TM 10 1670 305 23 and P
TM 10 1670 305 23 and P
TM 10 1670 305 23 and P
AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 NSN 1670-01-369-7914 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 NSN 1670-01-370-0752 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453 NSN 1670-01-468-9471
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. *This manual supersedes TM 10-1670-305-13&P, dated 30 JUNE 1995
TM 10-1670-305-23&P
WARNING SUMMARY
This warning summary includes general safety precautions and instructions that must be understood and applied during the operation and maintenance of this system/equipment to ensure personnel against injury, death, or long-term health hazards. A summary of safety and hazardous material warnings that should be heeded in conduct of operation and maintenance is provided below. W ARNING When attaching the power cable assembly to the AR2, always verify proper engagement of ball end of power cable with piston rod of AR2 by looking through transparent plastic cable seal retainer. Cable seal retainer and power cable seal must be present to ensure seating of power cable ball. If ball is not engaged with piston rod, or if cable seal retainer is missing, actuation of AR2 will fail to pull ripcord pins, which may result in death of parachutist. W ARNING If there is any indication of a leak in the aneroid, remove the AR2 from service. A leaking aneroid may cause a malfunction which may result in death of parachutist. W ARNING The altitude dial indicates thousands of feet above mean sea level (not above ground level). If the altitude dial is incorrectly set, two parachutes may deploy and become entangled, which may result in death of parachutist. W ARNING Do not move the JUMP/OFF switch to jump unless the (equivalent pressure altitude inside the) aircraft is at least 1,500 feet above the altitude set on the dial. It is imperative that the AR2 remains well above its actuation altitude at all times after the jump/off switch has been moved to jump. If there is a temporary reduction in aircraft altitude, and the AR2 switch is not recycled back to jump after again rising above the actuation altitude, the AR2 will actuate prematurely during the jump, possibly causing deployment of two parachutes which may become entangled, which may result in death of parachutist. W ARNING When the AR2 is used on the reserve parachute, the main parachute must be activated at an altitude high enough to obtain a fully deployed canopy at least 1,500 feet above the actuation altitude for the AR2. If the main parachute opens within only a few hundred feet of the AR2 actuation altitude, the AR2 may deploy the reserve parachute. The two parachutes may become entangled, which may result in death of parachutist.
TM 10-1670-305-23&P
W ARNING The JUMP/OFF switch must be set to OFF immediately after every jump. Setting the JUMP/OFF switch to OFF repositions the mechanism for the next jump and prevents inadvertent actuation on the ground or during transport. If the switch is left in JUMP position, the next jump will cause the AR2 to actuate prematurely. Two parachutes may deploy and become entangled, which may result in death of parachutist. W ARNING Model 452 test chamber and carrying case weighs 70 lbs. The mounting base with attached components weighs 50 lbs. Use two persons or lifting device when lifting to prevent injury to personnel. W ARNING Model 453 test chamber and carrying case weighs 60 lbs. The mounting base with attached components weighs 42 lbs. Use two persons or lifting device when lifting to prevent injury to personnel. W ARNING The heads of the air compressor and vacuum pump become hot with use and can cause burns to unprotected skin. Do not touch these components during operation or until they have been allowed to cool down after the test chamber has been switched off. W ARNING Do not move CLIMB/FALL/COCK switch on test chamber to cock unless AR2 JUMP/OFF switch is in the fully OFF position. Attempting to cock the mechanism with the switch in an intermediate position may damage internal components and render the AR2 inoperative. This will prevent deployment of a parachute and may result in death of parachutist. W ARNING If malfunctions of the rate of fall mechanism occur, or if actuation altitude deviates from the dial setting by more than the prescribed tolerance, a malfunction may occur, which may result in death of parachutist. W ARNING Do not open or remove screws of AR2 housing. No internal maintenance is authorized. Unauthorized disassembly may cause a malfunction which may result in death of parachutist. W ARNING The power housing (outer flexible metal casing) must be inspected for looseness between its convolutions. Looseness indicates either damage or a loss of interference fit between the outer housing and teflon liner, which maintains the housing length. Changes in housing length will affect the pulling stroke of the AR2 and could result in incomplete extraction of ripcord pins, which may result in death of parachutist. b
TM 10-1670-305-23&P
W ARNING Make sure the jump and off decals are replaced on the correct sides of the switch lever. Incorrectly placed decals will give a false indication of AR2 condition and may result in death of parachutist if the AR2 is used in a jump. W ARNING Be sure test chamber is disconnected from 110 VAC power before beginning disassembly to prevent injury to personnel.
c/d Blank
ARMY TM 10-1670-305-23&P AIR FORCE T.O. 14D2-11-1 MARINE CORPS TM 1670-23&P NAVSEA SS400-AY-MMO-010 CHANGE NO. 3 HEADQUARTERS, DEPARTMENT OF THE ARMY WASHINGTON, DC, 30 June 2006 TECHNICAL MANUAL UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS) AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 NSN 1670-01-369-7914 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 NSN 1670-01-370-0752 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453 NSN 1670-01-468-9471 DISTRIBUTION STATEMENT A. - Approved for public release; distribution is unlimited. TM 10-1670-305-23&P, 21 JUNE 2000, is updated as follows: 1. File this sheet in front of the manual for reference. 2. This change is a result of several user-requested changes in wording for maintenance and record keeping on the AR2. 3. New or updated text is indicated by a vertical bar in the outer margin of the page. 4. Remove old pages and insert new pages as indicated below: Remove Pages i-v/vi Blank A/B Blank Insert Pages i-v/vi Blank A/B Blank
5. Replace the following work packages with their revised version: Work Package Number WP 0008 00 WP 0018 00
ARMY TM 10-1670-305-23&P AIR FORCE T.O. 14D2-11-1 MARINE CORPS TM 1670-23&P NAVSEA SS400-AY-MMO-010 C-3
By Order of the Secretaries of the Army, Air Force and Navy (including the Marine Corps):
Official: GEORGE T. BABBETT General, USAF Commander, Air Force Materiel Command
D.G. MORRAL Rear Admiral, USN Program Executive Officer For Expeditionary Warfare Naval Sea Systems Command
DISTRIBUTION: To be distributed in accordance with initial distribution number (IDN) 256621 requirements for TM 10-1670-305-23&P.
TM 10-1670-305-23&P
CHANGE NO. 2
TECHNICAL MANUAL UNIT AND INTERMEDIATE DIRECT SUPPORT (DS) MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR AUTOMATIC RIPCORD RELEASE AR2, MODEL 451 (NSN 1670-01-369-7914) TEST CHAMBER ASSEMBLY AR2, MODEL 452 (NSN 1670-01-370-0752) ELECTRONIC TEST CHAMBER ASSEMBLY AR2, MODEL 453 (NSN 1670-01-468-9471)
DISTRIBUTION STATEMENT A: - Approved for public release; distribution is unlimited. TM 10-1670-305-23&P, 21 June 2000, is updated as follows: 1. File this sheet in front of the manual for reference. 2. This change implements Army Maintenance Transformation and changes the Maintenance Allocation Chart (MAC) to support Field and Sustainment Maintenance. 3. New or updated text is indicated by a vertical bar in the outer margin of the page. 4. Added illustrations are indicated by a vertical bar adjacent to the figure number. Changed illustrations are indicated by a miniature pointing hand adjacent to the updated area and a vertical bar adjacent to the figure number. 5. Remove old pages and insert new pages as indicated below: Remove Pages A/(B Blank) Sample 2028 Front/Back 2028 Front/Back 2028 Front/Back Insert Pages A/(B Blank) Sample 2028 Front/Back 2028 Front/Back 2028 Front/Back 2028 Front/Back
6. Replace the following work packages with their revised version: Work Package Number WP 0027 00 WP 0028 00
TM 10-1670-305-23&P C2
By Order of the Secretaries of the Army, Air Force, and Navy (including the Marine Corps):
Chief of Staff
Official:
SANDRA R. RILEY
General, USAF
Commander, Air Force Materiel Command
D.G. MORRAL Rear Admiral, USN Program Executive Officer For Expeditionary Warfare Naval Sea Systems Command
R.P. SHOCKEY
DISTRIBUTION: To be distributed in accordance with initial distribution number (IDN) 256621 requirements for TM 10-1670-305-23&P
TM 10-1670-305-23&P CHANGE NO. 1 HEADQUARTERS, DEPARTMENT OF THE ARMY WASHINGTON, DC, 31 JULY 2003 TECHNICAL MANUAL UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 NSN 1670-01-369-7914 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 NSN 1670-01-370-0752 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453 NSN 1670-01-468-9471 DISTRIBUTION STATEMENT A: - Approved for public release; distribution is unlimited. TM 10-1670-305-23&P, 21 JUNE 2000, is updated as follows: 1. File this sheet in front of the manual for reference. 2. This change is a result of several part number changes as well as the deletion of the Detachable Eye power cable for the Automatic Ripcord Release (AR2). 3. New or updated change information is indicated by a vertical bar in the outer margin of the page. 4. Remove old pages and insert new pages as indicated below: Remove Pages A/B Blank Title Page/Blank i/vi Blank Insert Pages A/B Blank i/ii Blank iii/vi Blank
5. Replace the following work packages with their revised version: Work Package Number WP 0001 00 WP 0002 00 WP 0007 00 WP 0008 00 WP 0009 00 WP 0014 00 Work Package Number WP 0016 00 WP 0019 00 WP 0025 00 WP 0026 00 WP 0027 00 WP 0030 00 Work Package Number WP 0031 00 WP 0032 00 WP 0033 00 WP 0034 00 WP 0036 00 WP 0041 00 Work Package Number WP 0042 00
TM 10-1670-305-23&P C1
By Order of the Secretaries of the Army, Air Force, and Navy (including the Marine Corps):
Official: GEORGE T. BABBETT General, USAF Commander, Air Force Materiel Command
D.G. MORRAL Rear Admiral, USN Program Executive Officer For Expeditionary Warfare Naval Sea Systems Command
DISTRIBUTION: To be distributed in accordance with initial distribution number (IDN) 256621 requirements for TM 10-1670-305-23&P .
TM 10-1670-305-23&P
INSERT LATEST CHANGED PAGES/WORK PACKAGES. DESTROY SUPERSEDED DATA. LIST OF EFFECTIVE PAGES/WORK PACKAGES NOTE: The portion of text affected by the changes is indicated by a vertical line in the outer margins of the page. Changes to illustrations are indicated by a vertical bar adjacent to the title. Zero in the Change No. column indicates an original page or work package. Dates of issue for original manual and changed pages / work packages are: Original Change 1 Change 2 21 June 2000 31 July 2003 31 August 2005 Change 3 30 June 2006
TOTAL NUMBER OF PAGES FOR FRONT AND REAR MATTER IS 28 AND TOTAL NUMBER OF WORK PACKAGES IS 42, CONSISTING OF THE FOLLOWING: Page/WP No. Front Cover a c/(d Blank) i/(ii Blank) iii v/(vi Blank) Chp 1 title page WP 0001 00 (4 pgs) WP 0002 00 (4 pgs) WP 0003 00 (8 pgs) WP 0004 00 (2 pgs) WP 0005 00 (6 pgs) WP 0006 00 (2 pgs) Chp 2 title page WP 0007 00 (8 pgs) WP 0008 00 (10 pgs) WP 0009 00 (14 pgs) WP 0010 00 (16 pgs) WP 0011 00 (2 pgs) WP 0012 00 (2 pgs) Chp 3 title page WP 0013 00 (2 pgs) WP 0014 00 (2 pgs) WP 0015 00 (4 pgs) Chp 4 title page WP 0016 00 (2 pgs) WP 0017 00 (2 pgs) WP 0018 00 (4 pgs) WP 0019 00 (6 pgs) WP 0020 00 (4 pgs) WP 0021 00 (8 pgs) WP 0022 00 (8 pgs) WP 0023 00 (6 pgs) Chp 5 title page WP 0024 00 (2 pgs) WP 0025 00 (6 pgs) Chp 6 title page Change No. 1 0 3 3 0 1 1 0 0 0 0 0 1 3 1 0 0 0 0 0 1 0 0 1 0 3 1 0 0 0 0 0 0 1 0 Page/WP No. WP 0026 00 (2 pgs) WP 0027 00 (4 pgs) WP 0028 00 (4 pgs) WP 0029 00 (8 pgs) WP 0030 00 (4 pgs) WP 0031 00 (4 pgs) WP 0032 00 (4 pgs) WP 0033 00 (2 pgs) WP 0034 00 (2 pgs) WP 0035 00 (2 pgs) WP 0036 00 (2 pgs) WP 0037 00 (2 pgs) WP 0038 00 (2 pgs) WP 0039 00 (2 pgs) WP 0040 00 (2 pgs) WP 0041 00 (2 pgs) WP 0042 00 (2 pgs) INDEX 1 INDEX 8 Back Cover Change No. 1 2 2 0 1 1 1 1 1 0 1 1 0 0 0 1 1 0 0
A/(B Blank)
*TM 10-1670-305-23&P AIR FORCE T.O. 14D2-11-1 NAVSEA SS400-AY-MMO-010 MARINE CORPS TM 1670-23&P
HEADQUARTERS, DEPARTMENT OF THE ARMY WASHINGTON, D.C., 21 June 2000 TECHNICAL MANUAL UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS) AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 NSN 1670-01-369-7914 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 NSN 1670-01-370-0752 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453 NSN 1670-01-468-9471
REPORTING ERRORS AND RECOMMENDING IMPROVEMENTS You can help improve this manual. If you find any mistakes or if you know of a way to improve the procedures, please let us know. ARMY - Mail your letter, DA Form 2028 (Recommended Changes to Publications and Blank Forms), located in the back of this manual direct to: Commander, US Army Tank-automotive & Armament Command, ATTN: AMSTA-LC-CECT, Kansas St., Natick, MA 01760. You may also submit your recommended changes via electronic mail or by fax. Our fax number is DSN 2565205 or commercial 508-233-5205. Our e-mail address is amssbriml@natick.army.mil. A reply will be furnished directly to you. AIR FORCE Reports by U.S. Air Force units should be submitted on AFTO Form 22, Technical Order Publication Improvement Report, and forwarded to the address prescribed above for the Army. An informational copy of the prepared AFTO Form 22 shall be furnished to SAALC/LDEAM, Kelly AFB, TX 78241-6421. NAVY Submit NAVSEA Form 4160/1 (REV 2-99) to Commander, NSDSA Code 5E30, NAVSURFCENDIV, 4363 Missile Way, Port Hueneme CA 93043-4307. A reply will be sent to you. MARINE CORPS Submit NAVMC Form 10772 to Commander, Life Cycle Management Center (Code 826), 814 Radford Blvd., Albany, GA 31704-0320. A reply will be sent to you.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. *This manual supersedes TM 10-1670-305-13&P, dated 30 June 1995
i/(ii Blank)
Change 3
TM 10-1670-305-23&P
TABLE OF CONTENTS WP Sequence No. WARNING SUMMARY CHAPTER 1 INTRODUCTORY INFORMATION WITH THEORY OF OPERATION General Information .............................................................................................................0001 00 Automatic Ripcord Release, Model 451, Equipment Description and Data .........................0002 00 Test Chamber Assembly, Equipment Description and Data ................................................0003 00 Automatic Ripcord Release, Model 451, Theory of Operation..............................................0004 00 Test Chamber Assembly, Theory of Operation.....................................................................0005 00 Supporting Data for Repair Parts, Special Tools, TMDE, and Support Equipment..............0006 00 CHAPTER 2 OPERATING INSTRUCTIONS Description and Use of Controls and Indicators....................................................................0007 00 Automatic Ripcord Release, Model 451, Operation Under Usual Conditions.......................0008 00 Test Chamber Assembly, Model 452, Operation Under Usual Conditions...........................0009 00 Electronic Test Chamber Assembly, Model 453, Operation Under Usual Conditions..........0010 00 Test Chamber Assembly, Model 452, Operation Under Unusual Conditions.......................0011 00 Electronic Test Chamber Assembly, Model 453, Operation Under Unusual Conditions......0012 00 CHAPTER 3 TROUBLESHOOTING PROCEDURES Troubleshooting Procedures, General Information ..............................................................0013 00 Troubleshooting Procedures ................................................................................................0014 00 Troubleshooting Procedures ................................................................................................0015 00 CHAPTER 4 UNIT MAINTENANCE INSTRUCTIONS Service Upon Receipt...........................................................................................................0016 00 Preliminary Checks and Adjustments ..................................................................................0017 00 Preventive Maintenance Checks and Service (PMCS)........................................................ 0018 00 Power Cable Assembly, Main/Reserve, Unit Maintenance...................................................0019 00 Automatic Ripcord Release, AR2, Jump/Off Switch Maintenance........................................0020 00 Test Chamber Assembly, Model 452, Unit Maintenance......................................................0021 00 Electronic Test Chamber Assembly, Model 453, Unit Maintenance.....................................0022 00 Preparation for Storage or Shipment ...................................................................................0023 00 CHAPTER 5 DIRECT SUPPORT MAINTENANCE INSTRUCTIONS Test Chamber Assembly, Model 452, Direct Support Maintenance ....................................0024 00 Electronic Test Chamber Assembly, Model 453, Direct Support Maintenance ...................0025 00 CHAPTER 6 SUPPORTING INFORMATION References ...........................................................................................................................0026 00 Maintenance Allocation Chart (MAC)....................................................................................0027 00 Maintenance Allocation Chart (MAC)....................................................................................0028 00 Repair Parts List and Special Tool List (RPSTL) .................................................................0029 00 Automatic Ripcord Release, Model 451, Repair Parts List ..................................................0030 00 Test Chamber Assembly, Model 452, Repair Parts List ......................................................0031 00 Electronic Test Chamber Assembly, Model 453, Repair Parts List .....................................0032 00
iii
Change 3
TM 10-1670-305-23&P
National Stock Number Index...............................................................................................0033 00 Part Number Index ...............................................................................................................0034 00 Components of End Items (COEI) and Basic Issue Items (BII) Introduction .......................0035 00 Automatic Ripcord Release, Model 451, Components of End Items (COEI) and Basic Issue Items (BII)....................................................................................................................0036 00 Test Chamber Assembly, Model 452, Components of End Items (COEI) and Basic Issue Items (BII) ............................................................................................................................0037 00 Electronic Test Chamber Assembly, Model 453, Components of End Items (COEI) and Basic Issue Items (BII)..........................................................................................................0038 00 Additional Authorization List (AAL) Introduction....................................................................0039 00 Expendable and Durable Items List Introduction .................................................................0040 00 Tool Identification List...........................................................................................................0041 00 AR2 Maintenance Log..........................................................................................................0042 00 Index .................................................................................................................................... Index 1
Change 3
iv
TM 10-1670-305-23&P
v/(vi Blank)
Change 3
TM 10-1670-305-23&P
CHAPTER 1 INTRODUCTORY INFORMATION WITH THEORY OF OPERATION FOR AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453
TM 10-1670-305-23&P
0001 00
Type of Manual: Operators Unit and Direct Support Maintenance Manual (including Repair Parts and Special Tool List). Model Numbers and Equipment names: Automatic Record Release, AR2, Model 451 Test Chamber Assembly, AR2, Model 452 Electronic Test Chamber Assembly, AR2, Model 453
Purpose of Equipment: The Automatic Ripcord Release. Model 451 (hereinafter referred to as AR2) automatically pulls the ripcord pins on a free falling parachute at a predetermined altitude. The Test Chamber Assembly, Model 452 and the Electronic Test Chamber Assembly, Model 453 are designed to test the AR2. Maintainer Qualifications: A maintainer must be certified by the USA QMC & S at Ft. Lee, VA in order to maintain the Automatic Ripcord Release, AR2, Model 451, Test Chamber Assembly, AR2, Model 452, and Electronic Test Chamber Assembly, AR2, Model 453. MAINTENANCE FORMS, RECORDS, AND REPORTS Reports of Maintenance and Unsatisfactory Equipment. Department of the Army forms and procedures used for equipment maintenance will be those prescribed in DA PAM 738-750. The Army Maintenance Management System (TAMMS) and DA PAM 738-751, The Army Maintenance Management System-Aircraft (TAMMLS-A). Reports of Packaging and Handling Deficiencies. Fill out and forward a Supply Discrepancy Report (SDR) , formerly known as a Report of Discrepancy (ROD) Standard Form 364 (SF 364) as prescribed in AR 735-11-2/DLAR 4140.55/SECNAVINST 4355.73A/AFR 400-54/MCO 4430.3J. Discrepancy in Shipment Report (DSR). Fill out and forward Discrepancy in Shipment Report (DSR) Standard Form 361 (SF361) as prescribed in AR 55-38/NAVUSPINST 4610.33C/AFR 7518, MCO P4610.19./DLAR 4500.15. Marine Corps Users-Marine Corps Forms and maintenance procedures used for equipment maintenance and reporting discrepancy/deficiencies are contained in TM 4700-15/1. Marine Corps organizations will use their local SOP and TM 4700-15/1 in performance of maintenance, record keeping, and reports on this equipment. For Product Quality Deficiency Reports (PQDR), Marine Corps users shall submit a Standard Form 368 (SF 368) in accordance with MCO 4855.10 to Life Cycle Management Center, ATTN: Product Support Section 822, 814 Radford Blvd., Albany, GA 31704-0320. A reply will be sent to you. REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIR) You can help improve this manual. If you find a mistake or if you know of a way to improve the procedures, let us know. ARMY - Mail DA Form 2028 (Recommended Changes to Publications and Blank Forms), or DA Form 2028-2 located in the back of this manual directly to: Commander, U.S. Army Soldier
0001 00-1
Change 1
TM 10-1670-305-23&P
0001 00
Biological and Chemical Command, ATTN: AMSSB-RIM-E(N), 15 Kansas Street, Natick, MA 01760. A reply will be furnished directly to you. AIR FORCE - Reports by US Air Force units should be submitted on AFTO Form 22, Technical Order Publication Improvement Report, and forwarded to the address prescribed above for the Army. An information copy of the prepared AFTO Form 22 shall be furnished to ALC/LDEAM, Kelly AFB, TX 78241 NAVY - Submit NAVSEA Form 4160/1 (REV 2-99) to Commander, NSDSA Code 5E30, NAVSURFCENDIV, 4363 Missle Way, Port Hueneme CA 93043-4307. A reply will be sent to you. MARINE CORPS - Submit NAVMC Form 10772 to Life Cycle Management Center, ATTN: Product Support Section 822, 814 Radford Blvd., Albany, GA 31704-0320. A reply will be sent to you. CORROSION PREVENTION AND CONTROL (CPC) Not Applicable DESTRUCTION OF ARMY MATERIAL TO PREVENT ENEMY USE Destruction of Army material to prevent enemy use shall be in accordance with TM 750-244-2. PREPARATION FOR STORAGE OR SHIPMENT Requirements for packaging and administrative storage are contained in Chapter 2. WARRANTY INFORMATION There is no warranty for the Automatic Ripcord Release AR2, Model 451, Test chamber Assembly, Model 452, or Electronic Test Chamber Assembly, Model 453. NOMENCLATURE CROSS REFERENCE LIST Common Name AR2 LIST OF ABBREVIATIONS AGL ALT AMP AR2 C CAGEC CHMBR COMP Cyl D DA Above Ground Level Altitude Ampere Automatic Ripcord Release Celsius Commercial and Government Entity Code Chamber Compressor Cylinder Depth Department of the Army Original Nomenclature Automatic Ripcord Release
Change 1
0001 00-2
TM 10-1670-305-23&P
GENERAL INFORMATION LIST OF ABBREVIATIONS ECP EMP F Fig ft FT MSL Ft/sec GFD H HCI Hz lbs LED MAC MSL No. NSN PIS P/N PMCS PSI Pwr ROD RPSTL Sec SMR Sol SRA Sup TDR TM U/M UOC VAC Vac W WP Engineering Change Proposal Electromagnetic Pulse Fahrenheit Figure Feet Feet Mean Sea Level Feet per second Ground Height Hardness Critical Item Hertz Pounds Light Emitting Diode Maintenance Allocation Chart Mean Sea Level Number National Stock Number Placed In Service Part Number Preventive Maintenance Checks and Services Pounds per Square Inch Power Report of Discrepancy Repair Parts and Special Tools List Second Source Maintenance Recoverability Solenoid Specialized Repair Activity Supply Transportation Discrepancy Report Technical Manual Unit of Measure Usable On Code Volts Alternating Current Vacuum Width Work Package
0001 00
SAFETY, CARE AND HANDLING Observe normal precautions to prevent any unit from being subjected to unusual jolts and dropping. CALIBRATION Calibration, testing and certification shall be performed at intervals specified in indicated work packages: Automatic Ripcord Release, Model 451 WP 0018 00. Test Chamber Assembly, Model 452 WP 0018 00
Change 1
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 EQUIPMENT DESCRIPTION AND DATA EQUIPMENT CHARACTERISTICS, CAPABILITIES AND FEATURES CHARACTERISTICS
0002 00
Senses rate-of-fall and altitude above mean sea level (MSL) (not above ground level (AGL). Altitude dial is graduated to permit settings from 500 feet to 25,000 feet. AR2 actuates when it falls through a preselected altitude at a fall rate of 80 ft/sec or greater. CAPABILITIES AND FEATURES Automatically removes ripcord pins on the parachute at a predetermined altitude. Designed to remove ripcord pins on the reserve parachute but can be used with main parachute. LOCATION AND DESCRIPTION OF MAJOR COMPONENTS The AR2 basically consists of an aneroid with associated mechanism, rate-of-fall sensing chamber, and a spring-loaded power cable. All components except the power cable and its flexible conduit are contained in a housing. The housing provides all required chamber, passages and mounting pads for each component. An altitude setting dial and JUMP/OFF switch are mounted on the housing. The power cables end in a fixed eye, which connects to the parachute ripcord pin. A lanyard assembly is attached to the power cable to protect the open end of the power housing when detached from the AR2.
