Aquaduct Design (V) - 3320 TO 3400
Aquaduct Design (V) - 3320 TO 3400
Aquaduct Design (V) - 3320 TO 3400
Canal Data
1
2
3
4
5
6
7
8
9
a
b
10
3320 To 3400
3320 - 3400 =
m
171.10
1.75
1.45
0.75
4.380
0.0007
0.77
168.80
D
1 IN 1500
m
m
m
m
Cumec
m/sec
m
4.50
1.50 m
m
1.5:1
2.0:1
0.0180
172.55
173.30 m
1.50
2.00
11.00
0.0025
167.58
20.00
180.33
1.91
169.40
0.03
80.00
1 in 400.00
SqKm
m
m
Cumecs
m/sec
m
m
Looking to the site conditions, drainage Syphon is best alternative, hene Dr.
Syph shall be designed for the following conditions
a Canal full & Drainage Empty
b Canal empty & Drainage full
c Check for buyoncy & Uplift
1- Hydraulic Calculations
Drainage Channel
a By Dicken's empirical formula
As per Bodhi TC no. 51 C =
1-DICKEN'S DISCHARGE=C*A0.75
24.88X11^0.75
Add 20 for hilly area
Total
Hydraulic calculations
Area Perimeter Calculations
HFL given as R.L.
169.40 m
Diff.
Between
Av.depth
HFL-R.L
Area
successive
Below HFL
R.Ls
S.No
R.D.
R.L
1
2
3
4
5
6
7
8
9
3320
3330
3340
3350
3360
3370
3380
3390
3400
168.80
168.49
168.31
167.95
167.58
167.84
168.13
168.42
168.60
0.00
0.31
0.18
0.36
0.37
0.26
0.29
0.29
0.18
0.60
0.91
1.09
1.45
1.82
1.56
1.27
0.98
0.80
0.00
0.75
1.00
1.27
1.64
1.69
1.42
1.13
0.89
80.00
Hydraulic mean depth
Q=A*V
R=A/P
R.667
S0.5
V=1/N*R.667*S.5
97.8*1.91
Hence adopt HFL
80.00
1.22
1.14
0.05
1.91
186.32
7=2*6
0.00
7.55
10.00
12.70
16.35
16.90
14.15
11.25
8.90
24.88
150.28 Cumecs
30.06 Cumecs
180.33 Cumecs
Sq-R.D.
Sq-R.L.4
Perimeter
8=2^2
9=4^2
10=(8+9)^0.
5
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
97.80
SQM
m
97.8/80.03
m
1.22^0.75
0.0025^0.5
m/sec
1/172.55*1.14*0.05
cumecs >
More than
180.33
169.40 m
O.K.
0.00
0.10
0.03
0.13
0.14
0.07
0.08
0.08
0.03
0.00
10.00
10.00
10.01
10.01
10.00
10.00
10.00
10.00
80.03
M
O.K.
A=
R=
V=
(B+nd)d
5.69
0.82
Q/A
2- Box dimension
Permissible velocity in box
Area required
Q/V
Provide 1 boxes of size=4x2.2
No. of boxes
1.00
Width of box
4.00
Depth of box
2.20
Depth of Water
1.45
Thickness of Slab
0.30
Thickness of Wall
0.30
Nos of Pier
7
Nos of Abutment
2
Length of Barral
80.00
Total C/C Span
10.00
m
m
m
m
m
Nos.
Nos.
m
m
Area provided
Velocity achieved
V1=
186.32/3
1*4*2.2
186.32/5.8
At B-B
1.75+3*(1.45+0.
