MAY 2013
HIMOINSA SATISFIES THE DEMANDS
OF THE ENERGY MARKET WITH ITS
GAS AND DIESEL GENSETS
2nd.FRONT COVER.WIP.MAY.2013.HIMOINSA:1.Front cover.wip.AVIVA.JUNE.2011.qxd 05/06/2013 15:13 Page 1
ansaldoenergia.it
1853-2013
Branded energy
for 160 years
Alternators 20
The role of AC diesel-driven generating sets in telecoms.
CHP 22
The 9.5MW GE Jenbacher installed in Rosenheim, Bavaria.
CHP & Biofuel 24
Beckton in London is the site of a new fat-fuelled powerplant.
Gas Engines 26
GEM Energy & Capstone Microturbines in Toledo, USA.
Company Profile: Leroy-Somer 28 & 29
One of the worlds leading electromechanical OEMs.
Gen-sets 30
We look at Caterpillars remarkable new G3516H gen-set.
CHP & Trent 60 32
A Rolls-Royce Trent 60 is bound for Veracruz, Mexico.
Combined Cycle Plant 34
We look at the ultra-efficient 595MW Lausward CCPP.
District.Heating 36
Dalkia has renewed a district heating contract in Bratislava.
Sonic Soot Blowers 38
A successful solution for S. Koreas Youngheung Power Plant.
Gas.Engines 40
Alstom is supplying China with GT13E2 gas turbines.
Gen-sets 42
FG Wilsons gen-sets feature at Milas-Bodrum Airport, Turkey.
Cogeneration 44
Covasna, Romania, is the site of a new CHP plant.
Powerplant for Centrepoint 46
Almacantar is looking for a CHP unit for Centrepoint.
Publishing Director:
Richard Teasdale
rteasdale@gmp.uk.com
Managing Editor:
Aidan Turnbull
powereditorial@gmp.uk.com
Sales Director:
Neb Saric
nsaric@gmp.uk.com
Journal Assistant:
Sally Jones
sjones@gmp.uk.com
Accounts Division:
Gretta Hay
accounts@gmp.uk.com
Far East Sales:
Christine Guan
Tel: 0086-10-65059168
cguan@public3.bta.net.cn
MSN: cguan019@hotmail.com
Mobile: 0086-13701009982
Russia Sales:
Sergey Stanovkin
stanovkin@dars.ru
US Sales & Subscriptions:
Alex Carter
acarter@gmp.uk.com
Advertisment Manager
Germany & Sweden in
Digital & Print:
Stevan Pancic
Tel: +44 (0)1403 220750
Energy Writer:
Laura Ravenhill
lauraravenhill@hotmail.com
Energy Writer:
George Ronayne
Contributors
Iberdrola, Mecc Alte, GE, Leroy-
Somer, Emerson, Clarke Energy, FG
Wilson, GE Jenbacher, Wartsila,
Caterpillar, Siemens, Dalkia,
Primasonics, Alstom, Dresser Rand.
Published by:
Global Media Publishing Ltd
Global House, 13 Market Square,
Horsham, West Sussex, RH12 1EU,
UK.
Tel: +44 (0)1403 220750
Fax: +44 (0)1403 220751
Website: www.gmp.uk.com
Worldwide Independent Power
(ISSN 1468-7100).
Subscription price 120 (UK),
180 (overseas) per year.
Please send address changes to
Worldwide Independent Power,
Global House, 13 Market Square,
Horsham, RH12 1EU, UK.
Printed by Manor Creative, UK
NEXT ISSUE: JUNE 2013
CHP/Cogen, Gen-Sets, Diesel
Engines, Wind, Marine, Controls &
Monitoring, Steam Turbines,
Instryuments, Blading, UPS,
Batteries, District Heating,
Biomass, Software, Power Plants, REGULARS: News/Sharewatch 6-18
C O N T E N T S
R E G U L A R S
W O R L D W I D E I N D E P E N D E N T P O W E R
Our power portfolio includes:
Gas engine at a Bavarian plant. p.22.
M A Y 2 0 1 3
P R O M O T I N G O N - S I T E P O W E R A N D C O G E N E R A T I O N
w
w
w
.
g
m
p
.
u
k
.
c
o
m
/
p
o
w
e
r
MAY 2013
HIMOINSA SATISFIES THE DEMANDS
OF THE ENERGY MARKET WITH ITS
GAS AND DIESEL GENSETS
HIMOINSA
SATISFIES THE
DEMANDS
OF THE
ENERGY MARKET
WITH ITS
GAS AND
DIESEL GENSETS
Founded in 1982 HIMOINSA is based in
San Javier, Murcia, Spain. HIMOINSA
is a multinational company which
specialises in the manufacture and
marketing of energy generation
systems providing guaranteed, clean,
efficient continuous-energy supply.
It has an international distribution
network and manufacturing centres,
offices and subsidiaries worldwide.
M I D D L E E A S T P O W E R
Mexico buys a Trent 60 CHP unit p.32.
GMP
Global Media Publishing Ltd
2013
AMPS
Members
contents.WIP.MAY.2013:contents.WIP.MAY.2011.qxd 06/06/2013 09:21 Page 1
The Total Energy Solution Provider:
- Feasibility Consultancy
- Innovative Finance Options
- Design & Construction
- Full Turnkey Contracts
- Project Management
- Commissioning
- Operation & Maintenance
Suppliers of Efficient Gas EngineTechnology
Proven Technical Solutions for:
- Combined Heat and Power
- Trigeneration
- Anaerobic Digestion
- Bio Gas
- Landfill Gas
- Sewage Gas
- Coal Mine Methane
Edina UK
Unit 13 Rugby Park, Bletchley Road, Stockport SK4 3EJ
T: +44 (0) 161 432 8833 F: +44 (0) 161 975 1499
E: sales@edinauk.com
Sole Distributor in the UK & Ireland for
Highest Efficiency - Proven Relability - Dependable Service
MAY 2 0 1 3 WO R L D WI D E I N D E P E N D E N T P O WE R
5
EDITORS LETTER
EUROPE ASIA-PACIFIC MIDDLE EAST
AFRICA AMERICAS
WELCOME
A warm welcome to this months
issue of Worldwide Independent
Power - as always bringing you
closer to the stories and issues
affecting on-site power and
cogeneration around the world.
For editorial comments, please do
not hesitate to contact the editor.
BIENVENUE
Soyez le bienvenu cette issue de
Worldwide Independent Power.
Comme d'habitude, nous vous
apportons toujours plus prs des
sujets qui affectent l'nergie et la
co-generation sur place autour du
monde.
N'hsitez pas contacter le
rdacteur pour des commentaires
ditoriaux.
WILLKOMMEN
Herzlich Willkommen zur Ausgabe
dieses Monates von Worldwide
Independent Power. Wie immer
bringen wir Sie nher heran an die
Ereignisse und Geschichten der
Stromerzeugungsindustrie rund um
die Welt.
Fr redaktionelle Kommentare und
Anregungen wenden Sie sich bitte
an den Autor.
BIENVENIDO
Bienvenido a esta edicin de
Worldwide Independent Power.
Como siempre, acercndolo a los
temas que afectan a la energa y a
la cogeneracin in-situ. No dude
en contactar con nuestro editor
para cualquier cuestin editorial.
BENVENUTI
Benvenuti a questa nuova edizione
di Worldwide Independent Power.
Come sempre cercheremo di
offrirvi storie e questioni
riguardanti on-site power e
cogeneration a livello globale. Per
commenti editoriali, si prega di
contattare l'editore.
Aidan Turnbull
- Editor
Unique power grid project
launched in Oregon, USA
A
unique insider's view of a working smart grid demonstration project
with the development of the 8,000-square-foot Salem Smart Power
Center facility in Salem, Oregon, USA, by Portland General Electric. Whats truly unique about this
is the way a 5MW lithium-ion battery systemis at the centre of everything.
Installed with a large-scale energy storage system, the centre is primarily a test-bed to help PGE test
how to store and better integrate variable renewable energy sources like solar and wind into the
power grid, along with several other smart technologies as part of its Salem Smart Power Project. The
technologies work together to create a highly reliable micro-griddesigned to serve about 500 business
and residential customers in southeast Salem.
PGE collaborated with Eaton and EnerDel, Inc. on the $23 million Salem Smart Power Project. The
project received U.S. Department of Energy matching funds as part of the largest regional smart grid
demonstration project in the US officially its known as the Pacific Northwest Smart Grid Demonstration
Project (PNW-SGDP).
We are demonstrating smart grid technologies to help teach others how to build intelligent energy
resources for the future, while continuing to deliver long-term value for our own customers," Jim Piro,
PGE president and CEO, told WIP. "We are proud of the collaboration, hard work and ingenuity that went
into this project, and thank our customers who volunteered to participate in this important study."
Senator Ron Wyden of Oregon, chairman of the U.S. Senate Energy and Natural Resources Committee,
outlined the international importance of this smart grid set-up: "Increasing renewables, reliability and
storage moves our country toward a low-carbon, more sustainable energy future. This Smart Power Center
and the Pacific Northwest Smart Grid Demonstration Project shows that when it comes to energy innova-
tion, Oregon takes a back seat to no one."
The PGE project will test energy storage, dispatchable standby generation, remotely operated power
line switches, demand response, renewable energy integration and transactive control.
PGE worked with EnerDel to outfit the centre with a 5MW, lithium-ion battery system, while Eaton
provided engineering expertise and two-way inverters to manage and operate the energy storage system.
The energy storage system works with state of Oregon standby generators to create a high-reliability
zone to reduce service interruptions for PGE customers. The Oregon State Data Center, Oregon Military
Department and the Anderson Readiness Center are all participating in the research.
Salem-based Kettle Brand, the pioneer of kettle-cooked potato crisps and an industry leader in
sustainability, is connecting its 616-panel rooftop
solar installation to the project to help test
storage and bring solar energy into the grid when
it's needed most.
To test demand-response technologies, PGE
business customers are volunteering to cycle
their heating, cooling and other systems on and
off throughout the day or shift their use to
off-peak.
PGE is also testing its own Smart PowerSM soft-
ware, which brings power generating resources
online at the optimal time.
amended.Ed letter.WIP.LEADER.p5:Ed letter.WIP.MAY.p5.qxd 07/06/2013 09:04 Page 1
Protection made simple
MCDGV4
generator diferential protection
FOR MEDIUM AND
HIGH POWER GENERATORS
America: SalesPGD_Americas@woodward.com Europe, Middle East, Africa: SalesPGD_EMEA@woodward.com ASEAN, Oceania: SalesPGD_ASEAN@woodward.com
POWER DISTRIBUTION
All in One
Block protection: Diferential protection for
the generator and the step-up transformer
Full generator protection package
Interconnection menu for DER and renewables
(QV protection and LVRT)
Large backup protection feature set
Flexible hardware applicable for all rated voltages
and currents
Safe & Quick Handling
Intuitive operating concept
Integrated fault simulation (dry test possible)
Plausibility checks for parametrizing
The MCDGV4 ofers the combination of all high precision protection features
you need in one unit. This HighPROTEC device is easy to use and quick to adapt.
Proven quality and reliability for a total protection of your power system.
N E WS
7
Estevo II opens in
Galicia
May 23rd, 2013: Spain-
based IBERDROLA chair-
man, Ignacio Galan, and
the head of Galicias
regional government,
Alberto Nuez Feijoo,
unveiled a plaque to com-
memorate the full
commissioning of Santo
Estevo II, a new hydro-
electric power plant built
in the Sil river basin,
close to the village of
Nogueira de Ramuin
(Ourense).
IBERDROLA has invested
over 1.1 billion and
made purchases of 1.2
billion from more than
200 local providers in
Galicia over the past 10
years.
Wrtsil to supply
major gas engine
power plant to
Russia
Wrtsil has just been
awarded the contract to
supply a major power
plant for Russia. The 110
MW unit will be by far the
largest power plant
running on Wrtsil
engines in Russia. The
order comes from
Transmashenergo, an
independent power pro-
ducer, and the power
plant is to be located in
Tikhvin in Russias
Leningrad region.
The plant will run on
natural gas using six
Wrtsil 50SG engines.
Wrtsil will supply the
engineering both basic
and detailed, the
generating sets with
auxiliary modules and sys-
tems, automation and
control equipment.
Also supplied will be the
electrical system, and the
engine hall complete with
stacks fitted with carbon
monoxide control
catalysts.
Alstom has been awarded a contract by Bharat
Heavy Electricals Limited (BHEL)to supply
components and services for the 2x800 MW
Gadarwara super thermal power plant at
Gadarwara, Narsingpur, Madhya Pradesh, India.
This contract is worth approximately 100 million.
