Sl. Description of work UOM 1 2 3 4 5 No. A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm 22 25.4 18.9 IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm 20.9 IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm 23 12 24.5 IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm External Plastering -IInd Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
Summary of Progress Cum. Qty. Cum. Qty. UOM Qty.(Jan) (upDec) (upJan) Cum 6.7 6.7 Sqm 146.7 146.7 Sqm 0 0 Sqm 0 0 Sqm 18 18 Sqm 0 0
Jan'11 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0.9
0.5
18
5.3
234
Legend Sunday Holiday 24 25 26 27 28 29 30 31 Total Qty 0 66.3 0 0 0 0.9 20.9 0 0 0.5 59.5 0 18 0 5.3 0 0 0 0 234 0 0 0 0 Remarks
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. No. Description of work UOM 1 2 A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist CoatSqm External Plastering -IInd Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
Summary of Progress Cum. Qty. UOM Qty.(Jan) (upDec) Cum 0 Sqm 0 Sqm 0 Sqm 0 Sqm 0 Sqm 0
10
11
12
13
Cum. Qty.(upJan) 0 0 0 0 0 0
14
15
16
17
18
19
Jan'11 20
21
22
Total Qty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Remark s
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. No. Description of work UOM 1 A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm nd External Plastering -II Coat Sqm
Summary of Progress Descript ion Brickwork Cum Internal Plastering Sqm External Plastering Sqm IPS Flooring Sqm AR Tilling Sqm UOM Qty.(Jan) 0 0 0 0 0 Cum. Qty. (upDec)
10
11
12
Cum. Qty.(upJan) 0 0 0 0 0
13
14
15
16
17
18
19
Jan'11 20
21
31
Total Qty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Remark s
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. No. Description of work UOM 1 A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm nd External Plastering -II Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
Summary of Progress UOM Qty.(Jan) Cum 0 Sqm 0 Sqm 0 Sqm 0 Sqm 0 Sqm 0
10
11
12
Cum. Qty.(upJan) 0 0 0 0 0 0
13
14
15
16
17
18
19
Jan'11 20
21
31
Total Qty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Remark s
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building 2 3 Sl. No. Description of work UOM 1 A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm nd External Plastering -II Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
10
11
12
13
Cum. Qty.(upJan) 0 0 0 0 0 0
14
15
16
17
18
19
20
21
22
Total Qty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Remark s
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. No. Description of work UOM 1 2 3 A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm nd External Plastering -II Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
10
11
12
13
Cum. Qty.(upJan) 0 0 0 0 0 0
14
15
16
17
18
19
20
21
22
Total Qty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Remark s