0002 00-1
Change 1
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 EQUIPMENT DESCRIPTION AND DATA - CONT LOCATION AND DESCRIPTION OF MAJOR COMPONENTS - CONT
0002 00
Change 1
0002 00-2
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 EQUIPMENT DESCRIPTION AND DATA DIFFERENCES BETWEEN MODELS Upgraded units are marked ECP-8/ECP-13 on service record decal. EQUIPMENT DESCRIPTION Original Issue ECP-8/ECP-13 Upgrade EQUIPMENT DATA Operational Data Operating Range (altitude) Accuracy 1,500 (feet) to 25,000 (feet) above MSL + 300(feet) less than 10,000 feet above MSL + 500 feet at 10,000 feet or more above MSL NOTE Cable measurements are from center of ball to farthest distance inside the eye hole. Power Cable, Main Power Cable, Reserve Storage Cable Environmental Conditions Operational Altitude Temperature Storage Altitude Temperature Physical Characteristics Dimensions Weight 33.12 in. long 26.19 in. long 7.25 in. long ALTITUDE DIAL INCREMENTS 500 feet 250 Feet LEAK CHECK INDICATOR 6,000 feet 10,000 feet
0002 00
1,000 (feet) to 35,000 (feet) above MSL -60qF (-51qC) to +122qF (+50qC) -1,000 (feet) to 30,000 (feet) above MSL +41qF (+5qC) to +122qF (+50qC) 1.6 in. H x 5.2 in. W x 3.1 in. D 1.9 lbs (without power cable)
Change 1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY EQUIPMENT DESCRIPTION AND DATA EQUIPMENT CHARACTERISTICS AND FEATURES CHARACTERISTICS (ALL MODELS) Provides all equipment required to test the AR2. CAPABILITIES AND FEATURES
0003 00
Capable of testing the AR2 in the operating range of 1,500 (feet) to 25,000 (feet) above mean sea level (MSL). CAUTION Damage to internal components of the AR2 will occur if tested at rates of fall between 65 and 85 ft/sec. MODEL 452 May be set to a rate of fall between 10 and 200 ft/sec. MODEL 453 May be set to a rate of fall between 10 and 240 ft/sec except that rates between 65 and 85 ft/sec cannot be selected. LOCATION AND DESCRIPTION OF MAJOR COMPONENTS (MODEL 452) The test chamber basically consists of an air compressor, vacuum pump, altitude chamber with switch lever, lid and air cylinder, and a control assembly. All components are attached to a mounting base and are contained in a carrying case which also serves as the storage container. The control assembly consists of a pressure (PSI) gage, ALTITUDE CONTROL (vacuum) regulator, CLIMB/FALL/COCK switch, RAPID FALL dump switch, PRESSURE CONTROL regulator, indicator light, ON/OFF switch, fuse, and an altimeter (ALT) on the control housing. Inside the control housing are a power supply for the altimeter vibrator, a dump solenoid valve, climb solenoid valve, air cylinder solenoid valve and all required plumbing and wiring.
0003 00-1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY EQUIPMENT DESCRIPTION AND DATA - Cont LOCATION AND DESCRIPTION OF MAJOR COMPONENTS (MODEL 452) - Cont.
0003 00
0003 00-2
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY EQUIPMENT DESCRIPTION AND DATA LOCATION AND DESCRIPTION OF MAJOR COMPONENTS (MODEL 453)
0003 00
The test chamber basically consists of a vacuum pump/air compressor assembly, altitude chamber and control assembly. All components are attached to a mounting base and are contained in a carrying case which also serves as a storage container. The altitude chamber has a detector which senses the movement of the piston to the AR2. It is connected to the control assembly so that a Light Emitting Diode (LED) signals the instant the piston moves. It also has a provision for monitoring the position of the AR2 JUMP/OFF switch. The control assembly is a self-contained, independently calibrated, completely interchangeable, removable unit. This unit contains a precision calibrated pressure sensor, a printed circuit board containing the required signal conditioning and operating logic, digital displays incorporating a preprogrammed microprocessor for pressure-to-altitude conversions, pneumatic valves and regulators to control altitude chamber conditions, regulated power supplies to run associated electronic circuits and devices, and operational controls and indicator lights to perform and monitor the various test functions. Finally, a quick-disconnect port is incorporated into the control assembly to provide access to a master altimeter for verifying calibration of the electronic pressure sensor.
0003 00-3
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY EQUIPMENT DESCRIPTION AND DATA - Cont LOCATION AND DESCRIPTION OF MAJOR COMPONENTS (MODEL 453) Cont
0003 00
0003 00-4
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY EQUIPMENT DESCRIPTION AND DATA LOCATION AND DESCRIPTION OF MAJOR COMPONENTS (MODEL 453)
0003 00
0003 00-5
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY EQUIPMENT DESCRIPTION AND DATA - Cont EQUIPMENT CHARACTERISTICS, CAPABILITIES AND FEATURES EQUIPMENT DATA (MODEL 452) Operational Data Operating Range (Altitude) Reading Resolution (Altitude) Power Requirements Fuse Size Environmental Conditions Operational Altitude Temperature Storage Altitude Temperature Physical Characteristics Carrying Case Dimensions Weight Fully packed Chamber w/o case 12.2 in. H X 25.9 in. W X 19.2 in. D 70 lbs 50 lbs 0 (feet) to 30, 000 (feet) above MSL +41F(+5C) to +122F (+50C)
0003 00
1,000 (feet) to 35,000 (feet) above MSL 50 (feet) 110 VAC 60 Hz DIA x 1-1/4 slow blow 5 AMP 250 volt
0003 00-6
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY EQUIPMENT DESCRIPTION AND DATA EQUIPMENT CHARACTERISTICS, CAPABILITIES AND FEATURES EQUIPMENT DATA (MODEL 453) Operational Data Operating Range (Altitude) Reading Resolution (Altitude) Operating Range (Rate-of-fall) Reading Resolution (Rate-of-fall) Power Requirements Fuse Size Environmental Conditions Operational Altitude Temperature Storage Altitude Temperature Physical Characteristics Carrying Case Dimensions Weight Fully packed Chamber w/o case 12.2 in. H X 25.9 in. W X 19.2 in. D 60 lbs 42 lbs 0 (feet) to 35, 000 (feet) above MSL +41F(+5C) to +122F (+50C)
0003 00
1,000 (feet) to 35,000 (feet) above MSL 1 (foot) 10 (ft/sec) to 240 (ft/sec) 0.1 (ft/sec) 110 VAC 50/60 Hz DIA x 1-1/4 slow blow 5 AMP 250 volt
TM 10-1670-305-23&P
0004 00
The AR2 senses rate of fall and altitude above mean sea level (not above ground level). When the AR2 falls through the altitude set on the altitude dial at a rate of fall of over 80 ft/sec, the power cable will retract two inches (minimum) and at an initial force of 70 pounds. If the rate of fall is at a slower speed, such as 70 ft/sec, the AR2 will not actuate. When the AR2 is used on the reserve parachute, the main parachute must be fully deployed at least 1,500 feet above the actuation altitude for the AR2. While in free fall, if the main parachute opens within only a few hundred feet above the actuation altitude, the fall rate mechanism may not have sufficient time to equalize pressure and deactivate. This could result in the deployment of two parachutes, leading to problems associated therewith. If the fall is initiated below the altitude set on the altitude dial, the AR2 will definitely actuate, and generally within 1,000 feet of free fall.
TM 10-1670-305-23&P
0005 00
The test chamber components are arranged according to the schematic diagram. The air compressor supplies compressed air at 40 PSI. It is used to cock the AR2 being tested and provides controlled air pressure to the altitude chamber. The rate at which air is introduced into the altitude chamber controls the simulated rate-of-fall of the AR2. When in operation, if the air solenoid valve is opened by positioning the CLIMB/FALL/COCK switch to COCK, compressed air flows into the air cylinder and forces the piston to the right. This will cock the AR2. When the CLIMB/FALL/COCK switch is moved from the COCK position a vent in the solenoid valve allows the compressed air behind the piston to bleed off, thus enabling the AR2 to actuate under the appropriate conditions. Compressed air is also available to the PRESSURE CONTROL regulator, which controls the rate at which air is introduced into the altitude chamber. Outlet pressure from the PRESSURE CONTROL regulator is registered on the pressure (PSI) gauge. Air thus regulated passes through a restrictor and on into the altitude chamber. By controlling the pressure, the simulated rate of fall of the AR2 may be varied. The vacuum pump is connected to the altitude chamber through the ALTITUDE CONTROL regulator, which allows selection of any desired altitude up to 35,000 feet. When the CLIMB/FALL/COCK switch is moved to the CLIMB position, the climb solenoid valve opens. Turning the ALTITUDE CONTROL regulator knob allows selection of the desired altitude. Turning the knob counterclockwise will increase altitude. When the CLIMB/FALL/COCK switch is moved to the FALL position, the climb solenoid valve closes and the restrictor in the line from the PRESSURE CONTROL regulator allows controlled air pressure to enter the altitude chamber, causing the altitude to gradually decrease. The RAPID FALL dump switch (push button) controls the dump solenoid valve. When the RAPID FALL dump switch is pressed the dump solenoid valve opens, and air from the compressor is introduced directly into the altitude chamber for rapid descent. The ON/OFF switch controls power to both the air compressor and vacuum pump. When the air compressor and vacuum pump are running, the indicator light will illuminate. It will extinguish when the ON/OFF switch is positioned to OFF.
0005 00-1
TM 10-1670-305-23&P
0005 00
0005 00-2
TM 10-1670-305-23&P
0005 00
0005 00-3
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY THEORY OF OPERATION - CONT THEORY OF OPERATION (MODEL 453)
0005 00
The AR2 is installed inside the transparent altitude chamber during testing. The JUMP/OFF switch and piston rod of the AR2 engage fittings inside the chamber which enable the switch to be operated and the AR2 to be recocked after actuation without opening the chamber lid or returning the unit to ground level. The ON and OFF position of the JUMP/OFF switch are electrically monitored by magnetic sensors in the bottom wall of the chamber. An infrared LED emitter/detector switch mounted inside the air cylinder senses movement of the piston rod assembly at the instant the AR2 actuates. Signals from these sensors are transmitted to the control assembly through an electrical connector in the left side wall of the control assembly near the front. The combination vacuum pump/air compressor enables the operator to raise and lower the air pressure inside the sealed altitude chamber and thereby simulate the entire functional altitude range of the AR2. The compressor also provides regulated pressure to the air cylinder to cock the mechanism of the AR2. The necessary pneumatic plumbing connections between the pump/compressor unit, control assembly, and altitude chamber are located along the bottom left side wall of the control assembly. Power for the pump/compressor is supplied through a separate electrical connector, also located in the left side wall of the control housing. Routing and connections for all external electrical wiring and pneumatic plumbing are shown in schematics. The control assembly is a self-contained, independently calibrated, completely interchangeable modular unit. It contains a precision calibrated pressure sensor, a printed circuit board incorporating signal conditioning and complete system operating logic, digital displays which feature a preprogrammed microprocessor for making pressure-to-altitude conversion, pneumatic valve and regulators to control altitude, regulated power supplies to run associated electronic circuits and devices, and operational controls and indicator lights to perform and monitor the various test functions. A quick disconnect port is located in the front wall of the control assembly to permit attachment of a precision pressure standard during periodic altimeter calibration. A separate auxiliary chamber used for calibrating wrist altimeters may also be connected through this port. WP 0007 00 shows the configuration of the control panel. The altitude and fall rate displays are placed at the upper left with their respective setting controls at the right. The chamber can simulate altitudes greater than 35,000 feet MSL. The fall rate may be set to any value between approximately 10 and 240 feet per second, except that rates between 65 and 85 feet per second cannot be selected because actuation at these rates will cause increased wear to internal components of the AR2. The altitude display reads to the nearest foot, and the fall rate display reads to the nearest 0.1 foot per second with positive values indicating a descent and negative values indicating a climb. Although the displays are updated approximately two times per second, the internal circuitry of the altimeter is designed to instantaneously capture and hold the pressure sensor signal as soon as piston rod movement is detected by the infrared switch. The altitude corresponding to this pressure is then locked in and displayed as the actuation altitude at the next update interval. Six (6) push button controls and seven (7) indicator lights are located on the control panel. In addition to their primary functions, several of the controls are provided with interlocking logic circuitry to preclude operations which are out of sequence or which might damage the AR2. The description and function of the controls and lights are summarized in WP 0007 00.
0005 00-4
TM 10-1670-305-23&P
0005 00
TM 10-1670-305-23&P
SUPPORTING DATA FOR REPAIR PARTS, SPECIAL TOOLS, TMDE AND SUPPORT EQUIPMENT REPAIR PARTS
0006 00
Repair parts for the Automatic Ripcord Release, Model 451, Test Chamber Assembly, Model 452, and Electronic Test Chamber Assembly, Model 453, are listed and illustrated in WP 0030 00 SPECIAL TOOLS, TMDE AND SUPPORT EQUIPMENT Special tools and support equipment for the Automatic Ripcord Release, Model 451, Test Chamber Assembly, Model 452, and Electronic Test Chamber Assembly, Model 453, are listed in WP 0028 00.
TM 10-1670-305-23&P
CHAPTER 2 OPERATING INSTRUCTIONS FOR AUTOMATIC RIPCOR RELEASE, AR2, MODEL 451 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453
TM 10-1670-305-23&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS AUTOMATIC RIPCORD RELEASE, MODEL 451
0007 00
KEY 1 2 3 4
CONTROL OR INDICATOR Altitude Dial Warning Decal JUMP/OFF Switch Aneroid Leak Indicator
FUNCTION OR USE Allows preselection of altitude at which AR2 will actuate. Provides warning to operator. When set to JUMP, AR2 will become armed. Indicates local ground altitude when the Altitude Dial is set to at least 3,000 feet above the local altitude. Indicates modification and overhaul on unit.
0007 00-1
Change 1
TM 10-1670-305-23&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS - CONT TEST CHAMBER ASSEMBLY, MODEL 452
0007 00
Change 1
0007 00-2
TM 10-1670-305-23&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS TEST CHAMBER ASSEMBLY, MODEL 452 KEY 1 2 3 4 5 6 7 8 CONTROL OR INDICATOR Altimeter Fuse ON/OFF switch Indicator light PRESSURE CONTROL regulator WARNING decal RAPID FALL dump switch CLIMB/FALL/COCK switch
0007 00
FUNCTION OR USE Indicates altitude inside chamber. Protects test chamber from electrical overload. Controls electrical power to the test chamber. Lights when test chamber is powered up. Controls rate of fall. Operational warning. Actuates altitude chamber dump solenoid to quickly reach sea level. Actuates solenoids to change altitude chamber conditions. CLIMB: Opens climb solenoid so that chamber altitude setting can be made. FALL: Closes climb solenoid so that controlled air pressure enters the chamber, causing gradual decrease in altitude in chamber. COCK: Opens air solenoid to cock AR2 under test. Identifies test chamber. Provides information on rate of fall during testing. Contains testing control components. Used to set altitude inside chamber. Indicates relative rate of fall. Operates AR2 JUMP/OFF switch when AR2 is enclosed in altitude chamber. Allows access to altitude chamber. Provides identification of electrical connectors (mounted inside control assembly housing panel). Aligns AR2 and altitude chamber piston rod.
9 10 11 12 13 14 15 16
Identification decal Functions decal Control assembly Altitude control regulator Pressure gage (PSI) Altitude chamber switch lever Altitude chamber lid Connections schematic decal
17
Cocking support
0007 00-3
Change 1
TM 10-1670-305-23&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS - CONT ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453
0007 00
Change 1
0007 00-4
TM 10-1670-305-23&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453
0007 00
0007 00-5
Change 1
TM 10-1670-305-23&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS - CONT ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 CONT KEY 1 2 3 4 5 6 CONTROL OR INDICATOR Altitude Chamber Switch Lever Altitude Chamber Lid Cocking Support SET ALTITUDE control SET FALL RATE control ALTITUDE DWELL indicator FUNCTION OR USE
0007 00
Operates AR2 automatic ripcord release JUMP/OFF switch when AR2 is enclosed in altitude chamber. Allows access to altitude chamber. Aligns AR2 and altitude chamber piston rod. Use to set altitude in test chamber. Use to set fall rate. Blinks continuously while the chamber is gaining altitude and during the time while the AR2 is stabilizing. When sufficient time at altitude has elapsed, the indicator will stop blinking and remain steadily illuminated, signifying that the test may be initiated. The indicator goes out when a valid FALL command is given. Pressing this switch causes the chamber to climb to the set altitude. As this altitude is reached, the fall-rate value will decrease to zero. The switch will function with the chamber vented, but the chamber will not be able to gain altitude until the DUMP circuit is disengaged. Becomes steadily illuminated when a valid FALL command is given. It remains illuminated while the test is in progress and after the AR2 actuates. It extinguishes when the GO TO ALTITUDE AND DWELL control is pressed. Pressing this switch initiates the test. Because of interlocks built into the system, however, the switch will not function unless the AR2 has been recocked, the displays have been reset, sufficient dwell time at altitude has elapsed, the Jump switch has been set to ON and no other indicators are blinking or illuminated except the JUMP SWITCH ON indicator. Depressing and holding this switch recocks the AR2 after an actuation. Its function may be verified by observing the movement of the piston rod through the lid of the altitude chamber. Interlocks in the system prevent this switch from functioning unless the AR2 is in the actuated condition and the JUMP/OFF switch is set to OFF. This indicator remains steadily illuminated whenever the AR2 JUMP/OFF switch is in the fully OFF position.
FALL switch
10
11
Change 1
0007 00-6
TM 10-1670-305-23&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS KEY 12 CONTROL OR INDICATOR JUMP SWITCH ON indicator FUNCTION OR USE
0007 00
This indicator remains steadily illuminated whenever the AR2 JUMP/OFF switch is in the fully JUMP position. Its color, green, matches that on the AR2 JUMP/OFF switch and signifies that the AR2 is prepared for the test. The FALL switch will not function unless this indicator is illuminated. Once the fall has been initiated, however, the JUMP/OFF switch may be returned to the OFF position without affecting the test. The AR2 will not actuate with the JUMP/OFF switch OFF. When this switch is depressed, the displays show the altitude and fall rate to which the chamber has been adjusted. As long as the button is held down, the values displayed on the meters are the set values. When the button is released, the meters display the presently existing chamber conditions. This switch will function at any time (even during a fall) except when the displays are locked. This indicator blinks continuously only while the HOLD DOWN TO SET switch is depressed. Pressing this switch vents the chamber to rapidly return to ambient altitude. This switch has a latching mechanism which keeps it locked in the on (CHAMBER VENTED) position until it is pressed again. This indicator blinks continuously whenever the DUMP circuit is engaged. This switch clears the values locked into the displays from the previous actuation. To prevent inadvertent loss of data, the switch will not function until after the AR2 has been recocked. This indicator becomes illuminated at the instant the AR2 actuates and blinks continuously while the displays are in the locked condition. It goes out when the RESET DISPLAYS switch is pressed, provided the correct conditions are present to reset the meters. This indicator displays fall rate. This indicator displays altitude. Use to turn unit ON and OFF. Protects circuitry in Control Assembly. Use to connect calibration standard to control assembly. Identifies Model 453 Electronic test chamber Assembly. Identifies control assembly and adjustment screws. Contains testing control components. Use to lift test chamber.
13
14 15
16 17
18
19 20 21 22 23 24 25 26 27
FALL RATE (FT/SEC) display ALTITUDE (FT MSL) display ON/OFF switch Fuse, 5 AMP, slow blow Calibration port Identification decal Control Assembly decal Control Assembly Lifting Handle
Change 1
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS SHELTER REQUIREMENTS
0008 00
The AR2 should be stored and tested in a building that meets storage requirements outlined in TM 10-1670-201-23, T.O. 13C-1-41, or NAVAIR 13-1-17, at an altitude of 0 feet to 30,000 feet above MSL with temperature controlled between +41F (+5C) to +122F (+50C). ASSEMBLY AND PREPARATION FOR USE The AR2 and power cables are shipped in separate multi-unit packages. Check for open, damaged, or dented package or evidence of dampness. Open packages. Remove and count AR2 and power cables. Compare count to shipping manifest. Check for missing components, including damaged or missing decals. CAUTION Move the JUMP/OFF switch between the two detent positions only. Do not force the switch past either detent position. This may damage internal components of the AR2 and cause a malfunction. Check that JUMP/OFF switch is secure and does not bind when operated. Check whether AR2 was packed with a storage cable and piston rod cap installed. Check that power cable has a lanyard assembly installed. 1. Remove AR2 storage cable (1) and piston rod cap (3). The AR2 is supplied with a short storage cable to permit relaxation of the power springs during long periods of nonuse. The storage cable is fitted with an eye (2) of similar configuration to that of the power cable. The piston rod cap provides protection for the end of the piston rod on a cocked unit. The storage cable and piston rod cap must be removed prior to testing. Remove storage cable as follows:
a.
Ensure that the AR2 JUMP/OFF switch is OFF. NOTE It requires approximately 70 pounds of pull to cock the AR2.
b.
Secure the AR2. Use a screwdriver or other suitable tool, inserted through eye (2) of storage cable to form a T-handle. Pull eye (2) of storage cable (1) until mechanism reaches the cocked position and storage cable remains extended.
0008 00-1
Change 3
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT ASSEMBLY AND PREPARATION FOR USE - CONT
0008 00
c.
Remove storage cable (1) and piston rod cap (3) by unscrewing piston rod cap and disengaging ball of storage cable from recess in piston rod. Visually inspect the storage cable for damage to the end fittings and for fraying of the cable or broken strands of wire. Remove from service any storage cable exhibiting damage. Do not discard serviceable storage cables. The storage cable should be used to relax the power springs of the AR2 if it will not be used within 120 days. Unless the AR2 is to be immediately placed in the test chamber, reattach the piston rod cap (3) to the unit to protect the end of the piston rod from external forces or impacts.
d.
e.
f.
Change 3
0008 00-2
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT ASSEMBLY AND PREPARATION FOR USE 2.
0008 00
A Jump Log Record shall be maintained for each AR2 placed in service. If an AR2 has been upgraded to ECP 8 or upgraded to ECP 13 or is overhauled and put back in service, a new Jump Log Record shall replace the original one and be maintained for the AR2. Upgrades to ECP 8 and ECP 13 and overhauls are identified on the AR2's service record" decal. Refer to additional PMCS, WP 0018 00. a. All parachute jumps with the AR2 must be recorded in an altered individual Army Parachute Log Record (DA Form 3912). b. Alteration of the Army Parachute Log Record and subsequent entries will be accomplished as follows:
(1) (2)
On the front cover, after "ARMY PARACHUTE LOG RECORD", add "AR2". In the "JUMP, INSPECTION, AND REPACK DATA" page, make the following changes:
(a) (b)
In the heading, cross out "REPACK". Cross out the heading "BAG NUMBER" and enter "AR2 DIAL SETTING".
On the inside of the front cover, enter the individual AR2 serial number, type, the most recent date of manufacture or date of upgrade to ECP 8 or date of upgrade to ECP 13 or date of overhaul, manufacturer, contract number, station, unit and date placed in service. On the "INSPECTION DATA" page, enter the date of the test, the altitude setting on the AR2 and the number of the jump.
(2)
Cut a 36-inch length of tape lacing and tying and double the lacing length_ Pass looped ends of doubled lacing length around centerfold of Log Record and form a slip loop on outside at Log Record top. Pass lacing length running ends through corner attaching hole from front cover of Log Record_ Ensure running ends are routed over that part of the lacing length located along the Log Record centerfold. Complete attachment tie by making a Y2 hitch on top of the slip loop previously made in step (2). Pass the loose ends of the cord length around power cable housing at a point adjacent to power housing retainer.
(3)
(4)
(5)
0008 00-3
Change 3
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT
0008 00
ASSEMBLY AND PREPARATION FOR USE CONT (6) Secure cord ends to cord length with three alternating half-hitches and an overhand knot in each tie end. 3. Maintenance Log Record shall be maintained for each AR2 placed in service. If an AR2 has been upgraded to ECP 8 or upgraded to ECP 13 or is overhauled and put back into service, a new Jump Log Record shall replace the original one and be maintained for the AR2. Upgrades to ECP 8 and ECP 13 and overhauls are identified on the AR2's "service record" decal. Refer to additional FMCS, WP 0018 00. a. Test results must be recorded on the local form (reproducible) contained in WP 0042 00. There is room on each form for three (3) test series. The interval between tests may be determined by the number of jumps (50) or by time since the last test (120 days), whichever comes first, or if there is a possibility that the AR2 was damaged or malfunctioned. b. Record Information as follows: (1) Record the AR2 serial number and date placed in service in the assigned spaces. If the date placed in service is more than 3 years after the date of manufacture (new unit) or more than 3 years after the date of upgrade to ECP 8 or date of upgrade to ECP 13 or date of overhaul, record that date directly above the date placed in service. In such cases, 7 years from that date placed into service, the AR2 is to be taken out of service and returned to the manufacturer for overhaul (instead of 4 years from the date the new AR2 was put into service). (2) Record the date of the test and the cumulative number of jumps in the assigned blocks. The cumulative number of jumps is determined by taking the number of jumps since the last test (obtained from the Jump Log Record) and adding this number to the previous cumulative number of jumps. Note that when the unit is first placed into service, the cumulative number of jumps will be zero. (3) Enter the result of each test in the assigned space as the test is completed. If tests are repeated for any reason, such as an error in test procedure, record only the final result, but be sure to also record the total number of actuations. (4) Enter the cumulative number of actuations in the assigned block. The cumulative number of actuations is determined by adding the number of actuations in the just completed test, together with any actuation noted in the Jump Log Record since the last test, to the previous cumulative number of actuations. Note that when the unit is first placed into service, the cumulative number of actuations will be the total number of actuations completed in the In-Service test. (5) Note any unusual occurrences or conditions in the remarks space. (6) Enter the date and signature of the tester in the assigned spaces. 4. Installation of the AR2.
Change 3
0008 00-4
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT
0008 00
Detailed instructions for installation of the AR2, AR2 pocket, and power cable assemblies are given in TM 10-1670-287-23&P or service specific parachute packing manual. OPERATING PROCEDURES CAUTION The power cable and power housing must be inspected if the AR2 was actuated prior to preparation for operation. 1. Perform pre-operational FMCS procedures before operating the AR2 (WP 0018 00). 2. Verify that the JUMP/OFF switch is in OFF position and that AR2 has been cocked at installation. WARNING If there is any indication of a leak in the aneroid, remove the AR2 from service. A leaking aneroid may cause a malfunction, which may result in death of parachutist. Check the AR2s for aneroid leakage at ground level before every jump. The yellow indicator should indicate the local ground altitude when the altitude dial is set to an altitude at least 3,000 feet above the local altitude. Example: If local ground elevation is 500 feet above mean sea level, and the altitude dial is set at 3,500 feet or above, the yellow indicator should be approximately half way between the mean sea level mark and the 1,000-feet mark. If there is a leak in the aneroid, the yellow indicator will show some altitude above 500 feet, such as 2,000 or 3,000 feet or higher.
Note: Original issue AR2s have graduations between sea level and 6,000 feet only. Figure 2. Aneroid Leak Indicator Window (ECP-8/ECP-13 Upgrade Version).