Under the scope of the contract, Alstom Thermal
Power will co-operate with BHEL in designing the
boilers and supply pressure parts of the 800 MW
supercritical boilers along with pulverisers and air-
preheater components.
It will also assist BHEL with technical advisors
during the erection and commissioning of the two
units. Key components will be manufactured from
Alstoms state-of-the-art facilities in Wellsville and
Concordia in the USA as well as in Durgapur and
Shahabad, India. Unit I is expected to be
commissioned in 2016, whilst unit II is expected to be commissioned in 2017. Andreas Lusch, Senior
Vice President of Alstom Thermal Powers Steam
business, said: We are delighted to continue to
partner with BHEL on this project. Alstom is com-
mitted to further invest and develop in India in
power sector.
The new Gadarwara contract is a confirmation of
the strong cooperation established since 2005 with
BHEL. It comes in addition to seven contracts signed
with BHEL between 2008 to 2012 for supercritical
boilers in Barh II, Krishnapatnam, Bara, Yeramarus,
Bellary, Mouda and Nabinagar in India.
Alstoms supercritical coal-fired boilers are state-
of-the-art technology. They are designed for the
challenges of the power industry in India, i.e. to
achieve increased efficiency & reduced emissions.
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
Alstom wins new 100m contract with India
In brief...
EU ETS in turmoil after carbon-credits rejection
Last month the European Union
Parliament rejected a proposal to
backload - or postpone - the
auctioning of additional credits
within the EU Emissions Trading
Scheme (EU ETS). The proposal
was aimed to rebalance the
supply of credits and stabilise the
price of carbon.
The rejected vote prompted the
price of credits within the EU ETS
to plummet.
The European Commissioner for
Climate Action, Connie Hedegaard
responded to the vote. She com-
ments: The Commission, of
course, regrets that the European
Parliament has not approved the
back-loading proposal...Europe
needs a robust carbon market to
meet our climate targets and spur
innovation. The Commission
remains convinced that back-
loading would help restore
confidence in the EU ETS in the
short term.
The WorldGBCs European
Regional Network also weighed in
on the vote, commenting: Today
is a desperately sad day for the
EU; previously a world leader on
climate change policy, and with
many countries around the world
developing their own cap-and-
trade schemes, the message
we have sent out is an over-
whelmingly negative one.
The EU ETS not only supports the
emissions reduction targets of
European countries and corpora-
tions, but also the trading of the
UN flexible mechanisms under the
Kyoto Protocol, including
Certified Emissions Reductions for
Clean Development Mechanism
projects.
NEWS.WIP.p.7.8.10.12:NEWS.MAY..qxd 07/06/2013 09:07 Page 1
8
N E WS
In brief...
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
Aquamarine Power
secures full consent
for 40MW Lewis wave
energy farm
Aquamarine Power has
received full consent from
the Scottish Government
for a 40MW wave farm off
the north-west coast of
Lewis, Scotland - making it
the world's largest fully-
permitted ocean energy
site.
The nxt few years will see
the deployment of between
40 and 50 Oyster devices
along the coast at Lag na
Greine, near to Fivepenny
Borve, in one of the best
wave energy locations in
Europe. Once complete, the
farm will have the capacity
to power nearly 30,000
homes.
New biomass plant to
be built in Senta,
Serbia
The northern Serbian town
of Senta will provide the
location for a new biomass-
fired cogeneration plant
which will be built in two
phases. The first phase,
costing 15.2m will produce
8.4 MW of heat and 4.9 MW
of electricity, with a second
phase scheduled to be
completed in 2015-16.
The plant will require fuel
in the form of 35,000
tonnes of biomass a year,
supplied by agricultural
operations in neighbouring
municipalities.
European investors behind
the project include
Belgiums renewable energy
project developer
WindVision, and Synvalor of
the Netherlands, which has
already been awarded the
plant design contract.
Google decides to go fly a kite and make power
Google has bought a US-based-
company which generates power
using turbines which are mounted
on tethered kites or wings.
Makani Power will become part
of Google X - the secretive
research and development arm of
the search giant. The deal comes
as Makani carries out the first
fully autonomous flights of robot
kites bearing its power-generating
propellers.
Google has not said how much
it paid to acquire Makani, but it
has already invested $15m
(9.9m) in the company.
Makani reports that the deal
will "provide us with the
resources to accelerate our work
to make wind energy cost
competitive with fossil fuels".
Rather than use fixed turbines
to generate power, Makani has
recently been experimenting with
flying wings adorned with
several smaller turbines which act
as propellers as the craft takes
off.
Makani claims that mounting the
turbines on a wing is more
efficient as large numbers can be
built with fewer materials than
traditional tower-based turbines.
In addition, the robot wings can
land to avoid damage if wind
speeds are too high or during bad
weather.
The compan has plans to
operate the tethered wings in
small groups of six with each one
anchored at the
points of a vast
hexagon. The wings
operate between
250m (820ft)and
600m meters above
ground.
The firm has
just successfully
completed tests on
a 30 kW prototype
to see if its control
system lets it
launch, hover,
and generate power and land
without any human intervention.
Fully working models will be
larger and, Makani hopes, be able
to generate 600 kW. It hopes the
cost of the power generated will
initially be competitive with
off-shore wind farms.
Power is generated by the wing
flying in a circular path, with
electricity transmitted to the
ground via the conducting core of
the tether.
Google X is the big ideas arm
of the search company - it seeks
out unusual investment projects
and is tasked with testing out
ideas outside the normal remit of
the larger company.
The lab has already inspired
investment in Google's self-
driving car initiative currently in
the news and also did the early
investigation work on its
augmented spectacles project
which was launched in 2012.
Leak discovered in Space Station power cooling
On May 10th, 2013, the International Space Station discovered radiator leak in its power system.The leak
was in the system used to cool electronics associated with solar array power channel 2B, one of eight fed by
the station's huge solar panels. Ammonia flowing through a large radiator is used to carry away heat
generated by the array's batteries and electrical
systems.
The two U.S. arrays at the far left end of the station's
integrated power truss - the port six, or P6 arrays -
feed power to electrical channels 2B and 4B.
The P6 set of arrays, like its three counterparts, routes
power from the solar panels directly into the station's
electrical grid during daylight passes, at the same time
charging dual sets of batteries that take over during
orbital darkness. Nasa said the leak is from one
previously leaking loop which could be bypassed if
needed, and that eventual repairing the leak might
require a portion of the station's cooling system be
shut down for about 48 hours.
NEWS.WIP.p.7.8.10.12:NEWS.MAY..qxd 07/06/2013 09:07 Page 2
BS EN ISO 9001-2008
Reg. No. FM38224
EJ Bowman (Birmingham) Ltd
Chester Street, Birmingham B6 4AP, UK
Tel: +44 (0) 121 359 5401 Fax: +44 (0) 121 359 7495
Email: info@ejbowman.co.uk www.ejbowman.co.uk
01-2008
M38224
EMULATION CAN
PROVE CRITICAL
The DEIF Group: sales, competence & training centres in Brazil, China, Denmark, France, Germany, India, Norway, Singapore, UK, and USA
DEIF A/S Frisenborgvej 33 DK-7800 Skive Tel.: +45 9614 9614 Fax: +45 9614 9615 info@deif.com www.deif.com
DEIF is THE ONLY SOLUTIONS PROVIDER to offer Power
Management System testing as a fast, simple and safe
emulation procedure.
Simply connect your controllers to your PC to improve project
planning, reduce risks to personnel and equipment and cut
commissioning and costs.
DEIF EMULATION gives you A CRITICAL MARKET EDGE
and guarantees end users market-leading quality solutions.
Meet DEIF at stand K49 at Power-Gen Asia, October 2 - 4, 2013, Bangkok, Thailand.
Emulation Software Solution
s -EETCRITICALDEADLINES
s 0REINSTALLATIONAPPLICATIONTEST
s #USTOMERAPPROVAL
s %NDUSERTRAINING
AGC-4
[
P
a
t
e
n
t
P
e
n
d
i
n
g
]
ROVE P
A L U M E
e
n
d
i
n
g
]
a
t
e
n
t
P
E
CAL ITI R C
N CAN O TI AAT
L
N
ion
Contact us at; Turner Engine Powered Services Ltd
Newstead Trading Estate, Trentham, Stoke-on-Trent ST4 8HT
Tel: +44 (0) 1782 657331 Email: sales@turner-eps.co.uk Website: www.turner-eps.co.uk
Its 2:30am Spot the Turner EPS
engineer......
When most of us are safely tucked up in bed, chances are somewhere, someones
having power problems. And if that someone happens to be you, isnt it nice to know
that whatever time it is, there is a company you can trust with qualified engineers who is
on call 24 hour a day, 7 days a week, 365 days a year.
Losing your power supply will be a disaster for your business. Losing it in the
dark of night will be an even bigger disaster
Turner EPS, a Turner Group Company, provide a UK-wide 24/7 emergency call-out
service to restore essential power supplies or carry out repairs without delay, so for a
good nights sleep and peace of mind put your power requirements in our hands.
In addition we also provide a comprehensive Generator Maintenance Service to a wide
range of customers in both the public and private sector enabling customers to
concentrate on their core business and at the same time have peace of mind and
confidence in the knowledge that their power generation assets are being properly
maintained. Our tailor made maintenance solutions ensure that your investment is kept
in prime condition and ready to power up whenever it is needed. These solutions
include; planned preventative maintenance visits, reactive repairs, generator and load
bank hire, and fuel contamination removal & polishing services, all fully supported by a
dedicated professional Asset Management Team of skilled technicians and service
engineers.
Turner EPS are Europes largest single source providers of maintenance and repair
services, bespoke design & build solutions and systems for power generation equipment
involving; diesel and gas reciprocating engines, electrical & mechanical governors,
explosion protection systems, low carbon emission microturbines, organic rankin cycle
machines and uninterruptible power systems (UPS).
With depots covering the UK were here to help providing a
One Stop Shop solution 24 hours a day, 7 days a week,
365 days a year.
Turner:Layout 1 15/02/2013 09:36 Page 1
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
26
GAS ENGINES
T
he new onsite power system for
ProMedicas Wildwood campus will
use natural gas to provide
electricity and heat to the hospital
facility.
The system has already been installed on
the hospital campus and will be
commissioned in late June 2013. The
combined heat and power system has
been designed to radically reduce the
hospitals overall energy usage. It will also
serve to decrease the hospitals
greenhouse gas emissions and increase the
campuss Energy Star score.
Because healthcare facilities and hospi-
tals need electricity and heat 24/7/365,
they benefit tremendously from the
energy efficiency and reliability that com-
bined heat and power (CHP) systems pro-
vide, Glenn Powers, energy efficiency
manager, GEM Energy, tells WIP.
This systems compact size and low
sound level make it a nice fit for our
customer.
Natural gas CHP for US
hospital campus
Other local combined
heat and power
systems GEM Energy
has installed &
integrated are located
at the Toledo Museum
of Art, The Huntington
Center; SeaGate
Convention Centre, and
The University of
Toledo in the USA.
GEM Energy provides
comprehensive energy
services & technologies
including energy
management programs,
distributed power
generation systems,
energy management
controls and energy
procurement strategies
for commercial,
institutional, industrial
and mission-critical facilities.
Cranes installed the microturbine
generators which replaced the hospital's
traditional boiler system.
The new compact system, which has a
low sound level, cost about US$500,000,
Joseph Merritt, ProMedica project
engineer, tells WIP.
Using microturbine technology, the
hospital will reduce its carbon footprint
and - Merritt says - should reduce energy
use by 1 million kilowatt-hours per year or
by US$50,000. So, its system costs should
be recouped in 10 years, he said. The
system will use natural gas to provide
heat and electricity.
Over the next month GEM will prep the
campus and its mechanical room for the
system's 24-hour use, which includes tying
in natural gas, heating and water piping,
and electrical feeds. A control system will
be installed to manage the energy
service.
The Microturbine system was chosen
because it provides an immediate impact
for ProMedicas commitment to providing
both energy-efficient and sustainable
facilities, concludes Glen Powers.
GEM Energy recently won a contract to install and integrate a combined heat and power system
at ProMedicas Wildwood campus based in Toledo, USA. GEM Energy has provided
equipment in the form of Capstone Microturbines to transfrom energy usage, reports WIP.
WIP
www.capstoneturbine.com
Internet link Internet link
A CHP unit from
Capstone
Microturbines is
lowered into place.
GEM Energy delivering
the CHP units.
The new system cost around
US$500,000, reports the project
engineer, Joseph Merritt.
WIP.GAS ENGINES.CAPSTONE.MAY13. p26:RHP.WIP.p27.qxd 28/05/2013 16:27 Page 1
www.scania.com
the all-new Scania GenSetS. ReDeFininG ReliaBilitY.