4.35*3/2
5.80 Sqm
0.76 m/sec
5.80
10.90
0.53
0.43
4.35 m
6.53 m
80.00 m
5.69 Sqm
0.77 m/sec
0.03 m
0.00
5.80
0.76
0.03
0.00
V^2/2g
.2*(V1^2-V2^2)/2*g
V^2/2*g
.3*(V1^2-V2^2)/2*g
V2n2L/2g*R4/3
At A-A
0.30 m
0.20
At C-C
3.00 m/sec
1.46 Sqm
Assume
1x4x1.45
2*1*(4+1.45)
5.8/10.9
Area 0f section
Q/A
Velocity =
Velocity Head
Loss of Head at exit
Area 0f section
Q/A
Velocity =
Velocity Head=
Loss of Head
Head Loss through Barrel
0.002
0.00
0.60
0.76 M/sec
Av Ra4/3 =
Av Va =
Va2n2L/2g*Ra4/3
4.35*3/2
Va2n2L/2g*Ra4/3
0.0001
6.53
0.0001
TOTAL Loss
Say TOTAL Loss
0.0533
0.06 m
0.10 m
Due to gradient
P=
R4/3 =
R3/2 =
0.74
0.77 m/sec
0.505
0.00032
0.03
f2 = a(1+b/R)
L/R
V^2/2*g
Hf=
TOTAL Loss
Max
at Sec AA
Controlling levels :U/S
R.L. of Canal Bed
Velocity head =
R.L. of T.E.L. at AA =
171.1+1.45+0.1/(2*9.81)
R.L. of Water surface at AA =
172.55
R.L. of bed atAA=
at Sec BB
U/S
Loss of head at Entry =
Loss of head in U/S Transition =
0.00033
150.34
0.03
0.05
0.10
171.10
0.01
172.56
172.55
171.10
AA to BB
0.00
0.0001
m
m
m
m
O.K.
O.K.
6.98
0.76
Net
R.L. of T.E.L. at BB =
Velocity head at BB hb =
172.55
0.04
0.00 m
172.55 m
0.04 m
172.52
172.52 m
171.10 m
at Sec CC
BB to CC
Barral
Loss of head in Barral =
0.00
Loss of head in Barral due to gradient =
R.L. of T.E.L. at CC =
Velocity head at CC ha =
0.04
R.L. of Water surface at CC=
R.L. of bed at CC=
at Sec DD
CC to DD
Barral
Loss of head at Exit =
Loss of head in D/S Transition =
Net
R.L. of T.E.L. at DD =
Velocity head at DD =
172.49
R.L. of Water surface at DD=
R.L. of bed at DD=
0.1-(171.1-171.01)
Loss to be neglected
0.01
4- TRANSITIONS :U/S
1.75
8.35
4.00
4.00 Bn
Bx
4.35
4.35
x
Bn =
Bf =
Lf =
0.00
0.05
172.50
0.04
172.46
171.01
0.00
0.0001
0.00
172.50
0.01
172.49
171.04
m
m
m
m
m
Bf
Lf
At
x=
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
Bx =
Bn*Bf*Lf / (Lf*Bn-(Bn-Bf)*x)
Bottom
4.00
3.09
2.51
2.12
1.83
1.75
1.75
1.75
0.00
1.00
2.00
3.00
4.00
4.35
4.35
4.35
Top
4.00
4.54
5.26
6.24
7.68
8.35
8.35
8.35
Bn*Bf*Lf / (Lf*Bn-(Bn-Bf)*x)
Bn =
Bf =
Lf =
1.75
4.00
6.53
0.00
8.35
4.00
6.53
D/S
1.00
0.00
1.00
2.00
Bottom
4.00
Top
4.00
3.34
4.35
2.00
2.87
4.76
3.00
3.00
2.51
5.26
4.00
5.00
6.00
7.00
8.00
9.00
10.00
4.00
2.24
2.01
1.83
1.75
1.75
1.75
1.75
5.88
6.66
7.68
8.35
8.35
8.35
8.35
TBL
5.00
6.00
6.53
6.53
6.53
6.53
173.30
173.60
173.30
173.51
173.21
171.10
170.80
CANAL
2.20
171.01
170.71
80.00
80.00
HFL
169.40
Hence total downward loas req with fectr of safety 1.25
Uplift Pr.= HFL - Foundation Level of Abutment
2.80 m
4.60
0.30
B
0.30
748.00
Hunch
0.15
0.15
0.30
4.00
2.80
2.20
0.30
C
density of concrete
2.40 t/cum
Live load
Load of Parapet Wall
Load from top slab
Load from top haunches
Load from side walls
Load from bottom haunches
Load from bottom slab
6.2*2/4
.6*.2*2.4
0.3*2.4
0.5*2*0.15*0.15*2.4
2.2*0.3*2.4
0.5*2*0.15*0.15*2.4
0.3*2.4
Total dead load
3.10
0.29
0.72
0.05
1.58
0.05
0.72
3.42
6- Design of barrel
Max Ht. of earth fill over box
Top slab span AB/BC
Density of Earth
Dead Load (self load + Earth load) per m
t
t
t
t
t
t
t
t
0.00 m
1.80 t/cum
3.42 t/m
3.10
0.00
4.50
0.00
0.50
0.00
Hight of fill above box
Dispersion area in width area
(0.5+0+0)*(0.25+0+0)
