53,861.74
Ready-mix Concrete
561.07
cu.m
4,750.00
2,665,082.50
36
264
pcs
pcs
1289.75
859.83
46,431.00
226,995.12
214
256
155
pcs
pcs
pcs
1170.35
1040.31
760.23
250,454.90
266,319.36
117,835.65
Earthworks
QTY
32mm
9m
6m
25mm
13.5m
12.0m
7.5m
12mm
13.5m
10.5m
6m
10mm
9m
7.5m
6m
#16 G.I. Tie Wire
391
148
63
pcs
pcs
pcs
241.89
211.65
120.95
94,578.99
31,324.20
7,619.85
11
4326
1145
693
pcs
pcs
pcs
kgs
125.85
104.37
83.9
80
1,384.35
451,504.62
96,065.50
55,440.00
875
10591
12477
4449
246.5
pcs
pcs
pcs
bags
cu.m
12.00
14.00
18.00
234.00
573.52
10,500.00
148,274.00
224,586.00
1,041,066.00
141,372.68
1104
6670
pcs
pcs
940.00
115.00
1,037,760.00
767,050.00
Masonry
Formworks
TOTAL AMOUNT
7,802,219.11
DETAILED ESTIMATES:
MATERIALS
ITEM OF WORKS
UNIT COST
TOTAL
EQUIPMENT
UNIT RATE
TOTAL
QTY
UNIT
Excavation Works
828.38
cu.m
Backfilling Works
580.11
cu.m
Soil Compaction
580.11
cu.m
Gravel Bedding
82.84
cu.m
9m - 32mm bar
36.00
pcs
1,289.75
46,431.00
46,431.00
6m - 32mm bar
264.00
pcs
859.83
226,995.12
226,995.12
11.00
kg
80.00
880.00
880.00
71.47
cu.m
4,750.00
339,482.50
339,482.50
6m - 12mm bar
63.00
pcs
120.95
7,619.85
7,619.85
6m - 10mm bar
20.00
pcs
83.90
1,678.00
1,678.00
7.00
kg
80.00
560.00
560.00
10.50
cu.m
4,750.00
49,875.00
49,875.00
UNIT
UNIT COST
TOTAL AMOUNT
STRUCTURAL WORKS
EARTHWORKS/FOOTING FOUNDATION
115.00
650.19
66,713.00
13.00
10,768.88
10,768.88
13.00
7,541.47
74,254.46
26.00
15,082.86
15,082.86
53,861.74
53,861.74
MATERIALS
ITEM OF WORKS
QTY
TOTAL
EQUIPMENT
UNIT RATE
TOTAL
TOTAL AMOUNT
STRUCTURAL WORKS
GROUND FLOOR
SLAB
Reinforcement
7.5m - 10mm bar
756.00
pcs
104.37
78,903.72
78,903.72
90.00
kg
80.00
7,200.00
7,200.00
41.58
cu.m
4,750.00
197,519.25
197,519.25
4,750.00
49,115.00
49,115.00
10.34
Formworks
1/4" x 4' x 8' phenolic board
56.00
pcs
940.00
52,640.00
52,640.00
623.00
pcs
115.00
71,645.00
71,645.00
231.00
pcs
83.89
19,378.59
19,378.59
4.00
kg
80.00
320.00
320.00
2,267.00
pcs
14.00
31,738.00
31,738.00
2,853.00
pcs
18.00
51,354.00
51,354.00
Mortar
Sand
Cement (40kg)
44
cu.m
573.52
25,138.67
25,138.67
791
bags
234.00
185,102.11
185,102.11
8.50
cu.m
573.52
4,874.92
4,874.92
153
bags
234.00
35,802.00
35,802.00
Plastering Works
Sand
Cement (40kg)
MATERIALS
ITEM OF WORKS
QTY
UNIT
UNIT COST
TOTAL
EQUIPMENT
UNIT RATE
TOTAL
TOTAL AMOUNT
STRUCTURAL WORKS
SECOND FLOOR
SLAB
Reinforcement
7.5m - 10mm bar
714.00
pcs
104.37
74,520.18
74,520.18
85.00
kg
80.00
6,800.00
6,800.00
41.24
cu.m
4,750.00
195,890.00
195,890.00
86.00
pcs
940.00
80,840.00
80,840.00
13.68
cu.m
4,750.00
64,980.00
64,980.00
45.00
pcs
940.00
42,300.00
42,300.00
501.00
pcs
115.00