Prime or standby power? Single or synchronised installations? Whatever
your challenge, the all-new Scania Gensets will deliver everything that
the Scania brand stands for in terms of operating economy, fuel effciency,
uptime and proven reliability.
This is why the Scania Gensets are the given choice for demanding
duties in remote mining districts. Just plug in and relax.
The Scania Gensets and Scania Services a complete range of power generation
equipment and services for maximum uptime and long-term proftability.
Plug in and relax.
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
28
COMPANY PROFILE
E
MERSON Industrial Automation's
Electric Power Generation (EPG)
division is a world leader in the
manufacture of alternators from 1 kW to
20 MW. It has recognised expertise in all
aspects of power generation.
The Electric Power Generation division
incorporates the following brands: Leroy-
Somer (Low, Medium and High Voltage
Alternator ranges )and Kato (USA)
(Medium and High Voltage Alternator
ranges. Today, Leroy-Somer operates 30
production units and 470 sales and service
outlets worldwide. Sales in fiscal 2012
were 1.342 billion.
Leroy-Somer, a global presence for
accessible service, has infrastructure
operations in Europe, the US, Mexico,
China and India. Leroy-Somer is a global
partner offering, in addition to total
quality, a service dedicated to design
offices, gen-set builders and end-users.
With 470 commercial subsidiaries and
services, Leroy-Somer provides a global
service to multinational companies.
Leroy-Somers markets focus on the
Low, Medium and High Voltage alternator
ranges. Leroy-Somer meets the full
requirements of a variety of business s
ectors: residential, commercial, health,
rental, marine, cogeneration, tele-
communications, power stations,
petrochemicals and wind turbines.
IE2 high-efficiency ATEX motor ranges
Although safety motors for use in ATEX
gas and dust zones were not included in
the EuP European directive lot 11 which
imposes, from 16 June 2011, the exclusive
use of motors with IE2 efficiency level in
accordance with IEC 60034-30, Leroy-
Somer has taken the decision to make the
majority of its ATEX ranges also or
Leroy-Somer - leading manufacturer
in motors & alternators
exclusively available in an IE2 version. In
numerous installations, the ATEX zones
are adjacent to safe zones where the
installation of high-efficiency motors has
now become a statutory obligation.
According to the company, an increasing
number of users are insisting that their
equipment suppliers integrate IE2 motors
on all the machines they supply.
ATEX Gas Zone 1 - Leroy-Somer provides
a new range of flameproof motors with
IE2 efficiency level as standard.
Leroy-Somer has taken the decision to
develop a new range of FLSD flameproof
motors with IE2 efficiency level as
standard (from 11 kW) in order to
anticipate what this market requires.
Leroy-Somer has selected low-loss
magnetic laminations as part of its
optimised component design.
The end shields are ribbed to ensure
maximum heat dissipation. The profile of
the housing cooling fins has been
optimised, reducing the power absorbed
by the cooling fans.
The considerable reduction in
temperature rise increases the life of the
windings (more than 10,000 hrs on
average) and reinforces the capacity to
accept brief overloads. The new cover
and fan design also reduce the noise
level: - 5 dBA for example on a 30 kW
motor running at 3000 rpm.
Leroy-Somer offers a variety of
complementary equipment (PTC or Pt100
sensors, heaters, cable gland, incremental
encoder and/or forced ventilation unit,
Corrobloc finish for harsh atmospheres,
etc). In terms of maintenance, the
greasing intervals have been significantly
extended, resulting in a reduction in
maintenance costs: a 30 kW motor
running at 1500 rpm, operated at an
ambient temperature of 25C, can
therefore run for more than 20,000 hrs
without intervention.
A Guaranteed Availability charter of
delivery times allied with a gearbox
assembly centre allows the customer to
procure several hundred part numbers on
guaranteed short delivery (between 1 and
5 days ex. works depending on the
optional equipment chosen).
As WIP reveals in this company profile, Leroy-Somer is one of the worlds leading manufacturers
in electromechanical & electronic drive systems and a world leader in industrial alternators. A
subsidiary of the Emerson Group, Leroy-Somer is a French company employing 9,300 people.
ATEX
motor.tch
WIP.LEROY-S.COMPANY.PROFILE.p28:RHP.WIP.p27.qxd 24/05/2013 15:02 Page 1
WO R L D W I D E I N D E P E N D E N T P O W E R MA Y 2 0 1 3
29
As part of its LSA 40 line of high-
performance alternators [above] , Leroy-
Somer's Electric Power Generation division
produced the LSA 42.3, a new product in
its Partner low voltage range, designed to
meet the needs of both manufacturers
and users of generators.
LSA 42.3 is a 4-pole three-phase
alternator which offers the following
range of power ratings to complement
those of the LSA 40:
- 50 Hz - 1500 rpm: 25 to 60 kVA
- 60 Hz 1800 rpm: 25 to 60 kW
As with LSA 40, LSA 42.3 is also available
in a dedicated single-phase version. LSA
42.3 comes with three field excitation
versions, to suit customer requirements:
Shunt (high starting capacity); AREP (high
starting capacity + short-circuit capacity);
and PMG (equivalent system to AREP)
Available in a single-bearing or two-
bearing version, LSA 42.3 is a particularly
versatile alternator which is mechanically
suitable for most engines on the market.
It is also interchangeable with alternators
from the previous Partner range, reports
Leroy-Somer.
As with LSA 40, compactness is one of
the strong points of LSA 42.3: despite
being the same size as the previous
model, LSA 42.3 gives you increased
power along with high efficiency levels.
This power and efficiency combined mean
that the user saves energy.
What's more, the low reactance of
these new products give them a high
capacity for starting electric motors and
the ability to withstand disturbance from
distorting loads.
Pure Energy generation alternators are
also very easy to install. As such, for LSA
42.3, a cap has been added to the
terminal box originally designed for LSA
40, to ease the access to the AVR. Leroy-
Somer EPG has developed a robust, high-
quality range that meets international
standards and is perfectly suited to the
most complex and restrictive new genera-
tion of Pure Energy alternators.
Leroy-Somers' has also invested money
and research into creating high efficiency
motors, driven by the fact that, on June
2011, European Commission regulation
640/2009 came into effect.
This made it mandatory for class IE2
high-efficiency motors to be placed on the
market.
Based on standard IEC 60034-30 and
defining efficiency classes, this regulation
specifies the efficiency levels to be
attained for machines sold in the current
European market and outlines the full
timetable for their implementation.
The regulation excludes certain motors
on the basis of their specific operating
conditions or specialist categories, such as
brake motors, onboard motors, safety
motors according to directive ATEX
94/9/EC, etc.
Leroy-Somer has proved equal to the
task, releasing complete IE2 efficiency
class motor ranges onto the market well
before the deadline for application of the
June 2011 directive. Its new LS2 range has
been available since the end of 2010.
On the LS2 the winding life has been
doubled thanks to technical choices
designed to reduce the temperature rise,
the terminal box has been made larger,
the DE and NDE shield mounting has been
strengthened. The packaging has also
been redesigned to ensure the motor is
fully protected during transport.
In parallel with this launch of a class
IE2 efficiency range, Leroy-Somer sought
to anticipate the next phase of the
Directive, applicable in 2015, and is
already offering motor ranges with class
IE3 efficiency. A number of manufacturers
have chosen to switch directly to class IE3
motors already. This is another example of
how, even before the 2015 date, Leroy-
Somer has found a way to anticipate its
customers' specific requirements.
The latest challenge involves an
innovative design for IE3 motors. Leroy-
Somer has been successfully developing
its brand new range of IE3 motors for
several years. This new design offers fea-
tures such as optimised cooling
(ventilation, housing fin design, etc) and
redesigned laminations and winding.
WIP
www.leroy-somer.com
Internet link Internet link
COMPANY PROFILE
LSA42.3
Three-phase brushless alternator
from Leroy-Somer.
High
efficiency
LS2
range
The Dyneo range
combines all the solutions which
incorporate Leroy-Somer's frequency
inverters.
Three-phase asynchronous electric
motor - LS FCR Series.
WIP.LEROY-S.COMPANY.PROFILE.p.29:RHP.WIP.p27.qxd 24/05/2013 15:05 Page 1
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
30
GEN-SETS
T
he G3516H is the first of the H-
Series product line now available
for operation on natural gas fuel
and is aimed at creating greater return on
investment for combined heat and power
(CHP) and continuous electric power
applications.
The new sets can be used in industrial
and commercial facilities such as
hospitals, data centres, manufacturing
plants, and greenhouses as well as in
distributed generation power plants by
electric utilities.
This product will provide customers in
all applications with exceptional value;
helping them reduce energy costs while
continuing to provide the high reliability
customers expect of the G3500 family,
Thoralf Lemke, Caterpillar Electric Power
Gas Marketing Manager, tells WIP.
Caterpillar district energy customer and
G3516H owner, Uwe Klingler of HBG based
in Reutlingen, Germany, adds: We were
pleased how smoothly the startup went.
We got an all-inclusive, worry-free
package, and the planned 97% operating
reliability was exceeded by a long shot.
The generator set's industry-leading low
owning and operating costs are achieved
through an improved electrical efficiency,
up to 44.7% (ISO, 1.0 p.f.), and several
The G3516H - the first of
the H-Series product line
improve-
ments that
reduce
maintenance
costs up to
20%.
Specifically,
the G3516H
offers
reduced oil
consumption
& extended
maintenance
intervals.
The major
overhaul
period of
the G3516H
is 80,000
hours with
an in-frame
maintenance interval at 40,000 hours.
The new H Series is built on the legacy
of the proven G3500 generator set
platform, now with over 8,000 units and
9,200 MWe of power installed worldwide.
With over 35,000 test hours
accumulated on the G3516H across
multiple global locations, this generator
set has demonstrated itself to be a robust
power plant that is also very easy to
install and commission.
Operational cost improvements are the
result of the increased electrical
efficiencies, which are achieved with a
new long-stroke engine design that fea-
tures high compression ratio steel pistons,
and a high efficiency turbocharger and
electrical generator.
Performance is not compromised at
higher altitudes and ambient conditions
based on updated turbocharger trim
options, reports the company. For
applications isolated from a primary
electric utility, the G3516H offers
industry-leading load acceptance
capability. The new generator set - as
well as the associated electrical and
mechanical equipment required to
complete a fully functional CHP plant -
are being sold and supported through the
global Cat Dealer network.
The generator set also features easy
integration with a customer's building
management system, using a non-
proprietary communication infrastructure
from Caterpillar's new EMCP4.3 generator
set controller.
The expanded set of features from
Caterpillar also includes a complete gas
train, package-mounted air cleaners, and
simplified customer wiring connections.
Caterpillar has introduced the G3516H, the first of the H-Series product line now available for
operation on natural gas fuels. Currently offering up to 2027 kWe power output at 50Hz, a
60Hz rating will be introduced later in 2013. WIP has the story.
WIP
www.catgaspower.com
Internet link Internet link
WIP.MAY13. CATERPILLAR.p30:RHP.WIP.p27.qxd 29/05/2013 11:58 Page 1
www.hitachi-power.com
Intelligent Power Generation Solutions
Hitachi Power Europe supplies up-to-date, efficient
products. We construct and renew power plants.
We deal in condition-based maintenance. Our green
technologies in energy storage and biomass,
for instance are examples of our innovation and
reliability. Intelligent power generation solutions
require know-how and experience. We have them both.
And that has been the case now for over 100 years.
4 6 June 2013
Messe Wien, Vienna, Austria
Hitachi Power Europe GmbH
Visit us at stand B2453
Know-how
needs experience
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
32
CHP
T
he Rolls-Royce Trent 60 is the most
advanced aeroderivative gas turbine
available today. Delivering up to
64MW of electric power in simple cycle
service, at 42% efficiency, the Trent 60
has established a new benchmark for fuel
economy and cost savings.
It also offers operators fast delivery and
installation times and beneficial
performance.
Rolls-Royce will be providing a Trent 60
as part of a contract to supply onsite
power equipment at a CYDSA processing
plant in Veracruz, Mexico.
Marcelo Garza of Mexican textile and
chemicals conglomerate CYDSA said: The
proven efficiency and high power output
of the Rolls-Royce Trent 60 industrial gas
turbine will enable us to meet the
increased power requirements of our pro-
cessing plants. In addition, the ability of
Rolls-Royce to deliver the equipment in a
very tight timescale is critical to helping
us meet our growth objectives.
Under the terms of the contract,
awarded by engineering contracting com-
panies OHL and Sener, the Trent 60 unit
will be installed for duty in a combined
heat and power configuration to provide
process steam and electricity for CYDSAs
processing plants, with excess electrical
power sold to Mexicos national grid.