Intensity of loading with impact factor
Live Load on top Slab
This may be taken as UDL on overall length on span for safety purpose
total load on Bottom slab
3.42+3.23
Load on AF & CD vertical walls
C/C Span
0.00
A
Wall thk
No. of wall
2.20
F
0.00 m
0.13 sqm
3.23 t/sqm
6.65 t/sqm
2.50 m
0.30 m
2.00
Water Load
2.20 t/sqm
8.72 t/sqm
1.25
3.11 O.K.
8.72/2.2
clockwise +ve
4.30 m
-6.33 tm/m
MFBA =
4.11*4.3^2/12
Bottom slab span
MFDC=
8.72*4.3^2/12
MFCD=
6.33 tm/m
4.30 m
13.44 tm/m
8.72*4.3^2/12
-13.44 tm/m
2.50 m
4.718 tm/m
MFBC=
-4.718 tm/m
MFDA=
5.437 tm/m
MFCB=
-5.437 tm/m
6-ii-Moment Distribution
Distribution factors (D.F.)
Joint A
Stifness = 4*EI/L
E = Constant for all members
I = bd^3/12
For AB
b
d
I = bd^3/12
400*30^3/12
L
Stifness = 4*EI/L
For AD
b
d
I = bd^3/12
220*30^3/12
L
Stifness = 4*EI/L
D.F. at A for AB
D.F. at A for AD
0.50
Joint
0.50
D
400.00 cm
30.00 cm
4*900000/400
220.00 cm
30.00 cm
4*495000/220
900000/(900000+495000)
495000/(900000+495000)
900000.00 cm^4
400.00 cm
9000.00 *E
495000.00 cm^4
220.00 cm
9000.00 *E
0.50
0.50
0.73
6.47
6.52
Joint B
A
4.72
0.81
-4.72
2.56
3.37
C
D.F. at B for BA
D.F. at B for CB
Similarly D.F. for other members are alike above.
Moment Distribution table
-3.37
3.37
2.56
-2.56
-0.40
0.40
0.81
-0.81
-6.33
6.33
0.50
0.50
0.50
0.50 -4.72
-0.81
4.72
-2.56
-3.37
-6.16
-2.56
0.40
-9.44
5.44 0.50
0.50
F 13.44
-9.44
4.72
-2.56
6.16
6.16
2.56
-0.40
9.44
0.50 -5.44
0.50
-13.44
9.44
-4.72
2.56
-6.16
0.50
0.50
final
distribute
c.o.
distribute
initial
initial
distribute
c.o.
distribute
final
final
distribute
c.o.
distribute
initial
initial
distribute
c.o.
