Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Transportation

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Microsoft Excel 12.0 Sensitivity Report Worksheet: [transportation.

xls]Sheet1 Report Created: 2/9/2012 9:19:52 PM

Adjustable Cells Cell $C$10 $D$10 $E$10 $C$11 $D$11 $E$11 Name Plant 1 NW Plant 1 WW Plant 1 EW Plant 2 NW Plant 2 WW Plant 2 EW Final Reduced Objective Allowable Allowable Value Cost Coefficient Increase Decrease 5 0 24 4 3.999999997 45 0 30 3.999999997 1E+30 0 4 40 1E+30 4 20 0 30 3.999999997 4 0 3.999999997 40 1E+30 3.999999997 10 0 42 4 1E+30

Constraints Cell $C$12 $D$12 $E$12 $F$10 $F$11 Name LHS NW LHS WW LHS EW Plant 1 LHS Plant 2 LHS Final Value 25 45 10 50 30 Shadow Price 30 36 42 -6 0 Constraint R.H. Side 25 45 10 50 50 Allowable Increase 20 5 20 20 1E+30 Allowable Decrease 20 20 10 5 20

Transportation Problem
Delivery cost per ton From/To Plant 1 Plant 2 NW 24 30 WW 30 40 EW 40 42 Supply constraints Supply <= 50 30 <= 50

Demand constraints

From/To Plant 1 Plant 2 LHS Demand Obj. func

NW 5 20 = 25

WW 45 0 45 = 45

EW 0 10 10 = 10

LHS

You might also like