Incorporating an AC generator &
associated control systems, the Trent 60
will feature WLE (wet low emissions)
A Trent 60 CHP plant
is bound for Mexico
technology, utilising water injection
during combustion to reduce emissions
and boost performance, and inlet spray
intercooling to reduce energy
requirements during compression,
resulting in higher power and efficiency
levels.
One of the most efficient gas turbines on
the market, the Trent 60 provides up to
64MW in simple cycle service. Its cold
start capability and high cyclic life allow
it to add power to the grid very rapidly to
compensate for the fluctuations &
variability of renewable and other power
sources, making it ideal for peaking
markets. Key features for power
generation include:
* Meets stringent 25ppm NOx
requirements
* Power generation at 50 or 60 Hz
without a gear box
* Full load train starting with a 205kW
motor
* Electric start motor: 155kW and 215kW
peak
* High cyclic life meets daily peaking
market
* Cold start to full power in under 10
minutes
* Designed for ease of installation and
maintenance.
The Trent 60 is said to be ideally suited
to meet the higher power, variable speed
demands required by applications such as
natural gas liquefaction (NGL), gas
transportation, and gas induction for oil
recovery. Thanks to its three independent
shaft design, the Trent 60 is capable of
meeting driven equipment power demand
at reduced speeds with minimal drop off
in efficiency.
The Trent 60 WLE uses an annular
combustor system from the Trent aero
engine but modified to operate with
liquid and gas fuel.
The injection of water is used to reduce
emissions and boost performance. At ISO
conditions the engine is rated for 64MW.
The Trent 60 can be offered with an
Inlet Spray Intercooling (ISI) system to
reduce the ambient inlet temperature and
decrease the energy required for
compression. The result is higher power
and efficiency at ambients above 7C.
Rolls-Royce has been awarded a contract to supply a conglomerate with onsite power equipment at
its processing plants in Veracruz, Mexico. A Trent 60 unit will be at the heart of the CHP
unit providing process steam and electricity for CYDSAs processing plants, reports WIP.
WIP
www.rolls-royce.com
Internet link Internet link
Trent 60
turbine.
Trent 60
components.
WIP.MAY13. CHP.ROLLS.ROYCE.p32:RHP.WIP.p27.qxd 07/06/2013 09:19 Page 1
AMPS DIRECTORY 2013
37
AMPS2892 Directory 04.indd 37 26/02/2013 16:14
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
34
COMBINED CYCLE
N
orbert Wenn, Director of Sales
Support and Product Line
Management at Siemens, recently
told the media: "The renewed German
CHP law and incentive scheme has made a
business case of the Lausward plant
currently being built in Dusseldorf. This
would have never happened had it been
planned as a pure condensing plant."
The Siemens chief says that selling heat
in addition to electricity has made new
combined-cycle power plants more
economically feasible in Germany.
Siemens aims for a net efficiency of over
61% at the plant, when it becomes opera-
tional in 2016.
Siemens Energy has received an order
for turnkey erection of the Lausward
combined cycle power plant with district
heat extraction in Dsseldorf.
It will employ Siemens H-class
combined cycle gas and steam turbine
technology, which set a world record a
year ago and has since also proven itself
in commercial operation.
The order was placed by Stadtwerke
Dsseldorf AG (SWD). With an electrical
unit output of around 595 megawatts and
a net efficiency of over 61%, the Lausward
CCPP will set a new world record for both
parameters.
New combined cycle
plant for Germany
In addition, the
generated thermal
energy will be used for
the district heating
system in the city of
Dsseldorf.
Never before has it
been possible to extract
300 MWth of district
heat from a single
power plant unit in
combined cycle
operation, claims
Siemens. Thus, the
overall efficiency of the
natural gas fuel will be
around 85%, says the
company.
The Lausward CCPP
plant will be one of the
most efficient and
environmentally
sustainable plants in the
world. The value of the
contracts, including a
long-term maintenance
contract for the
supplied components, is
between 400m and
500 million.
The SGT5-8000H gas
turbine developed by
Siemens forms the heart
of the highly efficient
combined cycle power plant with district
heat extraction in Dsseldorf, Germany.
In addition, the generated thermal
energy will be used for the district
heating system in the city of Dsseldorf.
According to Siemens, never before has
it been possible to extract 300 MWth of
district heat from a single power plant
unit in combined cycle operation. Thus,
the overall efficiency of the natural gas
fuel will be around 85%.
Once it is in fully operation in 2016 the
new plant in Duesseldorf is likely to be be
one of the most efficient and
environmentally sustainable plants in the
world.
The new ultra-efficient 595 MW Lausward combined cycle power plant (CCPP) in Dusseldorf,
Germany, is likely to be the first of many similar plants to come onstream thanks to a recent
development in German CHP legislation, reports WIP.
WIP
www.siemens.com
Internet link Internet link
The SGT5-8000H gas turbine developed by Siemens
forms the heart of the highly efficient combined cycle
power plant in Dsseldorf, Germany.
A single SGT5-8000H turbine in combined cycle
operation can supply an entire metropolis the size of
Berlin with electrical power.
WIP.may13. COMBINED.C.SIEMENS.p34:RHP.WIP.p27.qxd 29/05/2013 15:20 Page 1
Combining Energy Flows
Efficiently
Industrieterrein Durmakker 27 - B-9940 Evergem
l +32 [0|P 23 08 00 * F +32 [0|P 23 40 82
lnlo@vonwlngen.be * www.vanwingen.be
E. VAN WINGEN NV
The Green Wave
in Power Solutions
Cogeneration is your declaration of independence. Make your
own heat and power and save as much as 30% energy, even
when there is no sun or wind around.
EVW helps you to do more with less.
We design and build cogeneration units which stand for long-
term, affordable sustainability and we keep a close eye on their
condition.
Partner with us for your energy project and take a decisive step
towards making our blue planet a little greener.
t $0(&/&3"5* 0/ 8* 5) /"563"- ("4
#* 0("4 "/% 1-"/5 0* -
t .* /* $)1
t ."* /4 '"* -63& 40-65* 0/4
Page 35 HARCO & E VAN WINGEN:ad page 2 halfs grid.qxd 31/05/2013 14:30 Page 1
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
36
DISTRICT HEATING
D
alkia has undertaken the
installation of high-performance
cogeneration plants, which will
simultaneously produce both electricity
and heat.
The electricity generated will be sold to
the Slovak national grid and the heat will
supply the district heating network.
Cogeneration will be assured by 18 gas
turbines installed in the existing heating
plants, with a total capacity of 15 MW of
electricity.
Vincent Barbier, CEO of Dalkia in
Slovakia comments: "The extension of our
partnership with the city of Bratislava
rewards the efforts put in by Dalkia over
the past14 years, both in terms of quality
of service and energy efficiency. We will
continue to upgrade the heatingnetwork,
partly by reinforcing the distribution
network's reliability and also by improving
the system's energyefficiency, with no
impact on tariffs."
Since 2000, Dalkia has been providing
heat and hot water for the whole of
Petralka, which, with 40,000 households,
is the largest residential district in central
Europe.
In 2003, the first energy performance
Heating for Bratislava's
Petralka district from Dalkia
contract was added,
covering all the schools
in the neighborhood.
This project was
carried out in partner-
ship with SIEA, the
Slovak innovation and
energy agency.
It generated more
than 25% energy
savings, with no impact
on the public
investment budget.
The resolve of the
government authorities
to defend energy
efficiency projects, the
commitment of local
elected representatives
and the professionalism of Dalkia came
together to bring about this project,
which was very innovative at the time.
Dalkia has been operating in Slovakia
since 1993 and now employs more than
800 people there.
It is a market leader in heating
networks and industrial utilities and is
also a pioneer in the field of energy
performance contracts. In July 2012
Dalkia signed a partnership contract with
Kosice, the country's second largest city,
for the energy management of all schools
in the area, including over 70 middle and
high schools.
A subsidiary of Veolia Environnement and
Electricit de France (EDF), Dalkia is a
global leader in energy services and
provides innovative solutions to support
the sustainable growth of cities and
businesses.
In an era of climate change, volatile
energy prices and scarce resources, Dalkia
offers customers its expertise in
developing, constructing and operating
greener and more economical energy
solutions.
With almost 50,000 employees in 35
countries, Dalkia reported managed
revenue of 8.9 billion in 2012.
Dalkia has renewed its contract to manage heat generation and distribution in Bratislava's
Petralka district. The 20-year contract extends the partnership with the city of Bratislava until
2039, applying energy efficiency with district heating. WIP has the story.
WIP
www.veolia.com
Internet link Internet link
Bratislava is to get a new district heating system.
District heating plants provide higher
efficiencies and better pollution control
than localised boilers. District heating with
combined heat and power (CHPDH) is the
cheapest way of cutting carbon emissions.
WIP.MAY13.DISTRICT.DALKIA.p36:RHP.WIP.p27.qxd 31/05/2013 11:10 Page 1
M
A
N
T
r
u
c
k
&
B
u
s
A
m
e
m
b
e
r
o
f
t
h
e
M
A
N
G
r
o
u
p
w
w
w
.
m
a
n
-
e
n
g
in
e
s
.
c
o
m
0$1(QJLQHV
$'LYLVLRQRI0$17UXFN%XV
MAN has an impressive |ine-up of powerfu|
high-speed diese| and gas engines fne|y tuned
to the needs of [ust about every industry. You
w||| |nd MAN eng|nes pu|s|ng at the heart of agr|
ou|tura| and env|ronmenta| equ|pment, oonstruo
t|on maoh|nery, ra|| veh|o|es, power generators,
yaohts and oommero|a| sh|ps to ment|on but a
few. Bu||t on a |ong and so||d ||neage of German
eng|neer|ng, MAN eng|nes embody the vast expe
r|enoe and |ns|ghts ga|ned from MAN`s |ndustr|a|
bus and truok ||nes. So put your bus|ness on the
w|nn|ng traok, w|th the unbr|d|ed horsepower,
eoonomy and enduranoe of a purebred.
v|s|t www.man-engines.com for more |nformat|on.
385(%5('3(5)250$1&(
)520$/21*/,1(2):,11(56
Our New Range of Generating Sets
...Designed to Deliver More
P & S Power Generation are
Authorised Dealers for FG
Wilson, one of the worlds
leading genset manufacturers.
Providing the full range of FG
Wilson Generators and parts, we
ensure all power requirements
are fulfilled.
With complete sales and on-site,
service support, we guarantee
our customers needs will be
met. From the first initial
enquiry, to the completion of
their purchasing journey.
Offering reliability, availability
and complete peace of mind.
For more information contact:
russell.britton@pspowergen.co.uk
Sales - 01623 550 550
Parts - 0121 386 1700
www.pspowergen.co.uk
Power Generation
Page 31 MAN BENDER:ad page 2 halfs grid.qxd 03/06/2013 12:26 Page 1
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
38
SONIC SOOT BLOWERS
Y
oungheung Power Plant is a coal-
fired power station located on
Youngheung Island, 40 kilometres
from the South Korean capital, Seoul.
To prevent buildup and blockages within
its SCRs, Youngheung Power Station had
previously relied on retractable steam
soot blowers.
However, due to the deteriorating
condition, reliability and performance of
the steam soot blowers the operating
efficiency of this equipment soon
declined, reports Primasonics.
After analysing the high costs of
replacing and maintaining the steam soot
blowers, plant personnel chose to look for
a more cost-effective and reliable solution
to the problems they were experiencing.
The search by the Youngheung Power
Plant team led them to the Primasonics
website and to its Korean agents, Artronix
System Co. Ltd.
Artronix System Co. Ltd arranged a site
visit with Youngheung Power Station
personnel to discuss in depth the benefits
and capabilities of Sonic Soot Blowers and
16 Sonic Soot Blowers
for South Korea
to obtain the relevant application
information and drawings.
Ultimately, this approach allowed
Primasonics to establish which would be
the most suitable model of Sonic Soot
Blower and the best potential installation
locations.
Following the submission of
recommendations and quotation from
Primasonics, Artronix won the order for 16
Q3 (120 Hz) model Sonic Soot Blowers.
Installation and commissioning of
equipment took place in June 2010 and
was supervised by Primasonics Technical
Director, Alex Bergus, who attended site
to ensure the smooth transition between
cleaning methods.
According to Primasonics, the
installation of the 16 Sonic Soot Blowers
at Youngheung Power Station saw an
increase in the scale removed and a
decrease in the differential pressure in
comparison to the three months prior to
installation.
