Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Api 54

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Description: Plan 54 is an external system supplying clean

BARRIER fluid to a dual seal arrangement 3 at greater pressure


than the process pressure being sealed. Pressure and circulation
are provided for by an external pump or pressure system.
Objective: Same as Plan 53A and will provide constant pressure
and flow through circulation system.
Advantages: Same as Plan 53A but provides
excellent circulation and cooling. Can be
used on multiple seals to reduce cost. The
barrier fluid enters the seal and exits in a
once=in=and=once=out=fashion.

Plan 55 is similar to Plan 54 except the


system supplying clean BUFFER fluid is at
less pressure than the process pressure
being sealed, to a dual seal arrangement
2. No process contamination and
improved cooling over Plan 52.

You might also like