Sl noConversion Taable
ENERGY CONVERSION 1 1 J=W.s=1N.m 2 1ft.lbf=1slug.ft2/s2 3 1ft.pounda=1lbm.ft2/s2 4 1erg=dyne.cm POWER CONVERSION 1 1W=1j/s 2 1ft.pdl/s=1ibm.ft2/s3 pressur conversion 1 1pa=N/m2 1poundal/ft2=1lbm.ft/s2 2 3 1torr=1mmHg Note:1+04 corresponds to 1X104 Note:1+04 corresponds to 1X104
Exercise 1 find Suitable Dia pipe to Carry15l/s from service line to over head tank Tota Length of service main =200,Residual pressur avalible At the Take off point on supply line Avalable head =15m Deduct Residual head =2m Dedut 10percent for losses in bends and specials =15-2=13 1.3 m 11.7 m 11700 11.7 required Dia 58.5
Larsen & Toubro limit 2 X384 GREL CCPP, Vemagiri-II Sl.no Description Brick Work 1 Brick Dimenssion Add 10mm mortar thick Cement Motar Required fro 1 m3 No of Bricks Required for 1 m3 Cement Bags Required for 1 m3 Plastering /10 m2 1 Ratio of motar 12mm thick Sand Requied for 10 m2 Ratio of motar 12mm thick WallThicknessLength 0.23 0.23 0.23 0.23 Breadth 0.1 0.11
12 12
100 1 6
2 Ratio of motar 6mm thick Sand Requied for 10 m2 Ratio of motar 6mm thick Cement Requred 3 Ratio of motar 18mm thick
6 6
10 1 4
Remarks 0.79
1.3
100
0.12 0.02 28.8 Kg 0.58 Bags 0.6 0.15 216 Kg 4.32 Bags 4.9 Bags
10
982.08 19.64
7 7 2 5 5
35 21 5 20.5 34
7 4 3 3.7
100% 100% 98% 100% 100% 96% 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Bri ck W or k Bri Bri ck ck W W or or k k @( @( +) +) 25 29 .5 .9 5 Bri ck W or k @( +) 35 .0 5 Bri ck W or k @( +) 41 .5
100% 100% 100% 99% 100% 100% 100% 100% 100% 98% 100% 87%
74%
77% 77%
Bri Bri Pla Int Int Int Int Int pla Ex IPS IPS IPS IPS IPS AR AR Da AR Da AR Da C ck ck ste er er er er er ste ter Flo Fo Fo Fo Fo Til Til do Til do Til doi r W W rin nal nal nal nal nal rin nal ori ori ori ori ori e e e e m or or g Pla Pla Pla Pla Pla g Pla ng ng ng ng ng Flo Fo Fo Fo c k k ter ter ter ter ter for ste @ @ @ @ ori ori ori ori T @( Fin in in in in in fin rin (+ (+ (+ (+ ng ng ng ng e +) s g g g g g s g ) ) ) ) @ @ @ F 48 @ @ @ @ @ 25 30 35 48 (+ (+ (+ o .4 (+ (+ (+ (+ (+ .5 .0 .1 .4 ) ) ) n 5 )2 )2 )3 )4 )4 0 0 m 5 25 35 35 m 5. 9. 5. 1. 8. m m m .5 .0 .0 50 50 05 50 50 0 5 5 m m m m m m m m Flo -u -u or nit nit -2 -3 Flo flo or or
Sl.no
Description
Scope Quantity
Brick Work Brick Work @(+)25.5 Brick Work @(+)29.95 Brick Work @(+)35.05 Brick Work @(+)41.5 Brick Work @(+)48.45m
7 8
10
11
Brick Work Fins Plastering Internal Platering @ (+)25.50 m Internal Platering @ (+)29.50 m Internal Platering @ (+)35.05 m Internal Platering @ (+)41.50 m Internal Platering @ (+)48.50 m plastering for fins External Plastering IPS Flooring IPS Fooring @ (+) 25.50 m IPS Fooring @ (+) 30.00m IPS Fooring @ (+) 35.1 m IPS Fooring @ (+) 48.45m AR Tile Flooring AR Tile Fooring @ (+) 25.50 m Floor Dado AR Tile Fooring @ (+) 35.05 m -unit-2 Floor Dado AR Tile