0008 00-5
Change 3
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT OPERATING PROCEDURES CONT WARNING
0008 00
The altitude dial indicates thousands of feet above mean sea level (not above ground level). If altitude dial is incorrectly set, two parachutes may deploy and become entangled, which may result in death of parachutist.
3. Before jumping, verify that altitude dial is set at desired setting. WARNING Do not move the JUMP/OFF switch to jump unless the equivalent pressure altitude inside the aircraft is at least 1,500 feet above the altitude set on the dial. It is imperative that the AR2 remains well above its actuation altitude at all times after the jump/off switch has been moved to jump. If there is a temporary reduction in aircraft altitude, and the AR2 switch is not recycled back to jump after again rising above the actuation altitude, the AR2 will actuate prematurely during the jump, possibly causing deployment of two parachutes which may become entangled, which may result in death of parachutist. CAUTION Move the JUMP/OFF switch between the two detent positions only. Do not force the switch past either detent position. This may damage the internal mechanism of the AR2 and cause a malfunction. NOTE If the dial setting must be changed in flight set the AR2 JUMP/OFF switch to OFF and reset the dial. Do not set the JUMP/OFF switch back to JUMP until the equivalent pressure altitude inside the aircraft is at least 1,500 feet above the new altitude dial setting. 4. Move JUMP/OFF switch to JUMP. Verify that switch is all the way over to detent position.
Change 3
0008 00-6
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT OPERATING PROCEDURES CONT WARNING
0008 00
When the AR2 is used on the reserve parachute, the main parachute must be activated at an altitude high enough to obtain a fully deployed canopy at least 1,500 feet above the actuation altitude for the AR2. If the main parachute opens within only a few hundred feet of the AR2 actuation attitude, the AR2 may deploy the reserve parachute. The two parachutes may become entangled, which may result in death of parachutist. WARNING The JUMP/OFF switch must be set to OFF immediately after every jump. Setting the JUMP/OFF switch to OFF repositions the mechanism for the next jump and prevents inadvertent actuation on the ground or during transport. if the switch is left in JUMP position, the next jump will cause the AR2 to actuate prematurely. Two parachutes may deploy and become entangled, which may result in death of parachutist. 5. After completing the jump, move the JUMP/OFF switch to OFF. Verify that switch is in the detent position. 6. With the JUMP/OFF switch in the OFF position, prepare the AR2 for the next jump by repeating steps 1 through 4. 7. After every jump and /or repack of the main chute the rigger is to inspect cable extension length with the slack checker as follows:
0008 00-7
Change 3
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT OPERATING PROCEDURES CONT
a.
0008 00
The parachute system must have an AR2 and power cable assembly correctly installed and routed to the reserve parachute. Ensure that the position of the AR2 in the pocket is the same as when worn by a jumper. Open top flap of parachute to expose the reserve ripcord pins. cable from the right side so the cable slips into the curved groove between the metal head and plastic handle. Engage the two contact points on the hooked end of the slack checker with the mouth of the end fitting of the power cable housing. The slack checker should be held flat against the parachute pack. The two contact points must be engaged at all times to ensure proper inspection.
b.
c. Refer to Figure 3. Slide the metal head of the slack checker under the power
d. Refer to Figure 4. Grasp the slack checker with the right hand, palm down, and
with the thumb pressed into the curved recess. Grasp the swaged section of the ripcord pin with left hand. Simultaneously rotate the slack checker and ripcord pin in the directions shown by the arrows. Hold the ripcord pin with the left hand in a fixed position when it becomes horizontally aligned.
e. Apply force as necessary to rotate the slack checker until all of the slack in the
power cable has been taken up. Ensure that the pin does not slip out of the closing loop of the parachute. Note the position of the swaged end of the power cable eye with respect to the index surface on the slack checker: (1) Refer to Figure 5. If the power cable assembly is correctly routed and installed, and has not been damaged, the end of the eye should not extend past the index surface.
WARNING Any amount of extension past the index surface may mean the ripcord pins will not be pulled, which may result in death of parachutist. (2) Refer to Figure 6. If the end of the eye does extend past the index surface, then something is wrong with the cable routing, or the power housing (conduit) may be damaged. The power cable assembly should be removed from service immediately. The rigger shall record satisfactory completion of inspection with the slack checker in the main parachute log record book (DA Form 3912). The slack checker test will be annotated in the JUMP, INSPECTION AND REPACK DATA section, in the area marked BAG NUMBER as follows: "SC Test PASS/FAIL".
Change 3
0008 00-8
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT
0008 00
OPERATING PROCEDURES
0008 00-9
Change 3
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 OPERATION UNDER USUAL CONDITIONS CONT DECALS AND INSTRUCTION PLATE
0008 00
SERVICE RECORD decal provides a place to record service record of the AR2. (For locations, refer to WP 0007 00).
WARNING Operator warning decal provides warning to the operator (for location, refer to WP 0007 00).
PREPARATION FOR MOVEMENT Whenever the AR2 is not attached to the power cable assembly or being tested, the piston rod cap shall be installed.
Change 3
0008 00-10
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS SITING REQUIREMENTS
0009 00
The test chamber requires bench space approximately 36 inches wide by 30 inches deep with a 110 VAC, 60 Hz power source within six feet of the unit. SHELTER REQUIREMENTS The test chamber shall be contained in a building that meets storage requirements outlined in TM 10-1670-201-23, T.O. 13C-1-41, or NAVAIR 13-1-17, with an altitude between 0 (feet) to 30,000 (feet) above MSL. Temperature shall be between +41qF (+5qC) and +122qF (+50qC). ASSEMBLY AND PREPARATION FOR USE The test chamber assembly carrying case is designed for movement and storage and no external packaging is required. WARNING Test chamber and carrying case weighs 70 lbs. The mounting base with attached components weighs 50 lbs. Use two persons or lifting device when lifting to prevent injury to personnel. Open test chamber assembly case cover. Lift and remove test chamber from carrying case (WP 0003 00). Place test chamber on work bench. Check for loose or missing attaching hardware or decals. Insure that all adjustable knobs and switches are present and operate without binding. Check for broken glass on test chamber control assembly gages. Check for damage to altitude chamber gasket. Retain carrying case for future movement of unit. Report any discrepancies on a Supply Discrepancy Report (SDR), formerly known as a SF 364 Report of Discrepancy (ROD). INITIAL ADJUSTMENT BEFORE USE CAUTION Do not transport or store AR2 without piston rod cap or power cable attached. External forces or impacts applied to the piston rod may cause unit to malfunction. Any AR2 subjected to external forces or impact must be tested and, if necessary, removed from service. Do not operate test chamber while in the carrying case. Components will overheat and may become damaged. NOTE To obtain correct rate-of-fall data, always install an AR2 in the altitude chamber before testing.
0009 00-1
Change 1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS CONT INITIAL ADJUSTMENT BEFORE USE - CONT
0009 00
Change 1
0009 00-2
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS INITIAL ADJUSTMENT BEFORE USE NOTE Ensure that the test chamber is in calibration (WP 0018 00). 1. Mount a AR2 test unit in the test chamber as follows:
0009 00
a. Verify that the AR2 test unit (3) is in the cocked condition, and the AR2 JUMP/OFF switch is in the OFF position. b. Remove the storage cable and piston rod cap from the AR2 (WP 0008 00). WARNING The heads of the air compressor and vacuum pump become hot with use and can cause burns to unprotected skin. Do not touch these components during operation or until they have been allowed to cool down after the test chamber has been switched off. NOTE The barometric pressure adjustment setting on the altimeter shall always remain at 29.92. c. Open altitude chamber lid (1). NOTE A specific dial setting for the AR2 is not required to conduct this test. NOTE It may be necessary to push the air cylinder rod (12) in or out to attach the piston rod of the test unit. d. Insert test unit into altitude chamber ensuring that the AR2 JUMP/OFF switch is aligned with the altitude chamber switch lever (2); use the cocking support (13) to align AR2 with air cylinder rod (12). e. Slightly raise the test unit to align the ball on air cylinder rod (12) with the recess in the piston rod of the test unit where the ball of the power cable connects. f. Close altitude chamber lid (1). NOTE Leave the AR2 JUMP/OFF switch in the OFF position at all times during these tests.
0009 00-3
Change 1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS - CONT INITIAL ADJUSTMENT BEFORE USE CONT
0009 00
2. Verify that ON/OFF switch (5) of the test chamber is in OFF position and CLIMB/FALL/COCK switch (8) in FALL position (centered). 3. Plug power cord (16) into 110 VAC outlet. NOTE Record test data on maintenance log (WP 0042 00). CAUTION To avoid damaging the test chamber do not switch the test chamber on/off switch to on while the air compressor or vacuum pump is under load (while the altitude chamber is under vacuum or the air cylinder is pressurized). If it has recently been used, wait one to two minutes for pressure trapped in the system to bleed off. 4. Position ON/OFF switch (5) on test chamber to ON. The indicator light (6) will illuminate, and the air compressor and vacuum pump will start. When switching the test chamber ON, immediately look under the transparent altitude chamber at the ends of both air compressor and vacuum pump to ensure that the cooling fans are spinning on both units. If either fan is not spinning, immediately cycle the CLIMB/FALL/COCK switch (8) between FALL and COCK until the fans spin. Move the CLIMB/FALL/COCK switch (8) on test chamber to CLIMB position and adjust the altitude control regulator (14) to an altitude of 6,500 feet. NOTE Pressure vs. rate of fall varies greatly with altitude; as altitude increases, the rate of fall will also increase for a given pressure reading on the gauge. To be sure of the exact rate of fall, always check it with a stop watch over the 1,000-foot interval from 500 feet above to 500 feet below the dial setting of the AR2. NOTE Check pressure vs. rate of fall values shown on FUNCTIONS decal once each hour with a stop watch to verify accuracy. These checks should be conducted between 6,000 and 5,000 feet simulated altitude with a barometric pressure adjustment of 29.92 on the altimeter. Values shown on the FUNCTIONS decal correspond approximately to rate of fall indicated thereon. The AR2 rate-of-fall mechanism senses rate of pressure change (PSI/sec), which corresponds to its rate of fall. To obtain correct rate-of-fall data, always install an AR2 in the altitude chamber before testing. NOTE It is not necessary to wait for the AR2 to stabilize since these checks do not result in actuation.
Change 1
0009 00-4
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS INITIAL ADJUSTMENT BEFORE USE
0009 00
5. Turn the PRESSURE CONTROL regulator (10) on the test chamber fully counterclockwise to its stop. NOTE If the test chamber will not maintain altitude, there is a leak in the pneumatic system. Ensure that compression nuts are hand tight and that the altitude chamber gasket is not damaged. DO NOT USE WRENCHES. If the chamber still does not maintain altitude, send it back to depot for repair. 6. Move the CLIMB/FALL/COCK switch (8) on the test chamber to FALL position. Verify that the altitude reading remains at 6,500 feet or that it falls less than 100 feet in ten seconds. 7. Move the CLIMB/FALL/COCK switch (8) to CLIMB. 8. Turn the PRESSURE CONTROL regulator (10) on the test chamber clockwise to obtain 15 PSI on the PRESSURE GAGE (11). 9. Move the CLIMB/FALL/COCK switch (8) on the test chamber to FALL and, using a stopwatch, record the time it takes for the altimeter to fall from 6,000 to 5,000 feet. 10. Calculate the rate of fall in ft/sec by dividing 1,000 by the stopwatch time. Using an erasable marker, soft pencil, or other suitable instrument, transfer the pressure value from the PRESSURE GAGE (11) and the rate of fall to the appropriate spaces on the FUNCTIONS decal (9) on the test chamber. 11. Move the CLIMB/FALL/COCK switch (8) to CLIMB. 12. Change the reading on the PRESSURE GAGE (11) to a higher or lower value as required. 13. Repeat steps 9 through 12 as required to obtain rate of fall information within the desired range. CAUTION To protect altimeter from damage, do not press rapid fall dump switch at altitudes greater than 25,000 feet. 14. Move CLIMB/FALL/COCK switch (8) to FALL, and increase pressure in altitude chamber to ambient by holding down on RAPID FALL DUMP switch (7). 15. Position test chamber ON/OFF switch (5) to OFF. 16. Open lid (1) of altitude chamber and remove AR2 (3). 17. Prepare AR2 for storage or movement (WP 0023 00). 18. Altimeter calibration. If altimeter (4) calibration is required, refer to (WP 0021 00 for removal and replacement.
0009 00-5
Change 1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS - CONT OPERATING PROCEDURE NOTE Operating procedure for the Model 452 test chamber Assembly consists of evaluation testing of the AR2.
0009 00
1. Verify that the AR2 JUMP/OFF switch is in OFF position, the storage cable and piston rod cap are removed, refer to WP 0008 00, and that AR2 is cocked. WARNING If there is any indication of a leak in the aneroid, remove the AR2 from service. A leaking aneroid may cause a malfunction which may result in death of parachutist. 2. Check the AR2 for aneroid leakage at ground level before testing (WP 0008). NOTE Ensure that the AR2 is cocked and the piston rod cap is removed before performing test procedure. 3. Set AR2 attitude dial to 5,500 feet. 4. Install AR2 in the test chamber (Refer to initial adjustments before use). CAUTION To avoid damage to test chamber do not switch it on while the air compressor or vacuum pump is under load (while the altitude chamber is under vacuum or the air cylinder is pressurized). If it has recently been used, wait one to two minutes for pressure trapped in the system to bleed off. 5. Switch ON the test chamber. The indicator light (6) will illuminate, and the air compressor and vacuum pump will start. When switching the test chamber ON, immediately look under the transparent altitude chamber at the ends of both the air compressor and vacuum pump to ensure that the cooling fans are spinning on both units. If either of the fans is not spinning, immediately cycle the CLIMB/FALL/COCK switch (8) between Fall and Cock until the fans spin. WARNING Do not move climb/fall/cock switch on test chamber to cock unless AR2 JUMP/OFF switch is in the fully off position. Attempting to cock the mechanism with the switch in an intermediate position may damage internal components and render the AR2 inoperative. This will prevent deployment of a parachute and may result in death of parachutist.
Change 1
0009 00-6
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS OPERATING PROCEDURE NOTE The end of the AR2 piston rod will be visible when the AR2 is cocked.
0009 00
6. Move the CLIMB/FALL/COCK switch (8) on test chamber to COCK for two seconds. Since the AR2 is already cocked, nothing will happen. On subsequent tests, after actuating the test unit, it will be necessary to recock the test unit by moving the CLIMB/FALL/COCK switch (8) to COCK. CAUTION Climb rates or fall rates greater than 833 ft/sec may cause damage to the altimeter. NOTE When conducting tests with AR2 dial settings greater than 15,000 feet, increase the wait time from 30 or more seconds to 40 or more seconds once the desired altitude is reached. Inadequate wait time can result in erroneous test results. 7. Move the CLIMB/FALL/COCK switch (8) on test chamber to CLIMB position. Adjust the pressure control regulator (14) on the test chamber to the desired altitude as observed on the altimeter (4). This altitude should be at least 2,000 feet above the altitude set on the altitude dial (refer to step 3). Once the desired altitude is reached, wait 30 or more seconds for the unit to stabilize. This allows pressure trapped in the rate-of-fall sensing chamber of the AR2 to bleed off so that it comes to the same pressure as the surrounding environment. This will allow the rate of fall mechanism to function properly. CAUTION Do not select a rate of fall between 65 and 85 ft/sec. Repeated testing between these values will cause excessive wear to the rate-of-fall mechanism of the AR2 and result in malfunctions. NOTE The barometric pressure adjustment setting on the altimeter on the test chamber shall always remain at 29.92 to assure correct readings of altitude with respect to mean sea level. NOTE Values shown on FUNCTIONS decal on test chamber correspond approximately to rates of fall indicated thereon. The exact rate of fall during testing should always be determined with the aid of a stop watch. 8. Turn the PRESSURE CONTROL regulator (10) on the test chamber console to adjust the rate of pressure increase inside the altitude test chamber. Adjust pressure as observed on the pressure (PSI) gage (11) of the test chamber to a pressure corresponding to a rate of fall of 85 to 90 ft/sec. The rate of fall should be established between 6,000 and 5,000 feet.
0009 00-7
Change 1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS - CONT OPERATING PROCEDURE CONT
0009 00
9. Rotate altitude chamber switch lever (2) on test chamber counterclockwise 180q. This will put the AR2 JUMP/OFF switch in JUMP position. NOTE AR2 functional test requirements are summarized in the following table.
Rate of fall Mechanism Verification: Fire Test No Fire Test No Fire Test Altitude Actuation Verification: Fire Test Fire Test Fire Test Fire Test
* See step 15. 10. Move the test chamber CLIMB/FALL/COCK switch (8) to FALL position. As altitude decreases, as observed on the test chamber altimeter (4), check for the altitude at which the AR2 actuates. Actuation of the AR2 should occur a 5,500 feet r 300 feet. Testing under the conditions described in step 8 constitutes a fire test for the rate of fall mechanism verification. NOTE It is not necessary to dump the altitude test chamber if a retest at the same altitude is desired. 11. After actuation, if a retest is desired, proceed as follows: CAUTION To avoid damage to the AR2 under test, never rotate altitude chamber switch lever with the CLIMB/FALL/COCK switch in the cock position.
Change 1
0009 00-8
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS OPERATING PROCEDURE 12. Rotate the altitude chamber switch lever (2) clockwise 180q. This will move the AR2 JUMP/OFF switch to OFF position. 13. Repeat steps 6 through 10. WARNING If malfunctions of the rate-of-fall mechanism occur, or if actuation altitude deviates from the dial setting by more than the prescribed tolerance, remove the AR2 from service. 14. To complete the test for rate-of-fall mechanism verification:
0009 00
a. Conduct a no-fire test using the above procedure. Leave the altitude dial set at 5,500 feet and set the rate of fall between 60 and 65 ft/sec. The rate of fall should be established between 6,000 and 5,000 feet. Actuation of the AR2 should not occur at any altitude. b. Conduct a second no-fire rate of fall test with the AR2 altitude dial set to 10,500 feet. Set the rate of fall between 60 and 65 ft/sec. The rate of fall should be established between 11,000 and 10,000 feet. Actuation of the AR2 should not occur at any altitude. 15. To conduct actuation altitude tests: a. Set the AR2 dial to 3,000 feet. Set the rate of fall between 100 and 120 ft/sec. The rate of fall should be established between 3,500 and 2,500 feet. Actuation of the AR2 should occur at 3,000 feet r 300 feet. b. Set the AR2 dial to 8,000 feet. Set the rate of fall between 100 and 120 ft/sec. The rate of fall should be established between 8,500 and 7,500 feet. Actuation of the AR2 should occur at 8,000 r 300 feet. c. Set the AR2 dial to 15,000 feet. Set the rate of fall between 100 and 120 ft/sec. The rate of fall should be established between 15,500 and 14,500 feet. Actuation of the AR2 should occur at 15,000 feet r 500 feet.
d. Set the AR2 dial to the MSL altitude where actuation is required for a normal mission profile. Set the rate of fall between 100 and 120 ft/sec. The rate of fall should be established between 500 feet above and 500 feet below the dial setting. The altitude actuation tolerance is r 300 feet for dial settings below 10,000 feet MSL and r 500 feet for settings of 10,000 or above. CAUTION To protect altimeter from damage, do not press RAPID FALL DUMP switch at altitudes greater than 25,000 feet. 16. Depress and hold the RAPID FALL DUMP switch (7) until the test chamber is dumped.
0009 00-9
Change 1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS - CONT OPERATING PROCEDURE - CONT 17. Rotate Test Altitude Chamber switch lever (2) clockwise 180q. This will put the AR2 JUMP/OFF switch in OFF position. 18. Recock the AR2. 19. Remove the AR2 from the test chamber. 20. Switch test chamber ON/OFF switch (5) to off. 21. Install power cable or prepare AR2 for storage or movement (WP 0023 00). DECALS AND INSTRUCTION PLATES
0009 00
WARNING decal gives operational warnings to operator (for location, refer to Page 2, WP 0007 00).
Change 1
0009 00-10
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS DECALS AND INSTRUCTION PLATES
0009 00
Functions decal provides a place to record pressures and fall rate (for location, refer to page 2, WP 0007 00.
0009 00-11
Change 1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS - CONT DECALS AND INSTRUCTION PLATES
0009 00
FUNCTIONS decal provides a place to record pressures and fall rate (for location refer to Page 2, WP 0007 00).
TEST CHAMBER ASSEMBLY, AR2, MODEL 452 identification decal (for locations, refer to Page 2, WP 0007 00).
Change 1
0009 00-12
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER USUAL CONDITIONS DECALS AND INSTRUCTION PLATES
0009 00
CONNECTIONS SCHEMATIC decal provides identification of electrical connections (for location, refer to Page 2, WP 0007 00). PREPARATION FOR MOVEMENT If necessary, open altitude chamber lid and remove AR2. Prepare AR2 for storage or shipment (refer to WP 0023 00). Disconnect control assembly power cable from 110 VAC outlet. Coil power cable behind control assembly. WARNING The test chamber and carrying case weighs 70 lbs. The test chamber weighs 50 lbs. Use two persons or lifting device when moving or lifting to prevent injury to personnel. Install test chamber in carrying case. Close and lock carrying case lid.
Change 1
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS SITING REQUIREMENTS
0010 00
The test chamber requires bench space approximately 36 inches wide by 30 inches deep with 110 VAC, 50/60 Hz power source within six feet of the unit. SHELTER REQUIREMENT The test chamber shall be contained in a building that meets storage requirements outlined in TM 10-1670-201-23, T.O. 13C-1-41, or NAVAIR 13-1-17, at an altitude between 0 (feet) and 30,000 (feet) above MSL. Temperature shall be between +41F (+5C) and +122 F (+50C). ASSEMBLY AND PREPARATION FOR USE The test chamber carrying case is used for movement and storage of the test chamber. No external packaging is required. WARNING The test chamber and carrying case weight is 60 lbs. The test chamber weighs 42 lbs. Use two persons or lifting device when moving or lifting to prevent injury to personnel. Open test chamber carrying case cover. Lift and remove test chamber from carrying case (WP 0003 00). Place test chamber on work bench. Check for loose or missing hardware or decals. Assure that all adjustable knobs and switches are present and operating without binding. Check for broken or damaged displays. Check for damage to altitude chamber, lid and gasket. Retain carrying case for future storage or movement of unit. INITIAL ADJUSTMENT BEFORE USE CAUTION Do not transport or store AR2 without piston rod cap or power cable attached. External forces or impacts applied to the piston rod may cause unit to malfunction. Any AR2 subjected to external forces or impact must be tested and, if necessary, removed from service. Do not operate test chamber while in the carrying case. Components will overheat and may become damaged. NOTE To obtain correct rate-of-fall data, always install an AR2 in the altitude chamber before testing.
0010 00-1
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS - CONT INITIAL ADJUSTMENT BEFORE USE - CONT NOTE Ensure that the test chamber is in calibration (WP 0018 00). 1. For all testing, an AR2 shall be installed in the altitude chamber.
0010 00
2. If necessary, set AR2 JUMP/OFF switch to OFF. Set altitude dial to 1000 feet. Cock AR2 and remove storage cable and piston rod cap. 3. Open altitude chamber lid (2). Position the cocking support (3) and install the AR2. Align AR2 JUMP/OFF switch lever with altitude chamber switch lever. 4. Close altitude chamber lid. NOTE The unit shall be turned on and warmed up for 30 minutes minimum before beginning any tests. 5. Plug power cord into 110 VAC 50/60 Hz outlet. 6. When ready to start test, position control assembly ON/OFF switch (21) to ON. When switching test chamber on, immediately look at the end of vacuum pump/air compressor to ensure that the cooling fan is spinning. If fan is not spinning, immediately press and release HOLD DOWN TO COCK switch several times until fan spins. ALTITUDE STABILITY TEST 1. If necessary, press DUMP switch (15) to extinguish CHAMBER VENTED indicator (16). Press RESET DISPLAYS switch. 2. Press and hold HOLD DOWN TO SET switch (13). Use SET ALTITUDE control (4) to set altitude to 2000 10 feet as observed on ALTITUDE (FT MSL) display (20). Release HOLD DOWN TO SET switch (13). 3. Press and hold HOLD DOWN TO SET switch (13). Turn SET FALL RATE control (5) fully counter-clockwise. 4. If necessary, reset ALTITUDE (FT MSL) display (20) to 2000 10 feet. Release HOLD DOWN TO SET switch (13). 5. Record altitude reading. 6. Wait three minutes. 7. Record altitude reading.
0010 00-2
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS ALTITUDE STABILITY TEST 8. Press DUMP switch (15); wait one second and press DUMP switch again. 9. Wait for displays to stabilize. 10. Record altitude reading. 11. All three altitude readings shall be within ten feet. 12. Repeat steps 2 thru 11 at 15,000 10 feet and at 35,000 10 feet.
0010 00
13. If no other tests are to be performed follow shut down after testing procedures at end of this work package.
0010 00-3
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS - CONT ALTITUDE STABILITY TEST - CONT
0010 00
0010 00-4
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS FALL RATE TEST RANGE 1. Obtain a timer (stop watch).
0010 00
2. Press and hold HOLD DOWN TO SET switch (13), use SET ALTITUDE control (4) to set altitude to 3000 100 feet as observed on ALTITUDE (FT MSL) display (20). Release HOLD DOWN TO SET switch (13). 3. Press and hold HOLD DOWN TO SET switch (13); use SET FALL RATE control (5) to achieve 26 1 ft/sec fall rate as observed on FALL RATE (FT/SEC) display (19). Release HOLD DOWN TO SET switch (13). 4. Press GO TO ALT AND DWELL switch (7). 5. When ALTITUDE DWELL indicator (6) stops flashing, use altitude chamber switch lever (1) to set AR2 JUMP/OFF switch to JUMP. 6. Press FALL switch (9). Set AR2 JUMP/OFF switch to OFF. 7. At first reading below 2000 feet start timer and record altitude. At first reading below 1000 feet, stop timer and record altitude. 8. Difference between two altitude readings divided by the time equals the fall rate. Fall rate shall be less than 30 ft/sec. 9. Repeat step 2 using 4000 100 feet. 10. Repeat step 3 using 225 1 ft/sec. 11. Press GO TO ALT AND DWELL switch (7). 12. When ALTITUDE DWELL indicator (6) stops flashing set AR2 JUMP/OFF switch to JUMP. 13. Press FALL switch (9); set AR2 JUMP/OFF switch to OFF. 14. At first reading below 2000 feet start timer and record altitude. At first reading below 1000 feet, stop timer and record altitude. 15. Difference between two altitude readings divided by the time equals the fall rate. Fall rate shall be greater than 200 ft/sec. 16. Repeat steps 2 through 15 using a preset altitude of 27,000 feet for the 26 ft/sec test and 28,000 feet for the 225 ft/sec test. Determine the fall rate between 26,000 feet and 25,000 feet for both tests. 17. If no other tests are to be performed, follow shut down after testing procedures at end of this work package.