57,615.00
57,615.00
220.00
pcs
83.89
18,455.80
18,455.80
3.00
kg
80.00
240.00
240.00
2,081.00
pcs
14.00
29,134.00
29,134.00
2,406.00
pcs
18.00
43,308.00
43,308.00
Mortar
Sand
Cement (40kg)
38
cu.m
573.52
21,854.98
21,854.98
688
bags
234.00
160,910.99
160,910.99
8.50
cu.m
573.52
4,874.92
4,874.92
154
bags
234.00
36,036.00
36,036.00
Plastering Works
Sand
Cement (40kg)
BEAM
Reinforcement works
13.5m - 25mm bar
36.00
pcs
1,170.35
42,132.60
42,132.60
54.00
pcs
760.23
41,052.42
41,052.42
72.00
pcs
241.89
17,416.08
17,416.08
27.00
kg
80.00
2,160.00
2,160.00
27.27
cu.m
4,750.00
129,532.50
129,532.50
81.00
pcs
940.00
76,140.00
76,140.00
761.00
pcs
115.00
87,515.00
87,515.00
4,750.00
25,507.50
25,507.50
940.00
4,700.00
4,700.00
Concreting Works
28 MPa
Formworks
1/4" x 4' x 8' phenolic board
2" x 2" wood frame
STAIRS
Concreting Works
28 MPa
5.37
cu.m
5.00
pcs
Formworks
1/4" x 4' x 8' phenolic board
MATERIALS
ITEM OF WORKS
QTY
UNIT
UNIT COST
TOTAL
EQUIPMENT
UNIT RATE
TOTAL
TOTAL AMOUNT
STRUCTURAL WORKS
THIRD FLOOR
SLAB
Reinforcement
7.5m - 10mm bar
714.00
pcs
104.37
74,520.18
74,520.18
85.00
kg
80.00
6,800.00
6,800.00
41.24
cu.m
4,750.00
195,890.00
195,890.00
86.00
pcs
940.00
80,840.00
80,840.00
13.68
cu.m
4,750.00
64,980.00
64,980.00
45.00
pcs
940.00
42,300.00
42,300.00
501.00
pcs
115.00
57,615.00
57,615.00
220.00
pcs
83.89
18,455.80
18,455.80
3.00
kg
80.00
240.00
240.00
2,081.00
pcs
14.00
29,134.00
29,134.00
2,406.00
pcs
18.00
43,308.00
43,308.00
Mortar
Sand
Cement (40kg)
38
cu.m
573.52
21,854.98
21,854.98
688
bags
234.00
160,910.99
160,910.99
8.50
cu.m
573.52
4,874.92
4,874.92
154
bags
234.00
36,036.00
36,036.00
Plastering Works
Sand
Cement (40kg)
BEAM
Reinforcement works
13.5m - 25mm bar
36.00
pcs
1,170.35
42,132.60
42,132.60
54.00
pcs
760.23
41,052.42
41,052.42
72.00
pcs
241.89
17,416.08
17,416.08
27.00
kg
80.00
2,160.00
2,160.00
27.27
cu.m
4,750.00
129,532.50
129,532.50
81.00
pcs
940.00
76,140.00
76,140.00
761.00
pcs
115.00
87,515.00
87,515.00
4,750.00
25,507.50
25,507.50
940.00
4,700.00
4,700.00
Concreting Works
28 MPa
Formworks
1/4" x 4' x 8' phenolic board
2" x 2" wood frame
STAIRS
Concreting Works
28 MPa
5.37
cu.m
5.00
pcs
Formworks
1/4" x 4' x 8' phenolic board
MATERIALS
ITEM OF WORKS
QTY
UNIT
UNIT COST
TOTAL
EQUIPMENT
UNIT RATE
TOTAL
TOTAL AMOUNT
STRUCTURAL WORKS
FOURTH FLOOR
SLAB
Reinforcement
7.5m - 10mm bar
714.00
pcs
104.37
74,520.18
74,520.18
85.00
kg
80.00
6,800.00
6,800.00
41.24
cu.m
4,750.00
195,890.00
195,890.00
86.00
pcs
940.00
80,840.00
80,840.00
13.68
cu.m
4,750.00
64,980.00
64,980.00
45.00
pcs
940.00
42,300.00
42,300.00
501.00
bd. ft.