distribute
final
Moment at Centre
5.05
Moment at Face A / B
Where
K =
0.12
M =
5.05
M2 =
2.59
Cl =
4.00
4K1-K)M+8/3K(CI-K2)M2 =
Side walls
Wl2/8+Wl2/15.6
2.59
4K(1-K)M+8/3K(CI-K2)M2
5.44
Wl2/8+Wl2/15.6
5.10
2.61
Moment at Face D / C
4K(1-K)M+8/3K(CI-K2)M2
Where
K =
0.12
M =
5.10
M2 =
2.61
Cl =
4.00
4K1-K)M+8/3K(CI-K2)M2 =
3.37
-3.37
3.37
A
0.58
Sqcm
10.88
7.71 Sqcm
Sqcm
6.16
7.65
Moment at Centre
3.21
6.16
Sqcm
0.15
2.50
3.21
0.72
6.81
1.54
0.00
7.71
D
-6.16
2.42
Sqcm
6.16
9.20
Sqcm
-3.37
B
C
6.16
Sqcm
19.46
7.71
5.49
tm
tm
tm
tm
tm
-6.16
6.81
Moment Distribution diagram
6-iv-Design Moment
Top Slab
Max support moment
Span moment
Bottom Slab
Max support moment
Span moment
Side wall
Max support moment
Span moment
AB
At Centre AB
At Face A/B
CD
At centre CD
At Face C/D
AD & BC
At Centre AD / BC
At Face D/C
3.21
0.16
2.49
6.81
0.66
5.27
7.71
2.95
2.22
tm
tm
tm
tm
tm
5.27 tm
M-20
c
t
m
67.00 kg/sqm
1500.00 kg/sqm
14.00
Top Slab - AB
Deff req
n
j
Q
0.29
0.90
8.76
5.27*1000/8.755
24.54
30.00
10.00
20.00
30-10
0.16*100000/(1500*0.903*20)
3.21*100000/(1500*0.903*20)
0.25
cm
cm
cm
cm
0.58 Sqcm
9.20 Sqcm
2.30 Sqcm
20.00 cm
0.66*100000/(1500*0.903*20)
5.27*100000/(1500*0.903*20)
0.25
2.42 Sqcm
19.46 Sqcm
4.87 Sqcm
Wall AD& BC
10.00 cm
30.00 cm
20.00 cm
2.95*100000/(1500*0.903*20)
2.22*100000/(1500*0.903*20)
0.25
10.88 Sqcm
8.20 Sqcm
2.72 Sqcm
30.00 cm
0.25 %
1.36 Sqm
Provide Tor 10-200 C/c as distribution steel on both faces in all members
Check for Shear
Max S.F.- in EF bottom slab
E
F
8.72 t/m (udl)
4.30
8.72*4.3/2
Shear Stress
18.75*1000/20*100
More than permissible for M-20
However 15X15 cm haunches have been provided, thus
Deff at support
20+10
Shear Stress
18.75*1000/30*100
Hence no shear Reinf. Is needed.
Continue above reinf in complete length of box
Rf
18.75 t
9.37 Kg/sqm
30.00 cm
6.25 Kg/sqm
O.K.
Provision of Reinforcement
A
B
AB
C
D
DC
E
F
G
H
P
Q
AD & BC
dia of bar in
mm
16.00
16.00
10.00
Mid. Span
Supp.. Span
20.00
25.00
3.14
4.91
2.42
19.46
Dist.
10.00
16.00
0.79
2.01
12.00
10.00
Mid. Span
Supp.. Span
Dist.
Mid. Span
Supp.. Span
Dist.
Hunches
Dist
2.01
2.01
0.79
Total Sec.