0010 00-5
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS - CONT FALL RATE TEST - CONT SELECTOR ACCURACY
0010 00
1. Press and hold HOLD DOWN TO SET switch (13), use SET ALTITUDE control (4) to set altitude to 7500 100 feet as observed on ALTITUDE (FT MSL) display (20). Release HOLD DOWN TO SET switch (13). 2. Press and hold HOLD DOWN TO SET switch (13), use SET FALL RATE control (5) to achieve 62.5 0.5 ft/sec fall rate as observed on FALL RATE (FT/SEC) display (19). Release HOLD DOWN TO SET switch (13). 3. Press GO TO ALT AND DWELL switch (7). 4. When altitude dwell indicator (6) stops flashing, set AR2 JUMP/OFF switch to JUMP. 5. Press FALL switch (9). Set AR2 JUMP/OFF switch to OFF. 6. At first altitude reading below 6500 feet, start timer and record altitude. 7. At first altitude reading below 4500 feet, stop timer and record altitude. 8. Difference between two altitude readings divided by the time equals the fall rate 9. Press GO TO ALT AND DWELL switch (7). Wait until ALTITUDE DWELL indicator (6) stops flashing. 10. Set AR2 JUMP/OFF switch to JUMP; press FALL switch (9). 11. Set AR2 JUMP/OFF switch to OFF; observe and record fall rate on FALL RATE (FT/SEC) display (17) at approximately 5500 feet. 12. Repeat step 2 using 87.5 0.5 ft/sec. 13. Repeat steps 3 through 11. 14. Repeat step 1 using 12,500 100 feet. Leave fall rate set at 87.5 0.5 ft/sec. 15. Press GO TO ALT AND DWELL switch (7).
0010 00-6
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS FALL RATE TEST SELECTOR ACCURACY
0010 00
16. When ALTITUDE DWELL indicator (6) stops flashing, set AR2 JUMP/OFF switch to JUMP. 17. Press FALL switch (9). Position AR2 JUMP/OFF switch to OFF. 18. At first altitude reading below 11,500 feet, start timer and record altitude. 19. At first altitude below 9500 feet, stop timer and record altitude. 20. Difference between two altitude readings divided by the time equals the fall rate. 21. Press GO TO ALT AND DWELL switch (7). Wait until ALTITUDE DWELL indicator (6) stops flashing. 22. Set AR2 JUMP/OFF switch to JUMP; press FALL switch (9). 23. Set AR2 JUMP/OFF switch to OFF; observe and record fall rate on FALL RATE (FT/SEC) display (17) at approximately 10,500 feet. 24. Repeat step 2 using 62.5 0.5 ft/sec. 25. Repeat steps 15 through 23. 26. Neither the calculated fall rate nor the displayed fall rate may differ from the set rate by more than 2 ft/sec for any of the four tests. 27. If no other tests are to be performed, follow shut down after testing procedures at the end of this work package.
0010 00-7
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS - CONT CONTROL INTERLOCKS TEST This is an optional test to verify correct function of switches and indicators. 1. Set AR2 altitude dial to 1,000 feet and install AR2 in altitude chamber.
0010 00
2. If DISPLAYS LOCKED indicator (18) is illuminated, press RESET DISPLAYS switch (17). 3. If CHAMBER VENTED indicator (16) is illuminated, press DUMP switch (15). 4. Press and hold HOLD DOWN TO SET switch (13); use SET ALTITUDE control (4) to set altitude to 3000 100 feet as observed on ALTITUDE (FT MSL) display (20); release HOLD DOWN TO SET switch. 5. Press and hold HOLD DOWN TO SET switch (13); use SET FALL RATE control (5) to achieve fall rate of 100 10 ft/sec as observed on FALL RATE (FT/SEC) display (19); Release HOLD DOWN TO SET switch. 6. Press GO TO ALT AND DWELL switch. Before ALTITUDE DWELL indicator (6) stops flashing, set AR2 JUMP/OFF switch to JUMP; press FALL switch (9). 7. The test chamber shall not indicate a fall. 8. Wait until ALTITUDE DWELL indicator (6) stops flashing, Set AR2 JUMP/OFF switch to OFF. Press FALL switch (9). 9. The test chamber shall not indicate a fall. 10. Set AR2 JUMP/OFF switch to JUMP. Press FALL switch (9). 11. The test chamber will indicate a fall and the AR2 will actuate. The DISPLAYS LOCKED indicator (18) will illuminate. Press RESET DISPLAYS switch (17). 12. The display shall not reset; DISPLAYS LOCKED indicator (18) shall remain illuminated. 13. Press HOLD DOWN TO COCK switch (10). 14. The AR2 shall not cock. 15. Set AR2 JUMP/OFF switch to intermediate position (neither JUMP SWITCH indicator lit). Press HOLD DOWN TO COCK switch (10). 16. The AR2 shall not cock. 17. Set AR2 JUMP/OFF switch to OFF. Press and hold HOLD DOWN TO COCK switch (10). 18. AR2 shall cock. Release HOLD DOWN TO COCK switch.
0010 00-8
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS CONTROL INTERLOCKS TEST 19. Press GO TO ALT AND DWELL switch (7).
0010 00
20. ALTITUDE DWELL indicator (6) shall flash. DISPLAYS LOCKED indicator (18) shall remain illuminated and displays shall not reset. 21. Wait until ALTITUDE DWELL indicator (6) stops flashing. Set AR2 JUMP/OFF switch to JUMP. Press FALL switch (9). 22. The test chamber shall not indicate a fall. 23. Press RESET DISPLAYS switch (17). 24. ALTITUDE (FT MSL) display (20) shall reset to 3000 feet (value set previously). FALL RATE (FT/SEC) display shall show approximately zero. 25. Set AR2 JUMP/OFF switch to OFF. 26. All interlocks and indicators shall function as described above or the test chamber is defective and must be returned to depot for repair.
0010 00-9
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS - CONT OPERATING PROCEDURE NOTE Operating Procedures for the ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 consist of evaluation testing of the AR2.
0010 00
1. Verify that the JUMP/OFF switch is in OFF position, the storage cable and piston rod cap are removed, and that AR2 is cocked. WARNING If there is any indication of a leak in the aneroid, remove the AR2 from service. A leaking aneroid may cause a malfunction which may result in death of parachutist. 2. Check the AR2 for aneroid leakage at ground level before testing (WP 0008). NOTE AR2 functional test requirements are summarized in table below.
3,000 ft 8,000 ft 15,000 ft Required Actuation Altitude, MSL* * See paragraph 13 of Actuation Altitude Test.
Rate threshold Verification: Fire Test No Fire Test No Fire Test Altitude Actuation Verification: Fire Test Fire Test Fire Test Fire Test
0010 00-10
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS OPERATING PROCEDURE RATE THRESHOLD (ALL FIRE) TEST 1. Install AR2 in test chamber.
0010 00
2. After test chamber warm-up, ensure DISPLAYS LOCKED indicator (18) and CHAMBER VENTED indicator (16) are extinguished. If not, press RESET DISPLAYS switch (17). 3. Set AR2 altitude dial to 5500 feet. Close altitude chamber lid (2). 4. Press and hold HOLD DOWN TO SET switch (13) and use SET ALTITUDE control (4) to set Test Chamber altitude to 7500 100 feet. Release HOLD DOWN TO SET switch (13). 5. Press and hold HOLD DOWN TO SET switch (13) and use SET FALL RATE control (5) to set fall rate at 87.5 0.5 ft/sec. Release HOLD DOWN TO SET switch (13). 6. If ALTITUDE DWELL indicator (6) is not illuminated or flashing, press GO TO ALT AND DWELL switch (7). Wait until ALTITUDE DWELL indicator (6) stops flashing. 7. Set AR2 JUMP/OFF switch to JUMP. Press FALL switch (9). 8. The AR2 shall actuate within 300 feet of AR2 dial setting. 9. Set AR2 JUMP/OFF switch to OFF, press HOLD DOWN TO COCK switch (10), and observe movement of piston rod to right until AR2 cocks. 10. If required, repeat steps 2 through 9. 11. If no other tests are to be performed, follow shut down after testing procedures at end of this work package. RATE THRESHOLD (NO FIRE) TEST 1. Ensure DISPLAYS LOCKED and CHAMBER VENTED indicators (16, 18) are extinguished. If not, press RESET DISPLAYS switch (17). 2. Set AR2 altitude dial to 5500 feet. Close altitude chamber lid (2). 3. Press and hold HOLD DOWN TO SET switch (13) and set Test Chamber altitude to 7500 100 feet. Release HOLD DOWN TO SET switch (13). 4. Press and hold HOLD DOWN TO SET switch (13) and set fall rate at 62.5 0.5 ft/sec. Release HOLD DOWN TO SET switch (13). 5. If ALTITUDE DWELL indicator (6) is not illuminated or flashing, press GO TO ALT AND DWELL switch (7). Wait until ALTITUDE DWELL indicator (6) stops flashing. 6. Set AR2 JUMP/OFF switch to JUMP. Press FALL switch (9). Wait until the altitude as observed on the ALTITUDE (FT MSL) display (20) reaches 4500 feet.
0010 00-11
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS - CONT OPERATING PROCEDURE RATE THRESHOLD (NO FIRE) TEST - CONT 7. The AR2 shall not actuate. 8. Set AR2 JUMP/OFF switch to OFF.
0010 00
9. Repeat steps 2 through 8 using AR2 altitude dial setting of 10,500 feet, test chamber altitude setting of 12,500 feet, and same fall rate setting. For this step, set AR2 JUMP/OFF switch to OFF when altitude reaches 9,500 feet. 10. If no other tests are to be performed, follow shut down after testing procedure at end of this work package. ACTUATION ALTITUDE TEST 1. Ensure CHAMBER VENTED indicator (16) and DISPLAYS LOCKED indicator (18) are extinguished. 2. Set AR2 altitude dial to 3000 feet. Close altitude chamber lid (2). 3. Press and hold HOLD DOWN TO SET switch (13); and set altitude to 5000 100 feet. Release HOLD DOWN TO SET switch (13). 4. Press and hold HOLD DOWN TO SET switch (13); and set fall rate to 110 10 ft/sec. Release HOLD DOWN TO SET switch (13). 5. If ALTITUDE DWELL indicator (6) is not illuminated or flashing, press GO TO ALT AND DWELL switch (7). Wait until ALTITUDE DWELL indicator (6) stops flashing. 6. Set AR2 JUMP/OFF switch to JUMP. Press FALL switch (9). 7. Wait for AR2 to actuate and DISPLAYS LOCKED indicator (18) to illuminate. 8. Observe ALTITUDE (FT MSL) display (20) and FALL RATE (FT/SEC) display (19). 9. The AR2 must actuate within 300 feet of AR2 dial setting. 10. Set AR2 JUMP/OFF switch to OFF. Press HOLD DOWN TO COCK switch (10) and observe movement of piston rod to right until AR2 cocks. 11. Repeat steps 1 through 10 using AR2 dial setting of 8000 feet, test chamber altitude setting of 10,000 feet, and same fall rate setting. 12. Repeat steps 1 through 10 using AR2 altitude dial setting of 15,000 feet, test chamber altitude setting of 17,000 feet and same fall rate setting. The altitude actuation tolerance is 500 feet for this setting.
0010 00-12
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS OPERATING PROCEDURE ACTUATION ALTITUDE TEST
0010 00
13. Repeat steps 1 through 10 with the AR2 dial set to the MSL altitude where actuation is required for a normal mission profile. Set the test chamber 2,000 feet higher than this altitude with the same fall rate setting. The altitude actuation tolerance is 300 feet for dial settings below 10,000 feet MSL and 500 feet for settings of 10,000 feet or above. 14. If no other tests are to be performed, follow shut down after testing procedure at end of this work package. DECALS AND INSTRUCTION PLATES 1. There are two Model 453 identification decals (24). One is located on the mounting board beneath the altitude chamber; the other is mounted on the carrying case. 2. There is one CONTROL ASSEMBLY identification decal (25) located on the back of the control assembly. This decal carries its own serial number; which may differ from the Model 453 serial number.
0010 00-13
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS - CONT DECALS AND INSTRUCTION PLATES - CONT
0010 00
0010 00-14
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER USUAL CONDITIONS SHUT DOWN AFTER TESTING 1. Verify that altitude chamber is at ground level. If required, press DUMP switch (15). 2. Open altitude chamber lid and remove AR2 from altitude chamber.
0010 00
3. Cocking support shall remain inside the altitude chamber. Close altitude chamber lid. 4. Switch test chamber ON/OFF switch (21) to OFF. 5. Prepare AR2 for storage or shipment (WP 0023 00). PREPARATION FOR MOVEMENT 1. If necessary, open altitude chamber lid and remove AR2. 2. Prepare AR2 for storage or shipment (refer to WP 0023 00). 3. Disconnect control assembly power cable from 110 VAC outlet. Coil power cable behind vacuum pump/air compressor. WARNING The test chamber and carrying case weighs 60 lbs. The test chamber weighs 42 lbs. Use two persons or lifting device when moving or lifting to prevent injury to personnel. 4. Install test chamber in carrying case. Close and lock carrying case lid.
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER UNUSUAL CONDITIONS (HIGH ALTITUDE FACILITES) TESTING AT HIGH ALTITUDE 1.
0011 00
If the test facility is located at high altitude, it may be necessary to conduct tests of the AR2 with dial settings lower than the elevation of the test site. Under such conditions, the pressure inside the altitude chamber will be greater than that outside, and the lid will not stay closed since it has no locks or latches. Nevertheless, testing may be conducted by clamping the lid shut using two standard C-clamps with a 6-inch opening capacity and a throat depth of approximately 3.5 inches. Care must be taken, however, to avoid clamping the lid too tightly. Use the following procedure to obtain the proper clamping force: a. Install the AR2 to be tested in the altitude chamber (refer to WP 0009 00). Close the altitude chamber lid. b. Select an altitude approximately 15,000 feet higher than the test site elevation and cause the chamber to climb to that altitude. This will fully compress the altitude chamber gasket. CAUTION Be sure to clamp only the main body of the chamber. c. Position the C-clamps as shown, using small pads of cardboard, cloth, or rubber to prevent marring the surfaces of the altitude chamber. Do not clamp fittings, tubing, or any other parts of the chamber which may be damaged. d. Tighten the clamps using only enough force to keep them from slipping or moving around on the altitude chamber lid. WARNING Do not allow the altitude to fall below 0 feet MSL when the altitude chamber is clamped. Doing so will damage the AAU-31/A altimeter and build up a dangerous level of pressure inside the altitude chamber, which may rupture and cause serious injury to personnel.
2.
3. Any test altitude may now be selected and testing conducted (refer to WP 0009 00). The clamps will prevent the lid from lifting, regardless of the internal pressure. 4. Since the chamber must be opened to change the AR2 dial setting, installing and removing the clamps will slow the testing process. Employ them only when low altitudes can not be reached using normal test procedures.
0011 00-1
TEST CHAMBER ASSEMBLY, MODEL 452 0011 00 OPERATION UNDER UNUSUAL CONDITIONS (HIGH ALTITUDE FACILITES) - CONT TESTING AT HIGH ALTITUDE - CONT
0011 00-2
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER UNUSUAL CONDITIONS (HIGH ALTITUDE FACILITES) TESTING AT HIGH ALTITUDE
0012 00
1. If the test facility is located at high altitude, it may be necessary to conduct tests of the AR2 with dial settings lower than the elevation of the test site. Under such conditions, the pressure inside the altitude chamber will be greater than that outside, and the lid will not stay closed since it has no locks or latches. Nevertheless, testing may be conducted by clamping the lid shut using two standard C-clamps with a 6-inch opening capacity and a throat depth of approximately 3.5 inches. Care must be taken, however, to avoid clamping the lid too tightly. 2. Use the following procedure to obtain the proper clamping force; a. Install the AR2 to be tested in the altitude chamber (refer to WP 0010 00); close the altitude chamber lid. b. Select an altitude approximately 15,000 feet higher than the test site elevation and cause the chamber to climb to that altitude. This will fully compress the altitude chamber gasket. CAUTION Be sure to clamp only the main body of the chamber. c. Position the C-clamps as shown, using small pads of cardboard, cloth, or rubber to prevent marring the surfaces of the altitude chamber. Do not clamp fittings, tubing, or any other parts of the chamber which may be damaged. d. Tighten the clamps using only enough force to keep them from slipping or moving around on the altitude chamber lid. 3. Any test altitude may now be selected and testing conducted (refer to WP 0010 00). The clamps will prevent the lid from lifting, regardless of the internal pressure. 4. Since the chamber must be opened to change the AR2 dial setting, installing and removing the clamps will slow the testing process. Employ them only when low altitudes cannot be reached using normal test procedures.
0012 00-1
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 OPERATION UNDER UNUSUAL CONDITIONS (HIGH ALTITUDE FACILITES)
0012 00
0012 00-2
TM 10-1670-305-23&P
CHAPTER 3 TROUBLESHOOTING PROCEDURES FOR AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453
TM 10-1670-305-23&P
0013 00
Work Package 0014 00 covers troubleshooting procedures for the Model 451. Work Package 0015 00 covers troubleshooting procedures for Model 452 and Model 453. Each work package basically refers to procedures in work packages 0008 00, 0009 00, or 0010 00. MALFUNCTION/SYMPTOM INDEX, MODEL 451 1. AR2 fails to cock with JUMP/OFF Switch in OFF position. 2. Aneroid leak check indicator shows incorrect altitude. 3. JUMP/OFF switch binds or has jerky motion. 4. Actuates at rates of fall below 65 ft/sec or does not actuate above 85 ft/sec. 5. Actuates at incorrect altitude. TROUBLESHOOTING PROCEDURE WP 0014
TROUBLESHOOTING PROCEDURE
WP 0015 WP 0015 WP 0015 WP 0015
0013 00-1
TM 10-1670-305-23&P
0013 00
TROUBLESHOOTING PROCEDURE
WP 0015 WP 0015 WP 0015 WP 0015 WP 0015
0013 00-2
TM 10-1670-305-23&P
TROUBLESHOOTING PROCEDURES INITIAL SETUP INFORMATION Maintenance Level Maintainer Materials Model 452 Test Chamber Assembly or Model 453 Electronic Test Chamber Assembly.
0014 00
Defective aneroid.
Replace AR2.
Defective switch.
Replace AR2.
Change 1
TM 10-1670-305-23&P
0015 00
MAINTENANCE LEVEL
Maintainer
MATERIALS
Model 451 Automatic Ripcord Release
Corrective Action a. Plug power cord into 110 VAC, 60 Hz outlet. b. Replace fuse. a. Replace vacuum pump or compressor (WP 0021 00).
a. Finger tighten external fittings to chamber and vacuum pump. b. Replace altitude chamber gasket. (WP 0021 00). c. Replace vacuum pump (WP 0021 00). a. Replace AR2 and attempt to cock a known serviceable AR2. a. Replace compressor (WP 0021 00). b. Replace Test Chamber. a. Replace Test Chamber.
b. Loose or damaged altitude chamber gasket. c. Damaged vacuum pump chamber. 4. Fan is spinning but compressor does not cock AR2 in Test Chamber. a. Damaged AR2.
b. Damaged compressor.
c. Leak in cylinder. 5. Pressure gage fails to operate properly and compressor is good. a. Damaged pressure gage.
0015 00-1
TM 10-1670-305-23&P
TROUBLESHOOTING PROCEDURES - CONT INITIAL SETUP INFORMATION - CONT TABLE 1. TROUBLESHOOTING (CONT) TEST CHAMBER ASSEMBLY, MODEL 452
0015 00
Malfunction 6. Altimeter pointer shows jerky motion when displaying falling altitude.
Corrective Action a. Check electrical connection to altimeter. b. Replace altimeter (WP 0021 00). a. Replace altimeter (WP 0021 00).
TABLE 2. TROUBLESHOOTING ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 Malfunction 1. Unit fails to operate. Probable Cause a. Power cord not plugged in. b. Blown fuse. 2. Fan fails to spin after repeated attempts. a. Vacuum pump/compressor not plugged in. b. Worn or damaged vacuum pump/compressor. 3. Displays garbled or nonfunctional. 4. Displays will not reset. 5. Panel indicators, controls or electric interlocks do not operate as described. a. Damaged control assembly. Piston rod location incorrect. a. Electrical connector not plugged in. b. Damaged control assembly. Corrective Action a. Plug power cord into 110 VAC, 50/60 Hz outlet. b. Replace fuse. a. Plug vacuum pump/compressor into control assembly (c). b. Replace vacuum pump/compressor (WP 0022 00) a. Replace control assembly (WP 0022 00). Implement reset procedure (WP 0010 00). a. Plug electrical connector into control assembly. b. Replace control assembly (WP 0022 00).
0015 00-2
TM 10-1670-305-23&P
0015 00
TABLE 2. TROUBLESHOOTING ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 Malfunction 6. Altitude chamber does not gain or hold altitude. Probable Cause a. Severe leak in system. b. Damaged altitude chamber gasket. c. Internal filter plugged 7. Fan on vacuum pump/compressor is spinning but compressor does not cock AR2 in altitude chamber. a. Damaged AR2. Corrective Action a. Finger tighten external fittings to altitude chamber and vacuum pump/compressor. b. Replace altitude chamber gasket (WP 0022 00). c. Replace control assembly (WP 0022 00) a. Replace AR2 and attempt to cock a known serviceable AR2. b. Replace vacuum pump/compressor (WP 0022 00). a. Send unit to calibration facility (WP 0025 00). b. Replace control assembly (WP 0022 00).
b. Damaged vacuum pump/compressor. 8. Displayed or calculated fall rate deviates from set value by more than 2 ft/sec. a. Fall rate span out of adjustment. b. Damaged control assembly.
TM 10-1670-305-23&P
CHAPTER 4 UNIT MAINTENANCE INSTRUCTIONS FOR AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453
TM 10-1670-305-23&P
SERVICE UPON RECEIPT SERVICE UPON RECEIPT AUTOMATIC RIPCORD RELEASE, MODEL 451
0016 00
1. Check for shipping damage. Check for open, damaged or dented packages or evidence of dampness. Report any shipping damage on SF 365 Transportation Discrepancy Report (TDR). 2. Unpacking. The AR2 and its power cables are shipped in separate multi unit packages. Remove and count AR2 units and power cables. Compare count to shipping manifest. 3. Checking the equipment. a. Check for missing components, including damaged or missing decals. CAUTION Move the JUMP/OFF switch between two detent positions. Do not force the switch past either detent position. This may damage internal components of the AR2 and cause malfunction. b. Check that JUMP/OFF switch is secure and does not bind when operated. c. Check that AR2 was shipped with a storage cable and piston rod cap installed.
d. Check that power cables have a lanyard assembly installed. 4. Report any discrepancies on SF 364 Supply Discrepancy Report (SDR), formerly known as a Report of Discrepancy (ROD).
0016 00-1
Change 1
TM 10-1670-305-23&P
SERVICE UPON RECEIPT - CONT SERVICE UPON RECEIPT, TEST CHAMBER ASSEMBLY, MODEL 452
0016 00
1. Check for shipping damage. Check carrying case for dents, holes, corrosion, broken carrying handles or open or damaged latches. Retain carrying case for future storage or movement. Report any shipping damage on SF 365 Transportation Discrepancy Report (TDR). WARNING Test chamber in carrying case weighs 70 lbs. Weight when mounting base is out of carrying case is 50 lbs: Use two persons or lifting device when moving to prevent injury to personnel. 2. Unpacking. Open test chamber carrying case cover. Lift and remove mounting base with attached components from carrying case. 3. Checking the equipment. Check for loose or missing attaching hardware or decals. Ensure that all knobs and switches are present and operate without binding. Check for broken glass on test chamber control assembly gages. Check for damage to altitude chamber, lid or gasket. 4. Report any discrepancies on SF 364 Supply Discrepancy Report (SDR), formerly known as a Report of Discrepancy (ROD). SERVICE UPON RECEIPT, ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 1. Check for shipping damage. Check carrying case for dents, holes, corrosion, broken carrying handles or open or damaged latches. Retain carrying case for future storage or movement. Report any shipping damage on SF 365 Transportation Discrepancy Report (TDR). WARNING Test chamber in carrying case weighs 60 lbs. Weight when mounting case is out of the carrying case is 42 lbs. Use two persons or lifting device when moving to prevent injury to personnel. 2. Unpacking. Open test chamber carrying case cover. Lift and remove test chamber from carrying case. 3. Checking the equipment. Check for loose or missing attaching hardware or decals. Ensure that no damage has occurred to control panel or other components. Check for damage to altitude chamber, lid or gasket. 4. Report any discrepancies on SF 364 Supply Discrepancy Report (SDR), formerly known as a Report of Discrepancy (ROD).
Change 1
0016 00-2
TM 10-1670-305-23&P
0017 00
Controls and indicators refer to WP 0007 for Automatic Ripcord Release, Model 451, WP 0007 for Test Chamber Assembly, Model 452, or WP0007 for Electronic Test Chamber Assembly, Model 453. CHECKS AND ADJUSTMENTS Perform operation under usual conditions per WP 0008 00 for Automatic Ripcord Release, Model 451, WP 0009 for Test Chamber Assembly, Model 452, or WP0010 for Electronic Test Chamber Assembly, Model 453.