Fooring @ (+) 35.05 m -unit-3 floor Dadoi Ceramic Tile Flooring Ceramic Tile Flooring (+)30.00 Ceramic Tile Flooring (+)35.1 Ceramic Tile Flooring (+)42.75 False Ceiling False Ceiling(+)30.00 False Ceiling(+)35.1 False Ceiling(+)42.75 Aluminimum False Flooring False Flooring (+)42.75m Ceiling Painting (WBD) Ceiling Painting (WBD) (+)25.5 m Ceiling Painting (WBD) (+)30.00 m Ceiling Painting (WBD) (+)35.1 m Ceiling Painting (WBD) (+)42.75 m Ceiling Painting (WBD) (+)48.45 m Wall Painting (OBD) Wall Painting (OBD) (+)25.5 m Wall Painting (OBD) (+)30.00 m Wall Painting (OBD) (+)35.1 m Wall Painting (OBD) (+)42.75 m Wall Painting (OBD) (+)48.45 m Wall Painting (Acrylic Emulsion) Wall painting(+)30.00 m Wall painting(+)35.1m Wall painting(+)42.75 m Rubber Painting Rubber Painting (+)25.5
35 16607.3 1552 1901 3800 2380 203.3 299 6472 2749.55 1347 800 566.3 36.25 850.27 169 139.27 160 111 160 111 1605.5 519 665.9 420.6 1790.12 365.9 436.36 987.86 1101.38 1101.38 5802.35 2516 1995 857 376.35 58 3672.2 1380 996 1051 41.9 203.3 4892 967 1608 2317 840 300
26 15066 1552 1901 3800 2380 203 230 5000 2722.55 1320 800 566.3 36.25 739.27 169 139.27 160 111 160 111 0
987.86
840 300
74% 91% 100% 100% 100% 100% 100% 77% 77% 99% 98% 100% 100% 100% 87% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 55% 0% 0% 100% 95% 95% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100%
12 13
Rubber Painting (+)35.1 Roof Water Proofing Roof Water Proofing External Painting (WCP) Extranal plastering Door & Windows Fire Doors (+)25.5m Fire Doors (+)30.00m Fire Doors (+)35.1m Fire Doors (+)42.75m Anodized Aluminmum glazed door(+)25.5m Anodized Aluminum glazed door(+)30.00m Anodized Aluminum glazed door(+)35.1m Anodized Aluminum glazed door(+)42.75m Water proof Flush Door(D2) Water proof Flush Door(D1a) windows Anodized Aluminum window(+)25.5m Anodized Aluminum window(+)30.00m Anodized Aluminum window(+)35.1m Anodized Aluminum window(+)42.75m Anodized Aluminum window(+)48.45m Anodized Aluminum Anodized Aluminum Anodized Aluminum Anodized Aluminum Anodized Aluminum Fixed window(+)25.5m Fixed window(+)30.00m Fixed window(+)35.1m Fixed window(+)42.75m Fixed window(+)48.45m
100% 100% 100% 23% 23% Err:522 38% 75% 86% 55% 0% 0% 0% 0% 0% 0%
14
50% 0% 0%
0% 0% 0% 0%
100% 0% 0%
16
Al. Glazing
100
0%
Brick Work
235
226
96%
IPS FLOORING AR Tile + Dado Rubber paint OBD (Ceiling )WBD 3 ELIVATION (+)30.0m Brick Work IPS FLOORING Cerimec Tiles Acrylic paint Rubber paint OBD (Ceiling )WBD FALSE Celing ELIVATION (+)35.1m Brick Work IPS FLOORING Cerimic Tiles AR Tile + Dado Acrylic paint Rubber paint OBD (Ceiling )WBD FALSE Celing ELIVATION (+)42.75m Brick Work IPS FLOORING Cerimic Tiles AR Tile + Dado Acrylic paint Rubber paint OBD (Ceiling )WBD FALSE Flooring FALSE Celing ELIVATION (+)48.45m Brick Work INTERNAL PLASTERING@48.45M extranal plastering