Plant personnel were so impressed with
the results and low operating and
maintenance costs that the following year
they installed another eight Q3 model
Sonic Soot Blowers on their Number 3 SCR
and are now planning the installation of a
further eight units towards the end of
2013.
Primasonics International Limited was involved in providing a technical solution for the
Youngheung Power Plant in South Korea. Here, scale buildup in the SCR had caused blockages
in the gas flow but this was solved by installing Q3 (120 Hz) model Sonic Soot Blowers.
WIP
www.quattrosonics.com
Internet link Internet link
Quattro sonic
soot blower
range from
Primasonics.
Installing the control system
for the Quattro soot blower
range.
Q3 Sonic Soot Blower installed &
partially insulated.
Q3 model Sonic Soot Blower.
WIP.MAY13.PRIMASONICS.p38:RHP.WIP.p27.qxd 31/05/2013 10:52 Page 1
Battery
Monitoring
Battery
Testing
Battery
Maintenance Seminars
www.batterymonitoring.com
Real Battery Monitoring & Management
solutions - not promises!
CellCare Technologies Limited
Unit J1, Valley Way
Welland Business Park
Market Harborough
Leicestershire, LE16 7PS
United kingdom
T: +44 (0)1858 468438
F: +44 (0)1858 468439
E: info@cellcare.com
W: www.cellcare.com
The Quattro Range of Sonic Soot Blowers
Cost effective & non
destructive
Helps prevention of ash build
up
No costly repair, maintenance
or operational costs
Increase lter bag life
Eliminates hopper blocking
No damage to boiler or other
plant structures
Prevents internal damage to
ESPs
Eliminates tube corrosion &
erosion problems
Website:www.quattrosonics.com
email: info@quattrosonics.com
The Quattro Rang
up
Helps prevention o
destructive
Cost effective & no
ge of Sonic Soot Blo
of ash build
n
owers
Prevents internal da
plant structures
No damage to boile
Eliminates hopper
Increase lter bag l
or operational cost
No costly repair, m
amage to
er or other
blocking
ife
s
maintenance
email: info m
Website:ww s
o@quattrosonics.com
erosion problems
Eliminates tube cor
ESPs
Prevents internal da
ww.quattrosonics.com
rrosion &
amage to
It doesnt take a genius
EASY FITTING
ACOUSTICALLY SOUND
WEATHERPROOF
RETRO-FIT
UV STABLE
driMET TECHNOLOGY
STYLISH
Shaped weatherproof paddle
The alternative
dri MET
TECHNOLOGY
Featuring
w: westonbodyhardware.com t: +44 (0) 1527 516060
INTERNATIONALLY PATENT PROTECTED
g a e k
s u i n e g
s
WEAT
eaturing
ECHNOLOG
dri MET
The
t: +44 (0) 1527 516060
e alternative
Page 39 Cell Care Primasonics WBH:ad page 2 halfs grid.qxd 31/05/2013 13:46 Page 1
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
40
GAS ENGINES
T
he Huaneng plant in China has an
overall capacity of 400 MW and the
contract is worth $52m. The unit is
third Alstom gas turbine order for
Huaneng in the last nine months and this
delivery is expected to be delivered early
next year.
Last month two of the transformers
manufactured by Alstom Grids Wuhan
factory (China) in the frame of Brazils Rio
Madeira transmission line contract arrived
at the Porto Velho substation in north-
west Brazil.
The total journey of the transformers
from Wuhan to Porto Velho took around 70
days with stops in Shanghai (China),
Manaus (Brazil) and Porto Velho.
Alstoms GT13E2 gas turbine is said to
build on proven fleet experience for 50 Hz
markets and it has the biggest level of
versatility which means that it can fit to
every possible power plant configuration.
The 2012 upgrade to the engine is said
to make plant more competitive,
improving its efficiency and power output,
lowering the emissions while keeping the
highest reliability level of above 99.5%,
the highest reliability in the heavy duty
gas turbine market reports Alstom.
A spokesman told WIP: The GT13E2 gas
turbine can meet the needs of today, but
is also ready for tomorrows dynamic
power markets. With the 2012 upgrade
GT13E2 gas turbine
generators for China
every major area of
performance has been
addressed, refined and
improved to meet the
customers needs.
Features of the
GT13E2 include:
Improved flexibility
through 2 operating
modes switch online
between maximising
performance or
maximising operation
time between
inspection intervals
Grid frequency
support with high
response and no extra
lifetime factors
Adaptability for a
range of industrial
applications including aluminium smelters
and desalination plants
Support for phased plant construction
with modularised and pre-tested
auxiliaries.
Backed by more than 7 millions of fired
hours, the GT13E2 gas turbine engine has
proven itself to be the ideal core of a
power plant, producing reliable,
competitively priced electricity.
The GT13E2 provides for a wide range of
applications and can operate as a stand-
alone turbine in a new or
existing power plant design or
as part of a turnkey power
plant.
Applications cover electrical
power generation in base load,
intermediate or peak duty. It
can be used in industrial
applications such as aluminium
smelters or cogeneration
plants, for district heating or
desalination. Finally, its modularised and
pre-tested auxiliaries mean it can be
brought on-line quickly to support phased
plant construction.
The turbine can also handle wide
fluctuations in gas composition while the
engine can operate on diesel oil (with or
without water injection for NOx control),
with an online switch-over between gas
and oil, even at full load.
With the GT13E2, operators can achieve
maintenance intervals of 36,000
Equivalent Operating Hours (EOH)
between hot gas path inspections.
This makes the GT13E2 the ultimate
choice for operating regimes with a
higher sensitivity to O&M costs and
availability, reports Alstom.
French power generation giant, Alstom will supply the Huaneng combined heat and power plant
at Suzhou, China, with two sets of GT13E2 gas turbine generators. Operational support for
them is provided 24/7 by the online Alstom Monitoring and Diagnosis System, reports WIP.
WIP
www.alstom.com/power
Internet link Internet link
GT13E2
WIP.MAY13.ALSTOM.p40:RHP.WIP.p27.qxd 31/05/2013 11:41 Page 1
POWER
EQUIPMENT CO. wabash
FOR SALE
GAS TURBINE GENERATORS
(3) 5.2MW MOBILE
SOLAR TAURUS 60
GAS LOW NOx (OIL)
(1) 15.1MW G.E.
FR5-LA GENERATOR UNITS
OIL/GAS 1840 HOURS
(3) 22 MW GE
FR-5P
OIL/GAS
(1) 40MW GEC
FR-6B GAS 50/60hz
1-800-704-2002
DIESELS TURBINES BOILERS
24/7 EMERGENCY SERVICE
IMMEDIATE DELIVERY
WWW.WABASHPOWER.COM
INFO@WABASHPOWER.COM
POWER
EQUIPMENT CO. wabash
Exhaust Gas Heat Exchangers
Exhaust Gas Steam Generators
Over 100 domestic and international
Steam Generator projects
Complete Steam Generator Systems
as Turn-Key-Solutions
User-friendly operation due to
APROVIS Controlling System (ACS)
Your Partner for CHP Heat Recovery
Experience from more than 5000 successfully
realised projects
Application-optimised design
APROVIS Energy Systems GmbH
Ornbauer Str. 10
91746 Weidenbach Germany
Tel.: +49 (0) 9826 / 65 83 - 0
Fax: +49 (0) 9826 / 65 83 - 110
info@aprovis-gmbh.de
www.aprovis-gmbh.de
Solicte nuestro nuevo catlogo ecolgico en: www. g u a s c o r p o we r . c o m
Guascor is Guascor is
s now part of Dresser-Rand s now part of Dresser Rand
d. d
Page 41 Wabash Approvis Dresser Rand:ad page 2 halfs grid.qxd 31/05/2013 14:21 Page 1
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
42
GEN-SETS
T
he Milas-Bodrum Airport project was
delivered on time and within budget
by FGW Jenerator, an official FG
Wilson dealer in Turkey, reports the
company.
Milas-Bodrum is one of the busiest
airports of the Aegean Region, serving
Milas, a residential area with prominent
cultural heritage, and the popular holiday
destination of Bodrum.
The terminal accommodates more than
five million passengers from 40 different
locations annually, meaning FG Wilson is
helping to support the journeys of almost
14,000 people every day.
Milas-Bodrum Airports new international
terminal, which is 425m long with an
indoor area of over 95,000 sq m, has been
provided with a critical standby power
system by FGW Jenerator.
The five high voltage generator sets
provide backup support for the entire new
terminal, including nine passenger
boarding bridges, restaurants, retail
stores, check-in desks and passenger
baggage facilities. They also serve all the
information desks, banks and a post
office, as well as almost 30,000 sq m of
bus and car parking space.
FGW Jenerators power solutions team
completed the installation and commis-
New gen-sets for Milas-
Bodrum Airport, Turkey
sioning phase in May
2012, overcoming a
series of significant
engineering challenges
in the process.
Any loss of power at
the airport can cause
major issues, so it is
essential that all
critical loads are
re-supplied as quickly
as possible.
In order to achieve
this, FGW Jenerator
installed five FG Wilson
high voltage P1825
generator sets with the
ability to deliver power
to the airport
distribution network at
6.3 kV.
Due to the critical nature of the
application, the management and control
of the entire standby power system was
implemented using a redundant PLC
(programmable logic controller) in
conjunction with a user-friendly touch-
screen SCADA HMI system.
The primary duty of the PLC system is to
ensure the airport is transferred to
standby power as quickly as possible on
mains failure and on mains return, the
load demand of the airport is smoothly
and seamlessly transferred to the normal
mains supplies.
The generator sets and mains
synchronising capability were ultimately
implemented using Woodward easYgen
3500 controllers, ensuring that the five
generator sets were synchronised and
available to take load within 25 seconds
of any mains power failure.
FGW Jenerator packaged both the PLC
system and the five easYgen controllers in
an integrated floor standing control panel
suite.
To underline the critical nature of this
project, each generator set was supplied
with two methods of engine starting, air
and battery, a capability which delivered
increased redundancy and ensured the
generator sets could always start and be
available to supply the critical airport
loads.
To meet the strict noise conditions on
site, the cooling system for each gen-set
was implemented using a combination of
a set-mounted heat exchanger and low
noise multi-electrical fan remote radiator.
Another key element in enabling the noise
conditions to be met was the installation
in the plantroom of critical exhaust
silencers on each engine.
The skys the limit for FG Wilson, a leading global manufacturer of diesel and gas generator
sets, following the successful completion of the supply and installation of a high voltage power
solution for the new international terminal of Milas-Bodrum Airport in Turkey, reports WIP.
WIP
www.fgwilson.com
Internet link Internet link
The 5 high voltage gen-sets
provide backup support for the
new terminal at Milas-Bodrum.
WIP.MAY13.GENSETS.FGWILSON.p42:RHP.WIP.p27.qxd 31/05/2013 12:26 Page 1
INVITATION TO PARTICIPATE
POWER -GEN Asia, co-located with Renewable Energy World Asia, is the regions leading
exhibition and conference dedicated to the power generation, renewable energy and
transmission and distribution industries.
Attracting 7,000 delegates and attendees from over 60 countries from South East Asia
and around the world, nowhere else gives you the opportunity to reach and meet senior
executives and industry professionals in one place at the same time, providing key
networking and business opportunities.
The POWER-GEN Asia conference has become the major annual platform for the industry
to discuss the topics and issues of today and is regularly contributed to with keynote
speeches from Government Ministers and Governors of the regions utility companies.
Leading Industry Exhibition
Discover new ideas, technologies and developments at the regions foremost exhibition
for the conventional power and renewable energy generation industries and source the
latest products and services from leading companies and suppliers from around
the world.
EARLY BIRD DISCOUNT REGISTER TODAY!
Register yourself and your colleagues by 6 September 2013 as conference delegates and
beneft from the Early Bird Discount Rate, plus free entry to the exhibition.
WE INVITE YOU TO JOIN US IN BANGKOK, THAILAND FROM 2-4 OCTOBER 2013
There is no better place to meet the key decision makers in the power industry.
ADVANCING ASIAS ENERGY FUTURE
2 4 October 2013
IMPACT Exhibition & Convention Centre
Bangkok, Thailand
www.powergenasia.com
OWNED AND PRODUCED BY: PRESENTED BY: CO-LOCATED WITH:
www.powergenasia.com
0175_PGA13_A4_AD.indd 1 04/04/2013 12:54
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
44
COGENERATION
R
omanias latest CHP plant, located
in Covasna county, will carry out
the basic processing of 800,000
cubic metres of wood per year, out of
which 70% will be further processed into
glued panels.
Around 80% of the plant's output will be
exported - part of it after downstream
processing in other plants owned by
Holzindustrie Schweighofer in Romania.