Provide
Area
Specing
0.58
300.00
9.20
3+3
2.30
200.00
Specing
Specing
3460.00
210.00
340.00
346.00
21.00
34.00
1290.00
4+4
1290.00
250.00
129.00
25.00
4.87
10.88
180.00
180.00
160.00
180.00
16.00
18.00
1.13
0.79
8.20
2.72
130.00
290.00
130.00
290.00
13.00
29.00
10.00
12.00
0.79
1.13
1.36
300.00
150.00
580.00
58.00
20.00
10.00
3.14
0.79
4 Nos.
150.00
H
A
E
B
Extra at Top
Only
E
F
G
C
D
Extra at Top
Only
C
Concrete Grade
Cover
M-20-20mm
50 mm
4-Scour Depth
Discharge
Discharge per m width
186.32/80
186.32 Cumecs
2.33 Cumecs per m
Silt factor f
dsm = 0.473(q/f)^0.333
Max. Scour Depth
6.00
0.473*(186.32/6)^0.33
dsm*1.50
1.5*1.47
2*1.47
169.4-2.2
1.47 m
2.20 m
2.94
167.20 m
166.46 m
161.58 m
160.98 m
160.98 m
160.98
160.98
m
8.42 m
STABILITY OF PIER
DATA
1 Grade of concrete
2. Clear Span
2 C/C span
Effective Span
3 Width of pier
a) Top width
b) Bottom width at foundation level
4 Batter
8 H.F.L.
9. Nalla bed
10 Foundation R.L.
11 Pier height
12 Slab thickness
LOADS CONSIDERED
a) Dead load & Live load on Top of Pier
b) Self Dead Loadof Pier
c) Impact effect of live load
d) Wind load
e) Breaking effect
f) Buoyancy effect
g) Force due to water current
173.600
173.300
BOX
2.800
10.00
2.20
171.100
170.800
170.500
0.30
1.100
1.00
1
HFL
1
12
169.400
1.820
12
9.220
M - 15
8.120
Nalla Bed
0.15
2.54
2.84
3.14
167.580
160.980
160.680
3.440
160.380
C/C span
=
Clear span
=
Effective span =
Length of Bearing =
10.00 M
9.00 M
9.50 M
0.155+0.0122*L
Say
1
2
3
4
5
6
0.277
0.300 M
2.40 T/M3
1 T/M3
Noted from I.R.C. (section II)
100 P/sqm
10 T/sqm
40 T/sqm
As above
=
3.420 t
0.25 M
5.43 t-m
As above
8.720
161.280
0.15
1.356 M
=
=
2.54
4.60 `+Circular
=
=
6.14 `+Circular
9.220 M
WEIGHT OF PIER
Height of Pier top to HFL =
Height of Pier HFL to Nalla Bed =
Height of Pier Nalla Bed to Pier Bottom =
Top width of Pier =
Width of Pier at HFL
Width of Pier at Nalla Bed
Width of Pier at Bottom
Width at Foundation (Ist Footing)
1.100
1.820
6.300
1.000
1.18
1.48
2.54
2.84
4.6
4.78
5.08
6.13
8.970
Inc. Circular
5.600
5.960
6.560
8.670
Vide clause no. 216.30 page 31 of IRC Bridge code section II. As pier displaces water only,
reduction in weight shall be equal to that of volume of water displaced.
Area at top of pier
=
5.39 M2
Area of pier at HFL
=
6.73 M2
0.600
=
=
=
=
=
=
25.47 M2
30.56 T
=
=
25.47 M2
18.34 T
340.102 T
Wt. of Duct
Wt. of Haunch for Duct
Wt. of Railing
Wt. of Pier Cap
Wt. of Unsubmerged Pier
Wt. of Submerged Pier
=
=
=
=
=
97.92
1.08
5.76
3.312
16
266.6
390.672
30.56
18.34
88 T
=
=
24.3 T
2.25 T
26.55 T
0.77 M
20.44 TM
=
=
9.24
20.63
287.89
3.312
M2
M2
T
T
T
T
T
T
T
T
T
At junction Level
8.120 M
Considering that height upto afflux level of water is effective and strata gets eroded upto R.L.
161.28
P = KAV2
here K = semicircular cut water =
0.5
V= Max mean velocity of water =
1.91 M/sec
Intencity of water current =
0.052KU2
(Where K =0.66 as per I.R.C.section II article 213.2 page 22)
=
0.052*0.66*3.19^2
0.12 T/M2
=
0.35*1.20
10.38 T
Acting at 1/3 from water surface i.e.at R.L. 468.5-4.65/3 =
166.6933333
Moment due to Water Current =
4.07*2/3*4.65
56.19 TM
WIND PRESSURE
Wind Pressure at pier (as per I.R.C. code of practice page21)
Taking P =
82 Kg/M2
Height of Pier =
9.220 M
Wind Pressure = ht x av. Width x intencity =
1.34 T
Moment at junction level =
6.18 TM
Wind Pressure acting on Box :From page I.R.C. II, we have P = 94.4 Kg /M2
=
0.0944 T/M2
P2 =
0.0944x2.6x10
=
2.93 T
Moment at junctin Level =
17.32 TM
WIND MOMENT ABOVE H.F.L. ON PIER :Wind Pressure = ht. of Pier above HFL x av. Width x intencity of wind pressure =
=
1.100
1.09
0.082
0.1 T
Moment =
0.1
5.16
0.52 TM
WIND PRESSURE ON EXPOSED LIVE LOAD
Wind pressure on live load =
300 Kg/Linear metres
0.3 T/Linear metres
P3
Wind Pressure on live load =
3T
acting at 1.50 mabove Road Level
Moment
F734*(C720+2.6+1.5)
39.96 TM
Total Moment due to Wind Pressure =
63.98 TM
Longitudinal moments :No live load acting
(vide I.R.C. code II page 22
Taking Wind Pressure=
240
K/M2
0.24
T/M2
and Wind moment on Box =
10x0.24*2.4*(6.62+2.6/2)