582 308.6
377
284 871.33 633.15 967.85 1115.31 1995.36 365.91 371 563.57 785.9 541.43 1608.66 1137.6 1367.62 846.42 436.36 250 -
358
541.43
247.23 -
Along A1 to A2 Along A1 to B1 Between B1 to B2 Along D1 to E1 Brick Work @35.05 Along A1 to B1 Along D1 to E1 Deductions Between D1 to E1 Along A1 to A2 And tiolet Wall Around Lift
2.4 4.1 1.5 2.9 Total Qty 3.4 3.4 2.1 4.25 5.75 4.25 4.25 4.25 5.3 6.07 4.57 3.65 Total Qty
10.1 10.1 -3 4.7 4.1 4.3 5 1.6 5.45 4.1 4.1 8.2
0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
IPS FLOORING GROUND FLOOR (+)25.5 DEDUCTION FOR BATTERY ROOM LIFT ROOM MH-4 MH-5 MH-6 MH-7 First Floor
1 1 1 1 1 1 1
43.1 7.97 2.5 3 2.5 2.5 3.5 Total Qty 23.450 1.300 0.800 1.300 0.800 1.410 0.800 0.900 0.500 0.250
43.100 38.490 18.585 18.360 36.945 32.395 28.500 0.900 0.850 0.800
44
13 Total Qty
plastering External
800
Tiling vitrified First Floor Tiling vitrified At third Floor tiling At Second Floor Brick work fins partion Fixing Alluminimam False Flooring False Ceiling External painting primer Paiting At 42.75m internal paint first Coat Door Alluminimum with Glass Fixing Rain Water Pipe Fixing in Rmt Plumbing At third Floor Plumbing At Second Floor Plumbing At First Floor Isolation Trasformer
70 464 294 20 200 992.2 1500 1000 10 115 4.1 5.73 8.1 65.22
4.4
100% 1 100
55%
0%0%0%0%
0%0%
0%0%0%0%0%0%0%0%0%0%0%0%0%0%0%0%
R Da AR Da AR Da Ce Ce Ce Ce Fal Fal Fal Fal Fal Fal Cei Cei Cei Cei Cei Cei W W W W W W W W W W Ru Ru il do Til do Til doi ra ra ra ra se se se se se se lin lin lin lin lin lin all all all all all all all all all all bb bb e e mi mi mi mi Cei Cei Cei Cei Flo Flo g g g g g g Pai Pai Pai Pai Pai Pai Pai pai pai pai er er o Fo Fo c c c c lin lin lin lin ori ori Pai Pai Pai Pai Pai Pai nti nti nti nti nti nti nti nti nti nti Pai Pai ri ori ori Til Til Til Til g g( g( g( ng ng nti nti nti nti nti nti ng ng ng ng ng ng ng ng ng ng nti nti g ng ng e e e e +) +) +) (+ ng ng ng ng ng ng (O (O (O (O (O (O (A (+ (+ (+ ng ng @ @ @ Flo Flo Flo Flo 30 35 42 )4 (W (W (W (W (W (W BD BD BD BD BD BD cry )3 )3 )4 (+ + (+ (+ ori ori ori ori .0 .1 .7 2. BD BD BD BD BD BD ) ) ) ) ) ) lic 0. 5. 2. )2 ) ) ng ng ng ng 0 5 75 ) ) ) ) ) ) (+ (+ (+ (+ (+ E 00 1 75 5. 5 35 35 (+ (+ (+ Al m (+ (+ (+ (+ (+ )2 )3 )3 )4 )4 m m m m 5 5 .0 .0 )3 )3 )4 u )2 )3 )3 )4 )4 5. 0. 5. 2. 8. uls 5 5 0. 5. 2. mi 5. 0. 5. 2. 8. 5 00 1 75 45 ion m m m 00 1 75 ni 5 00 1 75 45 m m m m m ) lo -u -u m m m m m m r nit nit u -2 -3 m Flo flo or or
Remarks
1.9
3.8
18.3
69.54 8.08
304.35 21.4
check once
primer coat
7 Frames completed
up to 24/3/11
270.72
72 36 17.25 81.3
2.26 2.36 1.41 3.34 9.37 7.9 7.9 -1.45 4.59 10.84 8.41 9.78 3.13 13.29 11.45 8.62 13.77 98.22
1622.72 -173.51 -5.38 -8.33 -6.25 -8.63 -12.25 1408.38 1010.695 -50.037 -14.868 -23.868 -29.556 -91.354 -22.800 -0.810 -0.425 -0.200 776.78 571.78 571.78