TM 10-1670-305-23&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) INITIAL SETUP MAINTENANCE LEVEL Unit INTRODUCTION GENERAL
0018 00
The following PMCS tables have been provided so you can keep your equipment in good operating condition and ready for its primary mission. Warnings and cautions appear before applicable procedures. You must observe these WARNINGS and CAUTIONS to prevent serious injury to yourself and others and to prevent your equipment from being damaged. There are no lubrication requirements. Item Number Column. Numbers in this column are for reference. When completing DA Form 2404 (Equipment Inspection and Maintenance Worksheet), or applicable service equivalent, include the item number for the check/service indicating a fault. Item numbers also appear in the order that you must do checks and services for the intervals listed. Interval Column. This column tells you when you must do the procedure in the procedure column. BEFORE procedures must be done before you operate or use the equipment for its intended mission. DURING procedures must be done during the time you are operating or using the equipment for its intended mission. AFTER procedures must be done immediately after you have operated or used the equipment. Location, Item to Check/Service Column. This column provides the location and the item to be checked or serviced. The item location is underlined. Procedure Column. This column gives the procedure you must do to check or service the item listed in the Check/Service column to know if the equipment is ready or available for its intended mission or for operation. You must do the procedure at the time stated in the interval column. Not Fully Mission Capable if: Column. Information in this column tells you what faults will keep your equipment from being capable of performing its primary mission. If you do check or service procedures that show faults listed in this column, do not operate the equipment. Follow standard operating procedures for maintaining the equipment or reporting equipment failure. Other Table Entries. Be sure to observe all special information and notes that appear in your table
0018 00-1
Change 3
TM 10-1670-305-23&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) PMCS Interval periods are defined as follows: B - Before Operation D - During Operation A - After Operation
0018 00
Table 1. Preventive Maintenance Checks and Services for Automatic Ripcord Release, Model 451 Item 1 Interval
B D A
Procedure a. Check for aneroid leakage (WP 0008 00) b. Check that AR2 is cocked. If unit actuated, inspect power cable and housing (refer to WP 0019 00).
Not fully Mission Capable if: a. Aneroid is leaking b. AR2 is not cocked Power cable is frayed or binds. Power housing conduit has loose convolutions.
ADDITIONAL PMCS The AR2 shall be tested and certified at each of the following times. Refer to WP 0009 00 for testing with the Model 452 Test Chamber Assembly. Refer to WP 0010 00 for testing with the Model 453 Electronic Test Chamber Assembly. 1. When the AR2 is put into service after being stored longer than 120 days. 2. At each 120-day interval while in service. 3. After 50 jumps, regardless of time interval. 4. After any jump where there is a possibility that the AR2 was damaged or malfunctioned. The AR2 shall be taken out of service and returned to the manufacturer for overhaul after whichever of the following three events comes first: 1. 500 cumulative actuations. Refer to the Maintenance Log, WP 0008 00. Cumulative actuations include both those recorded in the Jump Log Record and those from the AR2 Maintenance Log sheets, WP 0042 00. 2. 4 years from the date the AR2 was put into service. 3. 7 years from the date of original manufacture or upgrade to ECP 13 or 14, or overhaul. If the AR2 has been upgraded to ECP 8 or upgraded to ECP 13, or overhauled, the 7-year period commences from the last of any of these events. If the AR2 was upgraded, ECP 8 or ECP 13 is impression-stamped under the overhaul column on the AR2s service record decal, and the date (mm-yy) of the incorporation of the ECP is stamped under the date column. If the AR2 was overhauled, Overhaul is stamped under the overhaul column on the AR2s service record decal, and the overhaul date is stamped under the date column. The date opposite any other identification markings stamped under the overhaul column, such as W-XXX, is not to be used to establish the start of a new 7-year period.
Change 3
0018 00-2
TM 10-1670-305-23&P
0018 00
PMCS Interval periods are defined as follows: B-Before Operation D-During Operation A-After Operation
Table 2. Preventive Maintenance Checks and Services for Test Chamber Assembly, Model 452 Item No. 1 Interval B D A Altimeter barometric adjustment knob Check that altimeter barometric adjustment is set to 29.92 in Hg. Altimeter is set to incorrect barometric pressure. Gasket worn or damaged. Cooling fans are not spinning. Location Item to Check/Service Procedure Not fully Mission Capable if:
Check that both fans are spinning. If not, cycle CLIMB/FALL/COCK switch until fans begin to spin.
ADDITIONAL PMCS The Model 452 Test Chamber Assembly, while in service, shall be functionally tested at 30-day intervals (refer to WP 0009 00). The altimeter shall be tested and calibrated at 120-day intervals (refer to WP 0024 00).Calibration shall be performed by authorized calibration activity only.
0018 00-3
Change 3
TM 10-1670-305-23&P
0018 00
PMCS - CONT Interval periods are defined as follows: B-Before Operation D-During Operation A-AfterOperation
Table 3. Preventive Maintenance Checks and Services for Electronic Test Chamber Assembly, Model 453 Item Interval B D A Tubing Integrity of external tubing; finger tighten tubing. Check that electrical connections are secure. Check condition of gasket. Tubing damaged or connectors loose. Electrical connectors loose or unplugged. Gasket worn, damaged or out of groove in chamber. Cooling fan not spinning. Location Item to Check/Service Procedure Not fully Mission Capable if:
Electrical connectors
ADDITIONAL PMCS 1. Perform the following functional tests every 30 days while in use. a. Altitude Stability Test (Refer to WP 0010 00) b. Fall Rate Selector Accuracy (Refer to WP 0010 00). Perform altitude accuracy verification every 185 days (refer to WP 0025 00). Calibration shall be performed by authorized calibration activity only.
Change 3
0018 00-4
TM 10-1670-305-23&P
POWER CABLE ASSEMBLY, MAIN/RESERVE UNIT MAINTENANCE THIS WORK PACKAGE COVERS: Removal, cleaning, inspection, repair, replacement, and installation INITIAL SETUP TOOLS Screwdriver, Phillips, No. 2 (WP 0041 00, Item 7) Wrench, Adjustable, 6 inch (WP 0041 00, Item 14) Knife (WP 0041 00, Item 1) MATERIALS Isopropyl Alcohol (Anhydrous) (WP 0040 00, Item 1) Cloth, Lint Free, Cleaning (WP 0040 00, Item 3) GENERAL
0019 00
This work package contains information and instructions to keep the AR2 power cable assembly in good repair. WARNING Do not open or remove screws of AR2 housing. No internal maintenance is authorized. Unauthorized disassembly may cause a malfunction which may result in death of parachutist.
REMOVAL OF AR2 AND POWER CABLE ASSEMBLY 1. Ensure that the JUMP/OFF switch is OFF. NOTE If AR2 has not actuated, go to step 4. 2. If the AR2 has actuated, remove the AR2 and its power cable assembly from the parachute by removing tacking, two screws, nuts and clamp. These parts (hardware) are accessories attached to the parachute. WARNING Power cables are fitted with fixed eyes. After cocking the AR2 mechanism, always re-inspect the eye for distortion or other damage which may cause it to fail in use so that parachute may not deploy which may result in death of parachutist. Discard and replace cables showing distortion or damage.
0019 00-1
Change 1
TM 10-1670-305-23&P
POWER CABLE ASSEMBLY, MAIN/RESERVE UNIT MAINTENANCE - CONT REMOVAL OF AR2 AND POWER CABLE ASSEMBLY - CONT
0019 00
3. Use a screwdriver or other suitable tool, inserted through eye of power cable to form a Thandle. Secure AR2. Pull eye of power cable until the AR2 mechanism reaches the cocked position and power cable remains extended from power housing (requires approximately 70 pounds pull). 4. Unscrew power housing retainer from spring housing and remove power cable assembly by disengaging ball of power cable from piston rod. Attach storage cable and piston rod cap to AR2 INSPECTION OF POWER CABLE ASSEMBLY PRIOR TO DISSASSEMBLY 1. Shift power cable back and forth inside power housing as far as possible to expose both ends of cable. 2. Visually inspect the exposed portion of power cable for fraying. Any fraying or broken strands of wire indicate a defective power cable, which must be replaced. 3. Move power cable back and forth within power housing. A slight drag due to power cable seal is normal, but the cable should move smoothly and not bind. If there is any doubt as to the smoothness of motion, disassemble the power cable assembly and inspect all parts for wear or damage. Replace any defective parts, including, if necessary, power housing. WARNING The power housing (outer flexible metal casing) must be inspected for looseness between its convolutions. Looseness indicates either damage or a loss of interference fit between the outer housing and teflon liner, which maintains the housing length. Changes in housing length will affect the pulling stroke of the AR2 and could result in incomplete extraction of ripcord pins. 4. Grasp the outer flexible metal housing casing with both hands, thumbs pointing toward each other. Hold the housing firmly by pinching between thumbs and fingers. Placement of thumbs should be two to three inches apart, allowing clear visibility of the casing between thumbs. 5. Alternately push and pull the housing by applying approximately 10 pounds of force. Convolutions must not move relative to each other, but be careful not to mistake small changes in hand position caused by the pushing and pulling action for movement of the convolutions. Casing should look and feel solid, indicating no movement between convolutions. 6. Relocate the hand position and apply the procedure at four-inch to six-inch intervals over the entire length of the power housing. Verify that no movement between the casing convolutions exists. Any relative movement of the housing convolutions indicates a defective power housing, which must be replaced.
Change 1
0019 00-2
TM 10-1670-305-23&P
POWER CABLE ASSEMBLY, MAIN/RESERVE UNIT MAINTENANCE DISASSEMBLY OF POWER CABLE ASSEMBLY
0019 00
1. Tap flange end of power housing on a table top to cause the cable seal retainer to protrude from the power housing. If necessary, reach behind the cable seal retainer with a small hooked tool to start it from the power housing so that it may be gripped with the fingers. Slow withdrawal of cable seal retainer will usually bring power cable seal with it. If not, use same tool to free power cable seal and remove it. 2. Pull ball of power cable through power cable seal and remove power cable from power housing. 3. If power housing or power housing retainer must be replaced, first remove small split retaining ring from flanged fitting using thin screwdriver, knife blade, or other suitable tool. Insert the tool between the two layers of the ring and carefully run the tool around the fitting to cam the ring out of its groove. Be careful not to damage or lose the retaining ring. 4. Remove the retaining ring, lanyard assembly, and power-housing retainer off the small end of power housing.
0019 00-3
Change 1
TM 10-1670-305-23&P
0019 00
1. Clean exterior of power housing by wiping with a clean, lint-free cloth (WP 0040 00, item 3) moistened with anhydrous isopropyl alcohol (WP 0040 00, Item 1). 2. Clean all metal parts (except power housing) by washing in anhydrous isopropyl alcohol (WP 0040 00, Item 1) and dry thoroughly. INSPECTION 1. Visually inspect all components for wear or damage. 2. Discard worn or damaged parts. 3. Visually inspect entire power cable for fraying of cable or broken strands of wire. Discard if worn or damaged. ASSEMBLY OF POWER CABLE ASSEMBLY 1. Install lanyard assembly over small end of power housing. 2. Reinstall split retaining ring over small end of power housing and start tail of split end into groove in flanged fitting of power housing. 3. Using knife blade or fingernail, run around retaining ring to cam it into groove fitting. 4. Slide power cable into power housing by inserting ball of power cable into smaller end of power housing. Slide power cable completely through power housing until ball protrudes from opposite end of power housing. 5. Slip power cable seal over ball of power cable and into end of power housing. Seat power cable seal fully within power housing by slowly pulling on eye end of power cable. 6. Install cable seal retainer in end of power housing and against power cable seal. Use firm thumb pressure to seat nose of cable seal retainer within recess of power cable seal. 7. If an AR2 is not immediately attached, thread plug of lanyard assembly into power housing retainer.
Change 1
0019 00-4
TM 10-1670-305-23&P
POWER CABLE ASSEMBLY, MAIN/RESERVE UNIT MAINTENANCE INSTALL POWER CABLE ASSEMBLY
0019 00
1. The following instructions describe attachment of the power cable assembly to the AR2. Detailed instructions for installation of AR2 power cable assembly into parachute system are given in TM10-1670-287-23&P or service specific parachute packing manuals.
WARNING When attaching the power cable assembly to the AR2, always verify proper engagement of ball end of power cable with piston rod of AR2 by looking through transparent plastic cable seal retainer. Cable seal retainer and power cable seal must be present to ensure correct seating of power cable ball. If ball is not engaged with piston rod, or if cable seal retainer is missing, actuation of AR2 will fail to pull ripcord pins, which may result in death of parachutist. CAUTION Finger tighten the power housing retainer. Do not use pliers or other tools that will overtighten power housing retainer and possibly damage retainer. NOTE If AR2 is to be stored, install storage cable and piston rod cap instead of power cable (Refer to preparation for storage, this work package). 2. Hook ball of power cable into recess in piston rod. 3. Slide power housing over piston rod and install power housing retainer finger tight on spring housing. 4. Verify that ball is engaged by looking through transparent cable seal retainer. 5. Verify that JUMP/OFF switch is in OFF position. END OF WORK PACKAGE
Change 1
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, AR2 JUMP/OFF SWITCH MAINTENANCE THIS WORK PACKAGE COVERS: Removal, cleaning, inspection, repair, replacement, and installation INITIAL SETUP TOOLS Screwdriver, Slotted, 5/32-inch (WP 0041 00, Item 11) MATERIALS Isopropyl Alcohol (WP 0040 00, Item 1) Lubricant, Antiseize (WP 0040 00, Item 2) Cloth, Lint Free, Cleaning (WP 0040 00, Item 3) GENERAL
0020 00
This work package contains information and instructions to keep the AR2 JUMP/OFF switch in good repair. REMOVAL AND DISASSEMBLY OF JUMP/OFF SWITCH CAUTION Ensure that no foreign matter enters the AR2 through power cable openings, push rod opening or screw holes. 1. If replacement is required, remove four screws (1) securing JUMP/OFF switch (2) and remove JUMP/OFF switch (2). Move JUMP/OFF switch lever back and forth to access screws (1). 2. Remove packing (3), push rod (4) and push rod spring (5) form body of unit. NOTE Before removing OFF and JUMP decals (6 and 7) observe where and how they are positioned.
0020 00-1
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, AR2 JUMP/OFF SWITCH MAINTENANCE - CONT REMOVAL AND DISASSEMBLY OF JUMP/OFF SWITCH - CONT 3. If replacement decals are required, peel off OFF decal (6) and JUMP decal (7). NOTE Do not remove SERVICE RECORD decal or altitude cover decal from AR2 housing.
0020 00
ASSEMBLY AND INSTALLATION OF JUMP/OFF SWITCH WARNING Make sure the jump and off decals are replaced on the correct sides of the switch lever. Incorrectly placed decals will give a false indication of AR2 condition and may result in death if the AR2 is used in a jump.
0020 00-2
TM 10-1670-305-23&P
0020 00
1. Use lint-free cleaning cloth (WP 0040 00, Item 3) moistened with anhydrous isopropyl alcohol (WP 0040 00, Item 1) to clean areas where decals were mounted. Install new OFF decal (6) and JUMP decal (7) by peeling protective back from new decals and placing new decals in position. Press each new decal firmly in place. CAUTION When replacing the JUMP/OFF switch, always install the new push rod spring, push rod, and packing that are included in the switch kit. Never use an old push rod spring, push rod, or packing with a new switch. 2. If removed, lubricate packing (3) with anti-seize lubricant (WP 0040 00, Item 2) and install new push rod spring, (5) push rod (4) and packing (3). CAUTION Use care not to damage packing when installing JUMP/OFF switch. 3. Position and install new JUMP/OFF switch. Move JUMP/OFF switch lever back and forth to access screw holes. 4. Install and tighten self-locking screws. 5. Set the JUMP/OFF switch to OFF. 6. Test AR2 in accordance with procedures in WP 0009 00 or WP 0010 00 to be sure it functions correctly. END OF WORK PACKAGE
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 UNIT MAINTENANCE THIS WORK PACKAGE COVERS: Disassembly, calibration, cleaning, inspection, and reassembly. INITIAL SETUP TOOLS Putty Knife (WP 0041 00, Item 6) Wrench, Open End, 5/8-inch (WP 0041 00, Item 15) Wrench, Open End, 11/16-inch (WP 0041 00, Item 16) Nutdriver, 3/8-inch (WP 0041 00, Item 5) Screwdriver, Slotted, 1/4-inch (WP 0041 00, Item 12) MATERIALS Isopropyl Alcohol (Anhydrous) (WP 0040 00, Item 1) Cloth, Lint Free, Cleaning (WP 0040 00, Item 3) Tags (ID) (WP 0040 00, Item 4) GENERAL
0021 00
This work package contains information and instructions to keep the Test Chamber Assembly, Model 452 in good repair. WARNING Mounting base with attached components weighs 50 lbs, weight when mounting base is installed in carrying case is 70 lbs. Use two persons when moving or lifting to avoid injury to personnel. CAUTION Do not lift test chamber and base by grasping altitude chamber. Grasp altitude regulator in right hand and head of compressor in left hand to lift test chamber from carrying case. INSPECTION PRIOR TO DISASSEMBLY 1. Open carrying case (2) and lift out mounting base (29) with attached components. Place on a work bench. 2. Visually inspect all components for wear or damage. 3. Ensure that altitude chamber gasket (30) is not damaged. 4. Note all failures during initial adjustments before use (WP 0009 00).
0021 00-1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 UNIT MAINTENANCE - CONT INSPECTION PRIOR TO DISASSEMBLY - CONT NOTE If test chamber will not maintain high altitudes with CLIMB/FALL/COCK switch in CLIMB position, there is a leak in the pneumatic system. Check all compression nuts for tightness with the fingers. DO NOT USE WRENCHES. Carefully examine gasket for flaws or damage and replace, if necessary. If the chamber still will not maintain altitude, send the chamber back to depot for repair. DISASSEMBLY NOTE When disassembling the test chamber, use care to prevent scratching the altitude chamber. Be careful not to damage mating surface of altitude chamber when removing damaged gasket.
0021 00
1. Remove damaged altitude chamber gasket (30) by carefully pulling gasket away from altitude chamber. A putty knife or similar tool may be used to aid in gasket removal. 2. If replacement is required, peel off identification decal (1) from carrying case (2),and from control housing (6), WARNING decal (5), FUNCTIONS decal (7), and CONNECTIONS decal (15). Retain identification decal (1). 3. If replacement of air compressor (13), vacuum pump (14) or altimeter (26) is necessary, remove four screws (18) holding the housing panel (19) to the control housing (6). Connection strip (17) mounted inside control housing (6) contains all electrical connections from the input power and various components. The connections are identified on connections decal (15) found inside housing panel (19) 4. Unfasten and detach electrical connector (16) from altimeter (26). Unscrew compression nut (21) and disconnect tubing (22) from elbow (20). 5. Remove three screws (27) and lift altimeter (26) from control housing (6). NOTE Observe orientation of elbow (20) to aid in assembly. 6. If replacement altimeter (26) has no elbow (20) attached, it will be necessary to transfer elbow from the unit being removed to the replacement. CAUTION No sealant is used with elbow (20). An o-ring packing (23), located under backup washer (24) and lock nut (25) performs this function. Make sure not to lose or damage this packing.
0021 00-2
TM 10-1670-305-23&P
0021 00
0021 00-3
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 UNIT MAINTENANCE - CONT DISASSEMBLY - CONT
0021 00
0021 00-4
TM 10-1670-305-23&P
0021 00
7. Hold elbow (20) stationary using a 5/8-in. backup wrench, and loosen lock nut (25) approximately one turn using a 11/16-in. wrench. Elbow (20) may then be removed by hand. 8. Tag and disconnect three electrical leads to air compressor (13). Refer to connections decal (15) inside of housing panel (6). Unscrew compression nut (11) and disconnect tubing (10) from elbow (12). NOTE Observe routing of electrical leads from air compressor (13) to aid in assembly. 9. Remove three screws (31), washers (32), and compressor (13). 10. Tag and disconnect three electrical leads to vacuum pump (14). Refer to connections decal (15) inside of housing panel (19). Unscrew compression nut (4) and disconnect tubing (9) from elbow (3). NOTE Observe routing of electrical leads from vacuum pump (14) to aid in assembly. 11. Remove three screws (33), washers (34), and vacuum pump (14). ALTIMETER CALIBRATION Refer to direct support maintenance (WP 0024 00). CLEANING 1. Clean exterior of air compressor (13), vacuum pump (14), and air cylinder (8) with isopropyl alcohol (anhydrous). Air dry all parts thoroughly. INSPECTION 1. Visually inspect all components for wear or damage. 2. Discard worn or damaged parts.
0021 00-5
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 UNIT MAINTENANCE - CONT ASSEMBLY 1. Install replacement vacuum pump (14) using three washers (34) and screws (33).
0021 00
2. Connect tubing (9) to elbow (3) on vacuum pump (14) and secure with compression nut (4)(finger tight). 3. Route and reconnect electrical leads to vacuum pump (14) as identified at disassembly and remove tags. 4. Install replacement air compressor (13) using three washers (32) and screws (31). 5. Connect tubing (10) to elbow (12) on air compressor (13) and secure with compression nut (11)(finger tight). 6. Route and reconnect electrical leads to air compressor (13) as identified at disassembly and remove tags. 7. Use lint-free cleaning cloth and isopropyl alcohol (anhydrous) to clean areas where decals were mounted. Install new identification decal (1), making sure to transfer serial number identification of test chamber, WARNING decal (5), CONNECTIONS decal (15), and FUNCTIONS decal (7) by peeling protective back from new decals and pressing new decals firmly in position. 8. Peel protective backing off the right end (as it would be installed on the altitude chamber) of the gasket (30). Carefully align gasket and gently press in place. Continue to peel off protective backing as the gasket is installed. Use care not to develop any wrinkles in the gasket (30) or adhesive since they may cause a leak. 9. If necessary, install elbow (20) in replacement altimeter (26). Lubricate O-ring packing (23) sparingly using MIL-G-27617 lubricant. Turn elbow (20) into the threaded opening (boss) of altimeter (26) by hand until back-up washer (24) contacts the face of the boss. Position elbow (20) by backing it out (NOT MORE THAN ONE TURN COUNTERCLOCKWISE) until it is oriented correctly as observed at disassembly. Hold elbow (20) stationary, using a 5/8-in. back-up wrench, and tighten lock nut (25) with a 11/16-in. wrench until back-up washer (24) is pressed against the face of the boss of replacement altimeter (26). DO NOT OVERTIGHTEN. Joint is sufficiently tight if elbow (20) cannot be rotated with fingers.
0021 00-6
TM 10-1670-305-23&P
0021 00
10. Install replacement altimeter (26) into control housing (6) and secure with three screws (27). CAUTION Compression nuts used on pneumatic tube connections to air compressor (13) , vacuum pump (14), altimeter (26) and other components, such as the altitude chamber, are to be finger-tightened only. Do not use wrenches; overtightening will not give an improved seal but will hasten the splitting of compression sleeves and pneumatic tubes. 11. Connect tubing (22) to elbow (20) using compression nut (21). Attach and fasten electrical connector (16) to altimeter (26). Take care to correctly align connector (16) with the mating receptacle on altimeter (26) when assembling these parts. 12. Reassemble housing panel (19) to control housing (6) and secure with four screws (18). 13. Plug power cord into 110 VAC outlet. 14. Switch test chamber on. 15. Position CLIMB/FALL/COCK switch to CLIMB. 16. Turn altitude control regulator knob counterclockwise until altitude shown on altimeter reaches 35,000 feet. 17. Position CLIMB/FALL/COCK switch to FALL and wait until altitude falls below 25,000 feet; press and hold RAPID FALL DUMP switch until chamber reaches ground elevation. 18. Open carrying case (2) and carefully lower mounting base (29) with attached components into carrying case (2). Close and secure carrying case.
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 UNIT MAINTENANCE THIS WORK PACKAGE COVERS: Disassembly, cleaning, inspection assembly, calibration and adjustment. INITIAL SETUP TOOLS Nutdriver, 3/8-inch (WP 0041 00, Item 5) Screwdriver, Phillips No. 2 X 7-inch (WP 0041 00, Item 8) Screwdriver, Phillips No. 3 (WP 0041 00, Item 9) Screwdriver, Slotted, 3/32-inch (WP 0041 00, Item 10) MATERIALS Isopropyl Alcohol (Anhydrous) (WP 0040 00, Item 1) Cloth, Lint Free, Cleaning (WP 0040 00, Item 3) GENERAL
0022 00
This work package contains information and instructions to keep the Electronic Test Chamber Assembly, Model 453 in good repair. WARNING Mounting base with attached components weighs 42 lbs. Weight when mounting base is installed in case is 60 lbs. Use two persons or lifting device when moving or lifting to prevent injury to personnel. CAUTION Do not lift mounting base with attached components by grasping altitude chamber. Grasp lifting handle on control assembly in right hand and head of compressor in left hand to lift mounting base with attached components. INSPECTION PRIOR TO DISASSEMBLY 1. Open carrying case and lift out mounting base with attached components. Place mounting base on work bench. 2. Visually inspect all components for wear or damage. 3. Ensure that altitude chamber gasket is not damaged or depressed in any way. 4. Visually check all tubes for damage. 5. Note all failures during initial adjustments before use (WP 0010 00).
0022 00-1
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 UNIT MAINTENANCE - CONT DISASSEMBLY NOTE When disassembling the test chamber, use care to prevent scratching the altitude chamber or lid. Be careful not to damage mating surfaces of altitude chamber when removing damaged gasket.
0022 00
1. Remove altitude chamber gasket by carefully pulling gasket from groove in altitude chamber as shown. 2. If required, peel off two test chamber identification decals (1) (one located on carrying case and one on the mounting base (9) and control assembly decal (5)(refer to decals and instruction plates, WP 0010 00). Retain decals with their serial numbers. 3. Remove vacuum pump/compressor (4) as follows: a. Disconnect vacuum pump/compressor electrical plug from control assembly vacuum pump connector (11). Disconnect tubing. b. Unscrew compression nuts (13, 15) holding tubing to vacuum pump/compressor. Disconnect tubing. c. From underside of mounting base (9) remove four screws (16) and washers (17) securing vacuum pump/compressor (4) to mounting base; remove vacuum/compressor. 4. Remove control assembly (3) as follows: a. Disconnect vacuum pump/compressor electrical plug from vacuum pump/connector (11) on control assembly. b. Disconnect altitude chamber electrical connector (12) from control assembly. c. Unscrew compression nuts holding tubing from ALT CHMBR port, AIR CYL port, AIR COMP port, and VAC PUMP port. d. Remove four screws (14) securing control assembly to mounting base; remove control assembly.
0022 00-2
TM 10-1670-305-23&P
0022 00
0022 00-3
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 UNIT MAINTENANCE - CONT DISASSEMBLY - CONT
0022 00
0022 00-4
TM 10-1670-305-23&P
0022 00
View A
0022 00-5
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 UNIT MAINTENANCE - CONT CLEANING 1. Clean exterior of vacuum pump/compressor, control assembly, and air cylinder using isopropyl alcohol (anhydrous). Air dry all parts. INSPECTION 1. Visually inspect all components for wear or damage. 2. Discard worn or damaged parts. ASSEMBLY 1. Install control assembly (3) as follows: a. Position control assembly (3) on mounting base (9), secure with four screws (14). CAUTION Compression nuts used on pneumatic tubing are to be finger-tightened only. Do not use wrenches; overtightening will not give an improved seal but will hasten the splitting of compression sleeves and pneumatic tubing.
