Drain Capacity Design

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

perunding zar sdn bhd

300 mm H.R.S.G.W DRAIN


mm

DRAIN TOP WIDTH W'

(1/n) x A x R^(2/3) x (S)^(1/2)

HEIGHT

450

Q / A

B/WALL

DRAIN TOP WIDTH W' =

Q = flow in cumec
n = Manning's roughness coefficients

300 HRSGW

A = Area in m^2
R = Hydraulics Radius in m ( Area/Wetted perimeter)
S = Slope in m/m

HRSGW Drain Width

0.230

HRSGW Drain Radius

0.115

Drain X-Sectional Area

0.021

m2

Drain Wetted Perimeter

0.361

450

H.R.S.G.W DRAIN

CONCRETE 'n' =

DRAIN GRADIENT
0.015

1 in

100

1 in

200

1 in

300

1 in

400

1 in

500

1 in

1000

AREA

WET P

R=A/P

m2

cumec

m/s

cumec

m/s

cumec

m/s

cumec

m/s

cumec

m/s

cumec

m/s

0.00

0.02

0.36

0.02

0.99

0.01

0.70

0.01

0.57

0.01

0.50

0.01

0.44

0.01

0.31

0.45

0.22

1.48

0.42

1.89

0.30

1.34

0.24

1.09

0.21

0.94

0.19

0.84

0.13

0.60

0.60

0.29

1.78

0.58

1.99

0.41

1.41

0.33

1.15

0.29

1.00

0.26

0.89

0.18

0.63

0.70

0.34

1.98

0.69

2.04

0.48

1.44

0.40

1.18

0.34

1.02

0.31

0.91

0.22

0.65

0.80

0.38

2.18

0.79

2.08

0.56

1.47

0.46

1.20

0.40

1.04

0.35

0.93

0.25

0.66

1.05

0.49

2.68

1.06

2.16

0.75

1.52

0.61

1.25

0.53

1.08

0.48

0.96

0.34

0.68

1.20

0.56

2.98

1.23

2.19

0.87

1.55

0.71

1.26

0.61

1.09

0.55

0.98

0.39

0.69

1.35

0.63

3.28

1.39

2.21

0.98

1.57

0.80

1.28

0.70

1.11

0.62

0.99

0.44

0.70

1.50

0.70

3.58

1.56

2.24

1.10

1.58

0.90

1.29

0.78

1.12

0.70

1.00

0.49

0.71

1.65

0.76

3.88

1.72

2.25

1.22

1.59

0.99

1.30

0.86

1.13

0.77

1.01

0.54

0.71

1.80

0.83

4.18

1.89

2.27

1.33

1.61

1.09

1.31

0.94

1.13

0.84

1.02

0.60

0.72

1.95

0.90

4.48

2.05

2.28

1.45

1.61

1.18

1.32

1.03

1.14

0.92

1.02

0.65

0.72

2.10

0.97

4.78

2.22

2.30

1.57

1.62

1.28

1.33

1.11

1.15

0.99

1.03

0.70

0.73

2.25

1.03

5.08

2.38

2.31

1.68

1.63

1.38

1.33

1.19

1.15

1.07

1.03

0.75

0.73

2.40

1.10

5.38

2.55

2.31

1.80

1.64

1.47

1.34

1.27

1.16

1.14

1.04

0.81

0.73

2.55

1.17

5.68

2.71

2.32

1.92

1.64

1.57

1.34

1.36

1.16

1.21

1.04

0.86

0.73

2.70

1.24

5.98

2.88

2.33

2.04

1.65

1.66

1.35

1.44

1.16

1.29

1.04

0.91

0.74

2.85

1.30

6.28

3.05

2.34

2.15

1.65

1.76

1.35

1.52

1.17

1.36

1.04

0.96

0.74

3.00

1.37

6.58

3.21

2.34

2.27

1.66

1.85

1.35

1.61

1.17

1.44

1.05

1.02

0.74

3.15

1.44

6.88

3.38

2.35

2.39

1.66

1.95

1.36

1.69

1.17

1.51

1.05

1.07

0.74

3.30

1.51

7.18

3.54

2.35

2.51

1.66

2.05

1.36

1.77

1.18

1.58

1.05

1.12

0.74

3.45

1.57

7.48

3.71

2.36

2.62

1.67

2.14

1.36

