Technical Specification for 40 KLD (output) Sewage Treatment Plant

Sl. no Description

UOM

Qty

A
1
2
3
4

Final technical specs


Equalization tank with screen chamber
O&G chamber
FAB tank ( AT, SST, FFT & CPS)
FAB MEDIA

Lot
Lot
lot
LS

20 KLD
1 KL
10 KLD
3M3

Raw Sewage Feed pumps

no

6
7
8
9

no
Lot
no's
no's

2
1
1
2

no

2 KL

11
12

Blowers for FAB , SHT, TWST


Diffusers
Tube settling tank with Tube media
Sludge pumps
Intermediate storage tank(Treated water tank) - Filte
Feed Tank
Filter feed pumps
Multi media filter

no's
no

2
1

13

Chemical dosing system

no

14

Electrical panel with semi automation and necessary


cables

lot

15
16
17

ACF
Treated water tank
Erection & Commissioning

no
No
LS

1
10 KL

10

Total-A

VAT @ 5 %
Freight @ 2.5%
LANDED COST = Rs.
Other Terms & Conditions:
Delivery:

Payment:

Inspection:
Name of the Party
Address
Contact Person
Contact Number
Email ID

t Plant
Specifications/Re
marks

RATE

Amount

Civil
Civil
MSEP ( Pre Fab)
PP

14

280000
20000
515,000
42000

Kirloskar / Johnson / Eq

21000.00

42000

Everest / Equi
STD
STD
Johnson / Equi

75000.00

150000
13500
15000
50000

14000

25000.00

MSEP ( Pre Fab)

Kirloskar / Equ
FRP
I doser / Milton Roy /
Equi

18000.00
78000.00

36000
78000

6500.00

13000

STD

295000.00

295000

FRP
Sintex / Equi

78000.00
10.00

78000
100000
155000
1,882,500
94,125
47,063
2,023,687.50
90 working days
30% ADV, 60% Deliv, 10 % Inst
Yes In Vadodara

Envergy Projects Ltd


221, Hari Om Plaza, Borivali E
Vishal C Sathe
8080068282
snmv1@envergy.co.in

KPI for STP Plant


Sr.#
1
2
3
4
5
6
7
8
9
1
2
3
4

KPI for STP Plant


Technical Details
Flow in m3/day
Design Flow rate
pH
BOD in mg/l
COD in mg/lit.
TSS in mg/lit.
Oil & Grease in mg/l
Turbidity NTU
Use of treated water
Flow meter for inlet & outlet (Statutory requirement)
Energy Meter in MCC panel (Statutory requirement)
Chemical dosing system: Is this chlorination system, please confirm
Main sewage line for equalization

INLET

OUTLET

As per the Sheet

yes
yes
yes