0.36 46.8
28.27 169.62
100% 100% 100% 100% 100% 86% 75% 55% 38% 23% 23% 0% 0%0%0%0% 0%0% W W at at er er pr pr oof oof Flu Flu sh sh Do Do or( or( D2 D1 ) a) 0%0% wi An An An An An nd odi odi odi odi odi ow ze ze ze ze ze s d d d d d Al Al Al Al Al u u u u u mi mi mi mi mi nu nu nu nu nu m m m m m wi wi wi wi wi nd nd nd nd nd ow ow ow ow ow (+ (+ (+ (+ (+ )2 )3 )3 )4 )4 5. 0. 5. 2. 8. 5 00 1 75 45 m m m m m
50%
%0%0%0%0%0%
W W W W W W Ru Ru Ru Ro Ro Ex Ex ll all all all all all bb bb bb of of ter tra ai Pai Pai pai pai pai er er er W W nal nal ti nti nti nti nti nti Pai Pai Pai at at Pai pla g ng ng ng ng ng nti nti nti er er nti ste O (O (A (+ (+ (+ ng ng ng Pr Pr ng rin D BD cry )3 )3 )4 (+ (+ oof oof (W g ) lic 0. 5. 2. )2 )3 in in CP + (+ E 00 1 75 5. 5. g g ) 4 )4 m m m m 5 1 . 8. uls 5 45 ion m m )
Do Fir Fir Fir Fir An An An An or e e e e odi odi odi odi & Do Do Do Do ze ze ze ze Wi ors ors ors ors d d d d nd (+ (+ (+ (+ Al Al Al Al ow )2 )3 )3 )4 u u u u s 5. 0. 5. 2. mi mi mi mi 5 00 1 75 n nu nu nu m m m m m m m m u gla gla gla m ze ze ze gla d d d ze do do do d or( or( or( do +) +) +) or( 30 35 42 +) .0 .1 .7 25 0 m 5 .5 m m m
100%
50%
0%0%
0%0%0%0% An An An An An odi odi odi odi odi ze ze ze ze ze d d d d d Al Al Al Al Al u u u u u mi mi mi mi mi nu nu nu nu nu m m m m m Fix Fix Fix Fix Fix ed ed ed ed ed wi wi wi wi wi nd nd nd nd nd ow ow ow ow ow (+ (+ (+ (+ (+ )2 )3 )3 )4 )4 5. 0. 5. 2. 8. 5 00 1 75 45 m m m m m
Series1
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. No. Description of work UOM 1 2 3 A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum ` Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm nd External Plastering -II Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
10
11
12
13
Cum. Qty.(upJan) 0 0 0 0 0 0
14
15
16
17
18
19
20
21
22
Total Qty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Remark s
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. Description of work UOM 1 2 3 4 5 6 7 8 No. A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm 22 25.4 18.9 IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm 20.9 IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm 23 12 24.5 IPS Flooring Sqm A R Tilling Sqm 109 Painting Sqm D Third Floor at 41.500m Brickwork Cum 1.2 1.38 1.2 8.03 6.03 4.28 Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm 132 528 Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm External Plastering -IInd Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
Summary of Progress Cum. Qty. Cum. Qty. UOM Qty.(Jan) (upDec) (upJan) Cum 131.03 131.03 Sqm 718.88 718.88 Sqm 1141.7 1141.7 Sqm 128.5 128.5 Sqm 620.4 620.4 Sqm 1336 1336
Jan'11 9 10 11 12 1.8 13 14 15 16 17 18 19 20 21 22 23
0.5
3.5
25
18
22
75
95
20
20
22.4
26
35
1.2 12
3.5
8.5
18 64
64
400
67 216
75 75