Biomass projects like these have both
economical and environmental goals
(lowering the costs of energy and
reduction of the quantity of CO2
emissions).
It serves as a good example for other
major companies active in the field of
wood processing or in the field of energy
production.
The Sebes industrial biomass cogenera-
tion plant in Romania has a total capacity
of 43.5 MW (32.6 MWt + 10.9 MWe). It
uses biomass fuels consisting of: bark,
chips, branches and waste from wood pro-
cessing (mainly fir and spruce).
The energy (heat) is used for the
internal industrial process (drying of tim-
ber sawdust), the supplementary heat
production is normally delivered to
residential end-consumers.
Combined heat & power
plant for Covasna, Romania
The electricity is
used by local
consumers and any
supplementary power
production is injected
into the National Power
Grid.
At the Holzindustrie
Schweighofer Sebes
plant in Romania , the
total invetment cost of
the biomass CHP
facility (CHPP I+CHPP
II) was around 30m.
The financing was
ensured mainly by the
private sector (85%)
and Environment Fund
(15%).
The company was
also behind Romanias
biggest biomass-
cogeneration plant
located at a sawmill in
Radauti, Romania. This
began operations on
May 7th, 2009.
This cogeneration plant is fuelled by
biomass-like bark, as well as sawmill and
harvesting residues like chips or branches.
Its 20m investment
cost were partly
subsidised by AFM
(Administration of the
Environment Fund).
The total capacity
of this cogeneration
plant is 22 MW (17
MW thermal, 5 MW
electric).
The heat is
primarily used for the
kiln drying chambers
at the mill site,
whereas the heat potential would be suf-
ficient so supply 7.000 households.
Here, the electricity produced is direct-
ly fed into the public grid and enables the
supply of 25,000 households with green
electricity.
Gerald Schweighofer commented at the
official opening of the Radauti facility
[picture left]: This cogeneration plant is
not only a vital enhancement for the pro-
duction of energy from biomass in
Romania. It also creates new jobs in the
whole production chain.
Austria's Holzindustrie Schweighofer is building a combined heat and power plant to generate
power for a new wood processing facility in Romania. Located in the Covasna county - a region
with abundant wood resources - the plant will be commissioned in 2014, reports WIP.
WIP
www.schweighofer.at
Internet link Internet link
The Ridauti biomass CHP facility.
WIP.MAY 13. COGEN.HOLZIN.SCHW.p44:RHP.WIP.p27.qxd 07/06/2013 09:25 Page 1
2013 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you. is a trademark of Cummins Power Generation.
Our energy working for you.
www.cumminspower.com
Cogeneration
Combined Heat And Power Solutions For A Sustainable Future
Cogeneration Systems - also known as Combined Heat & Power (CHP) simultaneously produces electrical and
thermal energy from a single fuel source. The energy provided from our lean-burn gas generator sets is used for
many purposes, from heating commercial greenhouses and hospitals to heat production for drinks manufacture
and electrical and thermal energy for waste water treatment plants. Cogeneration drives efciency and cuts
costs, whilst helping users comply with emissions standards.
Visit the ComAp website:
www.comap.cz
InteliNano
NT
THE ANSWERS IN YOUR HANDS
InteliNano
NT
Small yet
powerful
Introducing many advanced
features packed into a
cost-effective controller.
ComAps new InteliNano
NT
is a family of
easy to use, super-compact AMF and MRS
controllers which deliver high quality
protection, monitoring and control for
small-to-medium sized generator sets.
Large screen with easy-to-understand
pictograms
Firmware updates available in two clicks
Support of electronic engines
History log
No PC required for confguration
Integrated USB port
Zero power consumption
Weak battery starting guaranteed
Current measurement
Page 45 CUMMINS COMAP:ad page 2 halfs grid.qxd 03/06/2013 12:32 Page 1
MA Y 2 0 1 3 WO R L D W I D E I N D E P E N D E N T P O W E R
46
POWERPLANT
D
eveloper Almacantar has resubmit-
ted plans to convert Londons
iconic Centrepoint - the 34-storey
office tower- into luxury flats.
The building will be upgraded to cut
energy consumption with new high
performance glazing, a central combined
heat and power system and sedum roof.
The planning committee involved in the
project is believed to be - amongst other
options - looking at a GE Jenbacher
JMS416GS-NL gas engine and a
cogeneration facility engineered, installed
and maintained by Clarke Energy, similar
to the one installed at The Shard.
A combined heat and power (CHP)
plant in the Centrepoint building is likely
to be designed to provide around
1.131MW of electricity and 1.199MW of
hot water at high efficiency (85.3% total,
41.4% electrical) to the surrounding area.
The addition of a CHP system will help
to reduce carbon emissions and contribute
to the low-carbon footprint of the build-
ing. In parallel this would provide
significant cost savings versus the
separate purchase of electricity and gas
from the national grids.
Its normal for the generators to be
located in the basement of the building
and they are likely to be housed in
acoustic enclosures in order to negate the
sound emissions from the engines.
Gas engines like these are also
characterised by very low levels of NOx
A new CHP system to be
installed in Centrepoint
emissions
(<250mg/Nm3). These
reduced emissions
levels are important
when it comes to
achieving strict air
quality requirements in
the London metropolis.
At The Shard its all
working well. The
efficiency of up to
47.8% of GE Jenbacher
engines results in out-
standing fuel economy
and the highest levels
of environmental
performance, says GE.
The engines are also
said to be highly
reliable and durable in all types of appli-
cations, particularly when used for natu-
ral gas & biological gas applications. GE
Jenbacher generators are renowned for
being able to constantly generate the
rated output even with variable gas
conditions, says the manufacturer.
The patented LEANOX lean burn
combustion control system fitted on all
GE Jenbacher engines guarantees the
correct air/fuel ratio under all operating
conditions in order to minimise exhaust
gas emissions whilst maintaining stable
operation.
In combination with the LEANOX system
the GE Jenbacher gas mixer balances out
fluctuations in calorific value, which
occurs mainly in biological gas
applications. GE Jenbacher engines can
operate on gases with extremely low
calorific value, low methane number and
hence degree of knock, but also gases
with a very high calorific value.
One of the most important properties
regarding use of gas in an engine is the
knock-resistance rated according to the
methane number.
High knock-resistance pure methane has
a number of 100. In contrast to this,
butane has a number of 10 and hydrogen
0 which is at the bottom of the scale and
therefore has a low resistance to
knocking.
The high efficiency of the GE Jenbacher
engines becomes particularly beneficial
when used in a CHP or tri-generation
application, such as district heating.
One of Londons most visible structures will have a new CHP system installed. The iconic
Centrepoint building on New Oxford Street is set for a 350m upgrade, with an advanced
cogeneration concept forming a significant part of the buildings plan, reports WIP.
WIP
www.clarke-energy.com
Internet link Internet link
WIP.MAY13.POWERPLANT.p46:RHP.WIP.p27.qxd 31/05/2013 15:18 Page 1
It isnt possible to tell
you all about us in
this much space.
Telephone: +44 (0)1723 871112
Fax: +44 (0)1723 870625
www.controlandpower.co.uk
Control & Power Systems Ltd. 3D Burniston Industrial Estate
Scarborough, North Yorkshire YO13 0HG
AUTOMATIC GENERATOR CONTROLS AUTOMATIC PARALLELING
LOW VOLTAGE SWITCHBOARDS MOTOR CONTROL CENTRES
AUTOMATIC TRANSFER SWITCH PANELS MAINS PARALLELING
PUTTING YOU IN CONTROL
control and power
at your finger tips
VISIT OUR WEBSITE:
Regular on-line washing reduces performance degradation of gas turbines operating
in polluted environments. For the largest gas turbines operating today, Turbotect has
introduced an air-assisted nozzle which uses air jets to bracket the wash fuid and
project it into compressor intakes with larger dimensions and faster air fows. The
new nozzle is designed to replace the existing nozzle, but fewer are required. For
the new system, only the same total volume of washing solution is needed to achieve
improved wetting of the surfaces to be cleaned.
n addition to TURBOTECT
TM
950 water-based and TURBOTECT
TM
927 solvent based
detergents, a new more powerful and environmentally friendly water-based detergent
is being introduced. TURBOTECT
TM
2020 has been formulated to dissolve the more
aggressive pollutants which are now found at many sites. Extensive tests show that
TURBOTECT
TM
2020 is the most effective cleaner on the market today
EXPERTS IN PROBLEM SOLVING
Turbotect Ltd.
PO Box 1411
CH-5401 Baden, Switzerland
Phone: +41 56 200 5020
Fax: +41 56 200 5022
E-mail: turbotect@turbotect.com
Turbotect (USA), Inc.
18811 N. Roselake Drive
Tomball, Texas 77377
Phone: +1 281 255 6092
Fax: +1 281 516 0427
E-mail: andrew.bromley@turbotect.com
452"/4%#4!$$36!,5%
&/2-/2%4(!.9%!23
On-Iine compressor washing for Iarge gas turbines
On our website see a 45 second video of the
new compressor washing system in action
on a 120 MW base loaded gas turbine
www.turbotect.com
TURBOTECT ADDS VALUE
FOR MORE THAN 30 YEARS
Page 47 Earth Safe C&PS Turbotech:ad page 2 halfs grid.qxd 31/05/2013 14:03 Page 1
C ON T R A C T S & A P P L I C AT I ON S
48
Yingli Green Energy Holding Company Limited, a
leading solar energy company and one of the world's
largest vertically integrated photovoltaic company
manufacturers, has signed a contract to supply 96
MW of PV modules to the Jasper PV, located in
South Africa's Northern Cape. This solar plant will
not only produce clean energy for South African
residents, but also create jobs and help to stimulate
the local economy.
The consortium formed by Iberdrola Ingenieria y
Construccion and South African company Group Five
has been selected by Jasper Power Company to
build the Jasper PV Plant in South Africa, which will
be powered by more than 325,000 Yingli YL295P-35b
multi-crystalline modules spread across 180
hectares. Yingli Green Energy is the exclusive PV
module supplier for this project.
This is said to be a significant milestone in the
history of Yingli Green Energy as the Jasper PV
Solar Plant is one of the solar projects that was
developed by a consortium led by SolarReserve, a
U.S. developer of utility-scale solar power projects,
and was selected by the South Africa Department of
Energy (DOE) in May of 2012 in the second round of
bids under the South Africa Renewable Energy
Independent Power Producer Procurement Program
(REIPPPP). The South Africa DOE awarded the
construction of eight PV plants and seven wind
farms during the second round of bidding.
Iberdrola selected Yingli Green Energy based on
experience of performance yield in existing
projects, superb quality and technology leadership.
In addition, given that Yingli Green Energy is one
of the major crystalline manufacturers to have
secured Munich RE's module performance warranty
insurance, the project will also be covered under
Munich RE's Option Cover. The Option Cover provides
greater investment security over the lifetime of the
project financing.
"This project is a major milestone in our strategy to
bring affordable green energy for all into emerging
markets like Africa," Mr. Liansheng Miao, Chairman
and Chief Executive Officer of Yingli Green Energy
told WIP. "Our strategic alliance with Munich RE has
enabled Iberdrola to reduce project investment risk
that has helped to lower financing barriers."
MA Y 2 0 1 3 W O R L D W I D E I N D E P E N D E N T P O W E R
Yingli Green Energy supplies 96 MW units
GDF/Mitsui & Fiera complete solar project
GDF SUEZ Canada Inc. and its
joint venture partners Mitsui
&Co., Ltd. and Fiera Axium
Infrastructure have announced
that the 10 MW Brockville Solar
project in the Township of
Elizabethtown-Kitley, Leeds
County, Ontario, has entered
commercial operation. This is
under a 20-year power purchase
agreement with the Ontario
Power Authority.
The $50 million project,
developed under Ontarios Feed-in
Tariff (FIT) Program, consists of
42,000 panels on approximately
80 acres of land, and has the
capacity to generate clean,
renewable energy for around
1,700 homes in Ontario.
GDF SUEZ Canada and partners
Mitsui &Co., Ltd. and Fiera Axium
Infrastructure currently operate
362 MW of wind-powered
generation facilities in the
Canadian Maritimes and Ontario,
and have another 300 MW of wind
generation projects under
construction in Ontario and British
Columbia. The Brockville project
is the joint ventures first solar
installation in Canada.
GDF SUEZ Canadas President
Mike Crawley told WIP: "With
Brockville, we are diversifying our
technology base and entering a
new and exciting business area.
We are proud to be providing
another form of clean, renewable
energy to the province and hope
this will be the first of many solar
projects in our portfolio."
This was a joint venture of AMEC
Americas Limited and Black &
McDonald Limited.