62.9 TM
and Wind load moment on Pier =
6.18 TM
Total Wind Moment =
69.08
69.08 TM
Taking Longitudinal Moment =
Moment due to water current + Moment due to wind Pressure
161.28
56.19
TRANSVERSE MOMENTS
69.08
125.27 T.M.
The water currents strike the pier at 20o as per code of Practice I.R.C. II with Sin 20o = 0.342
0.052xKAV2xSin20ox2/3H
Moment due to cross current =
3.15 TM
Due to breaking effect :The force due to breaking shall be assumed to be acting
along a line parallel to road way and 1.2 M above it.
h= ht. of Pier +depth of Duct+1.20
13.520 M
When the entire first train is on the full span, the breaking force shall be assumed to be 20% of the loads
2*6.80+2*11.4
20% 0f 36.4
36.4 T
7.28 T
98.43 T.M.
Moment =
Transverse moment due to eccentricity of Live load :According to previous calculations under item (B)3. Design of Pier - Live load
RR =
24.3
& RL =
2.25
t
Moment = (RR-RL)x0.5 Length of Bearing
11.03 T.M.
Note :- As per I.R.C. code of practice, the breaking effect is invariably greater than the tractive
effect. So it is not being considered here.
Total transverse moment =
112.61 TM
As per I.R.C. code of practice section II, the change of vertical reaction at the bearing
be accounted
due to breaking
Increase should
as reaction
due to breaking
effect :-effect.
Let F be the force due to breaking effect lever arm X =2.6+1.2 =3.80 m
4.300 m
Therefore we have Fx = RxL & R = Fx/L
Where R= vertical reaction
L = Span effective
1.69 t
Total direct loading acting on pier = Dead load on Box +Water load +Submerged weight of pier +
UnSubmerged weight of pier + live load reaction +wt. of railing & Kerb +change in vertical reaction
due to loading
501.91 t
Calculation for Z
(a)
At junction Level RL
Semicercular diameter
161.28 m
2.54 m
437.662/(2.54*8.67)+(92.925/31.82)+(112.61/9.32)
34.88 t/m2
<
100 T/M2
wt. of railing & kerb + wt. of Pear cap+ Live Load reaction
522.35 t.
(e)+A772:H780Due to breaking effecMoment due to eccentricity of live load (ML
Moment due to Wind pressure (ML-2)
20.44
63.98 tm
84.42 tm
98.43 tm
20.44 tm
118.87 tm
Transverse moment =
Breaking moment =
P=
Pmin =
Pmax =
522.35/(2.54*)-(84.42/31.82)-(118.87/9.32)
8.31 t/m2
39.13 t/m2
<
100 T/M2
Case-II
Case-III
Pmin =
15.23 t/m2
+ve
4.87 t/m2
+ve
8.31 t/m2
+ve
Pmax =
20.25 t/m2
+ve
34.88 t/m2
+ve
39.13 t/m2
+ve
(i) On Pier
(ii) Wt. of Foundation
Total
30.56
18.34
501.91
48.9
550.81
T
T
T
T
T
20.44 TM
67.95 TM
as done in Case -1
2.93 T
16.14 TM
Wind load =
moment
Total Longitudinal moment =
(d) Transverse Moment :-
2.93
36.83
300
3
45.36
186.72
T
(Ht. of Pier+Ht. of Steps +0.5*Ht. of Box
TM
Kg linear metre.