1.85

1.18

1.66

1.05

1.17

0.75

3.60

1.64

7.78

3.88

2.36

2.74

1.67

2.24

1.36

1.94

1.18

1.73

1.06

1.23

0.75

3.75

1.71

8.08

4.04

2.37

2.86

1.67

2.33

1.37

2.02

1.18

1.81

1.06

1.28

0.75

3.90

1.78

8.38

4.21

2.37

2.98

1.68

2.43

1.37

2.10

1.18

1.88

1.06

1.33

0.75

4.05

1.84

8.68

4.37

2.37

3.09

1.68

2.53

1.37

2.19

1.19

1.96

1.06

1.38

0.75

4.20

1.91

8.98

4.54

2.38

3.21

1.68

2.62

1.37

2.27

1.19

2.03

1.06

1.44

0.75

4.35

1.98

9.28

4.71

2.38

3.33

1.68

2.72

1.37

2.35

1.19

2.10

1.06

1.49

0.75

4.50

2.05

9.58

0.06
0.15
0.16
0.17
0.17
0.18
0.19
0.19
0.19
0.20
0.20
0.20
0.20
0.20
0.20
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21

4.87

2.38

3.45

1.68

2.81

1.38

2.44

1.19

2.18

1.07

1.54

0.75

B/W HT

Precast invert sections and concrete lined channels

Minimum n=.013

Normal n=0.015

Maximum n = 0.017

Concrete bottom with cemented rubble stone sides

Minimum n=.017

Normal n=0.020

Maximum n = 0.024

The desirable maximum velocity in urban areas is 3.05 m/s and the minimum velocity is 0.9 m/s

HRDRAIN

317627874.xlsx

PRECAST CONCRETE BLOCK EGG-SHAPED DRAIN(PCBESD)


Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
Drain Width W
Wall Thickness t
Drain Radius r = W/2
Top Drain Width, W' = W + 2t

=
=
=
=

0.300 m
0.075 m
0.150 m
0.450 m

Area = 3.0233r2 + (hx W')

Perimeter = 4.7883r + 2h + 2t
Generally for W<375 t=75mm, for W>375<600 t=100mm

SLOPE
CONCRETE 'n' =

0.015

B/W HT

AREA

WET P

R=A/P

m2

cusec

0.00

0.07

0.87

0.15

0.14

1.17

0.30

0.20

1.47

0.45

0.27

1.77

0.60

0.34

2.07

0.75

0.41

2.37

0.90

0.47

2.67

1.05

0.54

2.97

1.20

0.61

3.27

1.35

0.68

3.57

1.50

0.74

3.87

1.65

0.81

4.17

1.80

0.88

4.47

1.95

0.95

4.77

2.10

1.01

5.07

0.08
0.12
0.14
0.15
0.16
0.17
0.18
0.18
0.19
0.19
0.19
0.19
0.20
0.20
0.20

SLOPE

1 in

30

SLOPE

1 in

ft/s

cusec

33

1 in

ft/s

cusec

15
V
ft/s

5.38

7.34

5.13

7.00

7.60

10.38

13.91

9.53

13.26

9.09

19.67

13.48

23.42

10.72

22.33

10.22

33.12

15.15

33.38

11.46

31.82

10.93

47.20

16.21

43.58

11.98

41.55

11.42

61.63

16.94

53.93

12.35

51.42

11.78

76.27

17.47

64.37

12.64

61.38

12.05

91.04

17.88

74.88

12.87

71.40

12.27

105.90

18.20

85.44

13.05

81.47

12.45

120.84

18.46

96.04

13.21

91.57

12.59

135.82

18.68

106.66

13.33

101.69

12.71

150.84

18.86

117.30

13.44

111.84

12.82

165.89

19.01

127.96

13.54

122.00

12.91

180.96

19.15

138.63

13.62

132.18

12.99

196.05

19.26

149.31

13.69

142.37

13.05

211.16

19.36

Page 2

317627874.xlsx

PRECAST CONCRETE BLOCK EGG-SHAPED DRAIN(PCBESD)


Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
Drain Width W
Wall Thickness t
Drain Radius r = W/2
Top Drain Width, W' = W + 2t

=
=
=
=

0.450 m
0.225 m
0.255 m
0.900 m

Area = 3.0233r2 + (hx W')

Perimeter = 4.7883r + 2h + 2t
Generally for W<375 t=75mm, for W>375<600 t=100mm

SLOPE
CONCRETE 'n' =

0.015

SLOPE

1 in

50

1 in

SLOPE
100

1 in

B/W HT

AREA

WET P

R=A/P

m2

cusec

ft/s

cusec

ft/s

cusec

0.00

0.20

1.67

0.15

0.33

1.97

0.30

0.47

2.27

0.45

0.60

2.57

0.60

0.74

2.87

0.75

0.87

3.17

0.90

1.01

3.47

1.00

1.10

3.67

1.15

1.23

3.97

1.30

1.37

4.27

1.45

1.50

4.57

1.60

1.64

4.87

1.75

1.77

5.17

1.90

1.91

5.47

2.05

2.04

5.77

0.12
0.17
0.21
0.23
0.26
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.34
0.35
0.35

500
V
ft/s

15.78

7.46

11.16

5.27

4.99

2.36

33.77

9.46

23.88

6.69

10.68

2.99

54.29

10.81

38.39

7.64

17.17

3.42

76.33

11.79

53.97

8.33

24.14

3.73

99.37

12.53

70.26

8.86

31.42

3.96

123.10

13.12

87.04

9.28

38.93

4.15

147.33

13.60

104.18

9.61

46.59

4.30

163.70

13.87

115.75

9.81

51.77

4.39

188.51

14.22

133.29

10.05

59.61

4.50

213.56

14.52

151.01

10.26

67.53

4.59

238.80

14.77

168.86

10.45

75.52

4.67

264.20

15.00

186.82

10.60

83.55

4.74

289.73

15.19

204.87

10.74

91.62

4.80

315.37

15.37

223.00

10.87

99.73

4.86

341.09

15.52

241.19

10.97

107.86

4.91

Page 3

317627874.xlsx

PRECAST CONCRETE BLOCK EGG-SHAPED DRAIN(PCBESD)


Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
Drain Width W

0.600 m

Wall Thickness t

0.100 m

Drain Radius r = W/2

0.300 m

Top Drain Width, W' = W + 2t

0.800 m

Area = 3.0233r2 + (hx W')