Oman gets
temporary power
plant
CAltaaqa Global CAT
Rental Power, a leading
global power solutions
provider, recently
designed and installed
a 24MW temporary
power plant in the
Sultanate of Oman.
To meet electricity
demands throughout
the summer, the 24MW
temporary rental power
plant will supply power
to the electricity grid.
The extra power comes
at a time when there is
a significant increase in
the use of temperature
control equipment,
such as air conditioning
and district cooling.
Supporting the existing
generating capacity of
Oman, the interim
power plant will ensure
peak performance
during the hottest
months of the year.
Actom MV
Switchgear wins
SA contract
A 4.6 million contract
for the design, manu-
facture and supply of
60 pad-mounted
transformer kiosks for
the 138 MW Jeffreys
Bay wind farm in the
Eastern Cape has been
awarded to Actom MV
Switchgear.
The Jeffreys Bay wind
farm is one of 28
renewable energy
projects being
established by
independent power
producers (IPPs) as part
of a South African
government-approved
plan. The 28 projects,
which comprise wind,
solar photo-voltaic
(PV) and concentrated
solar power (CSP)
technologies, are the
first of a series of
groups of renewable
energy projects.
Contracts.WIP.MAY. 2013.p48:Contracts.WIP.MAY.p54.qxd 03/06/2013 13:40 Page 1
11 -13 February 2014
Dubai International Exhibition Centre, UAE
Under the patronage of H. H. Sheikh Maktoum bin Mohammed bin Rashid Al Maktoum, Dubai Deputy Ruler
www. mi ddl eeast el ect r i ci t y. com
Book your stand now
Co-located With Supported By
Doing Global Business the of Good
Expose your brand to 19,000 international buyers
at the worlds leading power event
of onage r e pat h Under t
in Moham b m ou t k Ma kh i e . Sh H . H
Du
11
ub , D m u o l Makt A d i h as R n i b ed m m
Exhibi l na io t a rn e Int i uba
y 2 r a u r b Fe 3 -1 1
r e ul R uty ep ai D b
E A U e, ntr e n C o ti
4 1 20
a tt st ss
ddddd l
s
st ssstt ssttta tttaa
d d
r
s
d d l
s Exxxxxppppoooosss
a sta r u o y ok o B
d lll
r
r wo e h at t
r ou ou y e e ss oo xpo xpo EE
and
s we p e
0
w p
9
o pow gg
o
p
wwwwww
g
w
p eeeee ee r e o
0
oow pooooooo pppppppp
199 oo 0 9999
ppooow oooooo
o
po ppppo
0 ,
o p w o
11111111
g ow
9
we o p g
999
p we w
oooooooooooooooooooooo
ndddddd nnddddddd
s
bbb
l s
b aaaaaaa
l sssss
and and nn www
oo
p
ooooo
dd
b
i ddl ee
w o and n
. m ww w
rrrr powe g
0
gg
i
g n i d a e l s
b 0 0 00 9,, 9,, 9999 1 o t d n a r b r
vv tt ee t vv
b yyyyyyyyyyyyy
y i ci t r ast el ect
nnn ee vvvvv eeeee
n ye u b al al nn oo i t aa n r te n
m . co
Supported By Co-located With
s r
MA Y 2 0 1 3 W O R L D W I D E I N D E P E N D E N T P O W E R
PRODUCTS AND SERVICES
SME to build & test PLAT-O paltform with STG 50 turbines
Sustainable Marine Energy (SME) will build and test a new generation
systems integration platform aimed at enabling tidal energy to
become a cost effective green source of energy. SME will be using its
unique PLAT-O platform, together with STG 50 tidal turbines it is
purchasing from propulsion experts SCHOTTEL GmbH, for trials off
the Isle of Wight. The trials will show the
ways SMEs new platform can drive down the
costs and risks of device installation and
maintenance, and help enable tidal energy
to become genuinely viable, from a small
unit up to utility scale deployments
providing MW capability. www.schottel.de
ORegen Waste-Heat Recovery Systems from GE
Berakas Power Company (BPC), Bruneis national energy company,
plans to install GE Oil & Gas innovative ORegenTM waste-heat
recovery systems to increase the output and efficiency of four GE
LM2500 aeroderivative gas turbines at the Berakas Power Station,
located outside the capital city of Bandar Seri Begawan in the
Sultanate of Brunei.
The ORegen system will be connected to three of the LM2500 units,
each of which generate up to 22 megawatts (MW). The fourth LM2500
turbine and one waste heat recovery unit will be kept on standby.
GEs ORegen system utilizes a thermodynamic superheat cycle that
recovers waste heat from gas turbines and converts it into 14 MW of
extra net electricity without using fuel or water and does not
produce additional CO2 or NOx emissions. The system also has mini-
mal operational and maintenance requirements. The Brunei project
is the first use of GEs ORegen technology in the Asia-Pacific region.
The equipment for the Berakas project is scheduled to be delivered
at the end of 2014 and commissioned in early 2015. The upgraded
power plant is expected to start commercial operation in the first
half of 2015. In addition to the equipment, GE also is providing site
installation and training as well as a resident engineer to support
BPMC for one year.
GEs ORegen technology is the largest Organic Rankine Cycle (ORC)
single unit available for gas turbine waste heat recovery. ORegen is
applicable on any type of simple-cycle gas turbine and can generate
electricity at lower gas turbine loads than a standard combined cycle
system which uses water and steam to recover waste heat.
www.ge.com
Quartzelec refurbish & rewind Takadori rotor
When the rotor on a T240-370, 154 MVA generator at the Takoradi
Power Station in Ghana suffered a double earth fault resulting in
severe arcing damage, TAQA, one of the largest independent power
producers in the Middle East and North Africa, turned to the UK-
based electrical engineering group Quartzelec, to deliver a six month
refurbishment and rewinding programme for the failed machine.
The damaged rotor, which measures 8 metres in length and weighs
36.5 tonnes, failed in May 2011 and was substituted with a new spare
rotor purchased from the OEM to allow continued operation.
This was an interesting and challenging
project, explains Steve Cooper, Business
Development for Power Generation at
Quartzelec. With a replacement generator
costing in excess of 2m we provided a
technically competent yet commercially
viable solution to re-establish full generat-
ing capacity. www.quartzelec.com
SDMOs latest innovation is the RC1650 power plant
SDMOs latest innovation is the RC1650 portable power station which
attracted attention at the recent Plantworx show. The R1650 is a
1450kVA, prime power (1200kW COP) portable generating plant fitted
into a 20ft (6m) ISO low cube container. The set has compact
dimensions and is designed to provide major back-up power for
factories, hospitals and/or sites that require continuous electricity at
short notice and where available space is limited.
We received confirmed orders for five 200kVA sets on the opening
day of the show and with the keen interest shown in all our
equipment by the visitors to our stand, we expect more orders to
follow, Clive Dix, SDMOs director, told WIP.
The power rental professionals who scrutinised our R1650 all
commented how compact the set is in relation to its power output,
continued Clive. They were also impressed with the new cooling
system which contributes to a
reduced noise output.
SDMO Industries is one of the
largest producers of power
generation equipment in the world.
Plantworx is a dedicated working
construction machinery show and
was held in May at the Stoneleigh
Park Showground.
www.sdmo.co.uk
Hawke Internationals new boxes for cable terminations
Hawke International has introduced a new range of high capacity,
environmentally-protected, boxes for cable termination. These
enclosures meet the need of offshore drilling and production, marine
and other challenging environments. This addition to the Hawke
stainless steel junction box range permits up to 12 x 400 sq. mm
cable terminations per bus-bar. Units can be flexibly configured for
single phase and Earth, three-phase and Earth or three-phase/neutral
and Earth. Fully ATEX approved and IECEx compliant, these have been
developed for harsh marine environments, the heavy gauge grade 316
stainless steel enclosures will
resist salt & chemical contami-
nation. Heavy duty base plates
give ample room for cable entry
and the installation of cable
glands. Compression controlled
silicone sponge gaskets provide
an effective environmental seal.
www.ehawke.com
50
NEWPRODUCTS.p50:NEWPRODUCTS.MAY.p56.qxd 07/06/2013 09:30 Page 1
Technical Consulting & Full NDE for Boilers/ HRSGs and Turbines Worldwide
Backed up by state-of-the-art Tools & Methodologies
Specialise in: Power Plant Benchmarking (for Efficiency
Improvement, Reducing Planned or Forced Outages and
Operation & Maintenance Costs), Cost Analysis for Base load or
Cyclic Duty Plant, Power Plant Technical Auditing, Condition
Assessment and Plant Integrity/Life Assessment/Extension
Provide Services in: Fitness-for-Service, Risk Based
Inspection/Maintenance, Crack Assessment, Piping Stress
Analysis/FE Analysis, Welding & Weld Repair Advice/Procedures
& Assessment, Support with Materials
Data/Standards/Procedures, Design Review & Improvement
especially for Cyclic Capability of Power Plants, Root Cause
Creep/Fatigue/Corrosion Failure Analysis/ Expert Witness,
Water Chemistry, Flow Assisted Corrosion (FAC), Specialists
support with P91, P92 using innovative tools like Scanning Force
Microscopy, Electrical Discharge Sampling Equipment etc. +
much more
Currently supporting utilities and plants in: UK, Europe, USA, Canada, South East Asia,
Far East, Middle East and South Africa.
Details at: www.etd-consulting.com ashibli@etd-consulting.com Tel: + 44 1372 363 111
European Technology Development , Fountain House, Cleeve Road, Leatherhead, Surrey KT22 7LX, UK
2-days (21-22 May 2013) Training Course n
P91 and P92 covering quality checks/assurance
when purchasing, welding and heat treatment,
NDE and integrity/ life assessment + more
Followed by:
2-days (23-24 May 2013) Int. Seminar on
Experience with New Materials (P91, P92,
T23, T24 ) , London
Details at: www.etd-consulting.com
Also, organize Training Courses worldwide
(including customized courses at the clients site
on all issues dealing with power plants)
chnic e TTe
B
al Consulting c
o - e t a t s yy b up dd e kke c a B
& Full NDE for
Me s & ool ls TTo t r a - e th - of f-
rs/ HRSG r Boile
s e i og ol hod t e
urbine nd TTu Gs a
orldwide WWo es
: in se i al i c Spe
a l P y t Du lic c y C
a M & n o i at r pe O
, tt, n e m e v o pr Im
B
B nt a l P r we o P
T nt a l P r we o P , t n
, ) ts s Co e nc na e t n ai
d ne an l P g n i duc e R
o e t a t s yy b up dd e kke c a B
fo ((f g n i k r a m h c n Be
, g n i t i d u A l ca i n ch e TTe
B r fo s si y l a n A t s o C
O d ce r o F or d
Me s & ool ls TTo t r a e th of
y c n e i c ffi EEf r o
n o i t ndi o C ,
r o d a o l se Ba
and s ge a ut O
s e i og ol hod t e
an t n e ssm sse A
i v r Se e id v o r P
s d r a d n a t S / a t a D
ss sse A &
a n A E F s/ si y l a n A
i Ma / n o i t c e sp n I
/L y t ri g e t In t n a Pl d n
s e n t i F : in s e c i
s e D s e r u d e c o r P s/
o p p u S , t n e sm
W & g n i d l e W s, si y l a
k c ra C , e c n a n e t n i
x E / t n e ssm sse A e f i L
R e, c i v er S - r fo - ss
m I & ew i v e R gn si
th i w t r o
ce i v Ad r i a p Re d l We
i P , t n e ssm sse A
n o si n e t x
ed s a B k s i R
t n me e ov r mp
ls ia r e t a M
s e r u d ce o r P / e
s s re t S g n i p
E D N
e h w
91 P
a d - 2
f li / t i t i d E
ld e w , g n i s ha c pur n e
g n i er v co 92 P d an 1
201 y Ma 22 - 21 ( ys a
+ t
e m t a e r t eat h d an g n i
an r u s as / s eck ch y t i l qua
se r u o C ng ni i a r T ) 13
, t n e
e c n
n
re o m ch u m
l E , yy, p o sc o r c Mi
9 P th i w t r o p p su
t s i m e h C r e t Wa
e/ u g i t a F / eep r C
C r fo y l l a i ec p es
s d r a d n a t S / a t a D
e g r a ch s i D l ca i r ct e
v o n n i g n si u 2 9 P , 91
d e t s ssi A w lo F , yy, r t
e r u l i a F n o i s o r r o C
o y t i l i b a p a C lic c y C
s e D s, e r u d e c o r P s/
m p ui q E g n i l p m a S
a c S e lik s ol o t ve i t va
) C FA ( n o i s o r r o C d
e p x E s/ si y l a n A e
s, nt a l P r we o P f o
m I & ew i v e R gn si
+ . c et nt e m
e c r o F g n i n n a
s t lis ia c e p S ,
ss, e n t i W rt
se u a C t o o R
t n me e ov r mp
a t e D
23 T
p x E
a d - 2
o l l Fo
E D N
n o c - d et . w ww : at s lls i a
on d on L , ) 24 T , 3
w e N h t i w ce en eri p
20 y Ma 24 - 23 ( ys a
: by ed w o
ss a e ffe li / yy/ t i r g e t n i d an E
om c . ng i t ul ns
P , 91 (P s l a eri t Ma
r na i m Se . t In ) 013
e or m + t n e ssm se
, 92
on
op
ng i t r o upp s y l t n rre u C
st a E le d id M , st a E r Fa
et D
ur EE
o
U : n i s tts an pl and s e i ilit t u
. ca i r f A th u o S d an
u ons c - d t e . www : at s l ai t
ell ev DD ogy hnol h l ec TTe T pean
ous
, a ad an C , A S U , pe o ur E K,
b hi as om c ng. i t ul
HH n aii ount FF , ent opm
he
ia, As st a E th u o S
om c ng. i t ul ons c - d et @ i bl
h Leat L t oad, d RR e eev ll CC e, s
a n o
l nc i (
o s l A
L
3 1372 44 + : el TTe
L 7 22 22 KT KT y rre Su S head, h d er
h t i w g n i l a e d s e ssu i l l a
u o c d e z mi o t s u c ng i ud l
g n i n i a r T ze i n a g r o o,
UK
1 1 1 363
UK X, X LL
) s nt a l p r we o p
s s t n e li c e h t at s e rs u
w d l r o w s se r u o C g
e t i s
e d i
Understanding, Solving and
Supplying Solutions
info@woodlands-generators.com
www.woodlands-generators.com
0800 358 3525
GENERATORS UP TO 2000 kVA
MULTI MEGAWATT INSTALLATIONS
SALES & RENTAL
SERVICE, INSTALLATION & COMMISSIONING
24 HOUR TECHNICAL SUPPORT
Woodlands Generators incorporated in 1950 and is one
of the largest generator hire companies in the UK.