0022 00
b. Attach tubing to VAC PUMP port, AIR COMP port, AIR CYL port and ALT CHMBR port using compression nuts finger tight. c. Attach altitude chamber electrical plug to altitude electrical connector (12) on control assembly (3). d. Attach vacuum pump/compressor electrical plug to VAC pump connector (11) on control assembly (3).
0022 00-6
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 UNIT MAINTENANCE ASSEMBLY 2. Install vacuum pump/compressor (4) as follows:
0022 00
a. Position vacuum pump/compressor (4) on mounting base (9); secure with four screws (16) and washers (17) from underside of mounting base (9). b. Connect electrical cable from vacuum pump/compressor (4) to connector (11) on control assembly. Attach vacuum pump/compressor electrical plug to VAC pump connector (11) on control assembly (3). CAUTION Compression nuts used on pneumatic tubing are to be finger-tightened only. Do not use wrenches; over tightening will not give an improved seal but will hasten the splitting of compression sleeves and pneumatic tubing. c. Connect tubing to vacuum pump/compressor (4) using compression nuts (13 and 15) finger tight. 3. Use lint-free cleaning cloth and isopropyl alcohol (anhydrous) to clean areas where decals were mounted. Peel protective back and install new decals as follows, making sure to transfer serial number identification: a. Control Assembly decal (located on the back of the control assembly [3]). b. Two identification decals; one on the mounting base of the test chamber (9); the other on the carrying case (2). 4. Install new altitude chamber gasket in groove in altitude chamber (refer to figure). Be sure tension in gasket is equalized around its entire length. 5. Conduct Altitude Stability Test at 35,000 feet (WP 0010 00) 6. Open carrying case (2) and carefully lower mounting base (9) with attached components into carrying case (2). Close and secure carrying case. CALIBRATION AND ADJUSTMENT Refer to direct support maintenance (WP 0025 00) END OF WORK PACKAGE
PREPARATION FOR STORAGE OR SHIPMENT AUTOMATIC RIPCORD RELEASE, MODEL 451, PREPARATION FOR STORAGE OR SHIPMENT USING MODEL 452 TEST CHAMBER ASSEMBLY PREPARATION FOR STORAGE WARNING Do not transport or store AR2 without piston rod cap, storage cable or power cable attached. External forces or impacts applied to the piston rod may cause unit to malfunction. Any unit subjected to external forces or impact must be tested and, if necessary, removed from service. NOTE Make sure the AR2 is cocked, and the JUMP/OFF switch is set to OFF.
0023 00
1. Pass ball end of storage cable (3) through piston rod cap (5) and then engage recess of piston rod. Attach piston rod cap (5) to spring housing (6) of AR2. Pull eye end of storage cable (3) to verify correct engagement. 2. Open lid of altitude chamber (7) and if necessary, remove cocking support (9). 3. Move air cylinder rod (4) as far to the right as it will go, approximately 1 inch.
0023 00-1
PREPARATION FOR STORAGE OR SHIPMENT - CONT AUTOMATIC RIPCORD RELEASE, MODEL 451, PREPARATION FOR STORAGE OR SHIPMENT USING MODEL 452 TEST CHAMBER ASSEMBLY - CONT 4 5 6 Set AR2 altitude dial (1) 1,000 feet above local MSL altitude. Place AR2 in altitude chamber as shown. Carefully close altitude chamber lid (7).
0023 00
7. Set test chamber ON/OFF switch lever (2) to ON and CLIMB/FALL/COCK switch to CLIMB. Raise altitude to approximately 2,500 feet above the altitude set on AR2 dial. 8. Move switch lever so that JUMP/OFF switch is set to JUMP; move the CLIMB/FALL/COCK switch to FALL, depress and hold the RAPID FALL dump switch, and allow the AR2 to actuate. Observe that storage cable is drawn partially into the AR2. 9. Position JUMP/OFF switch to OFF. 10. If necessary, increase pressure in altitude chamber to ambient by holding down on RAPID FALL dump switch. 11. Switch test chamber ON/OFF switch to OFF. 12. Open lid of altitude chamber and remove AR2 with piston rod cap and storage cable attached. Verify that storage cable is correctly attached by pulling on eye end. STORAGE AR2 units should be shelf stored in a clean dry area and protected from accumulation of dirt. SHIPMENT WARNING Do not transport or store AR2 without piston rod cap storage cable or power cable attached. External forces or impacts applied to the piston rod may cause unit to malfunction. Any unit subjected to external forces or impact must be tested and, if necessary, removed from service. With AR2 storage cable and piston rod cap installed, ensure that the AR2 JUMP/OFF switch is OFF. Protect AR2 with bubble pack and package using standard packing materials
0023 00-2
PREPARATION FOR STORAGE OR SHIPMENT AUTOMATIC RIPCORD RELEASE, MODEL 451, PREPARATION FOR STORAGE OR SHIPMENT USING MODEL 453 ELECTRONIC TEST CHAMBER ASSEMBLY PREPARATION FOR STORAGE WARNING Do not transport or store AR2 without piston rod cap storage cable or power cable attached. External forces or impacts applied to the piston rod may cause unit to malfunction. Any unit subjected to external forces or impact must be tested and, if necessary, removed from service. NOTE Make sure the AR2 is cocked, and the JUMP/OFF switch is set to OFF.
0023 00
1. Pass ball end of storage cable (3) through piston rod cap (5) and then engage recess of piston rod. Attach piston rod cap (5) to spring housing (6) of AR2. Pull eye end of storage cable (3) to verify correct engagement. 2. Open lid of altitude chamber (7) and if necessary remove cocking support (9) (refer to illustration on page 00-1). 3. Move air cylinder rod (4) as far to the right as it will go, approximately 1 inch. 4. Set AR2 altitude dial (1) to 1,000 feet above local MSL altitude. 5. Place AR2 in altitude chamber as shown. 6. Carefully close altitude chamber lid (7). 7. Set test chamber ON/OFF switch to ON. 8. Press and hold HOLD DOWN TO SET switch; use SET ALTITUDE control to set altitude to 2500 feet above the altitude set on AR2 dial. 9. Ensure DUMP circuit is disengaged. 10. Press GO TO ALT AND DWELL switch.
0023 00-3
PREPARATION FOR STORAGE OR SHIPMENT - CONT AUTOMATIC RIPCORD RELEASE, MODEL 451, PREPARATION FOR STORAGE OR SHIPMENT USING MODEL 453 ELECTRONIC TEST CHAMBER ASSEMBLY - CONT 11. Use altitude chamber JUMP switch lever to set AR2 JUMP/OFF switch to JUMP.
0023 00
12. Press DUMP switch and allow AR2 to actuate. Observe that storage cable is drawn partially into the AR2. 13. Set JUMP/OFF switch to OFF. 14. Set test chamber ON/OFF switch to OFF. 15. Open altitude chamber lid and remove AR2 with piston rod cap and storage cable attached. Verify that storage cable is correctly attached by pulling on eye end. STORAGE AR2 units shall be shelf stored in clean, dry area and protected from accumulation of dirt. SHIPMENT WARNING Do not transport or store AR2 without piston rod cap, storage cable, or power cable attached. External forces or impacts applied to the piston rod may cause unit to malfunction. Any unit subjected to external forces or impact must be tested and, if necessary, removed from service. With AR2 storage cable and piston rod cap installed, ensure that the AR2 JUMP/OFF switch is OFF. Protect AR2 with bubble pack and package using standard packing materials.
0023 00-4
0023 00
TEST CHAMBER ASSEMBLY, MODEL 452, PREPARATION FOR STORAGE OR SHIPMENT 1. With AR2 removed from altitude chamber, verify that altitude inside altitude chamber is at ground level. 2. Verify that cocking support is inside the altitude chamber. 3. Close altitude chamber lid. 4. Disconnect power cord from 120 VAC and coil power cord under altitude chamber.
WARNING Mounting base with attached components weighs 50 lbs. Weight when mounting base is installed in carrying case is 70 lbs. Use two persons or lifting device to prevent injury to personnel 5. Open carrying case (2) and carefully lower the mounting base (29) (with attached components) into the carrying case (2). Close and latch carrying case lid. 6. Verify that correct serial number and mfg date are shown on the carrying case identification decal (WP 0009 00). STORAGE Store unit in carrying case in a clean, dry area. SHIPMENT Ship unit in carrying case. ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453, PREPARATION FOR STORAGE OR SHIPMENT 1. With AR2 removed from altitude chamber, verify that altitude inside altitude chamber is at ground level. 2. Verify that cocking support is inside the altitude chamber. 3. Close altitude chamber lid. 4. Switch test chamber ON/OFF switch to OFF. 5. Disconnect power cord from 110 VAC power source and coil power cord under altitude chamber.
0023 00-5
0023 00
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453, PREPARATION FOR STORAGE OR SHIPMENT WARNING Mounting base with attached components weighs 42 lbs. Weight when mounting base is installed in carrying case is 60 lbs. Use two persons or lifting device to prevent injury to personnel. When lifting mounting base with attached components, use lifting handle and head of compressor 6. Open carrying case (2) and carefully lower the mounting base (9) (with attached components) into the carrying case (2). Close and latch carrying case lid. 7. Verify that correct serial number and mfg date are shown on the carrying case identification decal (WP 0010 00). STORAGE Store unit in carrying case in a clean, dry area. SHIPMENT Ship unit in carrying case. END OF WORK PACKAGE
0023 00-6
TM 10-1670-305-23&P
CHAPTER 5 DIRECT SUPPORT MAINTENANCE INSTRUCTIONS FOR TEST CHAMBER ASSEMBLY, AR2, MODEL 452 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 DIRECT SUPPORT MAINTENANCE CALIBRATION WARNING Calibration of the AAU-31/A aviation altimeter may be done only by an authorized calibration laboratory or repair facility with proper altitude-measuring standard instrument. For AAU-31/A aviation altimeter calibration procedures, refer to the applicable technical documentation covering altimeters.
0024 00
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 DIRECT SUPPORT MAINTENANCE CALIBRATION AND ADJUSTMENT WARNING Calibration of and adjustment to the control assembly may be made only by an authorized calibration laboratory or repair facility with proper altitude-measuring standard instrument. NOTE If the control assembly cannot be brought into tolerance, it is defective and must be replaced.
0025 00
ALTITUDE ACCURACY VERIFICATION NOTE Standard instrument used to verify altitude accuracy shall have a verified accuracy within 0.01 % full scale. 1. Position test chamber assembly near 110 VAC power outlet and a standard instrument. 2. Control ambient temperature to 68q r 9qF (20q r 5qC). 3. Use calibration adapter to connect calibration port on control assembly with standard instrument. A 1/8-in. male connector is provided with the calibration adapter to connect it to standard instrument. 4. Connect test chamber assembly to 110 VAC, 50/60 Hz power source. 5. Turn on both instruments and allow them to warm up for 30 minutes minimum. 6. Use SET ALTITUDE CONTROL on control assembly so that standard instrument reads within r 5 feet of the first value in Table 1. If calibration facility is at high altitude. It may be necessary to clamp the lid of the altitude chamber to effect a seal (refer to WP 0012 00).
0025 00-1
Change 1
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 DIRECT SUPPORT MAINTENANCE - CONT ALTITUDE ACCURACY VERIFICATION - CONT
0025 00
Change 1
0025 00-2
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 DIRECT SUPPORT MAINTENANCE ALTITUDE ACCURACY VERIFICATION
0025 00
7. After altitude stabilizes and ALTITUDE DWELL indicator stops flashing, observe and record altitude as observed on test chamber ALTITUDE (FT MSL) indicator. 8. Repeat step (6) and (7) for each table value. 9. All readings shall be within tolerances listed in Table 1. If not, see Zero Altitude Adjustment.
10. Disconnect the entire test setup and prepare test chamber for movement (WP 0023 00)
0025 00-3
Change 1
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 DIRECT SUPPORT MAINTENANCE - CONT ZERO ALTITUDE ADJUSTMENT NOTE Zero altitude adjustment is required if altitude accuracy is out of tolerance. Perform adjustment with unit set up as in preceding paragraphs. 1. Use SET ALTITUDE control to set standard instrument to first value in Table 1.
0025 00
2. Remove top screw securing cover plate, loosen bottom screw and rotate cover plate to side, breaking calibration seal and exposing adjustable resistors. 3. Adjust ALT SET resistor screw (refer to control assembly decal); until ALTITUDE (FT MSL) display comes to within r 5 feet of reading on standard instrument. 4. Verify tolerances for all other altitude values listed in Table 1. If required, readjust ALT SET within the allowable r 30-foot tolerance at zero altitude to obtain the prescribed accuracy for the other altitudes. NOTE If altitude cannot be brought within prescribed accuracy tolerances, control assembly must be returned to depot for repair. 5. Reassemble cover plate and affix a calibration sticker over cover plate to prevent tampering.
Change 1
0025 00-4
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 DIRECT SUPPORT MAINTENANCE RATE ADJUSTMENT
0025 00
This adjustment is performed in response to a reported defect from user level. The following procedure is used to correct an out of tolerance condition between the set fall rate and the actual measured rate. The difference between the set and displayed rates cannot be affected by adjustment. NOTE All four fall rate combinations; high altitude-high fall rate, high altitude-low fall rate, low altitude-high fall rate, and low altitude-low fall rate, must be evaluated together because adjustment of any one of them affects the entire range. Correct adjustment should bring all of the actual measured rates within r 2 ft/sec of their respective set values. If this cannot be done, the Control Assembly is defective and must be replaced. 1. Perform fall rate selector accuracy test (refer to WP 0010 00) to determine at which condition(s) the fall rate is out of tolerance. It is not necessary to place an AR2 in the altitude chamber for this test, and the JUMP/OFF switch may be left in the JUMP position. 2. Open cover plate on back of control housing. Turn RATE SET resistor screw to adjust the fall rate (One half turn of the screw in the clockwise direction will lower the actual fall rate by approximately one ft/sec. The set rate is not affected by the adjustment. There is some backlash in the movement of the screw; turning past the desired position and coming back to it may be beneficial). 3. Verify that the actual fall rates are within tolerance at all four conditions. 4. Reassemble cover plate and affix calibration sticker to prevent tampering.
Change 1
TM 10-1670-305-23&P
CHAPTER 6 SUPPORTING INFORMATION FOR AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451 TEST CHAMBER ASSEMBLY, AR2, MODEL 452 ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453
TM 10-1670-305-23&P
REFERENCES SCOPE
0026 00
This appendix contains all the pamphlets, forms and technical manuals referenced in this manual. 1. Pamphlets DA-PAM 738-750 DA-PAM 738-751 2. Forms DA Form 2028 DA Form 2404 DA Form 3912 NAVMC 10772 SF-361 SF-364 SF-365 SF-368 3. Manuals FM 21-11 TM 10-1670-201-23 NAVAIR 13-1-17 NAVAIR 13-1-21 First Aid General Maintenance of Parachutes and Other Air Drop Equipment General Maintenance of Parachutes and Other Air Drop Equipment Organizational Maintenance with Illustrated Parts Breakdown Ram Air Parachute Assembly MT-1 XS/SL Organizational Maintenance with Illustrated Parts Breakdown Ram Air Parachute Assembly MT-1 XS/SL Organizational Maintenance with Illustrated Parts Breakdown Ram Air Parachute Assembly MT-1 XS/SL Operational Instructions and Organizational Maintenance with Illustrated Parts Breakdown Ram Air Parachute Assembly MC-5 Recommended Changes to Equipment Technical Publications Equipment Inspection and Maintenance Army Parachute Log Record Recommended Change to Publication/Logistics Maintenance Coding Discrepancy of Shipment Report (DSR) Supply Discrepancy Report (SDR), formerly known as a Report of Discrepancy (ROD) Transportation Discrepancy Report (TDR) Product Quality Deficiency Report (PQDR) The Army Maintenance Management System (TAMMS) The Army Maintenance Management System-Aircraft (TAMMS-A)
0026 00-1
Change 1
TM 10-1670-305-23&P
0026 00
Organizational and Direct Support Maintenance Including Repair Parts and Special Tools List for MC-4 Ram Air Free-Fall Personnel Parachute System. Unit Maintenance Manual Including Repair Parts and Special Tools List for Ancillary Equipment for: Military Free-Fall System Equipment Record Procedures Destruction of Army Materials General Maintenance of Parachutes and Other Air Drop Equipment
TM 10-1670-300-20&P
Reporting of Transportation Discrepancies in Shipment Accounting for Lost, Damaged, and Destroyed Property Product Quality Deficiency Report (PQDR)
Change 1
0026 00-2
TM 10-1670-305-23&P
0027 00
INTRODUCTION
THE ARMY MAINTENANCE SYSTEM MAC This introduction provides a general explanation of all maintenance and repair functions authorized at the two maintenance levels under the Two-Level Maintenance System concept. This MAC (immediately following the introduction) designates overall authority and responsibility for the performance of maintenance functions on the identified end item or component. The application of the maintenance functions to the end item or component levels, which are shown on the MAC in column (4) as: Field - includes two columns, Unit Maintenance and Direct Support maintenance. The Unit maintenance column is divided again into two more subcolumns, C for Operator or Crew and O for Unit maintenance. Sustainment includes two subcolumns, general support (H) and depot (D). The tools and test equipment requirements (immediately following the MAC) list the tools and test equipment (both special tools and common tool sets) required for each maintenance function as referenced from the MAC. The remarks (immediately following the tools and test equipment requirements) contain supplemental instructions and explanatory notes for a particular maintenance function. MAINTENANCE FUNCTIONS Maintenance functions will be limited to and are defined as follows: 1. Inspect. To determine the serviceability of an item by comparing its physical, mechanical, and/or electrical characteristics with established standards through examination (e.g., by sight, sound, or feel.) This includes scheduled inspection and gagings and evaluation of cannon tubes. 2. Test. To verify serviceability by measuring the mechanical, pneumatic, hydraulic, or electrical characteristics of an item and comparing those characteristics with prescribed standards on a scheduled basis, i.e., load testing of lift devices and hydrostatic testing of pressure hoses. 3. Service. Operations required periodically to keep an item in proper operating condition; e.g., to clean (includes decontaminate, when required), to preserve, to drain, to paint, or to replenish fuel, lubricants, chemical fluids, or gases. This includes scheduled exercising and purging of recoil mechanisms. The following are examples of service functions: a. Unpack. To remove from packing box for service or when required for the performance of maintenance operations. b. Repack. To return item to packing box after service and other maintenance operations. c. Clean. To rid the item of contamination.
d. Touch up. To spot paint scratched or blistered surfaces. e. Mark. To restore obliterated identification.
0027 00-1
Change 2
TM 10-1670-305-23&P
0027 00
4. Adjust. To maintain or regulate, within prescribed limits, by bringing into proper position, or by setting the operating characteristics to specified parameters. 5. Align. To adjust specified variable elements of an item to bring about optimum or desired performance 6. Calibrate. To determine and cause corrections to be made or to be adjusted on instruments of test, measuring, and diagnostic equipment used in precision measurement. Consists of comparisons of two instruments, one of which is a certified standard of known accuracy, to detect and adjust any discrepancy in the accuracy of the instrument being compared. 7. Remove/install. To remove and install the same item when required to perform service or other maintenance functions. Install may be the act of emplacing, seating, or fixing into position a spare, repair part, or module (component or assembly) in a manner to allow the proper functioning of an equipment or system. 8. Paint. To prepare and spray color coats of paint so that the ammunition can be identified and protected. The color indicating primary use is applied, preferably, to the entire exterior surface as the background color of the item. Other markings are to be repainted as original so as to retain proper ammunition identification. 9. Replace. To remove an unserviceable item and install a serviceable counterpart in its place. Replace is authorized by the MAC and assigned maintenance level is shown as the third position code of the Source, Maintenance and Recoverability (SMR) code. 10. Repair. The application of maintenance services, including fault location/troubleshooting, removal/installation, disassembly/assembly procedures and maintenance actions to identify troubles and restore serviceability to an item by correcting specific damage, fault, malfunction, or failure in a part, subassembly, module (component or assembly), end item, or system.
NOTE
The following definitions are applicable to the repair maintenance function: Services. Inspect, test, service, adjust, align, calibrate, and/or replace. Fault location/troubleshooting. The process of investigating and detecting the cause of equipment malfunctioning; the act of isolating a fault within a system or Unit Under Test (UUT). Disassembly/assembly. The step-by-step breakdown (taking apart) of a spare/functional group coded item to the level of its least component, that is assigned an SMR code for the level of maintenance under consideration (i.e. identified as maintenance significant). Actions. Welding, grinding, riveting, straightening, facing, machining, and/or resurfacing.
11. Overhaul. That maintenance effort (service/action) prescribed to restore an item to a completely serviceable/operational condition as required by maintenance standards in appropriate technical publications. Overhaul is normally the highest degree of maintenance performed by the Army. Overhaul does not normally return an item to like new condition.
Change 2
0027 00-2
TM 10-1670-305-23&P
0027 00
12. Rebuild. Consists of those services/actions necessary for the restoration of unserviceable equipment to a like new condition in accordance with original manufacturing standards. Rebuild is the highest degree of material maintenance applied to Army equipment. The rebuild operation includes the act of returning to zero those age measurements (e.g., hours/miles.) considered in classifying Army equipment/components.
EXPLANATION OF COLUMNS IN THE MAC, SECTION II Column (1) Group Number. Column (1) lists Functional Group Code (FGC) numbers, the purpose of which is to identify maintenance significant components, assemblies, subassemblies, and modules with the Next Higher Assembly (NHA). Column (2) Component/Assembly. Column (2) contains the names of components, assemblies, subassemblies, and modules for which maintenance is authorized. Column (3) Maintenance Function. Column (3) lists the functions to be performed on the item listed in column (2). (For a detailed explanation of these functions refer to Maintenance Functions outlined above). Column (4) Maintenance Level. Column (4) specifies each level of maintenance authorized to perform each function listed in column (3), by indicating work time required (expressed as man-hours in whole hours or decimals) in the appropriate subcolumn. This work time figure represents the active time required to perform that maintenance function at the indicated level of maintenance. If the number or complexity of the tasks within the listed maintenance function varies at different maintenance levels, appropriate work time figures are to be shown for each level. The work time figure represents the average time required to restore an item (assembly, subassembly, component, module, end item, or system) to a serviceable condition under typical field operating conditions. This time includes preparation time (including any necessary disassembly/assembly time), troubleshooting/fault location time, and quality assurance time in addition to the time required to perform the specific tasks identified for the maintenance functions authorized in the MAC. The system designations for the various maintenance levels are as follows: Field: C O F Operator or Crew maintenance Unit maintenance Direct Support maintenance
0027 00-3
Change 2
TM 10-1670-305-23&P
0027 00
NOTE
The L maintenance level is not included in column (4) of the MAC. Functions to this level of maintenance are identified by work time figure in the H column of column (4), and an associated reference code is used in the REMARKS column (6). This code is keyed to the remarks and the SRA complete repair application is explained there.
Column (5) Tools and Equipment Reference Code. Column (5) specifies, by code, those common tool sets (not individual tools), common Test, Measurement and Diagnostic Equipment (TMDE), and special tools, special TMDE and special support equipment required to perform the designated function. Codes are keyed to the entries in the tools and test equipment table. Column (6) Remarks Code. When applicable, this column contains a letter code, in alphabetic order, which is keyed to the remarks table entries.
EXPLANATION OF COLUMNS IN THE TOOLS AND TEST EQUIPMENT REQUIREMENTS, SECTION III
Column (1) - Tool or Test Equipment Reference Code. The tool or test equipment reference code correlates with a code used in column (5) of the MAC. Column (2) - Maintenance Level. The lowest level of maintenance authorized to use the tool or test equipment. Column (3) - Nomenclature. Name or identification of tool or test equipment. Column (4) - National Stock Number (NSN). The NSN of the tool or test equipment. Column (5) - Tool Number. The manufacturers part number, model number, or type number.
Column (1) - Remarks Code. The code recorded in Column (6) of the MAC. Column (2) - Remarks. This column lists information pertinent to the maintenance function being performed as indicated in the MAC.
Change 2
0027 00-4
TM 10-1670-305-23&P
0028 00
SECTION II. MAINTENANCE ALLOCATION CHART (MAC) FOR AUTOMATIC RIPCORD RELEASE, MODEL 451
(1) GROUP NUMBER (2) COMPONENT/ ASSEMBLY (3) MAINTENANCE FUNCTION
UNIT
C 01 AUTOMATIC RIPCORD RELEASE Inspect Test Service Repair Replace Inspect Repair Replace Inspect Test Service Repair Replace
O 0.1 0.3 0.5 0.4 1.0 0.1 0.4 1.0 0.1 1.0 1.0 1.5 1.0
D 1, 2, & 3 7 A D B C A E
0101
4, 5, & 6
02
TEST CHAMBER
1 2, 3, 4, 5 & 6 2, 3, 4, 5, & 6
A D B C
SECTION III. TOOLS AND TEST EQUIPMENT FOR AUTOMATIC RIPCORD RELEASE, MODEL 451
(3) NOMENCLATURE
Model 452 Test Chamber Assembly Model 453 Electronic Test Chamber Assembly Slack Checker Screwdriver, Phillips NO. 2 Wrench Adjustable, 6 Inch Knife Screwdriver, Slotted, 5/32-Inch
SECTION IV. REMARKS FOR AUTOMATIC RIPCORD RELEASE, MODEL 451 (1) REMARKS CODE
A B C D E Inspect is a Technical-Rigger inspection. Service is cleaning of equipment. Repair is by replacement of AR2 de3cals, and JUMP/OFF switch. Test is to verify that the unit functions within specified ranges. Repair by replacement of components of power cable assembly.
(2) REMARKS
0028 00-1
Change 2
TM 10-1670-305-23&P
0028 00
SECTION II. MAINTENANCE ALLOCATION CHART (MAC) FOR TEST CHAMBER ASSEMBLY, MODEL 452
(1) GROUP NUMBER (2) COMPONENT/ ASSEMBLY (3) MAINTENANCE FUNCTION (4) MAINTENANCE LEVEL
FIELD UNIT DIRECT SUPPORT SUSTAINMENT GENERAL SUPPORT DEPOT
0201
ALTIMETER
SECTION III. TOOLS AND TEST EQUIPMENT FOR TEST CHAMBER ASSEMBLY, MODEL 452 (1) (2) TOOLS OR TEST EQUIPMENT REFERENCE CODE
1 2 3 4 5 6
(3) NOMENCLATURE
MAINTENANCE LEVEL
Model 451 Automatic Ripcord Release Putty Knife Wrench, Open End 5/8 Inch Wrench, Open End, 11/16 Inch Nut Driver, 3/8 Inch Screwdriver, Slotted, Inch
11-1-6905-1
SECTION IV. REMARKS FOR TEST CHAMBER ASSEMBLY, MODEL 452 (1) REMARKS CODE
A B C D E Inspect is an external type inspection. Service is cleaning of equipment. Repair is by replacement of decals and components. Test is to verify that the unit functions within specified ranges. Calibration is accomplished by aviation intermediate maintenance (AVIM).