T
TM
TM
The water currents strike the pier at 20 o as per code of Practice I.R.C. II with Sin 20 o = 0.342
Moment due to cross current =
0.052xKxAxV2xSin20ox2/3H
7.02 TM
(ii)Due to breaking effect :Ht.of(Pier+Box+Steps)+1.2
14.12 M
Breaking force =
7.28 T as perprevious case
Moments
(iii) Due to eccentricity of live load Moment :Total Transverse Moment =
7.02+102.79+11.03
102.79 TM
11.03 TM as perprevious case
120.84 TM
tm
tm
t/m2
t/m2
wt. of railing & kerb + wt. of Pear cap+ Live Load reaction+ submerged wt. Of footing
Longitudinal moment =
Transverse moment =
P=
W/A +- ML/Zyy +- MT/Zxx
Pmin =
(466.892/25.47)-(186.72/100.9)-(120.84/45.02)
466.89 t.
186.72 TM
120.84 TM
13.8 t/m2
Pmax =
(466.892/25.47)+(186.72/100.9)+(120.84/45.02)
22.87 t/m2
<
100 T/M2
P=
Pmin =
Pmax =
(554.892/25.47)+(118.77/100.9)+(113.82/45.02)
tm as perprevious case
tm
tm
tm
11.03 tm
113.82 tm
18.08 t/m2
25.49 t/m2
<
100 T/M2
Case-II
Case-III
Pmin =
17.03 t/m2
+ve
13.8 t/m2
+ve
18.08 t/m2
+ve
Pmax =
17.48 t/m2
+ve
22.87 t/m2
+ve
25.49 t/m2
+ve
171.100
CBL
2.800
170.800
170.500
0.5
3.90
W4
0.60
169.40 HFL
W1
1.700
9.520
0.600
W6
W3
8.72
168.800 GL
W7
0.15
7.820 0.15
160.98
W8
B
(i)
160.68
0.5
14.33
5.71
14.33 m
12.62 m
1.14
0.333 for = 30o
No Superimpose load is take as approach Slab is provided
(ii)
Moist Earth = Pm x .5 x he
(1)
0.333^2*1.8*12.
62
2.52*0.5*3.9
(iii)
(2)
2.52*(9.52-3.9)
(iv)
2.520
t / m2
4.91
t / m2
14.16
t / m2
1.741
7.59
38.02
Moment in tm
V
H
126.82
93.91
9.52
9.52
2.80
9.52
7.82
0.30
65.25
48.94
28.79
2.57
73.38
10.32
10.37
12.28
11.33
14.26
5.36
7.17
676.94
600.89
326.06
36.65
393.58
73.93
8.42
-26.14
2.07
-54.12
4.91
14.16
7.59
38.02
Total
241.08
T
64.68
8.41
4.21
2.91
1.00
41.34
59.58
22.06
38.02
2274.65
TM
161.00
12.620
Sv
Sh
Svm
Shm
Sm
=
=
=
=
=Svm-Shm
b=
Check for Eccentricity x = (Svm -Shm)/S
e
= b/2-x
b/6 =
e < = b/6
241.08
64.68
2274.65
161.00
2113.65
14.33
8.77
t
t
tm
tm
m
m
-1.61
2.39
-1.61<2.39
No Tension
P max, min =
75
7.5
t / m2
Kg/cm2
5.48
t / m2
Bearing Capacity
Sv / b(1+-6e/b)
P max =
P
min
Compression
2.816
Kg/cm2
Hence Design O.K.