As one of the market leaders in temporary power supply
and ancillary equipment you can be assured of fast,
friendly and efficient service, both in the UK &
Worldwide Market.
Page 51 TEKSAN EUROPEAN TECH:ad page 2 halfs grid.qxd 06/06/2013 12:23 Page 1
DIRECTORY OF EQUIPMENT AND SERVICES
BRADGATE CONTAINERS LTD,
Leicester Road, Shepshed, Longborough,
Leicestershire LE12 9EG, UK.
Tel +44 (0)1509 508678
Fax +44 (0)1509 504350
E-mail: sales@bradgate.co.uk
www.bradgate.co.uk
Contact: Malcolm Cropley/ James Bexon
Design, manufacture, fitting out, and site
installation of purpose built modules (On
shore and off shore), and acoustic containers
for the electrical and allied industries
UK manufactured power generation systems
from 6kVA to +30MVA:
Renewable energy
Prime & standby back up power
Base load generation
Oil & gas industry applications
Marine power generation
Critical power including UPS systems
Gas and co-generation (CHP) applications
Rental applications
International sales and service support
Broadcrown Ltd (Group Headquarters)
tel: +44 (0)1 889 272200
email: info@broadcrown.co.uk
www.broadcrown.com
Manufacture, InstaIIation,
Commissioning & Servicing
of 10KW - 2MW Bespoke
Generator Sets
HV/LV Switchgear Servicing
Load/Power Monitoring
TeI: +44 (0)1744 814444
EmaiI:sales@burtonwoodgroup.com
www.burtonwoodgroup.com
oad/Power Monit Load/Power Monit
Se hgear Servicing
ets
nerator Sets ee
f 10KW - 2MW Bespoke 10KW - 2MW Bespoke
Commissioning & Servicing Commissioning & Servicing
Manufacture, InstaIIation, Manufacture, InstaIIation,
.burtonwoodgroup.com www
oup.com tonwoodgr sales@bur EmaiI:
+44 (0)1744 814444 eI: TTe
Covrad Heat Transfer Ltd
Sir Henry Parkes Road
Canley, West Midlands
Coventry, CV5 6BN
UK
Tel: +44(0)2476 675 544
Fax: +44(0) 2476 676 029
e-mail: sales@covrad.co.uk
www.covrad.co.uk
Cranfield
UNIVERSITY
Specialised Courses in
Gas Turbine Technology for
Engine ers and Managers in the
Power Industry
For information please contact:
Mrs Karen Swann
School of Engineering
Cranfield University
Tel: +44(0) 1234 754683
Fax: +44(0) 1234 751566
E-mail: k.swan@cranfield.ac.uk
Turbochargers UK
Spare parts, replacement
turbochargers, overhauls
check, clean, balance and
reconditioning.
Hortonwood 37, Telford
TF1 7XT. Great Britain
Tel: + 44 1952 607200 (24hr)
Fax: + 44 1952 677179
Email: turbo@gb.abb.com
Web: www.abb.com/turbocharging
CLASSIFIED
Part of the Mecc Alte Group
www.cabeluk.com
Winding. Rewinding. Supply.
Service. Repair
Cabel UK Limited
8 Pillings Road, Oakham,
Rutland LE15 6QF
E: info@cabeluk.com
T: +44 (0)1572 755 168
F: +44 (0)1572 723 974
Second Avenue, Centrum 100
Burton-on-Trent
Staffs DE14 2WF
Manufacturers of
Load banks for sale or hire
AC/DC Resistive/Reactive
2kVa6000kVa
Contact: David Gould Sales Director
Tel: 01283 531645
Fax: 01283 510103
E-mail: sales@crestchic.co.uk
Website: www.crestchic.co.uk
Europes leading energy
equipment and service
suppliers
T: +44 (0) 161 432 8833
www.edinauk.com
Specialists in: Coal Mine
Methane, Combined Heat
& Power, Landfill Gas,
Sewage Gas, Bio Gas.
Tel.: +49 (0) 9826 / 65 83 - 0
www.aprovis-gmbh.de
CHP PLANT
HEATING
CONCEPTS
From the experts
in exhaust gas
heat exchangers
CHP PLANT
HEATING
CONCEPTS
From the experts
in exhaust gas
heat exchangers
INTERPOWER INTERNATIONAL
LTD
PO Box 70,
Pickering,
England YO18 7XU
Tel: +44 (0) 1751 474034
Fax: +44 (0) 1751 476103
Email: intpower@aol.com
Website: www.interpower.co.uk
Manufacturers of diesel and gas
generator sets, containerised sets,
chp systems, marine sets and
bespoke systems
Mecc Alte UK Ltd
6 Lands End Way, Oakham
Rutland, Leicestershire LE15 6RF
T: +44 (0)1572 771 160
F: +44 (0)1572 771 161
E: gen@meccalte.co.uk
www.meccalte.com
World-Class Alternators
Design, Sales and Rental of
Electrical Distribution Equipment
Equipment tailor made to your
specification
Stocked distribution boards,
cables and accessories
Comprehensive Rental Service
Head office Cannock, Staffs:
01543 574111
London depot: 01708 863963
Email: sales@idesystems.co.uk
www.idesystems.co.uk
Distributors for:
ENGINE GENERATOR
CONTROLS AIR &
HYRAULIC STARTERS
Installation, commissioning,
breakdown service, repair, site
survey, technical support and
training.
Contact:
Susan Campbell
Tel: +44 (0)161 476 4606
Fax: +44 (0)161 476 5639
sales@precisioncontrols.co.uk
www.precisioncontrols.co.uk
Precision Controls Ltd
www.agriemach.com
AGRIEMACHLTD
Agriemach Ltd, Old Domewood, Copthorne, West Sussex, RH10 3HD
CALL NOW ON 01342 713743
SCRANDOXIDATIONCATALYSTS
SCRSYSTEMS ANDDOSINGSYSTEMUPGRADES
EXHAUST SPARKARRESTORS
ENGINE AIRPRECLEANERS
HEAT ANDSOUNDINSULATION
Colchester
Engineering
Systems
Unit 5, Chancers Farm, Fossetts Lane,
Fordham, Colchester, Essex CO6 3NY
Tel: +44 (0)1206 240788
Fax: +44 (0)1206 240099
E-mail: colengsys@aol.com
www.colchesterengineering.com
Noise Control and Ventilation
System Engineers
Manufacturer of Gasoline,
Diesel and Natural Gas
Generating Sets
1 to 2500 kVA
Aksa International (UK) Ltd.
Unit 6, Pine Court
Walker Road
Bardon Hill
Coalville Leicestershire
LE67 1SZ UK
Tel: + 44 1530 837 472
Fax: + 44 1530 519 577
E-mail: sales@aksa-uk.com
www.aksa.com.tr
Manufacturersofbespokeandstandard
Diesel/gasgeneratorcontrolpanels
Lowvoltageswitchboards
PLCcontrol&monitoringsystems
Control&PowerSystemsLtd
3DBurnistonIndustrialEstate
ScarboroughEnglandYO130HG
Tel:+44(0)1723871112Fax:+44(0)1723870625
www.controlandpower.co.uk
www.bender-uk.com
ELECTRICAL SAFETY SOLUTIONS
Isolated Power Systems
Verifcation & Service
Healthcare Products
Power Quality Monitoring
Residual Current Monitoring
Earth Fault Detection
Insulation Monitoring
Maximum performance
Minimum Fuss
EXHAUST GAS SILENCERS
PIPEWORK & ACCESORIES
CATALYTIC CONVERTER UNITS
NoX REDUCTION SYSTEMS
ACOUSTIC CANOPIES
INLET & EXTRACT ATTENUATORS
ACOUSTIC DOORS
ON-SITE INSTALLATIONS
Industrial & Marine Silencers Ltd.
Tel: +44 (0) 1162 604985
Email: sales@silencers.co.uk
www.silencers.co.uk
The single source for diesel & gas engine products
T: +44 (0) 121 511 0400
www.ipu.co.uk
ENGINE STARTING
ENGINE CONTROL
ENGINE HEATING
ENGINE SILENCING
ENGINE FILTRATION
SINGLE SOURCING
Foam Techniques Ltd, manufacturer and
specialist in producing acoustic and thermal
insulationfoamproducts. Acomprehensiverange
of insulation materials offer a solution to almost
any problem, specification and budget. As a
market leader, we export our sound insulation
products and services globally to the Gen-Set
and Acoustic Enclosure Markets
Foam Techniques Ltd, 39 Booth Drive, Park Farm South,
Wellingborough, Northants NN8 6GR UK
Tel: 01933 400096 Fax: 01933 400095
www.foamtechniques.co.uk
THE ULTIMATE IN ACOUSTIC FOAM
For further information, samples, specs, brochure
and pricing, please call Neil Blythe quoting WIP
Office: 01933 400096 Mobile: 07801 469997
Email: nblythe@foamtechniques.co.uk
ISO 9001
Governor Technical Solutions
GTS specialises in the supply, repair,
overhaul and technical support for
Heinzmann and other well known
governor actuators, controllers and
generator accessories.
Tel:01833696712Fax:01833696713
Email:sales@governorts.com
www.governorts.com
Established in 1964, we have tailor-made generating sets op-
erating in almost every country in the world.
No matter what your requirement we can provide a generat-
ing set to meet your needs.
We design, test and build in our own purpose built factory
from 20 to 3000kVA single units and synchronised multiples
both low and high voltage.
James Dring Power Plant Ltd,
8 Eagle Road, Quarry Hill Industrial Park,
Ilkeston, Derbyshire DE7 4RB, UK
Tel: +44 (0)115 9440072 Fax: +44 (0)115 9440235
email: james.dring@talk21.com
website: www.jamesdring.co.uk
j a m e s
DRING
power plant limited
Classified MAY 2013 :classified .qxd 07/06/2013 14:13 Page 1
DIRECTORY OF EQUIPMENT AND SERVICES
Generating
Silence
iso containers, acoustic &
weatherproof enclosures,
CHP and
plant room equipment
Powerplus Engineering
School Road, Langham
Colchester, Essex CO4 5PB
T: +44 (0)1206 271266
F: +44 (0)1206 271208
enquiries@powerpluseng.co.uk
www.powerpluseng.co.uk
CLASSIFIED
The complete range of
power solutions from
desktops to datacentres.
Riello UPS Ltd
Contact us:
Tel: 0800 269 394
Email: sales@riello-ups.co.uk
Web: www.riello-ups.co.uk
Advanced Generator Control,
Protection and Monitoring
Engine Control and Protection
Alarm Monitoring and Processing
Signal Indication
Arc Detection