Perimeter = 4.7883r + 2h + 2t
Generally for W<375 t=75mm, for W>375<600 t=100mm

SLOPE
CONCRETE 'n' =

0.015

1 in

SLOPE
137

SLOPE

1 in

33

1 in

SLOPE
300

1 in

SLOPE
400

1 in

500

B/W HT

AREA

WET P

R=A/P

m2

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

1.50

1.47

4.63

0.15

0.39

1.93

0.30

0.51

2.23

0.45

0.63

2.53

0.60

0.75

2.83

0.70

0.83

3.03

0.85

0.95

3.33

1.00

1.07

3.63

1.15

1.19

3.93

1.30

1.31

4.23

1.45

1.43

4.53

1.60

1.55

4.83

1.75

1.67

5.13

1.90

1.79

5.43

2.05

1.91

5.73

0.32
0.20
0.23
0.25
0.27
0.27
0.29
0.30
0.30
0.31
0.32
0.32
0.33
0.33
0.33

138.26

8.72

281.72

17.78

93.44

5.90

80.92

5.11

72.37

4.57

27.30

6.47

55.63

13.18

18.45

4.37

15.98

3.79

14.29

3.39

38.70

7.02

78.85

14.30

26.15

4.74

22.65

4.11

20.26

3.67

50.53

7.43

102.97

15.13

34.15

5.02

29.57

4.35

26.45

3.89

62.66

7.74

127.67

15.77

42.35

5.23

36.67

4.53

32.80

4.05

70.86

7.91

144.39

16.12

47.89

5.35

41.47

4.63

37.09

4.14

83.30

8.13

169.72

16.56

56.29

5.49

48.75

4.76

43.60

4.25

95.85

8.31

195.30

16.92

64.77

5.61

56.10

4.86

50.17

4.35

108.50

8.45

221.07

17.23

73.32

5.71

63.50

4.95

56.79

4.43

121.22

8.58

246.99

17.49

81.92

5.80

70.94

5.02

63.45

4.49

134.00

8.69

273.02

17.71

90.55

5.87

78.42

5.09

70.14

4.55

146.82

8.79

299.15

17.90

99.22

5.94

85.92

5.14

76.85

4.60

159.68

8.87

325.35

18.08

107.91

5.99

93.45

5.19

83.58

4.64

172.57

8.95

351.62

18.23

116.62

6.05

101.00

5.24

90.33

4.68

185.49

9.01

377.95

18.36

125.35

6.09

108.56

5.27

97.10

4.72

Page 4

317627874.xlsx

PRECAST CONCRETE BLOCK EGG-SHAPED DRAIN(PCBESD)


Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
Drain Width W

0.900 m

Wall Thickness t

0.100 m

Drain Radius r = W/2

0.450 m

Top Drain Width, W' = W + 2t

1.100 m

Area = 3.0233r2 + (hx W')