as no tension at base Ignore below calculation of revised P max
14.33
28.16
Revised
P max =
5.48
Revised
P max =
8.94
t / m2
Sh / Sv
0.27
0.75
Svm / Shm
14.1300
1.50
173.600 m
173.600
4.20
W3
0.40
169.40 HFL
W1
12.620
12.920
1
W4
0.600
W2
168.80
W5
0.15
Foundation Level
GL
7.82
7.82 0.15
W6
160.98
A
160.68
0.50
5.05
13.67
13.67 m
12.92 m
1.06
0.333 for = 30o
(i)
(ii)
(iii)
45.58 t / m2
(iv)
(v)
0.600 SP-20
4.647
5.287
24.789
2*
38.02
Total
255.87
113.67
=
=
=
=
=Svm-Shm
b=
Check for Eccentricity x = (Svm -Shm)/S
e
= b/2-x
b/6 =
V
H
21.19
124.48
776.14
904.77
61.76
393.58
67.27
-16.94
45.54
196.29
72.05
38.02
2332.25
Sv
Sh
Svm
Shm
Sm
Moment in tm
TM
255.87
113.67
2332.25
351.90
1980.35
13.67
7.74
-0.91
2.28
t
t
tm
tm
m
m
351.90
2.70
e < = b/6
-0.91<2.28
No Tension
40
7.5
P
should be less than if Tension
foundation min
P max, min =
t / m2
Kg/cm2
Bearing Capacity
Sv / b(1+-6e/b)
P max =
11.24
min
t / m2
Compression
2.619
Kg/cm2
Hence Design O.K.
as no tension at base Ignore below calculation of revised P max
13.67
26.19
Revised
P max =
11.24
Revised
P max =
21.52
t / m2
Sh / Sv
0.44
0.75
Svm / Shm
6.6300
1.50
Provision of Reinforcement
Design of Aquaduct at RD 3320 To 3400 m R.B.C.
TOP
Bottom
Bentup Bar
Supp.. Span
Supp.. Span
Dist.
Dist.
Top
Bottom
Alternate
Top
Bottom
Top
Bottom
Main
Main
(BOTTOM Bentup Bar
SLAB)
Supp.. Span
Supp.. Span
Dist.
Dist.
Top
Bottom
Alternate
Top
Bottom
Top
Bottom
20
20
20
25 4+4
25 4+4
10
10
240
240
480
23
23
23
23
23
23
23
180
180
43
43
22
8
8
18
18
23
23
23
23
23
23
23
Inner
Outer
Inner
Outer
16
12
10
10
110
110
180
180
92
92
14
14
46
46
46
46
10
300
34
92
Struff
12
150
12
150
10
150
10
150
20 2 Nos.
20 2 Nos.
10
150
68
68
7
7
2
2
68
46
46
46
46
46
46
46
10
10
10
10
10
10
94
45
75
56
151
74
22
22
2
2
4
4
Nos
34
34
34
6
6
16
16
AB
(TOP
SLAB)
Provide
dia of bar Specing
Nos
16
300
16
300
16
300
16 3+3
16 3+3
10
200
10
200
DC
E
F
G
AD & BC
Hunches
Perapet
Ver
Supp.. Span
Dist.
Dist.
Ver
Dist
Q
Kerb
Pier
Inner
Outer
Inner
Outer
Top
Bottom
150
150
150
150
150
150
5%
Total
Total Wt in
Length
Length in Wt /M
Kg
4100 M 3206.2
1.58
5065.8
4100
3206.2
1.58
5065.8
4066 3179.612
1.58
5023.79
10100
1393.8
1.58
2202.2
10100
1393.8
1.58
2202.2
10000
3680
0.62
2281.6
10000
3680
0.62
2281.6
0
3100
3065.9
2.47
7572.77
3100
3065.9
2.47
7572.77
3066 1551.396
2.47
3831.95
10100
1858.4
3.86
7173.42
10100
1858.4
3.86
7173.42
10000
4140
0.62
2566.8
10000
4140
0.62
2566.8
0
1050
4443.6
1.58
7020.89
1050
4443.6
0.89
3954.8
10000
6440
0.62
3992.8
10000
6440
0.62
3992.8
0
1149 3594.072
0.62
2228.32
0
700
2189.6
0.89
1948.74
700
2189.6
0.89
1948.74
10000
3220
0.62
1996.4
10000
3220
0.62
1996.4
10100
929.2
2.47
2295.12
10100
929.2
2.47
2295.12
900
2815.2
0.62
1745.42
6620 13690.16
11780 11662.2
8290
1243.5
11100
1243.2
10890 6577.56
26520 7849.92
0.62
0.62
0.62
0.62
0.62
0.62
0
8487.9
7230.56
770.97
770.78
4078.09
4866.95
124201.72
6210.086
130412
130.412
Kg
Kg
Kg
Tonnes