55 55
95 95
152 152
Legend Sunday Holiday 24 25 26 27 28 29 30 31 Total Qty 1.8 66.3 79 0 0 0.9 129.26 49.5 0 5.5 2 35 25 14 45 70 24 43.5 94.5 0 620.4 0 84.83 428.82 0 0 1496 1486 1336 57 70.2 70.2 72 72 85 85 30 1171.7 1141.7 Remarks
18
36
25
15.5
19
15
6.5 40.5
4.4
3 130
5.5
57 35 35 44.5 44.5
1.9
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. No. Description of work UOM 1 2 3 A Ground Floor at 25.500m Brickwork Cum 2 Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Ceiling Painting Sqm Wall Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Ceiling Painting Sqm WallPainting Sqm C Second Floor at 35.500m Brickwork Cum 1 3.3 1.2 Internal Plastering Sqm 42 32 40 IPS Flooring Sqm A R Tilling Sqm 20 Ceiling Painting Sqm Wall Painting Sqm D Third Floor at 41.500m Brickwork Cum 6.4 3.2 3.3 Internal Plastering Sqm 5 120 80 Flooring Sqm Ceiling Painting Sqm Wall painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm 201 68 Water Proofing- I Coat Sqm 201 68 Water Proofing- II Coat Sqm Wearing Course Sqm 48 82 105 F External Plastering External Plastering -Ist Coat Sqm 50 nd External Plastering -II Coat Sqm DM PLANT CW PUMP HOUSE BF-II 98 3.5 100.8 4.9 5.04
1.8 72
2.1 85
180 68 85
80
7.5
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing Ceiling painting Wall painting
10
11
12
13
1.2 90
7.7 50
5.36 24
4.6
2.2 100
8.2
8 125
18.6 32
8.5 115
3.93 187
6.5 158
1.51 20
80
55
80
7.64 Cum. Qty.(Total Feb) 268.82 2616.46 1191.7 148.5 640.4 1748 0 0 2.35 101.99
0.54 3.6 Battery Room floor 164.04 Wall 43.83 Wall 66.02 plastering 24.85 7.69 1.2 1.9
37.37
Total Qty 37.93 5.95 4.6 5.75 4.6 4.5 2 1.2 1 2.1 Total Qty 18.1 6.8 2 1.2 14.6 4.5 Total Qty 7.69 4.7 1.25 0.8 1.2 0.75
0.9
4.35
3.75 3.75
0.23 0.23
Up to Feb 7th
Brick workAt25.5 plastering Brick workAt29.95 plastering Brick Work At 35.05 plastering At 35.05 Brick Work At 41.5 plastering At 41.5
136.5 Along E1 to E3 142.9 Around lift 146.2 Along C8 t oD8 149.5 151.6 155.8 160.3
14
15
16
17
18
19
20
21
22
38
100
100.28
60
1.15
3.89
4.32 15
1.61 15
0.8 50
6.8 59
4.6 47.5
6.35 52
2.2 130
3.32 25
1.3 32
0.45 42
0.4 53.08
67 206 110
121
86
95.05
82
162
42
32
35
32
28
26
345.42 106.89 -2.04 -2.66 447.61 225.65 26.45 20.7 -4.8 -2.1 265.9 123.08 -4.8 65.7 183.98 72.29 -1 -0.9 70.39 0.79 62.64
39.72 12.29 0.23 0.31 52.56 51.9 6.08 4.76 -0.55 0.48 62.68 5.75 0.15
19.71 6.81
-0.69 5.79 5.2 3.62 6.38 5.49 -0.48 1.13 52.96 215.99 46
Total Qty
226.25 1721.95 231 1364 309 2768.29 155.25 792 1419 656
828.29
1 1 1
10 9.3 22 2.4
4430 4530 4610 4744 4844 4964 5009 5059 5144 5216
623 205.29
120
Total Qty 2 0 418.28 0 0 0 0 1.15 0 0 0 0 0 36.78 430 0 20 0 0 0 97.86 1467.58 0 0 0 0 516 337 412 1679.05 0 50 530
Remark s
7.7
284.9
5.25
160 100 70 60
24.85
44
1093.4
Roof
36
37.5
1.7
40