Perimeter = 4.7883r + 2h + 2t
Generally for W<375 t=75mm, for W>375<600 t=100mm

SLOPE
CONCRETE 'n' =

0.015

SLOPE

1 in

40

1 in

SLOPE
400

1 in

SLOPE
500

1 in

SLOPE
500

1 in

600

B/W HT

AREA

WET P

R=A/P

m2

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

0.00

0.61

2.35

0.15

0.78

2.65

0.30

0.94

2.95

0.45

1.11

3.25

0.60

1.27

3.55

0.75

1.44

3.85

0.90

1.60

4.15

1.05

1.77

4.45

1.20

1.93

4.75

1.35

2.10

5.05

1.50

2.26

5.35

1.65

2.43

5.65

1.80

2.59

5.95

1.95

2.76

6.25

2.10

2.92

6.55

0.26
0.29
0.32
0.34
0.36
0.37
0.39
0.40
0.41
0.42
0.42
0.43
0.44
0.44
0.45

93.23

14.15

29.48

4.47

26.37

4.00

26.37

4.00

24.07

3.65

128.08

15.31

40.50

4.84

36.23

4.33

36.23

4.33

33.07

3.95

164.35

16.20

51.97

5.12

46.49

4.58

46.49

4.58

42.44

4.18

201.62

16.92

63.76

5.35

57.03

4.78

57.03

4.78

52.06

4.37

239.62

17.50

75.77

5.53

67.77

4.95

67.77

4.95

61.87

4.52

278.17

17.98

87.96

5.69

78.68

5.09

78.68

5.09

71.82

4.64

317.14

18.39

100.29

5.81

89.70

5.20

89.70

5.20

81.88

4.75

356.44

18.74

112.72

5.92

100.82

5.30

100.82

5.30

92.03

4.84

396.01

19.04

125.23

6.02

112.01

5.38

112.01

5.38

102.25

4.92

435.80

19.30

137.81

6.10

123.26

5.46

123.26

5.46

112.52

4.98

475.77

19.54

150.45

6.18

134.57

5.53

134.57

5.53

122.84

5.04

515.89

19.74

163.14

6.24

145.92

5.58

145.92

5.58

133.20

5.10

556.14

19.93

175.87

6.30

157.30

5.64

157.30

5.64

143.59

5.15

596.50

20.10

188.63

6.36

168.72

5.68

168.72

5.68

154.02

5.19

636.95

20.25

201.42

6.40

180.16

5.73

180.16

5.73

164.46

5.23

Page 5

CULVERT

CADANGAN PEMBINAAN JALAN SAMBUNGAN DARI JALAN PRIMA MAGNA


(MAGNA PARK) KE JALAN MERGASTUA, KEPONG, KUALA LUMPUR

R.C PIPE CULVERT


Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
SLOPE
CONCRETE 'n' =

0.015

SLOPE

1 in

33

SLOPE

1 in

35

SLOPE

1 in

25

SLOPE

1 in

30

SLOPE

1 in

35

SLOPE

1 in

40

1 in

45

DIA.