(2) REMARKS
Change 2
0028 00-2
TM 10-1670-305-23&P
0028 00
SECTION II. MAINTENANCE ALLOCATION CHART (MAC) FOR ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453
(1) GROUP NUMBER (2) COMPONENT/ ASSEMBLY (3) MAINTENANCE FUNCTION (4) MAINTENANCE LEVEL (5) TOOLS AND EQUIPMENT REFERENCE CODE (6) REMARKS CODE
SECTION III. TOOLS AND TEST EQUIPMENT FOR ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453
(3) NOMENCLATURE
Model 451 Automatic Ripcord Release Nutdriver, 3/8 Inch Screwdriver, Phillips, NO. 2X7 Inch Screwdriver, Phillips, NO. 3 Screwdriver, Slotted, 3/32 Inch
11-1-6905-1
SECTION IV. REMARKS FOR ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 (1) REMARKS CODE
A B C D E Inspect is an external type inspection. Service is cleaning of equipment. Repair is by replacement of decals and components. Test is to verify that the unit functions within specified ranges. Calibration is accomplished by aviation intermediate maintenance (AVIM). NOTE: TM must accompany test chamber AVIM.
(2) REMARKS
Change 2
TM 10-1670-305-23&P
0029 00
This RPSTL lists and authorizes spares and repair parts; special tools; special test, measurement, and diagnostic equipment (TMDE); and other special support equipment required for performance of operation level maintenance of the following: (1) Automatic Ripcord Release, AR2, Model 451 (2) Test Chamber Assembly, AR2, Model 452 (3) Electronic Test Chamber Assembly, AR2, Model 453. Each will have its own work package. It authorizes the requisitioning, issue, and disposition of spares, repair parts, and special tools as indicated by the source, maintenance, and recoverability (SMR) codes. GENERAL In addition to the introduction work package, this RPSTL is divided into the following work packages. 1. Repair Parts List Work Packages. Work packages containing lists of spares and repair parts authorized by this RPSTL for use in the performance of maintenance. These work packages also include parts which must be removed for replacement of the authorized parts. Parts lists are composed of functional groups in ascending alphanumeric sequence, with the parts in each group listed in ascending figure and item number sequence. Sending units, brackets, filters, and bolts are listed with the component they mount on. Bulk materials are listed by item name in FIG. BULK at the end of the work packages. Repair parts kits are listed separately in their own functional group and work package. Repair parts for reparable special tools are also listed in a separate work package. Items listed are shown on the associated illustrations. 2. Special Tools List Work Packages. Work packages containing lists of special tools, special TMDE, and special support equipment authorized by this RPSTL (as indicated by Basis of Issue (BOI) information in the DESCRIPTION AND USABLE ON CODE (UOC) column). Tools that are components of common tool sets and/or Class VII are not listed. 3. Cross-Reference Indexes Work Packages: There are cross-reference indexes work packages in the RPSTL: the national Stock Number (NSN) Index work package and the Part number (P/N) Index work package. The National Stock Number Index work package refers you to the figure and item number. The Part Number Index work package refers you to the figure and item number. EXPLANATION OF COLUMNS IN THE REPAIR PARTS LIST AND SPECIAL TOOLS LIST WORK PACKAGES Item no. (Column (1)). Indicates the number used to identify items called out in the illustration. SMR CODE (Column (2)). The SMR code containing supply/requisitioning information, maintenance level authorization criteria, and disposition instructions as shown in the following breakout:
0029 00-1
TM 10-1670-305-23&P
REPAIR PARTS AND SPECIAL TOOL LIST (RPSTL) CONT GENERAL CONT
0029 00
SOURCE CODE
XX 1ST TWO POSITIONS: HOW TO GET AN ITEM.
MAINTENANCE CODE
XX 3RD POSITION: WHO CAN INSTALL, REPLACE, OR USE THE ITEM. 4TH POSITION: WHO CAN DO COMPLETE REPAIR* ON THE ITEM.
RECOVERABILITY CODE
X 5TH POSITION: WHO DETERMINES DISPOSITION ACTION ON UNSERVICEABLE ITEMS.
*Complete Repair: Maintenance capacity, capability, and authority to perform all corrective maintenance tasks of the Repair function in a use/user environment in order to restore serviceability to a failed item. SOURCE CODE The source code tells you how you get an item needed for maintenance, repair, or overhaul of an end item/equipment. Explanation of Source Codes follow:
SOURCE CODE
PA PB PC PD PE PF PG KD KF KB MO-Made at unit/ AVUM level MF-Made at DS/ AVIM level MH-Made at GS level ML-Made at SRA MD-Made at depot
APPLICATION/EXPLANATION
Stock items; use the applicable NSN to requisition/request items with these source codes. They are authorized to the level indicated by the code entered in the 3rd position of the SMR code. NOTE: Items coded PC are subject to deterioration.
Items with these codes are not to be requested/requisitioned individually. They are part of a kit which is authorized to the maintenance level indicated in the 3rd position of the SMR code. The complete kit must be requisitioned and applied. Items with these codes are not to be requisitioned/requested individually. They must be made from bulk material which is identified by the P/N in the DESCRIPTION AND USABLE ON CODE (UOC) column and listed in the bulk material group work package of the RPSTL. If the item is authorized to you by the 3rd position code of the SMR code, but the source code indicates it is made at higher level, order the item from the higher level of maintenance.
0029 00-2
TM 10-1670-305-23&P
REPAIR PARTS AND SPECIAL TOOL LIST (RPSTL) GENERAL AO-Assembled by unit/AVUM level AF-Assembled by DS/AVIM level AH-Assembled by GS level AL-Assembled by SRA AD-Assembled by depot Items with these codes are not to be requested /requisitioned individually. The parts that make up the assembled item must be requisitioned or fabricated and assembled at the level of maintenance indicated by the source code. If the 3rd position of the SMR code authorizes you to replace the item, but the source code indicated the item is assembled at a higher level, order the item from the higher level of maintenance..
0029 00
XA XB
Do not requisition an XA coded item. Order the next higher assembly. (Refer to NOTE below). If an item is not available from salvage, order it using the CAGEC and P/N. Installation drawings, diagrams, instruction sheets, field service drawings; identified by manufactures P/N. Item is not stocked. Order an XD-coded item through normal supply channels using the CAGEC and P/N given, if no NSN is available NOTE
XC
XD
Cannibalization or controlled exchange, when authorized, may be used as a source of supply for items with the above source codes except for those items source coded XA or those aircraft support items restricted by requirements of AR750-1. Maintenance Code. Maintenance codes tell you the level(s) of maintenance authorized to use and repair support items. The maintenance codes are entered in the third and fourth positions of the SMR code as follows: Third Position. The maintenance code entered in the third position tells you the lowest maintenance level authorized to remove, replace, and use an item. The maintenance code entered in the third position will indicate authorization to the following levels of maintenance:
0029 00-3
TM 10-1670-305-23&P
REPAIR PARTS AND SPECIAL TOOL LIST (RPSTL) - CONT GENERAL - CONT
0029 00
MAINTENANCE CODE
C O F H L D
APPLICATION/EXPLANATION
Crew or operator maintenance done within unit /AVUM maintenance. Unit level/AVUM maintenance can remove, replace, and use the item. Direct support/AVIM maintenance can remove, replace, and use the item. General support maintenance can remove, replace, and use the item. Specialized repair activity can remove, replace, and use the item. Depot can remove, replace, and use the item.
Fourth Position. The maintenance code entered in the fourth position tells you whether or not the item is to be repaired and identifies the lowest maintenance level with the capability to do complete repair (perform all authorized repair functions). NOTE Some limited repair may be done on the item at a lower level of maintenance, if authorized by the Maintenance Allocation Chart (MAC) and SMR codes.
MAINTENANCE CODE
O F H L
APPLICATION/EXPLANATION
Unit/AVUM is the lowest level that can do complete repair of the item. Direct support/AVIM is the lowest level that can do complete repair of the item. General support is the lowest level that can do complete repair of the item. Specialized repair activity (operator) is the lowest level that can do complete repair of the item. Depot is the lowest level that can do complete repair of the item. Nonreparable. No repair is authorized. No repair is authorized. No parts or special tools are authorized for maintenance of B coded item. However, the item may be reconditioned by adjusting, lubrication, etc., at the user level.
D Z B
Recoverability Code. Recoverability codes are assigned to items to indicate the disposition action on unserviceable items. The recoverability code is shown in the fifth position of the SMR code as follows:
0029 00-4
TM 10-1670-305-23&P
0029 00
RECOVERABILITY CODE
Z
APPLICATION/EXPLANATION
Nonreparable item. When unserviceable, condemn and dispose of the item at the level of maintenance shown in the third position of the SMR code. Reparable item. When uneconomically reparable, condemn and dispose of the item at the unit level. Reparable item. When uneconomically reparable, condemn and dispose of the item at the direct support level. Reparable item. When uneconomically reparable, condemn and dispose of the item at the general support level. Reparable item. When beyond lower level repair capability, return to depot. Condemnation and disposal of item are not authorized below depot level. Reparable item. Condemnation and disposal not authorized below Specialized Repair Activity (SRA). Item requires special handling or condemnation procedures because of specific reasons (such as precious metal content, high dollar value, critical material, or hazardous material). Refer to appropriate manuals /directives for specific instructions.
O F
H D
L A
NSN (Column (3). The NSN for the item is listed in this column. CAGEC (Column (4). The commercial and Government Entity Code (CAGEC) is a five-digit code which is used to identify the manufacturer, distributor, or Government agency/activity that supplies the item. PART NUMBER (Column (5). Indicates the primary number used by the manufacturer (individual, company, firm, corporation, or Government activity), which controls the design and characteristics of the item by means of its engineering drawings, specifications, standards, and inspection requirements to identify an item or range of items. NOTE When you use an NSN to requisition an item, the item you receive may have a different P/N from the number listed. DESCRIPTION AND USABLE ON CODE (UOC) (Column (6). This column includes the following information:
0029 00-5
TM 10-1670-305-23&P
REPAIR PARTS AND SPECIAL TOOL LIST (RPSTL) - CONT GENERAL - CONT
0029 00
1. The federal item name, and when required, a minimum description to identify the item. 2. P/Ns of bulk materials are referenced in this column in the line entry to be manufactured or fabricated. 3. Hardness Critical Item (HCI). A support item that provides the equipment with special protection from electromagnetic pulse (EMP) damage during a nuclear attack. 4. The statement END of FIGURE appears just below the last item description in column (6) for a given figure in both the repair parts list and special tools list work packages. 5. QTY (column (7). The QTY (quantity per figure) column indicates the quantity of the item used in the breakout shown on the illustration/figure, which is prepared for a functional group, subfunctional group, or an assembly. A V appearing in this column instead of a quantity indicates that the quantity is variable and quantity may change from application to application. EXPLANATION OF CROSS-REFERENCE INDEXES WORK PACKAGES FORMAT AND COLUMNS 1. National Stock Number (NSN) Index Work Package. STOCK NUMBER Column. This column lists the NSN in National item identification number (NIIN) sequence. The NIIN consists of the last nine digits of the NSN. NSN (e.g., 5385-01-574-1476) NIIN When using this column to locate an item, ignore the first four digits of the NSN. However, the complete NSN should be used when ordering items by stock number.
FIG. Column. This column lists the number of the figure where the item is identified/located. The figures are in numerical order in the repair parts list and special tools list work packages. ITEM Column. Th item number identifies the item associated with the figure listed in the adjacent FIG. Column. This item is also identified by the NSN listed on the same line. 2. Part Number (P/N) Index Work package. P/Ns in this index are listed in ascending alphanumeric sequence (vertical arrangement of letter and number combinations which places the first letter or digit of each group in order A through Z, followed by the numbers 0 through 9 and each following letter or digit in like order). PART NUMBER Column. Indicates the P/N assigned to the item. FIG. Column. This column lists the number of the figure where the item is identified/located in the repair parts list and special tools list work packages. ITEM Column. The item number is the number assigned to the item as it appears in the figure referenced in the adjacent figure number column.
0029 00-6
TM 10-1670-305-23&P
REPAIR PARTS AND SPECIAL TOOL LIST (RPSTL) GENERAL INDEX NUMBERS
0029 00
Items which have the word BULK in the figure column will have an index number shown in the item number column. This index number is a cross references between the NSN/PN index work packages and the BULK material list in the repair parts list work package. REFERENCE DESIGNATOR Column. Indicates the reference designator assigned to the item. SPECIAL INFORMATION HOW TO LOCATE REPAIR PARTS 1. When NSNs or P/Ns are not known. First. Using the table of contents, determine the assembly group to which the item belongs. This is necessary since figures are prepared for assembly groups, and lists are divided into the same groups. Second. Find the figure covering the functional group or the subfunctional group to which the item belongs. Third. Identify the item on the figure and note the number(s). Fourth. Look in the repair parts list work packages for the figure and item numbers. The NSNs and part numbers are on the same line as the associated item numbers. 2. When NSN Is Known. First. If you have the NSN, look in the STOCK NUMBER column of the NSN index work package. The NSN is arranged in NIIN sequence. Note the figure and item number next to the NSN. Second. Turn to the figure and locate the item number. Verify that the item is the one you are looking for. 3. When P/N is Known. First. If you have the P/N and not the NSN, look in the Part Number column of the P/N index work package. Identify the figure and item number. Second. Look up the item on the figure in the applicable repair parts list work package. ABBREVIATIONS Not Applicable
TM 10-1670-305-23&P
0030 00
8 1 7
2 5 17 14 6 9 12
13
16
15 10 11
Change 1
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 REPAIR PARTS LIST
(1) ITEM NO. 1 (2) SMR CODE PAODD (3) NATIONAL STOCK NUMBER 1670-01-369-7914 (4) CAGEC 81337 (5) PART NUMBER 11-1-6905-1 (6) DESCRIPTION AND USABLE ON CODE GROUP 01 RIPCORD RELEASE ASSY, AUTOMATIC, MODEL 451 FIGURE 1 RIPCORD RELEASE ASSY, AUTOMATIC, MODEL 451 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 PAOOO XDOZZ XDOZZ XDOZZ XDOZZ PAOZZ PAOZZ PAOZZ XDOZZ PAOZZ PAOZZ PAOOO PAOOO XDOZZ XDOZZ XDOZZ 1670-01-428-9252 5930-01-390-4706 7690-01-390-4702 6150-01-390-4711 5330-01-390-4719 5330-01-390-4720 1670-01-428-3865 6150-01-390-4709 81337 81337 81337 26309 91906 81337 81337 81337 81337 81337 81337 81337 81337 81337 81337 26309 11-1-6906-4 11-1-6924-1 11-1-6925-4 451-059 MS274261103D 11-1-6913-1 11-1-6914-1 11-1-4052-1 11-1-6923-1 11-1-4053-1 11-1-6908-1 11-1-6909-1 11-1-6906-3 11-1-6924-2 11-1-6925-3 451-230-1 . POWER CABLE ASSY, MAIN . . POWER HOUSING, MAIN . . POWER CABLE, MAIN . . RETAINER POWER HOUSING . . RING RETAINING . . SEAL, POWER CABLE . . RETAINER CABLE SEAL . . LANYARD ASSY . . CABLE, STORAGE . . CAP, PISTON ROD . . SWITCH ASSY, JUMP/OFF . . DECAL,JUMP/OFF . POWER CABLE ASSY, RESERVE . . POWER HOUSING, RESERVE . . POWER CABLE, RESERVE SLACK CHECKER, RIPCORD RELEASE END OF FIGURE 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 REF
0030 00
Change 1
TM 10-1670-305-23&P
0031 00
2
8
0031 00-1
Change 1
TM 10-1670-305-23&P
0031 00
11 20
17
16 14
12
13
18 8
15 3 5 6
10
6 5
20
19
Change 1
0031 00-2
TM 10-1670-305-23&P
0031 00
1 1 2 3 3 1 2 1 1 1 1 3 1 1 1 4 1 1 1
Change 1
TM 10-1670-305-23&P
0032 00
1
7 2-16
5 VIEW A
10
14 6 15 14 11 3 16 12 4 2
13 8
Change 1
TM 10-1670-305-23&P
0032 00
4 1 4 1 1 1 1 1 1 10 1 2 4 1 4
Change 1
TM 10-1670-305-23&P
0033 00
NATIONAL STOCK NUMBER 1670-01-369-7914 1670-01-370-0752 1670-01-390-4718 1670-01-428-3865 1670-01-428-9252 1670-01-468-9471 3040-00-855-2020 4310-01-390-4722 4320-01-390-4723 4730-01-397-7890 5330-01-390-4719 5330-01-390-4720 5920-00-270-5179 5920-00-270-5179 5930-01-390-4706 6150-01-390-4709 6150-01-390-4711 6610-00-110-3368
FIGURE NO. 0030-1 0031-2 0031-2 0030-1 0030-1 0032-3 0031-2 0031-2 0031-2 0031-2 0030-1 0030-1 0031-2 0032-3 0030-1 0030-1 0030-1 0031-2
ITEM NO. 1 1 19 9 11 1 4 7 3 14 7 8 18 3 12 2 14 12
ITEM NO. 13 11
Change 1
TM 10-1670-305-23&P
0034 00
PART NUMBER AAU-31/A-1 MS27426-1103D MS51597-81 SS-600-2-6STKN 11-1-4051-1 11-1-4052-1 11-1-4053-1 11-1-4150-1 11-1-4154-1 11-1-4156-1 11-1-4151-1 11-1-6905-1 11-1-6906-4 11-1-6906-3 11-1-6908-1 11-1-6909-1 11-1-6913-1 11-1-6914-1 11-1-6915-1 11-1-6916-1 11-1-6916-2
FIGURE NO. 0031-2 0030-1 0032-3 0031-2 0031-2 0030-1 0030-1 0032-3 0032-3 0032-3 0032-3 0030-1 0030-1 0030-1 0030-1 0030-1 0030-1 0030-1 0031-2 0031-2 0031-2
ITEM NO. 12 6 14 14 19 9 11 1 6 8 10 1 2 14 12 13 7 8 1 3 7
PART NUMBER 11-1-6923-1 11-1-6924-1 11-1-6924-2 11-1-6925-4 11-1-6925-3 261-P-04 261-P-04 313005 313005 451-059 451-230-1 452-101 452-129 452-129 452-132 452-133 452-134 452-135 452-157 452-203 452-212
FIGURE NO. 0030-1 0030-1 0030-1 0030-1 0030-1 0031-2 0032-3 0031-2 0032-3 0030-1 0030-1 0031-2 0031-2 0032-3 0031-2 0031-2 0031-2 0031-2 0031-2 0031-2 0031-2
ITEM NO. 10 3 15 4 16 4 11 18 3 5 17 2 5 2 16 10 9 8 11 15 13
0034 00-1
Change 1
TM 10-1670-305-23&P
0034 00
PART NUMBER 452-213 452-224 452-224 453-099 453-099 453-165 453-280 453-450-1 453-451 453-542 453-543
FIGURE NO. 0031-2 0031-2 0032-3 0032-3 0031-2 0032-3 0032-3 0032-3 0032-3 0032-3 0032-3
ITEM NO. 17 6 4 5 20 7 9 12 13 15 16
PART NUMBER
FIGURE NO.
ITEM NO.
Change 1
0034 00-2
TM 10-1670-305-23&P
COMPONENTS OF END ITEMS (COEI) AND BASIC ISSUE ITEMS (BII) INTRODUCTION SCOPE
0035 00
This work package lists COEI and Bll for the Model 451 Automatic Ripcord Release, Model 452 Test Chamber Assembly, and Model 453 Electronic Test Chamber Assembly, to help you inventory items for safe and efficient operation of the equipment. GENERAL The COEI and Bll information is divided into the following lists: Components of End Item (COEI). This list is for information purposes only and is not authority to requisition replacements. These items are part of the applicable unit. As part of the end item, these items must be with the end item whenever it is issued or transferred between property accounts. Items of COEI are removed and separately packaged for transportation or shipment only when necessary. Illustrations are furnished to help you find and identify the items. Basic Issue Items (Bll). These essential items are required to place the applicable unit in operation, operate it, and to do emergency repairs. Although shipped separately packaged, BII must be with the units during operation and when it is transferred between property accounts. Listing these items is your authority to request/requisition them for replacement based on authorization of the end item by the TOE/MTOE. Illustrations are furnished to help you find and identify the items. Explanation of Columns in the COEI List and Bll List Column (1), Illus. Number, gives you the number of the item illustrated. Column (2), National Stock Number, identifies the stock number of the item to be used for requisitioning purposes. Column (3), Description, CAGEC, and part number, identifies the Federal item name (in all capital letters) followed by a minimum description when needed. The stowage location of COEI and BII is also included in this column. The last line below the description is the CAGEC (Commercial and Government entity code) (in parentheses) and the part number. Column (4), Usable on code, gives you a code if the item you need is not the same for different models of equipment. These codes are identified below: Code Used on
Column (5), U/M (unit of measure), indicates how the item is issued for the National Stock Number shown in column (2). Column (6), Qty Rqr, indicates the quantity required.
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 COMPONENTS OF END ITEMS (COEI) AND BASIC ISSUE ITEMS (BII)
0036 00
0036 00-1
Change 1
TM 10-1670-305-23&P
AUTOMATIC RIPCORD RELEASE, MODEL 451 COMPONENTS OF END ITEMS (COEI) AND BASIC ISSUE ITEMS (BII) - CONT BASIC ISSUE ITEMS (BII), AUTOMATIC RIPCORD RELEASE, MODEL 451
0036 00
STROKE SIMULATOR, RIPCORD RELEASE (81337) 11-1-4054-2 SLACK CHECKER (26309) 451-230-1 POWER CABLE ASSY, MAIN RIPCORD RELEASE (81337) 11-1-6906-4 POWER CABLE ASSY, RSV, RIPCORD RELEASE (81337) 11-1-6906-3
Change 1
0036 00-2
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 COMPONENTS OF END ITEMS (COEI) AND BASIC ISSUE ITEMS (BII) COMPONENTS OF END ITEM (COEI), TEST CHAMBER ASSEMBLY, MODEL 452
0037 00
0037 00-1
TM 10-1670-305-23&P
TEST CHAMBER ASSEMBLY, MODEL 452 COMPONENTS OF END ITEMS (COEI) AND BASIC ISSUE ITEMS (BII) CONT BASIC ISSUE ITEMS (BII), TEST CHAMBER ASSEMBLY, MODEL 452 There is no BII for the Test Chamber Assembly, Model 452.
0037 00
0037 00-2
TM 10-1670-305-23&P
ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 COMPONENTS OF END ITEMS (COEI) AND BASIC ISSUE ITEMS (BII) COMPONENTS OF END ITEMS (COEI), ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453
0038 00
EA EA
0038 00-1
TM 10-1670-305-23&P
MODEL 453 ELECTRONIC TEST CHAMBER ASSEMBLY COMPONENTS OF END ITEMS (COEI) AND BASIC ISSUE ITEMS (BII) - CONT
0038 00
BASIC ISSUE ITEMS (BII) ), ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453
(5) U/M
(6) QTYR QR 1
TM 10-1670-305-23&P AIR FORCE T.O. 14D2-11-1 NAVSEA SS400-AY-MMO-010 MARINE CORPS TM 1670-23&P TEHCNICAL MANUAL, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST), AUTOMATIC RIPCORD RELEASE, AR2, MODEL 451, TEST CHAMBER ASSEMBLY, AR2, MODEL 452, ELECTRONIC TEST CHAMBER ASSEMBLY, AR2, MODEL 453
EA
0038 00-2
TM 10-1670-305-23&P
0039 00
There is no Additional Authorization List for the Automatic Ripcord Release, Model 451, Test Chamber Assembly, Model 452, and Electronic Test Chamber Assembly, Model 453.