115.00
57,615.00
57,615.00
220.00
pcs
83.89
18,455.80
18,455.80
3.00
kg
80.00
240.00
240.00
2,081.00
pcs
14.00
29,134.00
29,134.00
2,406.00
pcs
18.00
43,308.00
43,308.00
Mortar
Sand
Cement (40kg)
38
cu.m
573.52
21,854.98
21,854.98
688
bags
234.00
160,910.99
160,910.99
8.50
cu.m
573.52
4,874.92
4,874.92
154
bags
234.00
36,036.00
36,036.00
Plastering Works
Sand
Cement (40kg)
BEAM
Reinforcement works
13.5m - 25mm bar
40.00
pcs
1,170.35
46,814.00
46,814.00
42.00
pcs
760.23
31,929.66
31,929.66
82.00
pcs
241.89
19,834.98
19,834.98
19.00
kg
80.00
1,520.00
1,520.00
27.27
cu.m
4,750.00
129,532.50
129,532.50
81.00
pcs
940.00
76,140.00
76,140.00
761.00
pcs
115.00
87,515.00
87,515.00
4,750.00
25,507.50
25,507.50
940.00
4,700.00
4,700.00
Concreting Works
28 MPa
Formworks
1/4" x 4' x 8' phenolic board
2" x 2" wood frame
STAIRS
Concreting Works
28 MPa
5.37
cu.m
5.00
pcs
Formworks
1/4" x 4' x 8' phenolic board
MATERIALS
ITEM OF WORKS
QTY
UNIT
UNIT COST
TOTAL
EQUIPMENT
UNIT RATE
TOTAL
TOTAL AMOUNT
STRUCTURAL WORKS
FIFTH FLOOR
SLAB
Reinforcement
7.5m - 10mm bar
714.00
pcs
104.37
74,520.18
74,520.18
85.00
kg
80.00
6,800.00
6,800.00
41.24
cu.m
4,750.00
195,890.00
195,890.00
86.00
pcs
940.00
80,840.00
80,840.00
13.68
cu.m
4,750.00
64,980.00
64,980.00
45.00
pcs
940.00
42,300.00
42,300.00
501.00
pcs
115.00
57,615.00
57,615.00
220.00
pcs
83.89
18,455.80
18,455.80
3.00
kg
80.00
240.00
240.00
2,081.00
pcs
14.00
29,134.00
29,134.00
2,406.00
pcs
18.00
43,308.00
43,308.00
Mortar
Sand
Cement (40kg)
38
cu.m
573.52
21,854.98
21,854.98
688
bags
234.00
160,910.99
160,910.99
8.50
cu.m
573.52
4,874.92
4,874.92
154
bags
234.00
36,036.00
36,036.00
58,517.50
Plastering Works
Sand
Cement (40kg)
BEAM
Reinforcement works
13.5m - 25mm bar
50.00
pcs
1,170.35
58,517.50
5.00
pcs
760.23
3,801.15
3,801.15
83.00
pcs
241.89
20,076.87
20,076.87
15.00
kg
80.00
1,200.00
1,200.00
27.27
cu.m
4,750.00
129,532.50
129,532.50
81.00
pcs
940.00
76,140.00
76,140.00
761.00
pcs
115.00
87,515.00
87,515.00
4,750.00
25,507.50
25,507.50
940.00
4,700.00
4,700.00
Concreting Works
28 MPa
Formworks
1/4" x 4' x 8' phenolic board
2" x 2" wood frame
STAIRS
Concreting Works
28 MPa
5.37
cu.m
5.00
pcs
Formworks
1/4" x 4' x 8' phenolic board
MATERIALS
ITEM OF WORKS
QTY
UNIT
UNIT COST
EQUIPMENT
TOTAL
UNIT RATE
TOTAL
TOTAL AMOUNT
STRUCTURAL WORKS
ROOF DECK
SLAB
Reinforcement
7.5m - 10mm bar
714.00
pcs
104.37
74,520.18
74,520.18
85.00
kg
80.00
6,800.00
6,800.00
41.24
cu.m
4,750.00
195,890.00
195,890.00
86.00
pcs
940.00
80,840.00
80,840.00
3.06
cu.m
4,750.00
14,535.00
14,535.00
8.00
pcs
940.00
7,520.00
7,520.00
238.00
pcs
115.00
27,370.00
27,370.00
6m - 10mm bar
14.00
pcs
83.89
1,174.46
1,174.46
9m - 10mm bar
11.00
pcs
125.85
1,384.35
1,384.35
1.00
kg
80.00
80.00
80.00
875.00
pcs
12.00
10,500.00
10,500.00
cu.m
573.52
3,387.35
3,387.35
106
bags
234.00
24,877.13
24,877.13
2.00
cu.m
573.52
1,147.04
1,147.04
31
bags
234.00
7,254.00
7,254.00
Plastering Works
Sand
Cement (40kg)
BEAM
Reinforcement works
13.5m - 25mm bar
52.00
pcs
1,170.35
60,858.20
60,858.20
82.00
pcs
241.89
19,834.98
19,834.98
14.00
kg
80.00
1,120.00
1,120.00
27.27
cu.m
4,750.00
129,532.50
129,532.50
81.00
pcs
940.00
76,140.00
76,140.00
761.00
pcs
115.00
87,515.00
87,515.00
4,750.00
25,507.50
25,507.50
Concreting Works
28 MPa
Formworks
1/4" x 4' x 8' phenolic board
2" x 2" wood frame
STAIRS
Concreting Works
28 MPa
5.37
cu.m
5.00
pcs
940.00
4,700.00
4,700.00
256.00
pcs
1,040.31
266,319.36
266,319.36
148.00
pcs
211.65
31,324.20
31,324.20
41.00
kg
80.00
3,280.00
3,280.00
Formworks
1/4" x 4' x 8' phenolic board
COLUMN
Reinforcement works
Tower crane
SUBTOTAL
Contingencies (30%)
Labor Cost (30%)
TOTAL
Cost per sq m
5.00 month
100,000.00
7,802,074.58
500,000.00
500,000.00
533,393.20
8,335,467.79
2,500,640.34
3,250,832.44
14,086,940.56
7,246.37