AREA

WET P

R=A/P

m2

cusec

ft/s

cusec

cusec

ft/s

cusec

ft/s

cusec

ft/s

0.90

0.64

2.83

0.75

0.44

2.36

0.90

0.64

2.83

1.00

0.79

3.14

1.30

1.33

4.08

1.40

1.54

4.40

1.50

1.77

4.71

1.60

2.01

5.03

0.23
0.19
0.23
0.25
0.33
0.35
0.38
0.40

ft/s

cusec

ft/s

cusec

ft/s

96.73

14.12

93.92

13.71

111.13

16.23

101.45

14.81

93.92

13.71

87.86

12.83

82.83

12.10

59.48

12.51

57.76

12.15

68.34

14.37

62.39

13.12

57.76

12.15

54.03

11.36

50.94

10.71

96.73

14.12

93.92

13.71

111.13

16.23

101.45

14.81

93.92

13.71

87.86

12.83

82.83

12.10

128.11

15.15

124.39

14.71

147.18

17.41

134.36

15.89

124.39

14.71

116.36

13.76

109.70

12.98

257.88

18.05

250.41

17.52

296.28

20.74

270.47

18.93

250.41

17.52

234.23

16.39

220.84

15.46

314.23

18.96

305.12

18.41

361.02

21.79

329.57

19.89

305.12

18.41

285.41

17.22

269.09

16.24

377.70

19.85

366.75

19.28

433.95

22.81

396.14

20.82

366.75

19.28

343.06

18.03

323.44

17.00

448.63

20.73

435.63

20.13

515.44

23.81

470.53

21.74

435.63

20.13

407.49

18.83

384.19

17.75

MITC, AYER KEROH, MELAKA


TEMPORARY EARTHDRAIN

317627874.xlsx

LINED INTERCEPTOR DRAIN/COLLECTOR DRAIN


Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
Drain Width b

0.500 m

Area = 0.5(2H + B)H

Perimeter = B + 2(D2 + D2)1/2


SLOPE
CONCRETE 'n' =

0.01

1 in

SLOPE
100

1 in

SLOPE
111

SLOPE

1 in

333

1 in

SLOPE
350

1 in

SLOPE
400

1 in

450

AREA

WET P

R=A/P

m2

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

0.50

0.38

2.25

0.70

0.67

2.48

0.80

0.84

2.76

1.00

1.25

3.33

1.20

1.74

3.89

1.50

2.63

4.74

3.00

9.75

8.99

0.17
0.27
0.30
0.38
0.45
0.55
1.09

40.22

9.96

38.18

9.46

22.04

5.46

21.50

5.33

20.11

4.98

18.96

4.70

97.94

13.68

92.96

12.99

53.67

7.50

52.35

7.31

48.97

6.84

46.17

6.45

134.52

14.88

127.68

14.12

73.71

8.15

71.90

7.95

67.26

7.44

63.41

7.01

230.44

17.13

218.73

16.25

126.28

9.38

123.18

9.15

115.22

8.56

108.63

8.07

360.17

19.23

341.86

18.25

197.37

10.54

192.52

10.28

180.09

9.61

169.79

9.06

626.72

22.18

594.85

21.05

343.44

12.15

334.99

11.85

313.36

11.09

295.44

10.45

3646.33

34.74

3460.94

32.97

1998.18

19.04

1949.05

18.57

1823.17

17.37

1718.90

16.38

Page 7

317627874.xlsx

BERM DRAIN
Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
H

1:2

Area = 0.5xHx4H

Perimeter = 2(H2 + 2H2)1/2


SLOPE
CONCRETE 'n' =

0.015

SLOPE

1 in

11

SLOPE

1 in

13

1 in

AREA

WET P

R=A/P

m2

cusec

ft/s

cusec

ft/s

cusec

0.20

0.08

0.69

0.25

0.13

0.87

0.45

0.41

1.56

0.90

1.62

3.12

0.12
0.14
0.26
0.52

SLOPE
25

SLOPE

1 in

28

SLOPE

1 in

50

1 in

100

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

13.50

15.68

12.42

14.42

8.96

10.40

8.46

9.83

6.33

7.36

4.48

5.20

24.49

18.20

22.52

16.74

16.24

12.07

15.35

11.41

11.48

8.53

8.12

6.04

117.39

26.93

107.98

24.77

77.87

17.86

73.58

16.88

55.06

12.63

38.93

8.93

745.39

42.74

685.66

39.32

494.44

28.35

467.20

26.79

349.62

20.05

247.22

14.18

Page 8

PROPOSED EASTERN DISPERSAL LINK (EDL) EXPRESSWAY JOHOR BAHRU

RECTANGULAR DRAIN
Q = (1.49/n) x A x R^(2/3) x (1/S)^(1/2)
V = Q / A
Drain Width B
free board

=
=

4.200 m
0.300 m

Area = BD
Perimeter = B + 2D

B
SLOPE

CONCRETE 'n' =

0.028

AREA

WET P

R=A/P

m2

cusec

1.50

1.20

5.04

6.60

1.80

1.50

6.30

7.20

1.90

1.60

6.72

7.40

2.10

1.80

7.56

7.80

0.60

0.30

1.26

4.80

0.75

0.45

1.89

5.10

0.80

0.50

2.10

5.20

0.90

0.60

2.52

5.40

SLOPE

1 in

0.76
0.88
0.91
0.97
0.26
0.37
0.40
0.47

200

1 in

V
cumec

ft/s

m/s

SLOPE
125

SLOPE

1 in

75

1 in

SLOPE
100

1 in

120

cusec

ft/s

cusec

ft/s

cusec

ft/s

cusec

ft/s

376.60

10.66

6.94

2.12

476.37

8.78

614.99

11.34

532.60

9.82

486.19

8.96

515.48

14.60

7.60

2.32

652.03

9.61

841.77

12.41

728.99

10.75

665.48

9.81

563.63

15.96

7.79

2.37

712.94

9.86

920.40

12.72

797.09

11.02

727.64

10.06

662.22

18.75

8.14

2.48

837.65

10.29

1081.40

13.29

936.52

11.51

854.92

10.50

46.20

1.31

3.41

1.04

58.44

4.31

75.45

5.56

65.34

4.82

59.65

4.40

87.21

2.47

4.29

1.31

110.32

5.42

142.42

7.00

123.34

6.06

112.59

5.53

102.62

2.91

4.54

1.38

129.80

5.74

167.58

7.41

145.12

6.42

132.48

5.86

135.60

3.84

5.00

1.52

171.53

6.32

221.44

8.16

191.77

7.07

175.06

6.45

L-Shape Drain size 5500 X 2000 ,


D = 2000 are 2/3 of actual size of L-shape Drain 5500 X 3000
means 75% full flow
Q actual from MASMA calculation = 1170.34 cusec
Q required > Q actual O.K

Page 9

PROPOSED EASTERN DISPERSAL LINK (EDL) EXPRESSWAY JOHOR BAHRU

SLOPE
1 in

150

cusec

ft/s

434.86

8.02

595.22

8.78

650.82

9.00

764.67

9.40

53.35

3.93

100.71

4.95

118.49

5.24

156.58

5.77

Page 10

You might also like