TM 10-1670-305-23&P
0040 00
This work package lists expendable and durable items that you will need to operate and maintain the AR2 Automatic Ripcord Release, Model 451, Test Chamber Assembly, Model 452, and Electronic Test Chamber Assembly, Model 453. This list is for information only and is not authority to requisition the listed items. These items are authorized to you by CTA 50-970. Expendable/Durable Items (Except Medical, Class V Repair Parts, and Heraldic items), or CTA 8100, Army Medical Department Expendable/Durable items. Explanations of columns in the Expendable/Durable Items List Column (1)-Item Number. This number is assigned to the entry in the list and is referenced in the narrative instructions to identify the item (e.g., Use desiccant (Item WP 0064 00).). Column (2)-Level. This column includes the lowest level of maintenance that requires the listed item (C = Operator/Crew). Column (3)-National Stock Number. This is the NSN assigned to the item which you can use to requisition it. Column (4)-Item Name, Description, Commercial and Government Entity Code (CAGEC), and Part Number (P/N). This column provides the other information you need to identify the item. Column (5)-Unit of Measure (U/M). This code shows the physical measurement or count of an item, such as gallon, dozen, gross, etc. EXPENDABLE AND DURABLE ITEMS LIST
TM 10-1670-305-23&P
0041 00
This work package lists all common tools and supplements and special tools/fixtures needed to maintain the Automatic Ripcord Release, Model 451, Test Chamber Assembly, Model 452, and Electronic Test Chamber Assembly, Model 453. EXPLANATION OF COLUMNS IN THE TOOL IDENTIFICATION LIST a. Column (1) Item Number. This number is assigned to the entry in the list and is referenced in the initial setup to identify the item (e.g., Extractor (item 32, WP 0105 00)). b. Column (2) Item Name. This column lists the item by noun nomenclature and other descriptive features (e.g., Gage, belt tension). c. Column (3) National Stock Number. This is the National Stock Number (NSN) assigned to the item; use it to requisition the item.
d. Column (4) Part Number/CAGEC. Indicates the primary number used by the manufacturer (individual, company, firm, corporation, or Government activity) which controls the design and characteristics of the item by means of its engineering drawings, specifications, standards, and inspection requirements to identify an item of range of items. The manufacturers Commercial and Government Entity Code (CAGEC) is also included. e. Column (5) Reference. This column identifies the authorizing supply catalog or RPSTL for items listed in this work package. TOOL IDENTIFICATION LIST (1) ITEM NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (3) NATIONAL STOCK NUMBER
5110-00-162-2205 1670-01-369-7914 1670-01-370-0752 1670-01-468-9471 5120-00-294-4605 5120-00-234-8913 5120-00-596-0861 5120-00-234-8912 5120-00-720-4969 5120-00-596-9364 5120-00-264-3795 5120-00-187-7126 5120-00-224-3160
KNIFE MODEL 451 AUTOMATIC RIPCORD RELEASE MODEL 452 TEST CHAMBER ASSEMBLY MODEL 453 ELECTRONIC TEST CHAMBER ASSEMBLY NUTDRIVER, 3/8 INCH PUTTY KNIFE SCREWDRIVER, PHILLIPS, NO. 2 SCREWDRIVER, PHILLIPS, NO. 2 x 7 INCH SCREWDRIVER, PHILLIPS, NO. 3 SCREWDRIVER, SLOTTED, 3/32 INCH SCREWDRIVER, SLOTTED, 5/32 INCH SCREWDRIVER, SLOTTED, INCH SLACK CHECKER WRENCH, ADJUSTABLE, 6 INCH WRENCH, OPEN END, 5/8 INCH WRENCH, OPEN END, 11/16 INCH
(5) REFERENCE
Change 1
TM 10-1670-305-23&P
0042 00
This work package provides a reproducible form to record the maintenance history in the AR2. Entries shall be in accordance with operation of either test set (WP 0009 00 or WP 0010 00). NSN 1670-01-369-7914 S/N:_____________ DATE OF TEST CUMULATIVE NO. OF JUMPS CUMULATIVE NO. OF ACTUATIONS
DATE PIS:__________
NOTE: ACTUATION ALTITUDE TOLERANCES r 300FT BELOW 10,000 FT; r 500FT AT 10,000 FT OR ABOVE
CHECKS: 1ST: 5,500FT FIRE ALT__________GO/NO GO 2ND: 5,500FT NO FIRE___________GO/NO GO 3RD: 10,500 FT NO FIRE__________GO/NO GO 4TH:3,000FT FIRE ALT_______GO/NO GO 5TH: 8,000FT FIRE ALT_______GO/NO GO 6TH: 15,000FT FIRE ALT______GO/NO GO 7TH: ______FT FIRE ALT______GO/NO GO
REMARKS:_____________________________________________________________ ______________________________________________________________________
DATE:_____________
CHECKS: 1ST: 5,500FT FIRE ALT__________GO/NO GO 2ND: 5,500FT NO FIRE ___________GO/NO GO 3RD:10,500 FT NO FIRE__________GO/NO GO
INSP:____________________________
4TH:3,000FT FIRE ALT_______GO/NO GO 5TH: 8,000FT FIRE ALT_______GO/NO GO 6TH: 15,000FT FIRE ALT______GO/NO GO 7TH: ______FT FIRE ALT______GO/NO GO
CHECKS: 1ST: 5,500FT FIRE ALT__________GO/NO GO 2ND: 5,500FT NO FIRE___________GO/NO GO 3RD: 10,500 FT NO FIRE__________GO/NO GO
4TH: 3,000FT FIRE ALT_______GO/NO GO 5TH: 8,000FT FIRE ALT_______GO/NO GO 6TH: 15,000FT FIRE ALT______GO/NO GO 7TH: ______FT FIRE ALT______GO/NO GO
Change 1
TM 10-1670-305-23&P
INDEX Subject A Additional Authorization List (AAL) Introduction.......................... Scope ............................................................................... AR2 Maintenance Log.............................................................. Automatic Ripcord Release, AR2 Jump/Off Switch Maintenance. Assembly and Installation of Jump/Off Switch...................... General............................................................................. Initial Setup ....................................................................... Materials ........................................................................... Removal and Disassembly of Jump/Off Switch .................... Tools................................................................................. Automatic Ripcord Release, Model 451 Components of End Items (COEI) And Basic Issue Items (BII).................................. Basic Issue Items (BII), Automatic Ripcord Release, Model 451 ................................................................................... Components of End Item (COEI) Automatic Ripcord Release, Model 451 ........................................................... Automatic Ripcord Release, Model 451 Equipment Description and Data ................................................................................. Capabilities and Features ................................................... Differences Between Models .............................................. Equipment Characteristics, Capabilities and Features Characteristics................................................................... Equipment Data................................................................. Location and Description of Major Components ................... Automatic Ripcord Release, Model 451 Operation Under Usual Conditions............................................................................... Assembly and Preparation For Use..................................... Decals and Instruction Plates.............................................. Operation Procedures ........................................................ Preparation For Movement ................................................. Shelter Requirements......................................................... Automatic Ripcord Release, Model 451 Repair Parts List ........... Repair Parts And Special Tools List .................................... Automatic Ripcord Release, Model 451 Theory of Operation ...... 0039 00-1 0039 00-1 0042 00-1 0020 00-1 0020 00-2 0020 00-1 0020 00-1 0020 00-1 0020 00-1 0020 00-1 0036 00-1 0036 00-2 0036 00-1 0002 00-1 0002 00-1 0002 00-3 0002 00-1 0002 00-3 0002 00-1 0008 00-1 0008 00-1 0008 00-10 0008 00-5 0008 00-10 0008 00-1 0030 00-1 0030 00-1 0004 00-1 WP Sequence No.-Page No.
INDEX-1
TM 10-1670-305-23&P
INDEX Subject WP Sequence No.-Page No.
C Components of End Items (COEI) and Basic Issue Items (BII) Introduction ............................................................................. General............................................................................. Scope ............................................................................... 0035 00-1 0035 00-1 0035 00-1
D Description and Use of Controls and Indicators.......................... Automatic Ripcord Release, Model 451 ............................... Electronic Test Chamber Assembly, Model 453 ................... Test Chamber Assembly, Model 452 ................................... 0007 00-1 0007 00-1 0007 00-4 0007 00-2
E Electronic Test Chamber Assembly, Model 453 Components of End Item (COEI) And Basic Issue Items (BII)............................. Basic Issue Items (BII), Electronic Test Chamber Assembly, Model 453 ......................................................................... Components of End Item (COEI), Electronic Test Chamber Assembly, Model 453 ......................................................... Electronic Test Chamber Assembly, Model 453 Direct Support Maintenance............................................................................ Altitude Accuracy Verification ............................................. Calibration And Adjustment ................................................ Rate Adjustment ................................................................ Zero Altitude Adjustment .................................................... Electronic Test Chamber Assembly, Model 453 Operation Under Unusual Conditions (High Altitude Facilities) .............................. Testing At High Altitudes .................................................... Electronic Test Chamber Assembly (Model 453) Operation Under Usual Conditions............................................................ Actuation Altitude Test ....................................................... Altitude Stability Test.......................................................... Assembly And Preparation For Use..................................... Control Interlocks Test ....................................................... Decals And Instruction Plates ............................................. 0038 00-1 0038 00-2 0038 00-1 0025 00-1 0025 00-1 0025 00-1 0025 00-5 0025 00-4 0012 00-1 0012 00-1 0010 00-1 0010 00-12 0010 00-2 0010 00-1 0010 00-8 0010 00-13
INDEX-2
TM 10-1670-305-23&P
INDEX Subject Fall Rate Test.................................................................... Initial Adjustment Before Use.............................................. Operating Procedure.......................................................... Preparation for Movement .................................................. Rate Threshold (All Fire) Test ............................................. Rate Threshold (No Fire) Test............................................. Siting Requirements........................................................... Shelter Requirements......................................................... Shutdown After Testing ...................................................... Electronic Test Chamber Assembly, Model 453 Repair Parts List Electronic Test Chamber Assembly, Model 453 Unit Maintenance............................................................................ Assembly .......................................................................... Calibration......................................................................... Cleaning............................................................................ Disassembly ...................................................................... General............................................................................. Initial Setup ....................................................................... Inspection.......................................................................... Inspection Prior To Disassembly ......................................... Materials ........................................................................... Tools................................................................................. Expendable And Durable Items List Introduction ........................ Expendable And Durable Items List..................................... Scope ............................................................................... WP Sequence No.-Page No. 0010 00-5 0010 00-1 0010 00-10 0010 00-15 0010 00-11 0010 00-11 0010 00-1 0010 00-1 0010 00-15 0032 00-1 0022 00-1 0022 00-6 0022 00-7 0022 00-6 0022 00-2 0022 00-1 0022 00-1 0022 00-6 0022 00-1 0022 00-1 0022 00-1 0040 00-1 0040 00-1 0040 00-1
G General Information ................................................................. Calibration......................................................................... Corrosion Prevention and Control (CPC) ............................. Destruction of Army Material To Prevent Enemy Use ........... List of Abbreviations........................................................... Maintenance Forms, Records, And Reports......................... Nomenclature Cross Reference List .................................... 0001 00-1 0001 00-3 0001 00-2 0001 00-2 0001 00-2 0001 00-1 0001 00-2
INDEX-3
TM 10-1670-305-23&P
INDEX Subject Preparation For Storage or Shipment .................................. Reporting Equipment Improvement Recommendations (EIR) Safety, Care and Handling.................................................. Scope ............................................................................... Warranty Information.......................................................... M Maintenance Allocation Chart................................................... Automatic Ripcord Release Model 451 ................................ Electronic Test Chamber Assembly, Model 453 ................... Test Chamber Assembly, Model 452 ................................... Maintenance Allocation Chart (MAC)......................................... Explanation of Columns in Remarks, Section IV................... Explanation of Columns in The MAC, Section II ................... Explanation of Columns in Tools And Test Equipment Requirements, Section III ................................................... Maintenance Functions ...................................................... The Army Maintenance System .......................................... 0028 00-1 0028 00-1 0028 00-3 0028 00-2 0027 00-1 0027 00-4 0027 00-3 0027 00-4 0027 00-1 0027 00-1 WP Sequence No.-Page No. 0001 00-2 0001 00-1 0001 00-3 0001 00-1 0001 00-2
N National Stock Number Index ................................................... P Part Number Index................................................................... Power Cable Assembly, Main/Reserve Unit Maintenance........... Assembly of Power Cable Assembly ................................... Cleaning............................................................................ Disassembly of Power Cable Assembly ............................... General............................................................................. Initial Setup ....................................................................... Inspection.......................................................................... Inspection of Power Cable Assemb ly Prior to Disassembly ... Install Power Cable Assembly............................................. Materials ........................................................................... 0034 00-1 0019 00-1 0019 00-4 0019 00-4 0019 00-3 0019 00-1 0019 00-1 0019 00-4 0019 00-2 0019 00-5 0019 00-1 0033 00-1
INDEX-4
TM 10-1670-305-23&P
INDEX Subject Removal of AR2 and Power Cable Assembly....................... Tools................................................................................. Preliminary Checks And Adjustments ........................................ Checks and Adjustments .................................................... Controls and Indicators....................................................... Preparation For Storage or Shipment ........................................ Automatic Ripcord Release, Model 451, Preparation For Storage or Shipment Using Model 452 Test Chamber Assembly .......................................................................... Preparation For Storage............................................... Storage ....................................................................... Shipment..................................................................... Automatic Ripcord Release, Model 451, Preparation For Storage or Shipment Using Model 453 Electronic Test Chamber Assembly............................................................ Preparation For Storage............................................... Storage ....................................................................... Shipment..................................................................... Electronic Test Chamber Assembly, Model 453, Preparation For Storage or Shipment .................................................... Storage ....................................................................... Shipment..................................................................... Test Chamber Assembly, Model 452, Preparation For Storage or Shipment .......................................................... Storage ....................................................................... Shipment..................................................................... Preventive Maintenance Checks and Services (PMCS) .............. Additional PMCS................................................................ Additional PMCS................................................................ Additional PMCS................................................................ General............................................................................. Initial Setup ....................................................................... Introduction ....................................................................... Maintenance Level............................................................. PMCS ............................................................................... PMCS ............................................................................... WP Sequence No.-Page No. 0019 00-1 0019 00-1 0017 00-1 0017 00-1 0017 00-1 0023 00-1
0023 00-3 0023 00-3 0023 00-4 0023 00-4 0023 00-5 0023 00-6 0023 00-6 0023 00-5 0023 00-5 0023 00-5 0018 00-1 0018 00-2 0018 00-3 0018 00-4 0018 00-1 0018 00-1 0018 00-1 0018 00-1 0018 00-2 0018 00-3
INDEX-5
TM 10-1670-305-23&P
INDEX Subject PMCS ............................................................................... R References.............................................................................. Scope ............................................................................... Repair Parts And Special Tool List (RPSTC).............................. Explanation of Columns in The Repair Parts List And Special Tools List Work Packages .................................................. Explanation of Cross-Reference Indexes Work Packages Format and Columns.......................................................... General............................................................................. Index Numbers .................................................................. Scope ............................................................................... Source Code ..................................................................... Special Information ............................................................ S Service Upon Receipt............................................................... Automatic Ripcord Release, Model 451 ............................... Service Upon Receipt, Test Chamber Assembly Model 452.. Service Upon Receipt, Electronic Test Chamber Assembly, Model 453 ......................................................................... Supporting Data For Repair Parts, Special Tools, TMDE and Support Equipment .................................................................. Repair Parts ...................................................................... Special Tools, TMDE and Support Equipment...................... 0016 00-1 0016 00-1 0016 00-2 0016 00-2 0006 00-1 0006 00-1 0006 00-1 0026 00-1 0026 00-1 0029 00-1 0029 00-1 0029 00-6 0029 00-1 0029 00-7 0029 00-1 0029 00-2 0029 00-7 WP Sequence No.-Page No. 0018 00-4
T Test Chamber Assembly Equipment Description and Data ......... Equipment Characteristics and Features ............................. Equipment Data (Model 452) .............................................. Equipment Data (Model 453) .............................................. Location and Description of Major Components (Model 452). Location and Description of Major Components (Model 453). Test Chamber Assembly, Model 452, Components of End Items (COEI) and Basic Issue Items (BII) ........................................... Components of End Items (COEI), Test Chamber Assembly, 0003 00-1 0003 00-1 0003 00-6 0003 00-7 0003 00-1 0003 00-3 0037 00-1
INDEX-6
TM 10-1670-305-23&P
INDEX Subject Model 452 ......................................................................... Basic Issue Items (BII) , Test Chamber Assembly, Model 452 Test Chamber Assembly, Model 452, Direct Support Maintenance............................................................................ Calibration......................................................................... Test Chamber Assembly, Model 452 Operation Under Unusual Conditions (High Altitude Facilities) ........................................... Testing At High Altitudes .................................................... Test Chamber Assembly, Model 452 Operating Under Usual Conditions............................................................................... Assembly Preparation For Use ........................................... Decals And Instruction Plates ............................................. Initial Adjustment Before Use.............................................. Operating Procedure.......................................................... Preparation For Movement ................................................. Siting Requirements........................................................... Shelter Requirements......................................................... Test Chamber Assembly, Model 452 Repair Parts List ............... Test Chamber Assembly, Model 452 Unit Maintenance.............. Altimeter Calibration........................................................... Assembly .......................................................................... Cleaning............................................................................ Disassembly...................................................................... General............................................................................. Initial Setup ....................................................................... Inspection.......................................................................... Inspection Prior to Disassembly .......................................... Materials ........................................................................... Tools................................................................................. Test Chamber Assembly Theory of Operation............................ Theory of Operation (Model 452) ........................................ Theory of Operation (Model 453) ........................................ Tool Identification List............................................................... Explanation of Columns in The Tool Identification List .......... Tool Identification List......................................................... WP Sequence No.-Page No. 0037 00-1 0037 00-2 0024 00-1 0024 00-1 0011 00-1 0011 00-1 0009 00-1 0009 00-1 0009 00-10 0009 00-1 0009 00-6 0009 00-13 0009 00-1 0009 00-1 0031 00-1 0021 00-1 0021 00-5 0021 00-6 0021 00-5 0021 00-2 0021 00-1 0021 00-1 0021 00-5 0021 00-1 0021 00-1 0021 00-1 0005 00-1 0005 00-1 0005 00-4 0041 00-1 0041 00-1 0041 00-1
INDEX-7
TM 10-1670-305-23&P
INDEX Subject Trouble Shooting Procedures, General Information .................... Scope of Task.................................................................... Trouble Shooting Procedures ................................................... Initial Setup Information...................................................... Trouble Shooting Procedures ................................................... Initial Setup Information...................................................... WP Sequence No.-Page No. 0013 00-1 0013 00-1 0014 00-1 0014 00-1 0015 00-1 0015 00-1
INDEX-8
TM 10--1670--305--23&P
By Order of the Secretaries of the Army, Air Force, and Navy (Including the Marine Corps):
0017208
D.G. MORRAL Rear Admiral, USN Program Executive Officer For Expeditionary Warfare Naval Sea Systems Command G. N. GEORGEADIS Director, Program Support Marine Corps Systems Command
DISTRIBUTION: To be distributed in accordance with initial distribution (IND 256621), requirements for TM 10-1670-305-23&P.
Subject: DA Form 2028 1. From: Joe Smith 2. Unit: home 3. Address: 4300 Park 4. City: Hometown 5. St: MO 6. Zip: 77777 7. Date Sent: 19--OCT--93 8. Pub no: 55--2840--229--23 9. Pub Title: TM 10. Publication Date: 04--JUL--85 11. Change Number: 7 12. Submitter Rank: MSG 13. Submitter FName: Joe 14. Submitter MName: T 15. Submitter LName: Smith 16. Submitter Phone: 123--123--1234 17. Problem: 1 18. Page: 2 19. Paragraph: 3 20. Line: 4 21. NSN: 5 22. Reference: 6 23. Figure: 7 24. Table: 8 25. Item: 9 26. Total: 123 27. Text: This is the text for the problem below line 27.
Use Part II (reverse) for Repair Parts and Special Tool Lists (RPSTL) and Supply Catalogs/Supply Manuals (SC/SM).
DATE
21 October 2003
COMMANDER U.S. ARMY TANK-AUTOMOTIVE AND ARMAMENT COMMAND ATTN: AMSTA-LC-CECT 15 KANSAS STREET NATICK, MA 01760-5052
DATE
PART I ALL PUBLICATIONS (EXCEPT RPSTL AND SC/SM) AND BLANK FORMS
PUBLICATION/FORM NUMBER
TM 10-1670-296-23&P
ITEM NO. PAGE NO. 0036 00-2 PARAGRAPH LINE NO. * FIGURE NO. TABLE NO.
30 October 2002
Unit Manual for Ancillary Equipment for Low Velocity Air Drop Systems
RECOMMENDED CHANGES AND REASON (Provide exact wording of recommended changes, if possible).
In table 1, Sewing Machine Code Symbols, the second sewing machine code symbol should be MD ZZ not MD 22. Change the manual to show Sewing Machine, Industrial: Zig-Zag; 308 stitch; medium-duty; NSN 3530-01-181-1421 as a MD ZZ code symbol.
*Reference to line numbers within the paragraph or subparagraph. TYPED NAME, GRADE OR TITLE TELEPHONE EXCHANGE/AUTOVON, PLUS EXTENSION SIGNATURE
508-233-4141
Jane Doe
Jane Doe
USAPPC V3.00
FROM: (Activity and location) (Include ZIP Code) TO: (Forward direct to addressee listed in publication) COMMANDER PFC Jane Doe U.S. ARMY TANK-AUTOMOTIVE AND ARMAMENT COMMAND CO A 3rd Engineer BR ATTN: AMSTA-LC-CECT 15 KANSAS STREET Ft. Leonardwood, MO 63108 NATICK, MA 01760-5052 PART II REPAIR PARTS AND SPECIAL TOOL LISTS AND SUPPLY CATALOGS/SUPPLY MANUALS PUBLICATION NUMBER DATE TITLE
DATE
21 October 2003
TM 10-1670-296-23&P
PAGE NO. 0066 00-1 COLM NO. LINE NO. NATIONAL STOCK NUMBER REFERENCE NO.
30 October 2002
FIGURE NO. ITEM NO. TOTAL NO. OF MAJOR ITEMS SUPPORTED
Unit Manual for Ancillary Equipment for Low Velocity Air Drop Systems
RECOMMENDED ACTION
Callout 16 in figure 4 is pointed to a D-Ring. In the Repair Parts List key for figure 4, item 16 is called a Snap Hook. Please correct one or the other.
(Any general remarks or recommendations, or suggestions for improvement of publications and blank forms. Additional blank sheets may be used if more space is needed.)
SIGNATURE
UASPPC V3.00
Use Part II (reverse) for Repair Parts and Special Tool Lists (RPSTL) and Supply Catalogs/Supply Manuals (SC/SM).
DATE
FROM: (Activity and location) (Include ZIP Code) TO: (Forward to proponent of publication or form) (Include ZIP Code) COMMANDER U.S. ARMYTANK-AUTOMOTIVE AND ARMAMENT COMMAND ATTN: AMSTA-LC-CECT 15 KANSAS STREET NATICK, MA 01760-5052 PART I ALL PUBLICATIONS (EXCEPT RPSTL AND SC/SM) AND BLANK FORMS PUBLICATION/FORM NUMBER
TM 10-1670-305-23&P
ITEM NO. PAGE NO.
DATE
21 June 2000
TITLE
Unit and Intermediate Direct Support (DS) Maintenance Manual including Repair Parts and Special Tools List for AR2
RECOMMENDED CHANGES AND REASON (Provide exact wording of recommended changes, if possible).
PARAGRAPH
LINE NO. *
FIGURE NO.
TABLE NO.
*Reference to line numbers within the paragraph or subparagraph. TYPED NAME, GRADE OR TITLE TELEPHONE EXCHANGE/AUTOVON, PLUS EXTENSION SIGNATURE
USAPPC V3.00
Use Part II (reverse) for Repair Parts and Special Tool Lists (RPSTL) and Supply Catalogs/Supply Manuals (SC/SM).
DATE
FROM: (Activity and location) (Include ZIP Code) TO: (Forward to proponent of publication or form) (Include ZIP Code) COMMANDER U.S. ARMYTANK-AUTOMOTIVE AND ARMAMENT COMMAND ATTN: AMSTA-LC-CECT 15 KANSAS STREET NATICK, MA 01760-5052 PART I ALL PUBLICATIONS (EXCEPT RPSTL AND SC/SM) AND BLANK FORMS PUBLICATION/FORM NUMBER
TM 10-1670-305-23&P
ITEM NO. PAGE NO.
DATE
21 June 2000
TITLE
Unit and Intermediate Direct Support (DS) Maintenance Manual including Repair Parts and Special Tools List for AR2
RECOMMENDED CHANGES AND REASON (Provide exact wording of recommended changes, if possible).
PARAGRAPH
LINE NO. *
FIGURE NO.
TABLE NO.
*Reference to line numbers within the paragraph or subparagraph. TYPED NAME, GRADE OR TITLE TELEPHONE EXCHANGE/AUTOVON, PLUS EXTENSION SIGNATURE
USAPPC V3.00
DATE
PART II REPAIR PARTS AND SPECIAL TOOL LISTS AND SUPPLY CATALOGS/SUPPLY MANUALS PUBLICATION/FORM NUMBER
TM 10-1670-305-23&P
PAGE NO. COLM NO. LINE NO.
21 June 2000
NATIONAL STOCK NUMBER REFERENCE NO. FIGURE NO. ITEM NO. TOTAL NO. OF MAJOR ITEMS SUPPORTED
DATE
Unit and Intermediate Direct Support (DS) Maintenance Manual including Repair Parts and Special Tools List for AR2
TITLE
RECOMMENDED ACTION
(Any general remarks or recommendations, or suggestions for improvement of publications and blank forms. Additional blank sheets may be used if more space is needed.)
SIGNATURE
UASPPC V3.00
DATE
PART II REPAIR PARTS AND SPECIAL TOOL LISTS AND SUPPLY CATALOGS/SUPPLY MANUALS PUBLICATION/FORM NUMBER
TM 10-1670-305-23&P
PAGE NO. COLM NO. LINE NO.
21 June 2000
NATIONAL STOCK NUMBER REFERENCE NO. FIGURE NO. ITEM NO. TOTAL NO. OF MAJOR ITEMS SUPPORTED
DATE
Unit and Intermediate Direct Support (DS) Maintenance Manual including Repair Parts and Special Tools List for AR2
TITLE
RECOMMENDED ACTION
(Any general remarks or recommendations, or suggestions for improvement of publications and blank forms. Additional blank sheets may be used if more space is needed.)
SIGNATURE
UASPPC V3.00
Use Part II (reverse) for Repair Parts and Special Tool Lists (RPSTL) and Supply Catalogs/Supply Manuals (SC/SM).
DATE
FROM: (Activity and location) (Include ZIP Code) TO: (Forward to proponent of publication or form) (Include ZIP Code) COMMANDER U.S. ARMYTANK-AUTOMOTIVE AND ARMAMENT COMMAND ATTN: AMSTA-LC-CECT 15 KANSAS STREET NATICK, MA 01760-5052 PART I ALL PUBLICATIONS (EXCEPT RPSTL AND SC/SM) AND BLANK FORMS PUBLICATION/FORM NUMBER
TM 10-1670-305-23&P
ITEM NO. PAGE NO.
DATE
21 June 2000
TITLE
Unit and Intermediate Direct Support (DS) Maintenance Manual including Repair Parts and Special Tools List for AR2
RECOMMENDED CHANGES AND REASON (Provide exact wording of recommended changes, if possible).
PARAGRAPH
LINE NO. *
FIGURE NO.
TABLE NO.
*Reference to line numbers within the paragraph or subparagraph. TYPED NAME, GRADE OR TITLE TELEPHONE EXCHANGE/AUTOVON, PLUS EXTENSION SIGNATURE
USAPPC V3.00
DATE
PART II REPAIR PARTS AND SPECIAL TOOL LISTS AND SUPPLY CATALOGS/SUPPLY MANUALS PUBLICATION/FORM NUMBER
TM 10-1670-305-23&P
PAGE NO. COLM NO. LINE NO.
21 June 2000
NATIONAL STOCK NUMBER REFERENCE NO. FIGURE NO. ITEM NO. TOTAL NO. OF MAJOR ITEMS SUPPORTED
DATE
Unit and Intermediate Direct Support (DS) Maintenance Manual including Repair Parts and Special Tools List for AR2
TITLE
RECOMMENDED ACTION
(Any general remarks or recommendations, or suggestions for improvement of publications and blank forms. Additional blank sheets may be used if more space is needed.)
SIGNATURE
UASPPC V3.00
Temperature (Exact)
_F Fahrenheit temperature 5/9 (after subtracting 32) Celsius temperature _C
PIN: 078216-000