Larsen Toubro Limited 2x384 MW GREL CCPP, Vemagiri Daily Progress Report for Finishing Works in Control Building Sl. No. Description of work UOM 1 2 A Ground Floor at 25.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm B First Floor at 30.000m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm Painting Sqm C Second Floor at 35.500m Brickwork Cum Internal Plastering Sqm IPS Flooring Sqm A R Tilling Sqm Painting Sqm D Third Floor at 41.500m Brickwork Cum Internal Plastering Sqm Flooring Sqm Painting Sqm E Roof Slab at 48.450m Water Proofing- Primer Sqm Water Proofing- I Coat Sqm Water Proofing- II Coat Sqm Wearing Course Sqm F External Plastering External Plastering -Ist Coat Sqm nd External Plastering -II Coat Sqm
Description Brickwork Internal Plastering External Plastering IPS Flooring AR Tilling Water Proofing
Summary of Progress UOM Qty.(Jan) Cum 0 Sqm 0 Sqm 0 Sqm 0 Sqm 0 Sqm 0
10
11
12
Cum. Qty.(upJan) 0 0 0 0 0 0
13
14
15
16
17
18
19
20
21
25
Total Qty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Remark s
LARSEN &TOUBRO LIMITED 2X384 GREL ,CCPP, VEMAGIRI -II A AUDIT FILE 1 MOM 2 PROGRAMME FILE 3 AUDIT FILE 4 QUALITY OBJECTIVE FILE FILE 5 WORKMEN TRAINING 6 FILE LIST 7 CIVIL WORK PROCCESER 8 FIELD QUALITY PLANE B CONTROL BUILDING 1 ARCITECTURAL DRAWINGS 2 BBS 3 RCC DRAWINGS 4 M -BOOK 5 PROTOCALS Plastering Brick Work Ips Tiling Painting Water Proofing False ceiling False Flooring 6 RCC POUR CARD 7 PCC POUR CARD 8 REGISETERS Plastering Brick Work Painting Water Proofing 9 EXTRA -WORK C STG ,GTG #2,3 (TRANSFORMER YARD) 1 RCC DRAWINGS 2 BBS 3 PROTOCALS Plastering Brick Work Painting 4 M -BOOK 5 RCC POUR CARD 6 PCC POUR CARD 7 REGISETERS Plastering
Brick Work Painting D BFP BUILIDING #2,3 1 ARCITECTURAL DRAWINGS 2 RCC DRAWINGS 3 BBS 4 M -BOOK 5 PROTOCALS Plastering Brick Work Ips Tiling Painting Water Proofing 6 RCC POUR CARD 7 PCC POUR CARD 8 REGISETERS Plastering Brick Work Painting Water Proofing E STG,GTG FOUNDATION #2,3 1 FOUNDATION DRARINGS 2 GE DRAWINGS 3 BBS F STG,GTG GRDE SLAB #2,3 1 ARCITECTURAL DRAWINGS 2 RCC DRAWINGS 3 BBS 4 M -BOOK 5 PROTOCALS Plastering Brick Work Ips Tiling Painting 6 RCC POUR CARD 7 PCC POUR CARD 8 REGISETERS Plastering Brick Work Painting MIV (METERIAL ISSUE VOUCHER
G CW PIPELINE 2 RCC DRAWINGS 3 BBS 4 M -BOOK 5 PROTOCALS 6 RCC POUR CARD 7 PCC POUR CARD 8 REGISETERS 9 MIV (METERIAL ISSUE VOUCHER H COMPLETED BOOKS 1 M-BOOK 2 RCC POUR CARD 3 PCC POUR CARD 4 PROTOCALS Plastering Brick Work Ips Tiling Painting
Sl.no Description 1 Between A1 to A3 And E1 to E3 2 Between A3 to A4 And E3 to E4 Deduction of Opening Lift Machine -Room Stair Case Room Removable tiolet External Plastering North South West East Fire Wall SAT Coping Beam top
No
1 1 1 1
Sqm Sqm
12 6 4 4 1
parapet Wall
Sqm
Depth Quantity Remarks 440 101.2 -5.38 -36.25 -25 -9.4 465.18 1426.23 1237.46 1209.79 1209.79
372.14 1735.8
0.22 0.88